About this file

This document is an architectural elevation drawing set for Building 60 masonry restoration work. The sheets depict the West Elevation (AE202) and South Elevation (AE1) at a scale of 1/8" = 1'-0", showing detailed exterior views of a historic structure with existing brick masonry walls, wood windows and doors, snow guards, bollards, canopies, and stairs. The building contains multiple floor levels with elevations marked at 10.30' (First Floor), 20.86' (First Floor Mezzanine), 39.64' (Second Floor), 56.80' (Bottom of Truss), and 69.63' (Roof).

The drawings identify repair and restoration work required across various building systems through keynoted references to architectural, electrical, mechanical, and plumbing sheets. Specific work areas include historic wood window and door repairs, electrical and mechanical penetrations, plumbing penetrations, lightning protection systems, and light fixture installation. An "Approximate Masonry Restoration Quantities" table indicates scope includes repointing (235 SF), brick patch repairs (80 locations), and crack repairs (81 LF). The document references coordination with structural, MEP, and interior finish documentation, indicating this is part of a comprehensive building rehabilitation project requiring multidisciplinary design coordination.

View the file

Other files

File Type Posted
_B60_Continuation Sheet_Amendment 010_03-31-26.pdf PDF
74_SP101_R1_AMENDMENT 010.pdf PDF
96_AE105_R2_AMENDMENT 010.pdf PDF
114_AE401_R1_AMENDMENT 010.pdf PDF
120_AE441_R1_AMENDMENT 010.pdf PDF
178_P-401_R2_AMENDMENT 010.pdf PDF
179_P-402_R1_AMENDMENT 010.pdf PDF
01 91 19_R1_AMENDMENT 009.pdf PDF
116_AE411_R1_AMENDMENT 009.pdf PDF
238_FX400_R1_AMENDMENT 009.pdf PDF
256_EP502_R1_AMENDMENT 009.pdf PDF
260_EP601_R1_AMENDMENT 009.pdf PDF
Att.pdf PDF
Solicitation Amendment N6247026R00120008 SF 30.pdf PDF
Att. S) FFE Final Package-R1_AMENDMENT 008.pdf PDF
_ATTAC1.PDF PDF
02 82 00.00 22_R1_AMENDMENT 008.pdf PDF
31_CS101_R1_AMENDMENT 008.pdf PDF
47_SD102_R1_AMENDMENT 008.pdf PDF
65_SF105_R1_AMENDMENT 008.pdf PDF
68_SF502_R1_AMENDMENT 008.pdf PDF
152_G-004B_R1_AMENDMENT 008.pdf PDF
182_P-601_R1_AMENDMENT 008.pdf PDF
190_MD106_R1_AMENDMENT 008.pdf PDF
192_MD108_R1_AMENDMENT 008.pdf PDF
02 83 00.00 22_R1_AMENDMENT 008.pdf PDF
02 84 16.00 22_R1_AMENDMENT 008.pdf PDF
148_AE804_R1_AMENDMENT 008.pdf PDF
193_MD109_R1_AMENDMENT 008.pdf PDF
210_MP107_R1_AMENDMENT 008.pdf PDF
N6247026R00120007 SF 30.pdf PDF
Solicitation Amendment N6247026R00120006 SF 30.pdf PDF
Solicitation Amendment N6247026R00120004 SF 30.pdf PDF
Att. A) Construction and Design Experience Project Data Sheet.doc.docx DOCX document
Att. E) Small Business Participation Commitment Document (SBPCD) AMD 0004.docx DOCX document
Att. F) Individual Small Business Subcontracting Plan AMD 0004.docx DOCX document
Att. Z) B60 Continuation Sheet AMD 004.pdf PDF
Att. X) DBIDS ACCESS REQUEST FORM.docx DOCX document
Amendment N6247026R00120003.pdf PDF
Att. W) DBIDS 5512 FORM.pdf PDF
Solicitation Amendment N6247026R00120002.pdf PDF
Att. T) Price_schedule AMD 0002.pdf PDF
Solicitation Amendment N6247026R00120001.pdf PDF
Att. G) - PIEE Vendor Access Instructions.pdf PDF
Att. M) Drawings Volume 2a.pdf PDF
Att. S) FFE Package.pdf PDF
Att. U) Submittal Register.xlsx XLSX spreadsheet
Att. I) Specifications Volume 2.pdf PDF
Att. L) Drawings Volume 1b.pdf PDF
Att. P) 01 45 35a Statement_of_Special_Inspections.xlsx XLSX spreadsheet
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FIRST FLOOR

