J-0200000-13_ELINs_(Amendment_0004).xlsx

XLSX spreadsheet 570 KB Posted

Attached to
BASE OPERATIONS SUPPORT (BOS) SERVICES AT U. S. NAVAL STATION ROTA, SPAIN Federal contract opportunity
Solicitation number
N62470-19-R-2001
Issued by
Department of the Navy Naval Facilities Engineering Command

About this file

This document is an attachment to a federal solicitation for base operations support services at Naval Station Rota, Spain. The solicitation requires the contractor to provide recurring and non-recurring facility services including facility investment, custodial services, pest control, integrated solid waste management, and grounds maintenance. Recurring work is priced by exhibit line item numbers for services such as preventative maintenance, inspections, and other recurring programs. Non-recurring work is priced as unit priced tasks including change of occupancy maintenance, interior and exterior painting, carpet installation, equipment replacement, and crane services with response times. The solicitation involves the Department of the Navy, Naval Facilities Engineering Command and has a performance period of one base period and four option periods.

J-0200000-13 ELINs (Amendment 0004)

View the file

Other files for this federal contract opportunity

Other files attached to BASE OPERATIONS SUPPORT (BOS) SERVICES AT U. S. NAVAL STATION ROTA, SPAIN, newest first.
File Type Posted
J-1502000-01-04_Equipment_and_Systems_Inventory-BUMED_(Amendment_0007).xlsx XLSX spreadsheet
N62470-19-R-2001_Rota_BOS_Amendment_0006.pdf PDF
J-1502000-00-04_Equipment_and_Systems_Inventory_(Amendment_0005).xlsx XLSX spreadsheet
J-1502000-01-04_Equipment_and_Systems_Inventory-BUMED_(Amend_0005).xlsx XLSX spreadsheet
F_Section_F_Deliverables_(Amendment_0005).pdf PDF
J-1502000-01_Facility_Investment_-_BUMED_(Amendment_0004).pdf PDF
J-1502000-01-04_Equipment_and_Systems_Inventory_-_BUMED_(Amendment_0004).xlsx XLSX spreadsheet
N62470-19-R-2001_Rota_BOS_Amendment_0004.pdf PDF
J-1503010-05_Custodial_Service_Classes_and_Frequencies_(Amendment_0003).xlsx XLSX spreadsheet
J-1502000-01_Facility_Investment-BUMED_(Amendment_0003).pdf PDF
J-1503010-07.b_Floor_Plans_-_DoDEA_(Amendment_0003).pdf PDF
J-1700000_Transportation_(Amendment_0003).pdf PDF
J-10_Site_Visit_Sign-In_Sheet.pdf PDF
J-9_Pre-Proposal_Conference_PowerPoint.pdf PDF
_J-1503010_Custodial.pdf PDF
_J-0200000-08_SPECIFICATION_INFORMATION.xlsx XLSX spreadsheet
_J-6_Basis_of_Estimate_(BOE)_(Sample).pdf PDF
_F_Section_F_Deliverables.pdf PDF
_J-1503020-04_Integrated_Pest_Management_Plan.pdf PDF
_J-0200000_Management_and_Administration.pdf PDF
_J-1401000-08_Cable_TV_System.pdf PDF
_J-1503030_Integrated_Solid_Waste_Management.pdf PDF
_J-0200000-11.b_Spill_Prevention_and_Response_Plan.pdf PDF
_J-1502000-00-03_Facility_Inventory.xlsx XLSX spreadsheet
_J-1503050-03.a_Grounds_Maintenance_Inventory.xls XLS spreadsheet
_J-1_Past_Performance_Questionnaire.docx DOCX document
_J-0200000-07_ASSET_INFORMATION.xlsx XLSX spreadsheet
_J-1501000-04_Characteristic_Meter_Reading_Information.xlsx XLSX spreadsheet
_J-1700000_Transportation.pdf PDF
_J-0200000-13_Exhibit_Line_Item_Number_(ELINs).xlsx XLSX spreadsheet
