J-1 Past Performance Questionnaire (Form PPQ).pdf

PDF 199 KB Posted

Attached to
Base Operations Support Services For NSA Annapolis and US Naval Academy, Annapolis, Maryland
Solicitation number
N6247026R0017
Issued by

About this file

This document is the NAVFAC Form PPQ-0 (Past Performance Questionnaire), a standardized template used by the Naval Facilities Engineering Command (NAVFAC) and U.S. Army Corps of Engineers (USACE) to evaluate contractor past performance on federal contracts.

The form establishes submittal requirements whereby offerors must submit either completed CPARS (Contractor Performance Assessment Reporting System) evaluations or completed PPQs with their proposals. Offerors are prohibited from submitting a PPQ when a completed CPARS evaluation is available. If a CPARS evaluation is unavailable, offerors must provide correct client contact information (phone numbers and email addresses) and submit completed PPQs with their proposal by the closing date. Should an offeror be unable to obtain a completed PPQ from a client before the deadline, the offeror must submit at minimum the first page of the PPQ containing contract and client information and should follow up with clients to ensure timely submission. Clients may submit questionnaires directly to the Government point of contact, Weston Polen, at weston.c.polen.civ@us.navy.mil. Offerors are prohibited from incorporating by reference PPQs or CPARS previously submitted for other RFPs, though the Government reserves the right to utilize previously submitted PPQ information during evaluation.

The form collects contractor information (firm name, CAGE code, DUNs number, address, phone, email, point of contact) and contract details (contract number, type, title, location, award date, completion dates, original and final contract prices). The client completes evaluation sections rating contractor performance across seven major categories: Quality (technical data preparation, quality standards, problem resolution, quality assurance); Schedule/Timeliness of Performance (schedule compliance, resource utilization); Customer Satisfaction (end-user satisfaction, staff cooperation, customer focus, overall satisfaction); Management/Personnel/Labor (on-site management, workforce qualification, property control, personnel expertise, small business utilization, multi-project management, change management, overall management effectiveness); Cost/Financial Management (pricing compliance, cost reduction innovations, invoice timeliness, accounting system adequacy, contract terminations, financial stability); Safety/Security (safety plan adherence, security compliance); and General (emergency response, contractual compliance, willingness to work together again, overall performance rating). Ratings use a six-point scale: Exceptional (E), Very Good (VG), Satisfactory (S), Marginal (M), Unsatisfactory (U), and Not Applicable (N).

