95_AE104_R1_AMENDMENT 009.pdf
PDF 403 KB Posted
- Solicitation number
- N6247026R0012
About this file
This is an architectural drawing for Building 60 (B60) repairs at Portsmouth Naval Shipyard in Kittery, Maine. The document is a first floor mezzanine part plan (west section) prepared by Naval Facilities Engineering Systems Command (NAVFAC) Mid-Atlantic, with a project number 1740579 and drawing number AE104. The plan shows detailed layout of mechanical systems, structural elements, and renovation work including mezzanine platforms, stairs, guardrail systems, wood flooring repairs, and mechanical equipment coordination. Key areas depicted include mechanical rooms (M104-M110), custodial space, locker rooms, break room, corridors, elevators, and utility spaces. The drawing indicates existing historic masonry exterior walls, existing columns, and expansion joints that must be preserved during repairs.
The specifications note that Building B59 will remain occupied during construction, requiring coordination of work plans and access with the construction officer. The plan includes 200 square feet of patch and repair wood floor work beyond what is specifically indicated, with locations to be coordinated with the contracting officer. Design revisions were issued as amendments 008 and 009 on March 10 and March 16, 2026, respectively, with final submission dated October 1, 2025. The document was prepared by designer T. Carleton, drawn by L. Lyons, checked by S. Rucinski, and includes project management oversight from ROICC-ME (Resident Officer in Charge of Construction - Maine).
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DN
DN
DN
DN
UP
DN
DN
UP
C1
AE203
A1
AE204
A1
AE203
A1
AE202
C1
AE202
C1
AE221
A1
AE221
C1
AE222
abcdefgjknp e1 e2 e3 e4 e5 e6 e7
AA
OPEN TO BELOW
MECH MEZZ
M110
OPEN
TO
BELOW
LOCKERS
M105
CUSTODIAL
M104
BLIND VENDING
M102
STAIR
003B
BREAK
M101
CORRIDOR
M103
NF
NF
AE741
D2
AE411
B1
AE440
A2
AE441
C3
AE440
C2
ELEV
(TYP)
(TYP)
EXISTING HISTORIC
MASONRY EXTERIOR
WALL SYSTEM (TYP)
C1
AE223
E12
FE
EXIST COLUMNS,
TYP
60W1A 60W1C 60W1D 60W1F 60W1G 60W1H 60W1I
60S1A
60S1C
60E1B60E1C60E1D60E1E
60PS1A
60E1F 60E1G
60E1K
60N1F
60N1G
60PN1A
C1
AE204
MECH
M106
5'
/4
4'
2"
/2
4'
1/ 2"
C
LE
A R
4'
8" 4'
6"
0"
19'-10" 19'-2"
BL3
BL3
STAIR
002B
STAIR
004B
UTILITY
M108
MECH MEZZ
M109
NF
NF
NF
NG
NG
D3
60E1A
NG
44 60W1E4
4 4 4 4 4
NF
3.5
2.8
2.5
4.2
5.8
5.6 i.1 g.1 f.1
7.1
2.1 n.9 k.9 k.1
2.4 n.5 k.5
J.2 J.1
60S1B
MECHANICAL
EQUIPMENT
CONCRETE SLAB,
SEE CIVIL SHEETS
CEILING SYSTEM
BELOW
OUTLINE OF
HATCH ABOVE
NF
AE501
D5
RELOCATED BRIDGE
CRANE (COORDINATE
WITH CONTRACTING
OFFICER)
NF3'
-0
AE443
D4
N11
116A
3B
M105
M104
M106
2B
M108
AE440
C4
UP
12'-6" 20'-7 1/2"
EXISTING
STAIR
12' - 11 1/2" 6' - 0 3/4" 5' - 3"
CEILING SYSTEM
BELOW
(TYP)2
AE640
A5
A1
AE223
L
/2
1. SEE SHEET AE101 FOR GENERAL NOTES.
2. B59 WILL BE OCCUPIED DURING CONTRACTING. COORDINATE WORK PLAN
AND ACCESS WITH CONSTRUCTION OFFICER.