ELEV=10.30'

FIRST FLOOR MEZZANINE

ELEV=20.86'

ROOF

ELEV=69.63'

SECOND FLOOR

ELEV=39.64'

BOTTOM OF TRUSS

ELEV=56.80'

A1

AE221

C1

AE222

111111111

EXISTING ASPHALT

SHINGLE ROOFING

EXISTING HISTORIC BRICK

MASONRY EXTERIOR WALL

SYSTEM (TYP)

60W2B 60W2E 60W2F 60W2G 60W2H 60W2I 60W2J

60W1H60W1G60W1F 60W1I

60W1D

60W1C60W1B 60W1E60W1A

101A

EXISTING MEMBRANE

ROOFING

EXISTING SNOW

GUARDS, TYP

EXISTING SNOW

GUARDS, TYP

'-1

0"

'-2

'-9

'-7

60W2A 60W2C 60W2D

EXISTING

BOLLARDS, TYP

1 1 1

EXISTING CANOPYEXISTING CANOPY

EXISTING STAIR

TO REMAIN

55555 5 5 5 5 5

EXISTING CONCRETE

FOUNDATION WALL

4 4 4 4 4

6 6 6 6

5 5

FIRST FLOOR

ELEV=10.30'

FIRST FLOOR MEZZANINE

ELEV=20.86'

ROOF

ELEV=69.63'

SECOND FLOOR

ELEV=39.64'

BOTTOM OF TRUSS

ELEV=56.80'

C1

AE221

1 1

EXISTING HISTORIC

BRICK MASONRY

EXTERIOR WALL

SYSTEM (TYP)

60S2C

60S1C 60S1A

60S3A 60S3B

C1

AE223

60S1B

60S2B60S2A

'-7

'-9

'-2

'-1

0"

42 1

ROOF LINE (BEYOND)

EXIST STEAM LINES,

SEE MECH SHEETS

SATISFACTORY TO DATE

APPROVED

FOR COMMANDER NAVFAC

SEAL

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SHEET

NAVFAC DRAWING NO.

DESIGNER

DRAWN BY

CHECKED BY

OF

EPROJECT NO.:

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

Y S

T E

M S

C O

M M

A N

D

DRAWFORM REVISION: 14 SEP 2023

DESIGN MANAGER

PROJECT MANAGER

FEAD/PM&E

FIRE PROTECTION

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

Y S

T E

M S

C O

M M

A N

D

M

ID

-A T

LA

N

T

IC

P O

R T

S M

O U

T H

N A

V A

L S

H

IP

Y A

R D

K

IT

T

E R

Y M

E

UNCLASSIFIED

UNCLASSIFIED

U N

C L

A S

S

IF

IE

D

ACTIVITY

1740579

T. CARLETON

L. LYONS

S. RUCINSKI

/1

/2

:4

:2

P

M

C U s e rs \m d o n o v a n \D o c u m e n ts \2

.2

B L

D G

A

R C

H

IT

E C

T U

R A

L -V m d o n o v a n

V F

X R

.r v t

AE202

B

R

E P

A

IR

S

E X

T E

R

IO

R E

L E

V A

T

IO

N S

RSH

JMR

MJD

K

IT

T E

R Y

M

E P

O R

T S

M O

U T

H N

A V

A L S

H

IP

Y A

R D

R O

IC

C

-M E

A E

SCALE: 1/8" = 1'-0" (AE102)

C1

WEST ELEVATION

SCALE: 1/8" = 1'-0" (AE102)

A1

SOUTH ELEVATION

MATCH LINE

C1

AE202

A1

AE202

GENERAL NOTES

APPROXIMATE MASONRY

RESTORATION QUANTITIES

REPAIR HISTORIC WOOD WINDOW/DOOR, SEE RESTORATION SCHEDULE ON SHEET AE622.

ELECTRICAL PENETRATION, SEE ELECTRICAL SHEETS.

MECHANICAL PENETRATION, SEE MECHANICAL SHEETS.

