262_EP603_R1_AMENDMENT 009.pdf
PDF 386 KB Posted
- Solicitation number
- N6247026R0012
About this file
This document is an electrical panel schedule for Building 60, detailing the circuit breaker configurations and load distributions across six panelboards (PL7, PL8, PL9, PL10, PH1, and PH2). The schedules specify circuit numbers, load descriptions, breaker trip ratings, and connected amperage across three phases (A, B, C) for 208/120-volt three-phase systems and 480-volt three-phase systems. Panel PL7 (150A, 208/120V) supplies lighting and receptacles for office areas with total connected amps of 40.2A (Phase A), 45.4A (Phase B), and 42.9A (Phase C). Panel PL8 (150A, 208/120V) serves training and multi-purpose areas with total connected amps of 97.9A, 87.2A, and 78.0A respectively. Panel PL9 (125A, 208/120V) distributes power to shop equipment and upholstery areas with total connected amps of 87.9A, 82.8A, and 74.0A. Panel PL10 (125A, 480V) feeds industrial equipment including a bridge crane and roll slitter transformer with total connected amps of 95.0A, 89.9A, and 86.6A.
Panels PH1 (225A, 480V) and PH2 (150A, 480V) provide three-phase power to major equipment loads. The document includes detailed circuit breakdowns for specific equipment such as unit heaters, emergency lighting, refrigeration units, sewing machines, textile processing equipment, and HVAC systems. Notable loads include EWH units (electric water heaters), bridge crane (30A breaker), lighting control systems, and various workshop equipment distributed across multiple circuits with spare capacity designated throughout the panelboards. The schedules maintain balanced phase loading and indicate equipment locations within Shop 207, Electrical 213, and other designated areas of the building.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SATISFACTORY TO DATE
APPROVED
FOR COMMANDER NAVFAC
SEAL
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SHEET
NAVFAC DRAWING NO.
DESIGNER
DRAWN BY
CHECKED BY
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
Y S
T E
M S
C O
M M
A N
D
DRAWFORM REVISION: 14 SEP 2023
DESIGN MANAGER
PROJECT MANAGER
FEAD/PM&E
FIRE PROTECTION
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
Y S
T E
M S
C O
M M
A N
D
M
ID
-A T
LA
N
T
IC
P O
R T
S M
O U
T H
N A
V A
L S
H
IP
Y A
R D
K
IT
T
E R
Y M
E
UNCLASSIFIED
UNCLASSIFIED
U N
C L
A S
S
IF
IE
D
ACTIVITY
1740579
T. CARLETON
L. LYONS
S. RUCINSKI
/1
/2
:3
:2
A
M
C U s e rs \b d a ig le \D o c u m e n ts
\2
.2
B
L D
G
E
L E
C -V b d a ig le
Q U
X G
.r v t
EP603
B R
E P
A
IR
S
P A
N E
L B
O A
R D
S C
H E
D U
L E
S
DCL
HRM
BPD
K
IT
T E
R Y
M
E P
O R
T S
M O
U T
H N
A V
A L S
H
IP
Y A
R D
R O
IC
C
-M E
E P
TOTAL CONNECTED AMPS: A: 158.6 B: 146.9 C: 126.7
59 SPARE 20 0.0 A 0.0 A 60
57 SPARE 20 0.0 A 0.0 A 58
55 SPARE 20 0.0 A 0.0 A
30 SPD
53 SPARE 20 0.0 A 0.0 A 20 SPARE 54