3. IN ADDITION TO THE AREAS INDICATED, PROVIDE 200 SF OF PATCH AND
REPAIR WOOD FLOOR WORK FOR WORK NOT OTHERWISE INDICATED IN THE
DRAWINGS. LOCATIONS TO BE COORDINATED WITH THE CONTRACTING
OFFICER, PLANS, SPECIFICATIONS, AND REPORTS. THE QUANTITIES
INDICATED IN PLANS AND SPECIFICATIONS AND NOTED ABOVE ARE TO BE
INCLUDED IN THE LUMP SUM BASE BID LINE ITEM.
SATISFACTORY TO DATE
APPROVED
FOR COMMANDER NAVFAC
SEAL
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SHEET
NAVFAC DRAWING NO.
DESIGNER
DRAWN BY
CHECKED BY
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
Y S
T E
M S
C O
M M
A N
D
DRAWFORM REVISION: 14 SEP 2023
DESIGN MANAGER
PROJECT MANAGER
FEAD/PM&E
FIRE PROTECTION
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
Y S
T E
M S
C O
M M
A N
D
M
ID
-A T
LA
N
T
IC
P O
R T
S M
O U
T H
N A
V A
L S
H
IP
Y A
R D
K
IT
T
E R
Y M
E
UNCLASSIFIED
UNCLASSIFIED
U N
C L
A S
S
IF
IE
D
ACTIVITY
1740579
T. CARLETON
L. LYONS
S. RUCINSKI
/1
/2
:5
:2
A
M
C U s e rs \m d o n o v a n \D o c u m e n ts \2
.2
B L
D G
A
R C
H
IT
E C
T U
R A
L -V m d o n o v a n
V F
X R
.r v t
AE104
B
R
E P
A
IR
S
F
IR
S T
F L O
O R
M E
Z Z
A N
IN
E
P A
R T
P L A
N
W E
S T
RSH
JMR
MJD
K
IT
T E
R Y
M
E P
O R
T S
M O
U T
H N
A V
A L S
H
IP
Y A
R D
R O
IC
C
-M E
A E
SCALE: 1/8" = 1'-0"
B1
FIRST FLOOR MEZZANINE PART PLAN - WEST
MATCH LINE
PLAN
NORTH
1/8" = 1' - 0" 0 5' 10' 15' 30'
GRAPHIC SCALE(S)
KEY PLANGENERAL NOTES KEYNOTES
MEZZANINE PLATFORM AND STAIRS, SEE STRUCTURAL SHEETS.
PERIMETER EXPANSION JOINT, SEE DETAILS C1 AND C3 ON SHEET AE530.
INSTALL SALVAGED HISTORIC BORROWED LIGHTS.
REPAIR HISTORIC WOOD WINDOW/DOOR, SEE RESTORATION SCHEDULE ON SHEET AE622.
MECHANICAL DUCT WINDOW PENETRATION, SEE DETAIL C3/AE621 AND COORDINATE WITH MECHANICAL SHEETS.
3/4" PLYWOOD FLOORING OVER METAL DECKING.
PROVIDE BLOCKING IN STUD WALL FOR MECHANICAL EQUIPMENT AND SUPPORT BRACKETS, COORDINATE LOCATIONS WITH
MECHANICAL SHEETS.
GUARDRAIL SYSTEM, SEE DETAIL A4/AE626.
GUARDRAIL SYSTEM, SEE DETAIL D1/AE445.
PROVIDE REMOVABLE SECTION OF GUARDRAIL.
(THIS SHEET ONLY)
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E A
P P
R
F
IN
A L
S U
B M
IS
S
IO
N
/0
1/
R
S H
A
M E
N D
M E
N T
/1
0/
R
S H
A
M E
N D
M E
N T
/1
6/
R
S H
| Sheets |
| AE104 - FIRST FLOOR MEZZANINE PART PLAN - WEST |
File details come from the government source that posted it. Updated .