_J-1401000-03C_FH_Painting_Measurements.xlsx XLSX spreadsheet
_J-1502000-00-04_Equipment_and_Systems_Inventory.xlsx XLSX spreadsheet
_J-1401000-07_FH_Street_Lighting.pdf PDF
_J-1401000-03_FH_Facility_Property_and_Systems_Equipment_Inventory.xlsx XLSX spreadsheet
_J-2_Corporate_Experience_Project_Data_Sheet.docx DOCX document
_J-1402000_Unaccompanied_Housing.pdf PDF
_J-0501030_Aviation_Fuel_Support.pdf PDF
_J-1503010-07.b_Floor_Plans_DoDEA.pdf PDF
_J-1401000_Family_Housing.pdf PDF
_J-1503010-05_Custodial_Service_Classes_and_Frequencies.xlsx XLSX spreadsheet
_J-1503030-05_Location_and_Frequency_Historical_Data.xlsx XLSX spreadsheet
N62470-19-R-2001_Rota_BOS_RFP.pdf PDF
_J-1503010-07_Floor_Plans.pdf PDF
_J-1503050_Grounds_Maintenance_and_Landscaping.pdf PDF
_J-1503010-06_Custodial_Inventory.xlsx XLSX spreadsheet
_J-1501000_Facility_Management.pdf PDF
_J-1502000-01_Facility_Investment-BUMED.pdf PDF
_J-5_Full_Time_Equivalent_(FTE).xlsx XLSX spreadsheet
_J-1502000-01-04_Equipment_and_Systems_Inventory_-_BUMED.xlsx XLSX spreadsheet
N62470-19-R-2001_Pre-Solicitation_Notice.pdf PDF
Show all 50

BASE OPERATIONS SUPPORT (BOS) SERVICES AT U. S. NAVAL STATION ROTA, SPAIN has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Base Period - Recurring

ATTACHMENT J-0200000-13
EXHIBIT LINE ITEM NUMBERS
SOLICITATION/CONTRACT # N62470-19-R-2001
EXHIBIT A - BASE PERIOD - RECURRING WORK
CLIN 0001
Recurring Work Price - Base Period
PROVIDE PRICES TO PERFORM FACILITY SERVICES RECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3
ELINs A001 THROUGH A222
ELIN/ SubELINDescriptionQuantityUnit of IssueUnit Price (USD)Total (USD)
CNRE / REGION Recurring Work
A001Specification 1501000 Facility Management (FP)
A001AAInfrastructure Condition Assessment Program (ICAP) (Spec Item 3.1)12MO$0.00
A002Specification 1502000 Facility Investment (ST)
Service Orders, Spec Item 3.1
A002AAEmergency Service Orders (Spec Item 3.1.1)12MO$0.00
A002ABUrgent Service Orders (Spec Item 3.1.2)12MO$0.00
A002ACRoutine Service Orders (Spec Item 3.1.3)12MO$0.00
Preventive Maintenance Program (PM), Spec Item 3.2
A002ADBoilers Systems (Spec Item 3.2.1)12MO$0.00
A002AEVertical Transportation Equipment (VTE) (Spec Item 3.2.2)12MO$0.00
A002AFExhaust Hoods and Fire Suppression (ANSUL) Systems (Spec Item 3.2.3)12MO$0.00
A002AGCooling Tower and Evaporative Condense Systems (Spec Item 3.2.4)12MO$0.00
A002AHUninterrupted Power Systems (UPS) (Spec Item 3.2.5 )12MO$0.00
A002AJPropane Tanks Systems (Spec Item 3.2.6 )12MO$0.00
A002AKVehicle Traffic Lights and Control Devices (Spec Item 3.2.7)12MO$0.00
A002ALFuel and POL Systems (Spec Item 3.2.8)12MO$0.00
A002AMGrease Traps and Grease Tank Reservoir (Spec Item 3.2.9 )12MO$0.00
A002ANOily Waste and Sewage Collection Holding Tanks (CHT) (Spec Item 3.2.11)12MO$0.00
A002APSwimming Pool (Spec Item 3.2.13)12MO$0.00
A002AQIrrigation System (Spec Item 3.2.14)12MO$0.00
A002ARCathodic Protection Systems (Spec Item 3.2.17)12MO$0.00
Inspection, Testing, and Certification Program, Spec Item 3.4
A002ASBoilers Systems (Spec Item 3.4.1)12MO$0.00
A002ATBoiler Air Emission Testing (Spec Item 3.4.2)12MO$0.00