PLUMBING PENETRATION, SEE PLUMBING SHEETS.

LIGHTNING PROTECTION TERMINAL AND CONDUCTOR, SEE DETAILS A1/AE522 AND B5/AE522

AND ELECTRICAL SHEETS.

LIGHT FIXTURE, SEE ELECTRICAL SHEETS.

REPOINTING

PENETRATION PATCH (<1")

PENETRATION PATCH (1-1/2")

CRACK REPAIR

200 LF

30 LOCATIONS

10 LOCATIONS

30 LF

NOTE:

PRIOR TO START OF WORK COORDINATE FINAL REPAIR LOCATIONS WITH

CONTRACTING OFFICER IN FIELD.

(TOTAL FOR

SHEETS

AE202-AE204)

PLAN

NORTH

1/8" = 1' - 0" 0 5' 10' 15' 30'

GRAPHIC SCALE(S)

KEY PLAN

KEYNOTES

1. SEE SHEET AE601 FOR DOOR SCHEDULE.

2. SEE SHEET AE622 FOR WINDOW AND DOOR RESTORATION SCHEDULE.

3. SEE SHEET AE205 FOR MASONRY REPAIR DETAILS.

4. MASONRY REPOINTING AND REPAIRS MUST BE IN ACCORDANCE WITH NATIONAL

PARK SERVICE TECHNICAL PRESERVATION SERVICES BRIEF 2. FOR REPOINTING

MASONRY, ANALYZE EXISTING ORIGINAL MORTAR BEFORE REPOINTING TO PROVIDE

ACCURATE MATCH. MOCK-UP APPROVAL IS REQUIRED PRIOR TO REPOINTING WORK

TO REVIEW CONFORMANCE IN MATCHING THE PHYSICAL CHARACTERISTICS OF THE

MASONRY AND MORTAR. MOCK-UP WILL ALSO REVIEW THE REPOINTING STYLE AND

TOOLING METHODS USED TO REMOVE THE MORTAR. MOCK-UP TO BE RETAINED FOR

THE DURATION OF THE PROJECT. SEE SPECIFICATION SECTION 04 01 00.91 22 FOR

ADDITIONAL MOCK-UP INFORMATION. SEE SHEET G-004A FOR GENERAL MASONRY

CLEANING/REPAIR/REPOINTING NOTES.

5. SEE STRUCTURAL SHEETS FOR INTERIOR CRACK REPAIR WORK.

6. PATCH HOLES LEFT BY FASTENERS AT REMOVED UTILITIES, WINDOW

GRATES/GRILLES, ETC. COORDINATE WITH REMOVALS SHEETS.

7. WINDOW SASH REPLACEMENT/REPAIR: SALVAGE REMOVED SASHES FOR THE

DURATION OF THE PROJECT. REMOVED SASHES MAY BE USED AS SOURCE MATERIAL

FOR OTHER REPLACEMENT AND REPAIR PIECES. ADDITIONAL WINDOW/SASH

MATERIAL (IN THE FORM OF ~20 STORED SASH UNITS) CAN BE USED FOR REPAIR

WORK AND CAN BE FOUND IN THE ATTIC. NOTE: EXISTING STORED SASHES ARE

PAINTED AND HEAVY METALS CONTAINING PAINT MUST BE MANAGED IF CONTRACTOR

CHOOSES TO USE FOR REPAIR WORK.

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E A

P P

R

F

IN

A L

S U

B M

IS

S

IO

N

/0

1/

R

S H

A

M E

N D

M E

N T

/1

0/

R

S H

Sheets
AE102 - FIRST FLOOR PART PLAN - WEST
AE104 - FIRST FLOOR MEZZANINE PART PLAN - WEST
AE131 - TYPICAL SIGNAGE DETAILS
AE202 - EXTERIOR ELEVATIONS 1
AE804 - SECOND FLOOR FF&E PLAN (OPTION 1)
G-004A - ABBREVIATIONS, LEGEND, AND GENERAL PROJECT NOTES - VOLUME 1
G-004B - ABBREVIATIONS, LEGEND, AND GENERAL PROJECT NOTES - VOLUME 2
Q-601 - EQUIPMENT SCHEDULE (OPTION 2)

File details come from the government source that posted it. Updated .