View the file

Other files

File Type Posted
J-1604000-09 SAMPLE SLUDGE ANAYLSIS REPORT AND SLUDGE GENERATOR REPORT.pdf PDF
J-1503020-06 ASSET DATA AND FREQUENCIES FOR SCHEDULED WORK.xlsx XLSX spreadsheet
J-1502000.1-03 DHA ASSET DATA INDEX, SYSTEM DESCRIPTIONS AND ASSET DATA BY SYSTEM.xlsx XLSX spreadsheet
0100000 C General Information.pdf PDF
J-1605000-07-04 SAMPLE UTILITY CONSUMPTION REPORTING LOG.xlsx XLSX spreadsheet
J-1502000.1 Facility Investment - DHA.pdf PDF
J-1605000-06 SAMPLE NAVFAC BOILER AND UPV INSPECTION FORM AND INSPECTION CERTIFICATE.pdf PDF
J-0200000-07-07 Contractor Incident Report System (CIRS) Form.pdf PDF
J-1604000-14-01 STORMWATER MANAGEMENT REPORT-ANNAPOLIS JANUARY 2017.pdf PDF
J-1602000 Electrical.pdf PDF
J-1604000 Wastewater.pdf PDF
J-0200000 Management and Administration.pdf PDF
J-1607000 Chiller.pdf PDF
1501000 C Facility Management.pdf PDF
0200000 C Management and Administration.pdf PDF
N6247026R0017 Pre-Sol Notice.pdf PDF
J-1606000 Water.pdf PDF
Attachment F - Section F Deliverables.pdf PDF
J-1601000-04 SERVICE DESK GUIDE FOR UTILITY OUTAGES.pdf PDF
J-1605000-07-02 SAMPLE ROVING PATROL LOG.xlsx XLSX spreadsheet
J-1606000-03-02 WTP AND DISTRIBUTION SYSTEM DESCRIPTION 2.docx DOCX document
J-1601000-05 UTILITY INTERRUPTIONS ROAD AND PARKING LOT CLOSURE AUTHORIZATIONS REQUEST FORM.xlsx XLSX spreadsheet
1502000 C Facility Investment.pdf PDF
J-0200000-20 - ELINS.xlsx XLSX spreadsheet
J-1605000-09 HISTORICAL BOILER HRSG UPV TESTING AND CERTIFICATION SCHEDULE.xlsx XLSX spreadsheet
J-1607000-08 Cooling Tower Water Testing and Treatment Asset Data.xlsx XLSX spreadsheet
J-1502000-04 FACILITY DATA.xlsx XLSX spreadsheet
DRAFT Solicitation - N6247026R0017.pdf PDF
J-1604000-14-03 STORMWATER MANAGEMENT REPORT-ANNAPOLIS JANUARY 2017.pdf PDF
J-4 Pre-Award Inquiry Form.xlsx XLSX spreadsheet
J-1503020 Pest Control.pdf PDF
J-1601000-08 EXCAVATION-UTILITY MARKING AUTHORIZATIONS REQUEST FORM.xlsx XLSX spreadsheet
J-1503070-03 Special Event Project Historical Data.xlsx XLSX spreadsheet
1700000 C BSVE.pdf PDF
J-1604000-04 WASTEWATER SYSTEM ASSET DATA.xlsx XLSX spreadsheet
1503020 C Pest Control.pdf PDF
J-1605000-04 STEAM ASSET DATA.xlsx XLSX spreadsheet
1604000 C Wastewater.pdf PDF
1601000 C Utility Management.pdf PDF
J-1604000-15 PERMEABLE PAVEMENT AREAS.pdf PDF
J-0200000-02-02 DBA WAGE DETERMINATION.pdf PDF
J-1700000-05 HISTORICAL FUEL DELIVERY QUANTITIES.xlsx XLSX spreadsheet
1606000 C Water.pdf PDF
J-1503070 Special Events.pdf PDF
J-1502000 Facility Investment.pdf PDF
J-1607000-04 Chiller Plant and Distribution System Asset Data.xlsx XLSX spreadsheet
1605000 C Steam.pdf PDF
J-1503030 Integrated Solid Waste Management.pdf PDF
J-0200000-02-01 SCA WAGE DETERMINATION.pdf PDF
J-1606000-08 MDE SCHEDULE OF MONITORING REQUIREMENTS EXAMPLE.pdf PDF
Show 40 more

Latest 50 of 86 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Form PPQ-0 (9/30/11)

ATTACHMENT J-1

1. The NAVFAC Form PPQ shall be utilized for all evaluations that require a Past Performance Questionnaire (PPQ).

2. Solicitation Submittal Requirements: IF A COMPLETED CPARS EVALUATION IS AVAILABLE, IT

SHALL BE SUBMITTED WITH THE PROPOSAL. IF THERE IS NOT A COMPLETED CPARS

EVALUATION, the Past Performance Questionnaire (PPQ) included in the solicitation is provided for the offeror or its team members to submit to the client for each project the offeror includes in its proposal for Factor (insert applicable factor number, usually Factor 1, and insert factor title, usually Corporate Experience). AN OFFEROR SHALL NOT SUBMIT A PPQ WHEN A COMPLETED CPARS

IS AVAILABLE.

IF A CPARS EVALUATION IS NOT AVAILABLE, ensure correct phone numbers and email addresses are provided for the client point of contact. Completed PPQs should be submitted with your proposal.

If the offeror is unable to obtain a completed PPQ from a client for a project(s) before proposal closing date, the offeror should complete and submit with the proposal the first page of the PPQ (Attachment J-1), which will provide contract and client information for the respective project(s). Offerors should follow-up with clients/references to ensure timely submittal of questionnaires. If the client requests, questionnaires may be submitted directly to the Government's point of contact, Weston Polen, via email at weston.c.polen.civ@us.navy.mil prior to proposal closing date. Offerors shall not incorporate by reference into their proposal PPQs or CPARS previously submitted for other RFPs. However, this does not preclude the Government from utilizing previously submitted PPQ information in the past performance evaluation.