A002AUVertical Transportation Equipment (VTE) Certification Support (Spec Item 3.4.3 )12MO$0.00
Other Recurring Services Program, Spec Item 3.5
A002AVLocksmith Services (Spec Item 3.5.1)12MO$0.00
A003Specification 1503010 Custodial (FX), Spec Item 3
A003AAScheduled Custodial Services (Spec Item 3.1)12MO$0.00
A003ABUnscheduled Custodial Services (Spec Item 3.4)12MO$0.00
A004Specification 1503020 Pest Control (FX), Spec Item 3
A004AAScheduled Pest Control Services (Spec Item 3.1)12MO$0.00
A004ABUnscheduled Pest Control Services (Spec Item 3.2)12MO$0.00
A005Specification 1503030 Integrated Solid Waste Management (ISWM) (FX), Spec Item 3
A005AASolid Waste Collection and Disposal (Spec Items 3.1, 3.2, 3.3, 3.4, 3.5, 3.6, 3.7, 3.8 and 3.9)12MO$0.00
A005ABRecycling Collection and Processing Services (19%) (Spec Item 3.11)12MO$0.00
A006Specification 1503050 Grounds Maintenance & Landscaping, Spec Item 3
A006AAImproved Grounds - Lawns (Spec Item 3.1)12MO$0.00
A006ABImproved Grounds - Fields (Spec Item 3.1)12MO$0.00
A006ACOperational Areas (Spec Item 3.2.)12MO$0.00
A006ADDebris Removal (Spec Item 3.3)12MO$0.00
A006AEUnscheduled Services - Grounds Maintenance Service Orders (Spec Item 3.5)12MO$0.00
A007-A017Reserved
CNRE / REGION Subtotal:$0.00
Bureau of Medicine and Surgery (BUMED) Recurring Work
A018Specification 1502000 Facility Investment - BUMED (ST)
Service Orders, Spec Item 3.1
A018AAEmergency Service Orders (Spec Item 3.1.1)12MO$0.00
A018ABEmergency Service Orders (Category 1) (Spec Item 3.1.1)12MO$0.00
A018ACUrgent Service Orders (Spec Item 3.1.2)12MO$0.00
A018ADRoutine Service Orders (Spec Item 3.1.3)12MO$0.00
Integrated Maintenance Program (IMP), Spec Item 3.2
A018AEHVAC and Refrigeration Systems (Spec Item 3.2.1)12MO$0.00
A018AFHVAC Seasonal Start-Up and Shutdown (Spec Item 3.2.1.1)12MO$0.00
A018AGHVAC Water Testing and Treatment (Spec Item 3.2.1.2)12MO$0.00
A018AHHVAC Direct Digital Control (DDC) Systems (Spec Item 3.2.1.3)12MO$0.00
A018AJBoilers and Unfired Pressure Vessels (UPVs) (Spec Item 3.2.2)12MO$0.00
A018AKBoiler Seasonal Start-Up and Shutdown (Spec Item 3.2.2.1)12MO$0.00
A018ALBoiler Water Testing and Treatment Services (Spec Item 3.2.2.2)12MO$0.00
A018AMBoiler Water Softener System (Spec Item 3.2.2.3)12MO$0.00
A018ANDomestic Water Systems (Spec Item 3.2.3)12MO$0.00
A018APAuxiliary Generator and Back-Up Power Systems (Spec Item 3.2.4)12MO$0.00
A018AQUninterrupted Power Systems (UPS) (Spec Item 3.2.5)12MO$0.00
A018ARVertical Transportation Equipment (VTE) (Spec Item 3.2.6)12MO$0.00
A018ASOverhead Doors (Spec Item 3.2.7)12MO$0.00
A018ATInterior Electrical Systems (Spec Item 3.2.8)12MO$0.00
A018AUMedical Gas Systems (Spec Item 3.2.9)12MO$0.00
A018AVMedical Air Systems (Spec Item 3.2.210)12MO$0.00
A018AWMedical Vacuum Systems (Spec Item 3.2.11)12MO$0.00
A018AXFire Protection Systems (Spec Item 3.2.12.1)12MO$0.00
A018AYFire Rated Doors Systems (Spec Item 3.2.12.2)12MO$0.00
A018AZFire Rated Walls Systems (Spec Item 3.2.12.3)12MO$0.00
A018BAFire / Smoke Damper Systems (Spec Item 3.2.12.4)12MO$0.00
A018BBEmergency and Exit Lighting Systems (Spec Item 3.2.12.5)12MO$0.00
A018BCInterior and Exterior Lighting Systems (Spec Item 3.2.13)12MO$0.00