51 SPARE 20 0.0 A 0.0 A 20 SPARE 52
49 LTG - OPEN OFFICE 208 20 4.2 A 0.0 A 20 SPARE 50
47 LTG - EXTERIOR EAST END 20 0.6 A 1.0 A 20 TPA-8 48
45 LTG - ATTIC 20 1.3 A 3.0 A 20 REC - TRAINING FLOOR BOX - 4 46
43 REC - TRAINING QUAD 20 3.0 A 3.0 A 20 REC - TRAINING FLOOR BOX - 3 44
41 REC- MEZZANINE M201 20 3.0 A 3.0 A 20 REC - TRAINING FLOOR BOX - 2 42
39 LTG - SECOND FL SOUTH, CORR, ELEC, NETWORK 20 1.2 A 3.0 A 20 REC - TRAINING FLOOR BOX - 1 40
37 SYSTEMS FURNITURE OFFICE 208 SOUTH - 2 20 6.0 A 6.0 A 20 REC - TRAINING AREA - 2 38
35 9.0 A 5.0 A 20 REC - TRAINING AREA 202 TV 36
33 9.0 A 5.0 A 20 REC - OPEN OFFICE PRINTER 34
SYSTEMS FURNITURE OFFICE 208 SOUTH
- 1
9.0 A 5.0 A 20 REC - COUNTER LEFT 32
29 REC - MULTI PURPOSE 20 9.0 A 6.0 A 20 REC - OPEN OFFICE 208 30
27 REC - REFRIGERATOR 20 5.0 A 3.0 A 15 CUH-4 28
25 SYSTEMS FURNITURE OFFICE 210-2 20 3.0 A 5.0 A 20 REC - COUNTER RIGHT 26
23 3.0 A 9.8 A 20 REC - RADON FAN ATTIC SOUTH 24
21 3.0 A 0.4 A 15 UH-2-10 (25W) UH-2-11 (25W) 22
SYSTEMS FURNITURE OFFICE 210-1 20
3.0 A 5.0 A 20 REC - MULTI PURPOSE 211 20
17 REC - ELEC & CORRIDOR 20 6.0 A 5.0 A 20 REC - OFFICE 210 18
15 REC - TRAINING AREA - 1 20 4.5 A 5.0 A 20 NAC, SECOND FLOOR 16
13 REC - OFFICE 210 20 7.5 A 2.2 A 15 UH 3-4 (1/20 HP) 14
11 25.4 A 1.5 A 20 REC - ATTIC SOUTH 12
9 40.3 A 14.6 A 20 EWH-3 (IN CABINET) 10
PANELBOARD TPP2 70
40.7 A 9.0 A 20 SYSTEMS FURNITURE OFFICE 208 NORTH - 2 8
5 42.9 A 9.0 A 6
3 45.4 A 9.0 A 4
PANELBOARD PL8 150
40.2 A 9.0 A
SYSTEMS FURNITURE OFFICE 208 NORTH
- 1
CKT
NO. LOAD DESCRIPTION
BKR
TRIP
A B C A B C BKR TRIP
LOAD DESCRIPTION
CKT
NO.
MCB RATING 250 A 208/120 Wye VOLTS 3PH, 4W, SN, 60HZ MIN. 22KAIC SURFACE
PANEL PL7 SCHEDULE
TOTAL CONNECTED AMPS: A: 40.2 B: 45.4 C: 42.9
41 REC - CEILING - 1 20 6.0 A -- -- SPACE 42
39 REC - CEILING - 4 20 6.0 A -- -- SPACE 40
37 UH-2-6 (1/20HP) UH-2-8 (1/20HP) 15 4.4 A -- -- SPACE 38
35 REC - SHOP EAST 20 4.5 A 0.0 A 20 SPARE 36
33 REC - BOX STITCHER 120V - 1 20 12.0 A 0.0 A 20 SPARE 34
31 REC - BOX STITCHER 120V - 2 20 12.0 A 0.0 A 20 SPARE 32
29 0.0 A 0.0 A 20 SPARE 30
27 0.0 A 0.0 A 20 SPARE 28
SPARE 30
0.0 A 0.0 A 20 SPARE 26
23 0.0 A 0.0 A 20 SPARE 24
21 0.0 A 0.0 A 20 SPARE 22
SPARE 30
0.0 A 0.0 A 20 SPARE 20
17 REC - SEWING MACH. SOUTH 2 20 10.0 A 0.0 A 20 SPARE 18
15 REC - SEWING MACH. SOUTH 1 20 10.0 A 0.0 A 20 SPARE 16
13 UH-2-7 (1/20HP) UH-2-9 (1/20HP) 15 4.4 A 0.0 A 20 SPARE 14
11 REC - LONG ARM SEWING 4 20 10.0 A 0.0 A 20 SPARE 12
9 REC - LONG ARM SEWING 3 20 10.0 A 0.0 A 20 SPARE 10
7 REC - SHOP WEST 20 3.0 A 6.0 A 20 REC - CEILING - 3 8
5 REC - LONG ARM SEWING 2 20 6.0 A 6.0 A 20 REC - CEILING - 6 6
3 REC - RADON FAN ATTIC CENTER 20 9.8 A 6.0 A 20 REC - CEILING - 2 4
1 UH 3-2 (1/20HP) & UH 3-3 (1/20HP) 15 4.4 A 6.0 A 20 REC - CEILING - 5 2
CKT
NO. LOAD DESCRIPTION
BKR
TRIP
A B C A B C BKR TRIP
LOAD DESCRIPTION
CKT
NO.
