This is a mechanical ductwork removals plan for Building 60 at Portsmouth Naval Shipyard in Kittery, Maine, prepared by Naval Facilities Engineering Systems Command (NAVFAC).
The drawing details first floor HVAC and industrial process equipment removal requirements, specifying the identification, disconnection, and capping of ductwork and mechanical systems throughout designated spaces. Key removal tasks include: extraction of capped exhaust air ducts running from interior building locations to roof level; removal of portable AC units; disconnection of dust and fume collector arms (four typical units); and elimination of various ductwork assemblies with specified diameter pipes ranging from 6 to 36 inches. The document references CLIN 002 for industrial equipment removal requirements and mandates coordination with architectural drawings for patching penetrations, hazmat drawings for hazardous material protocols, and existing steam condensate system testing prior to commencing removals. The mechanical subcontractor is responsible for identifying, making safe, cutting loose, and capping items designated for demolition, with the general contractor assuming responsibility for final demolition and off-site removal to authorized salvage facilities. The drawing was finalized on October 1, 2025, with an amendment dated March 10, 2026, and includes a graphic scale of 1/8 inch equals 1 foot for reference.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AA
EF
E
EF
E
REMOVE CAPPED EA DUCT
RUN IN ENTIRETY FROM INSIDE
BLDG UP TO ROOF LEVEL
EF
E
REMOVE
PORTABLE
AC UNIT
ø
E A
18ø TO PRESS
20ø TO PRESS
32ø 28ø EA
24ø 18ø EA
DUST/FUME COLLECTOR
ARM (TYP 4)
8ø CAPPED
18ø 8ø
8ø CAPPED
8ø
18ø DROP
TO PRESS
8ø DROP TO
EQUIP (TYP 3)
ABANDONED 18x18
26ø UP TO
ROOF LEVEL
EF
E
20x12
SA UP
S-E
E
(TYP 3)
8ø EA UP
EF
E
8ø MUA TO EQUIP
8ø 8ø DN
16ø DN12ø DN
6ø
18ø
20ø22ø
EF
E
22ø 6ø
12ø
12ø
26ø UP TO
ROOF LEVEL 5
16ø DUST COLLECTOR
DUCT, CAPPED
E-E
E
12ø EA UP
22ø
22ø UP
TO ROOF
LEVEL 5
DN
6ø
EF
E
REMOVE
PORTABLE
AC UNIT
B5
MD201
A1
MD223
C1
MD223
B1
MD222
m l i h e7 p e6 n k j g.1 g f.1 f
M3
5.6
4.2 e4 e3
3.5
2.8 n.9 n.5 k.9 k.5
2.5
2.4
2.1 e2 e1 k.1 e d c b a i.1
STAIR
STORAGE
104 SHOP
STORAGE
SHOP
SHOP
STORAGE
STORAGE
SHOP
STORAGE
SHOP
STORAGE
STAIR
OFFICE
OFFICE
STORAGE
WOMENS
MENS
STAIRS
CORRIDOR
SCALE: 1/8" = 1'-0"
B1
FIRST FLOOR MECHANICAL DUCTWORK REMOVALS PLAN - WEST
SATISFACTORY TO DATE
APPROVED
FOR COMMANDER NAVFAC
SEAL
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SHEET
NAVFAC DRAWING NO.