A018BDPublic Address (PA) System (Spec Item 3.2.14)12MO$0.00
A018BENurse Call and Code Blue Systems (Spec Item 3.2.15)12MO$0.00
A018BFInfant Security System (Spec Item 3.2.16)12MO$0.00
A018BGSubmersible Sump Pump And Sewage Ejector Pump Systems (Spec Item 3.2.17)12MO$0.00
A018BHElectric Water Coolers (Spec Item 3.2.18)12MO$0.00
A018BJIrrigation System (Spec Item 3.2.19)12MO$0.00
A018BKDifferential Pressure Monitor System (Spec Item 3.2.20)12MO$0.00
A018BLFuel and POL Systems (Spec Item 3.2.21)12MO$0.00
Inspection, Testing, and Certification Program, Spec Item 3.3
A018BMBoilers and UPVs Certification Support (Spec Item 3.3.1)12MO$0.00
A018BNBoiler Air Emission Testing (Spec Item 3.3.2)12MO$0.00
A018BPVertical Transportation Equipment (VTE) Certification Support (Spec Item 3.3.3)12MO$0.00
A018BQInterior Electrical Systems Annual Inspection (Spec Item 3.3.4)12MO$0.00
Other Recurring Services Program, Spec Item 3.4
A018BRLightning Protection Systems (Spec Item 3.4.1)12MO$0.00
A018BSUnder Ground (UG) Fuel Storage Tanks (Spec Item 3.4.2)12MO$0.00
A018BTCeiling Tile Inspection and Replacement Program (Spec Item 3.4.3)12MO$0.00
A018BUGutter Maintenance (Spec Item 3.4.4)12MO$0.00
A018BVDoors and Windows Annual Inspection and Lubrication (Spec Item 3.4.5)12MO$0.00
A018BWPlaster Cast Trap (Spec Item 3.4.6)12MO$0.00
A018BXPlumbing Systems and Fixtures Leak Control (Spec Item 3.4.7)12MO$0.00
A019Specification 1503010 Custodial (FX), Spec Item 3
A019AAScheduled Custodial Services (Spec Item 3.1)12MO$0.00
A019ABMTF Other/Special Cleaning Services (BUMED) (Spec Item 3.3)12MO$0.00
A020Specification 1503020 Pest Control (FX), Spec Item 3
A020AAScheduled Pest Control Services (Spec Item 3.1)12MO$0.00
A020ABUnscheduled Pest Control Services (Spec Item 3.2)12MO$0.00
A021Specification 1503030 Integrated Solid Waste Management (ISWM) (FX), Spec Item 3
A021AASolid Waste Collection and Disposal (Spec Items 3.1, 3.2, 3.3, 3.4, 3.5)12MO$0.00
A021ABRecycling Collection and Processing Services (2.5%) (Spec Item 3.11)12MO$0.00
A022Specification 1503050 Grounds Maintenance & Landscaping, Spec Item 3
A022AAImproved Grounds - Lawns (Spec Item 3.1)12MO$0.00
A022ABImproved Grounds - Fields (Spec Item 3.1)12MO$0.00
A022ACDebris Removal (Spec Item 3.3)12MO$0.00
A022ADStorm Drainage Systems (Spec Item 3.4)12MO$0.00
A023Specification 1800000 Environmental
A023AACollection and Removal of Medical Waste (Spec Item 3.1)12MO$0.00
A024-A031Reserved
BUMED Subtotal:$0.00
Family Housing Recurring Work
A032Specification 1401000 Family Housing (FH)
FH Service Orders, Spec Item 3.1.1
A032AAEmergency Service Orders (Spec Item 3.1.1.1)12MO$0.00
A032ABRoutine Service Orders (Spec Item 3.1.1.2)12MO$0.00
Project Work Orders, Spec Item 3.1.2
A032ACProject Work Order Level 1 (Spec Item 3.1.2.1)12MO$0.00
A032ADProject Work Order Level 2 (Spec Item 3.1.2.2)12MO$0.00
Preventive Maintenance Program, Spec Item 3.1.3
A032AEHVAC and Refrigeration System (Spec Item 3.1.3.1)12MO$0.00
A032AFElectrical Water Heater (Spec Item 3.1.3.2)12MO$0.00
A032AGElectrical Panels (Spec Item 3.1.3.3)12MO$0.00
A032AHDehumidifiers (Spec Item 3.1.3.4)12MO$0.00
A032AJExterior Lighting Systems (Spec Item 3.1.3.5)12MO$0.00