MLO RATING 150 A 208/120 Wye VOLTS 3PH, 4W, SN, 60HZ MIN. 10KAIC SURFACE
PANEL PL8 SCHEDULE
TOTAL CONNECTED AMPS: A: 97.9 B: 87.2 C: 78.0
41 SPARE 20 0.0 A 0.0 A 42
39 REC - ATTIC NORTH 20 1.5 A 0.0 A 40
37 CUH-3 15 3.0 A 0.0 A
30 SPD
35 UH-2-4 (1/20HP) UH-2-5 (1/20HP) 15 4.4 A 0.5 A 20 LTG - EXTERIOR NORTH END 36
33 REC - GROMMET MACH. - RIGHT 20 9.8 A 5.1 A 20 LTG - UPHOLSTERY 206-2 34
31 REC - GROMMET MACH. - LEFT 20 9.8 A 10.2 A 20 LTG - UPHOLSTERY 206-1 32
29 REC - SHOP 207 EAST & ROOF 20 7.5 A 0.7 A 20 LTG - CORRIDOR 201 30
27 REC - SHOP 107 NORTH 20 4.5 A 2.5 A 20 LTG - ATTIC 28
25 REC - WATER COOLER 20 5.0 A 0.0 A 26
23 TPA-7 AND EMERGENCY EYEWASH ALARM 20 1.1 A 0.0 A
30 SPARE
21 0.0 A 0.1 A 20 LTG - RSTRMS, EXPRESSING, UPHOLSTERY 22
SPARE 20
0.0 A 5.0 A 20 LIGHTING CONTROL PANEL 20
17 0.0 A 8.1 A 20 LTG - SHOP 207 EAST 18
15 0.0 A 3.1 A 20 LTG - SHOP 207 VIA EMERGENCY INVERTER 16
SPARE 20
0.0 A 0.0 A 20 SPARE 14
11 42.5 A 1.0 A 20 LTG - ELEV LIGHT 2ND FL 12
9 44.5 A 10.2 A 20 LTG - SHOP 207 - 5 10
PANELBOARD PL10 125
47.5 A 9.2 A 20 LTG - SHOP 207 - 4 8
5 REC - EXPRESSING REFRIGERATOR 20 3.0 A 9.2 A 20 LTG - SHOP 207 - 3 6
3 REC - EXPRESSING 20 4.5 A 9.2 A 20 LTG - SHOP 207 - 2 4
1 REC - WOMAN, MEN, CUST, CORR 20 7.5 A 9.2 A 20 LTG - SHOP 207 - 1 2
CKT
NO. LOAD DESCRIPTION
BKR
TRIP
A B C A B C BKR TRIP
LOAD DESCRIPTION
CKT
NO.
MCB RATING 150 A 208/120 Wye VOLTS 3PH, 4W, SN, 60HZ MIN. 10KAIC SURFACE
PANEL PL9 SCHEDULE
TOTAL CONNECTED AMPS: A: 47.5 B: 44.5 C: 42.5
41 REC - SHOP 207 NORTHWEST 20 3.0 A -- -- SPACE 42
39 REC - CEILING - 2 20 6.0 A -- -- SPACE 40
37 REC - CEILING -4 20 6.0 A -- -- SPACE 38
35 REC - CEILING - 1 20 6.0 A 0.0 A 20 SPARE 36
33 REC - CEILING - 3 20 6.0 A 0.0 A 20 SPARE 34
31 REC - LONG ARM SEWING 1 20 10.0 A 0.0 A 20 SPARE 32
29 REC - LONG ARM SEWING # 20 10.0 A 0.0 A 20 SPARE 30
27 REC - SEWING # 20 10.0 A 0.0 A 20 SPARE 28
25 REC - UPHOLSTERY CEILING 2 20 6.0 A 0.0 A 20 SPARE 26
23 REC - UPHOLSTERY CEILING 1 20 6.0 A 0.0 A 20 SPARE 24
21 REC - EMBROIDERY MACH. 20 4.0 A 0.0 A 20 SPARE 22
19 REC - STAND ALONE COMPUTER 20 3.0 A 0.0 A 20 SPARE 20
17 REC - SEWING MACH WEST 20 10.0 A 0.0 A 20 SPARE 18
15 REC - UPHOLSTERY 3 20 4.5 A 0.0 A 20 SPARE 16
13 REC - SEWING MACH. CENTER 2 20 10.0 A 0.0 A 20 SPARE 14
11 REC - UPHOLSTERY 2 20 4.5 A 0.0 A 20 SPARE 12
9 UH-2-1(25W) UH-2-2(25W) UH-2-3(25W) 15 0.6 A 0.0 A 20 SPARE 10
7 REC - SEWING MACH. CENTER 1 20 10.0 A 0.0 A 8
5 REC - UPHOLSTERY 1 20 3.0 A 0.0 A
30 SPARE
3 REC - RADON FAN, ATTIC NORTH 20 9.8 A 12.0 A 20 REC - POLYBAG SEALER 4
1 UH 3-1 ATTIC (1/20 HP) 15 2.2 A 0.0 A 20 SPARE 2
CKT
NO. LOAD DESCRIPTION
BKR
TRIP
A B C A B C BKR TRIP
LOAD DESCRIPTION
CKT
NO.