DESIGNER
DRAWN BY
CHECKED BY
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
Y S
T E
M S
C O
M M
A N
D
DRAWFORM REVISION: 14 SEP 2023
DESIGN MANAGER
PROJECT MANAGER
FEAD/PM&E
FIRE PROTECTION
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
Y S
T E
M S
C O
M M
A N
D
M
ID
-A T
LA
N
T
IC
P O
R T
S M
O U
T H
N A
V A
L S
H
IP
Y A
R D
K
IT
T
E R
Y M
E
UNCLASSIFIED
UNCLASSIFIED
U N
C L
A S
S
IF
IE
D
ACTIVITY
1740579
T. CARLETON
L. LYONS
S. RUCINSKI
/2
/2
:3
:3
P M
C U s e rs \m d o n o v a n \D o c u m e n ts \2
.2
B
L D
G
M
E C
H A
N
IC
A L
-V m d o n o v a n
V F
X R
.r v t
MD103
B R
E P
A
IR
S
F
IR
S T
F L O
O R
M E
C H
A N
IC
A
L D
U C
T W
O R
K R
E M
O V
A L S
P L A
N
W E
S T
MSA
RNC
CBM
K
IT
T E
R Y
M
E P
O R
T S
M O
U T
H N
A V
A L S
H
IP
Y A
R D
R O
IC
C
-M E
M D
GENERAL NOTES REMOVALS KEYNOTES
1/8" = 1' - 0" 0 5' 10' 15' 30'
GRAPHIC SCALE
KEY PLAN
CHECK GRAPHIC SCALE BEFORE USING
MATCH LINE
PLAN
NORTH
1.
2.
3.
4.
5.
6.
7.
8.
SEE M-001 FOR MECHANICAL LEGENDS, ABBREVIATIONS AND GENERAL NOTES.
REMOVE ALL HVAC AND INDUSTRIAL PROCESS EQUIPMENT AND ASSOCIATED CONTROLS, WIRING AND DUCTWORK THROUGHOUT THE SPACES SHOWN
ON THIS SHEET UNLESS OTHERWISE NOTED.
COORDINATE WITH ARCHITECTURAL DRAWINGS FOR PATCHING OF OPEN FLOOR, WALL AND CEILING PENETRATIONS ASSOCIATED WITH REMOVALS.
MECHANICAL SUBCONTRACTOR SHALL IDENTIFY, MAKE SAFE, CUT LOOSE AND CAP ALL ITEMS SPECIFIED TO BE DEMOLISHED. THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR DEMOLITION AND REMOVAL OFF SITE TO AN AUTHORIZED SALVAGE FACILITY.
REFER TO CLIN 002 FOR LIST OF INDUSTRIAL EQUIPMENT REMOVAL REQUIREMENTS.
COORDINATE REMOVAL WITH HAZMAT DRAWINGS AND REQUIREMENTS.
EXISTING MECHANICAL EQUIPMENT, DUCTWORK, AND PIPING THROUGHOUT THE BUILDING TO BE REMOVED, UNLESS OTHERWISE NOTED.
CONDUCT TESTING OF EXISTING PUMPED STEAM CONDENSATE SYSTEM RETURN LINE BACK PRESSURE AND REPORT RESULTS TO CONTRACTING
OFFICER PRIOR TO COMMENCING WITH REMOVALS IN BUILDING 60.
REMOVE THROUGH-WALL EXHAUST FAN, AND ASSOCIATED CONTROLS AND WIRING.
REMOVE EXHAUST FAN AND ASSOCIATED DUCTWORK, LOUVERS AND CONTROLS.
[CLIN002] REMOVE EXHAUST FAN AND ASSOCIATED DUCTWORK, HOODS, VFD, CONTROLS, AND WIRING.
[CLIN002] REMOVE EXHAUST FAN AND ASSOCIATED DUCTWORK, ENCLOSURES, HOODS, CONTROLS, AND WIRING.
[CLIN002] REMOVE ENTIRE EXHAUST DUCT RISER AND ASSOCIATED SUPPORTS.
[CLIN002] REMOVE DUCTWORK ASSEMBLY.
(THIS SHEET ONLY)
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E A
P P
R
F
IN
A L
S U
B M
IS
S
IO
N
/0
1/
R
S H
A
M E
N D
M E
N T
/10 /2
R S
H
| Sheets |
| MD103 - FIRST FLOOR MECHANICAL DUCTWORK REMOVALS PLAN - WEST |
File details come from the government source that posted it. Updated .