About this file

This is a mechanical ductwork removals plan for Building 60 at Portsmouth Naval Shipyard in Kittery, Maine, prepared by Naval Facilities Engineering Systems Command (NAVFAC).

The drawing details first floor HVAC and industrial process equipment removal requirements, specifying the identification, disconnection, and capping of ductwork and mechanical systems throughout designated spaces. Key removal tasks include: extraction of capped exhaust air ducts running from interior building locations to roof level; removal of portable AC units; disconnection of dust and fume collector arms (four typical units); and elimination of various ductwork assemblies with specified diameter pipes ranging from 6 to 36 inches. The document references CLIN 002 for industrial equipment removal requirements and mandates coordination with architectural drawings for patching penetrations, hazmat drawings for hazardous material protocols, and existing steam condensate system testing prior to commencing removals. The mechanical subcontractor is responsible for identifying, making safe, cutting loose, and capping items designated for demolition, with the general contractor assuming responsibility for final demolition and off-site removal to authorized salvage facilities. The drawing was finalized on October 1, 2025, with an amendment dated March 10, 2026, and includes a graphic scale of 1/8 inch equals 1 foot for reference.

View the file

Other files

File Type Posted
_B60_Continuation Sheet_Amendment 010_03-31-26.pdf PDF
74_SP101_R1_AMENDMENT 010.pdf PDF
96_AE105_R2_AMENDMENT 010.pdf PDF
114_AE401_R1_AMENDMENT 010.pdf PDF
120_AE441_R1_AMENDMENT 010.pdf PDF
178_P-401_R2_AMENDMENT 010.pdf PDF
179_P-402_R1_AMENDMENT 010.pdf PDF
01 91 19_R1_AMENDMENT 009.pdf PDF
116_AE411_R1_AMENDMENT 009.pdf PDF
238_FX400_R1_AMENDMENT 009.pdf PDF
256_EP502_R1_AMENDMENT 009.pdf PDF
260_EP601_R1_AMENDMENT 009.pdf PDF
Att.pdf PDF
Solicitation Amendment N6247026R00120008 SF 30.pdf PDF
Att. S) FFE Final Package-R1_AMENDMENT 008.pdf PDF
_ATTAC1.PDF PDF
02 82 00.00 22_R1_AMENDMENT 008.pdf PDF
31_CS101_R1_AMENDMENT 008.pdf PDF
47_SD102_R1_AMENDMENT 008.pdf PDF
65_SF105_R1_AMENDMENT 008.pdf PDF
68_SF502_R1_AMENDMENT 008.pdf PDF
152_G-004B_R1_AMENDMENT 008.pdf PDF
182_P-601_R1_AMENDMENT 008.pdf PDF
190_MD106_R1_AMENDMENT 008.pdf PDF
192_MD108_R1_AMENDMENT 008.pdf PDF
02 83 00.00 22_R1_AMENDMENT 008.pdf PDF
02 84 16.00 22_R1_AMENDMENT 008.pdf PDF
148_AE804_R1_AMENDMENT 008.pdf PDF
193_MD109_R1_AMENDMENT 008.pdf PDF
210_MP107_R1_AMENDMENT 008.pdf PDF
N6247026R00120007 SF 30.pdf PDF
Solicitation Amendment N6247026R00120006 SF 30.pdf PDF
Solicitation Amendment N6247026R00120004 SF 30.pdf PDF
Att. A) Construction and Design Experience Project Data Sheet.doc.docx DOCX document
Att. E) Small Business Participation Commitment Document (SBPCD) AMD 0004.docx DOCX document
Att. F) Individual Small Business Subcontracting Plan AMD 0004.docx DOCX document
Att. Z) B60 Continuation Sheet AMD 004.pdf PDF
Att. X) DBIDS ACCESS REQUEST FORM.docx DOCX document
Amendment N6247026R00120003.pdf PDF
Att. W) DBIDS 5512 FORM.pdf PDF
Solicitation Amendment N6247026R00120002.pdf PDF
Att. T) Price_schedule AMD 0002.pdf PDF
Solicitation Amendment N6247026R00120001.pdf PDF
Att. G) - PIEE Vendor Access Instructions.pdf PDF
Att. M) Drawings Volume 2a.pdf PDF
Att. S) FFE Package.pdf PDF
Att. U) Submittal Register.xlsx XLSX spreadsheet
Att. I) Specifications Volume 2.pdf PDF
Att. L) Drawings Volume 1b.pdf PDF
Att. P) 01 45 35a Statement_of_Special_Inspections.xlsx XLSX spreadsheet
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AA

EF

E

EF

E

REMOVE CAPPED EA DUCT

RUN IN ENTIRETY FROM INSIDE

BLDG UP TO ROOF LEVEL

EF

E

REMOVE

PORTABLE

AC UNIT

ø

E A

18ø TO PRESS

20ø TO PRESS

32ø 28ø EA

24ø 18ø EA

DUST/FUME COLLECTOR

ARM (TYP 4)

8ø CAPPED

18ø 8ø

8ø CAPPED

8ø

18ø DROP

TO PRESS

8ø DROP TO

EQUIP (TYP 3)

ABANDONED 18x18

26ø UP TO

ROOF LEVEL

EF

E

20x12

SA UP

S-E

E

(TYP 3)