A032AKFire Protection System (Spec Item 3.1.3.6)12MO$0.00
Other Recurring Services, Spec Item 3.1.4
A032ALHousing Unit Awning (Spec Item 3.1.4.1)12MO$0.00
A032AMPhotovoltaic Solar Systems (Spec Item 3.1.4.2)12MO$0.00
A032ANIrrigation System (Spec Item 3.1.4.3)12MO$0.00
A032APScheduled Roof Cleaning (Spec Item 3.1.4.4)12MO$0.00
A032AQCable Television System (Spec Item 3.1.4.5)12MO$0.00
A032AROrnamental Fountains (Spec Item 3.1.4.6)12MO$0.00
A032ASRain Water Drainage System (Spec Item 3.1.4.7)12MO$0.00
A032ATPlayground Inspections, Maintenanace, and Cleaning Services (Spec Item 3.1.4.8)12MO$0.00
Change Of Occupancy Maintenance (CHOC) Services, Spec Item 3.1.5
A032AUCHOC Services for Units A-1, A-2, B-1, D-1, D-2, E-2, A-1 Extended, A-2 Extended, D-1 Extended and D-2 Extended Units12MO$0.00
A032AVCHOC Services for House Units F, G and H12MO$0.00
A032AWExterior Paint Services Units A-1, A-2, B-1, D-1, D-2, E-2, A-1 Extended, A-2 Extended, D-1 Extended and D-2 Extended Units12MO$0.00
A032AXExterior Paint Services Units F, G and H12MO$0.00
A033Specification 1503010 Custodial (FX), Spec Item 3
A033AAScheduled Custodial Services (Spec Item 3.1)12MO$0.00
A034Specification 1503020 Pest Control (FX), Spec Item 3
A034AAScheduled Pest Control Services (Spec Item 3.1)12MO$0.00
A034ABUnscheduled Pest Control Services (Spec Item 3.2)12MO$0.00
A035Specification 1503030 Integrated Solid Waste Management (ISWM) (FX), Spec Item 3
A035AASolid Waste Collection and Disposal Las Palmeras Housing (Spec Items 3.1, 3.2, 3.3, 3.4)12MO$0.00
A035ABSolid Waste Collection and Disposal (Spec Items 3.1, 3.2, 3.3, 3.4, 3.5)12MO$0.00
A035ACRecycling Collection and Processing Services (36.7%) (Spec Item 3.11)12MO$0.00
A036Specification 1503050 Grounds Maintenance & Landscaping
A036AAImproved Grounds - Lawns (Spec Item 3.1)12MO$0.00
A036ABImproved Grounds - Fields (Spec Item 3.1)12MO$0.00
A036ACDebris Removal (Spec Item 3.3)12MO$0.00
A036ADUnscheduled Services - Grounds Maintenance Service Orders (Spec Item 3.6)12MO$0.00
EA37-A043Reserved
Family Housing Subtotal:$0.00
Air Operations Recurring Work
A044Specification 0501030 Aviation Fuel Support (AO)
A044AACryogenic Operations and Maintenance (Spec Item 3.1)12MO$0.00
A045-A049Reserved
Air Operations Subtotal:$0.00
USAF 725th Air Mobility Squadron (AMS) Recurring Work
A050Specification 1502000 Facility Investment (ST)
Service Orders, Spec Item 3.1
A050AAUrgent Service Orders (Spec Item 3.1.2)12MO$0.00
Preventive Maintenance Program (PM), Spec Item 3.2
A050ABFuel & POL Systems (Spec Item 3.2.8)12MO$0.00
Other Recurring Services Program, Spec Item 3.4
A050ACLocksmith Services (Spec Item 3.4.1)12MO$0.00
A051Specification 1503010 Custodial (FX)
A051AAScheduled Custodial Services (Spec Item 3.1)12MO$0.00
A052Specification 1503020 Pest Control (FX)
A052AAScheduled Pest Control Services (Spec Item 3.1)12MO$0.00
A053Specification 1503030 Integrated Solid Waste Management (ISWM) (FX)
A053AASolid Waste Collection and Disposal (Spec Items 3.1, 3.2, 3.3, 3.4, 3.5)12MO$0.00
A053ABRecycling Collection and Processing Services (1.5%) (Spec Item 3.11)12MO$0.00
A054Specification 1503050 Grounds Maintenance & Landscaping