NAVFAC/USACE PAST PERFORMANCE QUESTIONNAIRE (Form PPQ-0) CONTRACT INFORMATION (Contractor to complete Blocks 1-4)

1. Contractor Information Firm Name: CAGE Code:

Address: DUNs Number:

Phone Number:

Email Address:

Point of Contact: Contact Phone Number:

2. Work Performed as: Prime Contractor Sub Contractor Joint Venture Other (Explain) Percent of project work performed:

If subcontractor, who was the prime (Name/Phone #):

3. Contract Information Contract Number:

Delivery/Task Order Number (if applicable):

Contract Type: Firm Fixed Price Cost Reimbursement Other (Please specify):

Contract Title:

Contract Location:

Award Date (mm/dd/yy):

Contract Completion Date (mm/dd/yy):

Actual Completion Date (mm/dd/yy):

Explain Differences:

Original Contract Price (Award Amount):

Final Contract Price (to include all modifications, if applicable):

Explain Differences:

4. Project Description:

Complexity of Work High Med Routine How is this project relevant to project of submission? (Please provide details such as similar equipment, requirements, conditions, etc.)

CLIENT INFORMATION (Client to complete Blocks 5-8)

5. Client Information Name:

Title:

Phone Number:

Email Address:

6. Describe the client’s role in the project:

7. Date Questionnaire was completed (mm/dd/yy):

8. Client’s Signature:

NOTE: NAVFAC REQUESTS THAT THE CLIENT COMPLETES THIS QUESTIONNAIRE AND SUBMITS DIRECTLY BACK TO THE OFFEROR. THE OFFEROR WILL SUBMIT THE COMPLETED QUESTIONNAIRE TO NAVFAC WITH THEIR PROPOSAL, AND MAY DUPLICATE THIS QUESTIONNAIRE FOR FUTURE SUBMISSION ON NAVFAC SOLICITATIONS. CLIENTS ARE HIGHLY ENCOURAGED TO SUBMIT QUESTIONNAIRES DIRECTLY TO THE OFFEROR. HOWEVER, QUESTIONNAIRES MAY BE SUBMITTED DIRECTLY TO NAVFAC. PLEASE CONTACT THE OFFEROR FOR NAVFAC POC INFORMATION. THE

GOVERNMENT RESERVES THE RIGHT TO VERIFY ANY AND ALL INFORMATION ON THIS FORM.

ADJECTIVE RATINGS AND DEFINITIONS TO BE USED TO BEST REFLECT

YOUR EVALUATION OF THE CONTRACTOR’S PERFORMANCE

RATING DEFINITION NOTE

(E) Exceptional Performance meets contractual requirements and exceeds many to the Government/Owner’s benefit.

The contractual performance of the element or sub-element being assessed was accomplished with few minor problems for which corrective actions taken by the contractor was highly effective.

An Exceptional rating is appropriate when the Contractor successfully performed multiple significant events that were of benefit to the Government/Owner. A singular benefit, however, could be of such magnitude that it alone constitutes an Exceptional rating. Also, there should have been NO significant weaknesses identified.

(VG) Very Good Performance meets contractual requirements and exceeds some to the Government’s/Owner’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with some minor problems for which corrective actions taken by the contractor were effective.

A Very Good rating is appropriate when the Contractor successfully performed a significant event that was a benefit to the Government/Owner. There should have been no significant weaknesses identified.

(S) Satisfactory Performance meets minimum contractual requirements. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory.

A Satisfactory rating is appropriate when there were only minor problems, or major problems that the contractor recovered from without impact to the contract. There should have been NO significant weaknesses identified. Per DOD policy, a fundamental principle of assigning ratings is that contractors will not be assessed a rating lower than Satisfactory solely for not performing beyond the requirements of the contract.

(M) Marginal Performance does not meet some contractual requirements. The contractual performance of the element or sub-element being assessed reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor's proposed actions appear only marginally effective or were not fully implemented.

A Marginal is appropriate when a significant event occurred that the contractor had trouble overcoming which impacted the Government/Owner.

(U) Unsatisfactory Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element contains serious problem(s) for which the contractor's corrective actions appear or were ineffective.

An Unsatisfactory rating is appropriate when multiple significant events occurred that the contractor had trouble overcoming and which impacted the Government/Owner. A singular problem, however, could be of such serious magnitude that it alone constitutes an unsatisfactory rating.

(N) Not Applicable No information or did not apply to your contract Rating will be neither positive nor negative.