8ø EA UP

EF

E

8ø MUA TO EQUIP

8ø 8ø DN

16ø DN12ø DN

6ø

18ø

20ø22ø

EF

E

22ø 6ø

12ø

12ø

26ø UP TO

ROOF LEVEL 5

16ø DUST COLLECTOR

DUCT, CAPPED

E-E

E

12ø EA UP

22ø

22ø UP

TO ROOF

LEVEL 5

DN

6ø

EF

E

REMOVE

PORTABLE

AC UNIT

B5

MD201

A1

MD223

C1

MD223

B1

MD222

m l i h e7 p e6 n k j g.1 g f.1 f

M3

5.6

4.2 e4 e3

3.5

2.8 n.9 n.5 k.9 k.5

2.5

2.4

2.1 e2 e1 k.1 e d c b a i.1

STAIR

STORAGE

104 SHOP

STORAGE

SHOP

SHOP

STORAGE

STORAGE

SHOP

STORAGE

SHOP

STORAGE

STAIR

OFFICE

OFFICE

STORAGE

WOMENS

MENS

STAIRS

CORRIDOR

SCALE: 1/8" = 1'-0"

B1

FIRST FLOOR MECHANICAL DUCTWORK REMOVALS PLAN - WEST

SATISFACTORY TO DATE

APPROVED

FOR COMMANDER NAVFAC

SEAL

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SHEET

NAVFAC DRAWING NO.

DESIGNER

DRAWN BY

CHECKED BY

OF

EPROJECT NO.:

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

Y S

T E

M S

C O

M M

A N

D

DRAWFORM REVISION: 14 SEP 2023

DESIGN MANAGER

PROJECT MANAGER

FEAD/PM&E

FIRE PROTECTION

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

Y S

T E

M S

C O

M M

A N

D

M

ID

-A T

LA

N

T

IC

P O

R T

S M

O U

T H

N A

V A

L S

H

IP

Y A

R D

K

IT

T

E R

Y M

E

UNCLASSIFIED

UNCLASSIFIED

U N

C L

A S

S

IF

IE

D

ACTIVITY

1740579

T. CARLETON

L. LYONS

S. RUCINSKI

/2

/2

:3

:3

P M

C U s e rs \m d o n o v a n \D o c u m e n ts \2

.2

B

L D

G

M

E C

H A

N

IC

A L

-V m d o n o v a n

V F

X R

.r v t

MD103

B R

E P

A

IR

S

F

IR

S T

F L O

O R

M E

C H

A N

IC

A

L D

U C

T W

O R

K R

E M

O V

A L S

P L A

N

W E

S T

MSA

RNC

CBM

K

IT

T E

R Y

M

E P

O R

T S

M O

U T

H N

A V

A L S

H

IP

Y A

R D

R O

IC

C

-M E

M D

GENERAL NOTES REMOVALS KEYNOTES

1/8" = 1' - 0" 0 5' 10' 15' 30'

GRAPHIC SCALE

KEY PLAN

CHECK GRAPHIC SCALE BEFORE USING

MATCH LINE

PLAN

NORTH

1.

2.

3.

4.

5.

6.

7.

8.

SEE M-001 FOR MECHANICAL LEGENDS, ABBREVIATIONS AND GENERAL NOTES.

REMOVE ALL HVAC AND INDUSTRIAL PROCESS EQUIPMENT AND ASSOCIATED CONTROLS, WIRING AND DUCTWORK THROUGHOUT THE SPACES SHOWN

ON THIS SHEET UNLESS OTHERWISE NOTED.

COORDINATE WITH ARCHITECTURAL DRAWINGS FOR PATCHING OF OPEN FLOOR, WALL AND CEILING PENETRATIONS ASSOCIATED WITH REMOVALS.

MECHANICAL SUBCONTRACTOR SHALL IDENTIFY, MAKE SAFE, CUT LOOSE AND CAP ALL ITEMS SPECIFIED TO BE DEMOLISHED. THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR DEMOLITION AND REMOVAL OFF SITE TO AN AUTHORIZED SALVAGE FACILITY.

REFER TO CLIN 002 FOR LIST OF INDUSTRIAL EQUIPMENT REMOVAL REQUIREMENTS.

COORDINATE REMOVAL WITH HAZMAT DRAWINGS AND REQUIREMENTS.

EXISTING MECHANICAL EQUIPMENT, DUCTWORK, AND PIPING THROUGHOUT THE BUILDING TO BE REMOVED, UNLESS OTHERWISE NOTED.

CONDUCT TESTING OF EXISTING PUMPED STEAM CONDENSATE SYSTEM RETURN LINE BACK PRESSURE AND REPORT RESULTS TO CONTRACTING

OFFICER PRIOR TO COMMENCING WITH REMOVALS IN BUILDING 60.

REMOVE THROUGH-WALL EXHAUST FAN, AND ASSOCIATED CONTROLS AND WIRING.

REMOVE EXHAUST FAN AND ASSOCIATED DUCTWORK, LOUVERS AND CONTROLS.

[CLIN002] REMOVE EXHAUST FAN AND ASSOCIATED DUCTWORK, HOODS, VFD, CONTROLS, AND WIRING.

[CLIN002] REMOVE EXHAUST FAN AND ASSOCIATED DUCTWORK, ENCLOSURES, HOODS, CONTROLS, AND WIRING.

[CLIN002] REMOVE ENTIRE EXHAUST DUCT RISER AND ASSOCIATED SUPPORTS.

[CLIN002] REMOVE DUCTWORK ASSEMBLY.

(THIS SHEET ONLY)

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E A

P P

R

F

IN

A L

S U

B M

IS

S

IO

N

/0

1/

R

S H

A

M E

N D

M E

N T

/10 /2

R S

H

Sheets
MD103 - FIRST FLOOR MECHANICAL DUCTWORK REMOVALS PLAN - WEST

File details come from the government source that posted it. Updated .