A054AAImproved Grounds - Lawns (Spec Item 3.1)12MO$0.00
A054ABImproved Grounds - Fields (Spec Item 3.1)12MO$0.00
A054ACDebris Removal (Spec Item 3.3)12MO$0.00
A055-A063Reserved
USAF 725th AMS Subtotal:$0.00
USAF 521st Air Mobility Operations Group (AMOG) Recurring Work
A064Specification 1503010 Custodial (FX), Spec Item 3
A064AAScheduled Custodial Services (Spec Item 3.1)12MO$0.00
A065Specification 1503030 Integrated Solid Waste Management (ISWM) (FX)
A065AASolid Waste Collection and Disposal (Spec Items 3.1, 3.2, 3.3, 3.4, 3.5)12MO$0.00
A066Specification 1503050 Grounds Maintenance & Landscaping
A066AAImproved Grounds - Lawns (Spec Item 3.1)12MO$0.00
A066ABDebris Removal (Spec Item 3.3)12MO$0.00
A067-A073Reserved
USAF 521st AMOG Subtotal:$0.00
DeCA Recurring Work
A074Specification 1502000 Facility Investment (ST)
Service Orders, Spec Item 3.1
A074AAEmergency Service Orders (Spec Item 3.1.1)12MO$0.00
A075Specification 1503020 Pest Control (FX), Spec Item 3
A075AAScheduled Services (Spec Items 3.1, 3.2)12MO$0.00
A076Specification 1503030 Integrated Solid Waste Management (ISWM) (FX), Spec Item 3
A076AASolid Waste Collection and Disposal (Spec Items 3.1, 3.2, 3.3, 3.4, 3.5)12MO$0.00
A077-A083Reserved
DeCA Subtotal:$0.00
Galley Recurring Work
A084Specification 1502000 Facility Investment (ST)
Service Orders, Spec Item 3.1
A084AAEmergency Service Orders (Spec Item 3.1.1)12MO$0.00
A084ABRoutine Service Orders (Spec Item 3.1.3)12MO$0.00
Preventive Maintenance Program (PM), Spec Item 3.2
A084ACBoiler Systems (Spec Item 3.2.1)12MO$0.00
A084ADGrease Traps (Spec Item 3.2.9)12MO$0.00
A084AEFood Service Equipment (Spec Item 3.2.15)12MO$0.00
A085Specification 1503050 Grounds Maintenance & Landscaping
A085AAImproved Grounds - Lawns (Spec Item 3.1)12MO$0.00
A085ABDebris Removal (Spec Item 3.3)12MO$0.00
A086-A089Reserved
Galley Subtotal:$0.00
NAVFAC NWCF Recurring Work
A090Specification 1503030 Integrated Solid Waste Management (ISWM) (FX), Spec Item 3
A090AASolid Waste Collection and Disposal (Spec Items 3.1, 3.2, 3.3, 3.4, 3.5)12MO$0.00
A091Specification 1503050 Grounds Maintenance & Landscaping
A091AAImproved Grounds - Fields (Spec Item 3.1)12MO$0.00
A091ABDebris Removal (Spec Item 3.3)12MO$0.00
A092-A099Reserved
NAVFAC NWCF Subtotal:$0.00
Utilities (UT) Recurring Work
A100Specification 1502000 Facility Investment (Sustainment) (ST)
Service Orders, Spec Item 3.1
A100AAEmergency Service Orders (Spec Item 3.1.1)12MO$0.00
Preventive Maintenance Program (PM), Spec Item 3.2
A100ABLift Stations and Sewage Meters (Spec Item 3.2.10)12MO$0.00
A100ACElevated Water Tank and Cathodic Protection (Spec Item 3.2.12)12MO$0.00
Inspection, Testing, and Certification Program, Spec Item 3.3
A100ADHorizontal Lifeline Systems (Spec Item 3.3.4)12MO$0.00
A101Specification 1503020 Pest Control (FX), Spec Item 3
A101AAScheduled Services (Spec Items 3.1)12MO$0.00
A102Specification 1503030 Integrated Solid Waste Management (ISWM) (FX), Spec Item 3
A102AASolid Waste Collection and Disposal (Spec Items 3.1, 3.2, 3.3, 3.4, 3.5)12MO$0.00
A103-A105Reserved
Utilities (UT) Subtotal:$0.00
NCTAMS LANT Recurring Work
A106Specification 1502000 Facility Investment (ST)