Contractor Information (Firm Name): ________________________________________________ Client Information (Name): ________________________________________________________

TO BE COMPLETED BY CLIENT

PLEASE CIRCLE THE ADJECTIVE RATING WHICH BEST REFLECTS

YOUR EVALUATION OF THE CONTRACTOR’S PERFORMANCE.

1. QUALITY:

a) Quality of technical data/report preparation efforts E VG S M U N

b) Ability to meet quality standards specified for technical performance E VG S M U N

c) Timeliness/effectiveness of contract problem resolution without extensive customer guidance

E VG S M U N

d) Adequacy/effectiveness of quality control program and adherence to contract quality assurance requirements (without adverse effect on performance)

E VG S M U N

2. SCHEDULE/TIMELINESS OF PERFORMANCE:

a) Compliance with contract delivery/completion schedules including any significant intermediate milestones. (If liquidated damages were assessed or the schedule was not met, please address below)

E VG S M U N

b) Rate the contractor’s use of available resources to accomplish tasks identified in the contract

E VG S M U N

3. CUSTOMER SATISFACTION:

a) To what extent were the end users satisfied with the project? E VG S M U N

b) Contractor was reasonable and cooperative in dealing with your staff (including the ability to successfully resolve disagreements/disputes;

responsiveness to administrative reports, businesslike and communication)

E VG S M U N

c) To what extent was the contractor cooperative, businesslike, and concerned with the interests of the customer?

E VG S M U N

d) Overall customer satisfaction E VG S M U N

4. MANAGEMENT/ PERSONNEL/LABOR

a) Effectiveness of on-site management, including management of subcontractors, suppliers, materials, and/or labor force?

E VG S M U N

b) Ability to hire, apply, and retain a qualified workforce to this effort E VG S M U N

c) Government Property Control E VG S M U N

d) Knowledge/expertise demonstrated by contractor personnel E VG S M U N

e) Utilization of Small Business concerns E VG S M U N

f) Ability to simultaneously manage multiple projects with multiple disciplines E VG S M U N

g) Ability to assimilate and incorporate changes in requirements and/or priority, including planning, execution and response to Government changes

E VG S M U N

h) Effectiveness of overall management (including ability to effectively lead, manage and control the program)

E VG S M U N

5. COST/FINANCIAL MANAGEMENT

a) Ability to meet the terms and conditions within the contractually agreed price(s)?

E VG S M U N

Contractor Information (Firm Name): ________________________________________________

Client Information (Name): ________________________________________________________

b) Contractor proposed innovative alternative methods/processes that reduced cost, improved maintainability or other factors that benefited the client

E VG S M U N

c) If this is/was a Government cost type contract, please rate the Contractor’s timeliness and accuracy in submitting monthly invoices with appropriate back-up documentation, monthly status reports/budget variance reports, compliance with established budgets and avoidance of significant and/or unexplained variances (under runs or overruns)

E VG S M U N

d) Is the Contractor’s accounting system adequate for management and tracking of costs? If no, please explain in Remarks section.

Yes No

e) If this is/was a Government contract, has/was this contract been partially or completely terminated for default or convenience or are there any pending terminations? Indicate if show cause or cure notices were issued, or any default action in comment section below.

Yes No

f) Have there been any indications that the contractor has had any financial problems? If yes, please explain below.

Yes No

6. SAFETY/SECURITY

a) To what extent was the contractor able to maintain an environment of safety, adhere to its approved safety plan, and respond to safety issues?

(Includes: following the users rules, regulations, and requirements regarding housekeeping, safety, correction of noted deficiencies, etc.)

E VG S M U N

b) Contractor complied with all security requirements for the project and personnel security requirements.

E VG S M U N

7. GENERAL

a) Ability to successfully respond to emergency and/or surge situations (including notifying COR, PM or Contracting Officer in a timely manner regarding urgent contractual issues).

E VG S M U N

b) Compliance with contractual terms/provisions (explain if specific issues) E VG S M U N

c) Would you hire or work with this firm again? (If no, please explain below) Yes No

d) In summary, provide an overall rating for the work performed by this contractor.

E VG S M U N

Please provide responses to the questions above (if applicable) and/or additional remarks. Furthermore, please provide a brief narrative addressing specific strengths, weaknesses, deficiencies, or other comments which may assist our office in evaluating performance risk (please attach additional pages if necessary):

File details come from the government source that posted it. Updated .