MLO RATING 125 A 208/120 Wye VOLTS 3PH, 4W, SN, 60HZ MIN. 10KAIC SURFACE
PANEL PL10 SCHEDULE
TOTAL CONNECTED AMPS: A: 87.9 B: 82.8 C: 74.0
41 -- -- 42
39 -- -- 40
SPACE --
-- SPACE
35 -- -- 36
33 -- -- 34
SPACE --
-- SPACE
29 -- -- 30
27 -- -- 28
SPACE --
-- SPACE
23 7.5 A 0.0 A 24
21 7.5 A 0.0 A 22
CU-2 15
7.5 A 0.0 A
15 SPARE
17 6.7 A 0.0 A 18
15 6.7 A 0.0 A 16
OU-3 15
6.7 A 0.0 A
20 SPARE
11 2.5 A 0.0 A 12
9 2.5 A 0.0 A 10
BCU-3 15
2.5 A 0.0 A
20 SPARE
5 2.5 A 54.9 A 6
3 2.5 A 63.7 A 4
BCU-2 15
2.5 A 68.7 A
200 PANELBOARD PL7 VIA T4
CKT
NO. LOAD DESCRIPTION
BKR
TRIP
A B C A B C
BKR
TRIP LOAD DESCRIPTION
CKT
NO.
MLO RATING 225 A 480V VOLTS 3PH, 3W, SN, 60HZ MIN. 35KAIC SURFACE
PANEL PH1 SCHEDULE
TOTAL CONNECTED AMPS: A: 95.0 B: 89.9 C: 86.6
41 -- -- 42
39 -- -- 40
SPACE --
-- SPACE
35 -- -- 36
33 -- -- 34
SPACE --
-- SPACE
29 -- -- 30
27 -- -- 28
SPACE --
-- SPACE
23 -- 0.0 A 24
21 -- 0.0 A 22
SPACE --
-- 0.0 A
30 SPARE
17 18.0 A 0.0 A 18
15 18.0 A 0.0 A 16
EWH-1 25
18.0 A 0.0 A
15 SPARE
11 24.0 A 0.0 A 12
9 24.0 A 0.0 A 10
BRIDGE CRANE 30
24.0 A 0.0 A
20 SPARE
5 33.8 A 10.8 A 6
3 37.8 A 10.8 A 4
PANELBOARD PL9 VIA T5 125
42.4 A 10.8 A
ROLL SLITTER & ASSOCIATED
TRANSFORMER
CKT
NO. LOAD DESCRIPTION
BKR
TRIP
A B C A B C
BKR
TRIP LOAD DESCRIPTION
CKT
NO.
MLO RATING 150 A 480V VOLTS 3PH, 3W, SN, 60HZ MIN. 18KAIC SURFACE
PANEL PH2 SCHEDULE
KEYNOTES
1 PROVIDE GFCI CIRCUIT BREAKER.
[OPTION 3]: PROVIDE MELAMINE LABEL, "RADON SYSTEM". INCLUDE
SYSTEM NUMBER, IF APPLICABLE.
CONFIRM CIRCUIT BREAKER SIZE WITH THE SPD MANUFACTURER.
LOCATION: ELECTRICAL 213
LOCATION: SHOP 207
LOCATION: ELECTRICAL 213
LOCATION: SHOP 207
LOCATION: SHOP 207
LOCATION: SHOP 207
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E A
P P
R
F
IN
A L
S U
B M
IS
S
IO
N
/0
1/
R
S H
A
M E
N D
M E
N T
/1
6/
R
S H
| Sheets |
| EP603 - PANELBOARD SCHEDULES - 3 |
File details come from the government source that posted it. Updated .