Service Orders, Spec Item 3.1
A106AAUrgent Service Requests (Spec Item 3.1.2)12MO$0.00
Preventive Maintenance Program (PM), Spec Item 3.2
A106ABIrrigation System (Spec Item 3.5.12)12MO$0.00
A107Specification 1503010 Custodial (FX), Spec Item 3
A107AAScheduled Custodial Services (Spec Item 3.1)12MO$0.00
A108Specification 1503050 Grounds Maintenance & Landscaping
A108AAImproved Grounds - Fields (Spec Item 3.1)12MO$0.00
A108ABDebris Removal (Spec Item 3.3)12MO$0.00
A109-A111Reserved
NCTAMS LANT Subtotal:$0.00
Transportation (former BSVE) Recurring Work
A112Specification 1503030 Integrated Solid Waste Management
A112AASolid Waste Collection and Disposal (Spec Items 3.1, 3.2, 3.3, 3.4, 3.5)12MO$0.00
A112ABUsed Tire Disposal (Spec Item 3.9)12MO$0.00
A113-A117Reserved
Transportation Subtotal:$0.00
Fuel Disposition Services (former DRMO) Recurring Work
A118Specification 1503010 Custodial
A118AAScheduled Custodial Services (Spec Item 3.1)12MO$0.00
A119Specification 1503030 Integrated Solid Waste Management
A119AASolid Waste Collection and Disposal (Spec Items 3.1, 3.2, 3.3, 3.4, 3.5)12MO$0.00
A120-A125Reserved
Fuel Disposition Services Subtotal:$0.00
Department of Defense Education Activity (DoDEA) Recurring Work
A126Specification 1502000 Facility Investment (ST)
Service Orders, Spec Item 3.1
A126AAEmergency Service Requests (Spec Item 3.1.1)12MO$0.00
A126ABUrgent Service Requests (Spec Item 3.1.2)12MO$0.00
A126ACRoutine Service Requests (Spec Item 3.1.3)12MO$0.00
Integrated Maintenance Program (IMP), Spec Item 3.3
A126ADHVAC and Refrigeration Systems (Spec Item 3.3.1)12MO$0.00
A126AEHVAC Seasonal Start-Up and Shutdown (Spec Item 3.3.1.1)12MO$0.00
A126AFHVAC Water Testing and Treatment (Spec Item 3.3.1.2)12MO$0.00
A126AGBoiler Systems and UPVs (Spec Item 3.3.2)12MO$0.00
A126AHCommunication Systems (Spec Item 3.3.3)12MO$0.00
A126AJFire Protection Systems (Spec Item 3.3.4)12MO$0.00
A126AKElectrical Systems (Spec Item 3.3.5)12MO$0.00
A126ALEmergency and Exit Lighting Systems (Spec Item 3.3.6)12MO$0.00
A126AMInterior and Exterior Lighting Systems (Spec Item 3.3.7)12MO$0.00
A126ANGas Supply Systems (Spec Item 3.3.8)12MO$0.00
A126APFood Service Equipment (Spec Item 3.3.9)12MO$0.00
A126AQClock Systems (Spec Item 3.3.10)12MO$0.00
A126AREmergency Eyewash Stations (Spec Item 3.3.11)12MO$0.00
A126ASIrrigation System (Spec Item 3.3.12)12MO$0.00
A126ATGrease Traps (Spec Item 3.3.13)12MO$0.00
A126AUVertical Transportation Equipment (VTE) (Spec Item 3.3.14)12MO$0.00
A126AVExhaust Hoods and Fire Suppression (ANSUL) Systems (Spec Item 3.3.15)12MO$0.00
A126AWFuel and POL Systems (Spec Item 3.3.16)12MO$0.00
A126AXSolar Panel Systems (Spec Item 3.3.17)12MO$0.00
Inspection, Testing, and Certification Program, Spec Item 3.4
A126AYBoilers Systems and UPVs (Spec Item 3.4.1)12MO$0.00
A126AZBoiler Air Emission Testing (Spec Item 3.4.2)12MO$0.00
A126BAVertical Transportation Equipment (VTE) Certification Support (Spec Item 3.4.3 )12MO$0.00
Other Recurring Services Program, Spec Item 3.5
A126BBStructural Facilities Inspection Program (Spec Item 3.5.3)12MO$0.00
A126BCExterior Site Work Inspection Program (Spec Item 3.5.4)12MO$0.00
A126BDInterior and Exterior Surfaces Inspection Program (Spec Item 3.5.5)12MO$0.00
A126BEMechanical Systems Inspection Program (Spec Item 3.5.6)12MO$0.00
A126BFPlumbing and Drainage Systems Inspection Program (Spec Item 3.5.7)12MO$0.00
A126BGPlayground Inspections, Maintenance, and Cleaning Program (Spec Item 3.5.8)12MO$0.00
A127Specification 1503010 Custodial (FX)
A127AAScheduled Custodial Services (Spec Item 3.1)12MO$0.00
A127ABOther/Special Cleaning for Schools Facilities (DoDEA) (Spec Item 3.3)12MO$0.00
A128Specification 1503020 Pest Control (FX)
A128AAScheduled Pest Control Services (Spec Item 3.1)12MO$0.00
A128ABUnscheduled Pest Control Services (Spec Item 3.2)12MO$0.00
A129Specification 1503030 Integrated Solid Waste Management (ISWM) (FX)
A129AASolid Waste Collection and Disposal (Spec Items 3.1, 3.2, 3.3, 3.4, 3.5)12MO$0.00
A130Specification 1503050 Grounds Maintenance & Landscaping (FX)
A130AAImproved Grounds - Lawns (Spec Item 3.1)12MO$0.00
A130ABDebris Removal (Spec Item 3.3)12MO$0.00
A130ACGrounds Maintenance Service Orders (Spec Item 3.5)12MO$0.00
A130ADAdditional Grounds Maintenance Services - DoDEA (Spec Item 3.6)12MO$0.00
A131-A137Reserved
DoDEA Subtotal:$0.00
Naval Criminal Investigative Service (NCIS) Recurring Work
A138Specification 1503010 Custodial (FX)
A138AAScheduled Custodial Services (Spec Item 3.1)12MO$0.00
A139Specification 1503030 Integrated Solid Waste Management (ISWM) (FX)
A139AASolid Waste Collection and Disposal (Spec Items 3.1, 3.2, 3.3, 3.4, 3.5)12MO$0.00
A140-A145Reserved
NCIS Subtotal:$0.00
Credit Union Recurring Work
A146Specification 1503010 Custodial (FX)
A146AAScheduled Custodial Services (Spec Item 3.1)12MO$0.00
A147-A149Reserved
Credit Union Subtotal:$0.00
Air Operations N327 Recurring Work
A150Specification 1503010 Custodial (FX)
A150AACustodial Services (Spec Items 3.1) (86%)12MO$0.00
A151Specification 1503030 Integrated Solid Waste Management (ISWM) (FX)
A151AASolid Waste Collection and Disposal (Spec Items 3.1, 3.2, 3.3, 3.4, 3.5) (86%)12MO$0.00
A152-A157Reserved
AIR OPS N327 Subtotal:$0.00
NEPMU7 Recurring Work
A158Specification 1503030 Integrated Solid Waste Management (ISWM) (FX)
A158AASolid Waste Collection and Disposal (Spec Items 3.1, 3.2, 3.3, 3.4, 3.5)12MO$0.00
A159-A165Reserved
NEPMU7 Subtotal:$0.00
DFSP ROTA (former DLA) Recurring Work
A166Specification 1502000 Facility Investment (ST)
Service Orders, Spec Item 3.1
A166AAEmergency Service Orders (Spec Item 3.1.1)12MO$0.00
A166ABUrgent Service Orders (Spec Item 3.1.2)12MO$0.00
A166ACRoutine Service Orders (Spec Item 3.1.3)12MO$0.00
Preventive Maintenance Program (PM), Spec Item 3.2
A166ADFuel and POL Systems (Spec Item 3.2.8)12MO$0.00
Integrated Maintenance Program (IMP), Spec Item 3.3
A166AEAircraft Refueling Hydrant System Electrical Controls and Fire Suppression Systems (Spec Item 3.3.18)12MO$0.00
A167-A169Reserved
DFSP ROTA Subtotal:$0.00
SURFLANT SHIP SERVICES Recurring Work
A170Specification 1502000 Facility Investment (ST)
Preventive Maintenance Program (PM), Spec Item 3.2
A170AAOily Waste and Sewage Collection Holding Tanks (CHT) (Spec Item 3.2.11)12MO$0.00
Other Recurring Services Program, Spec Item 3.5
A170ABCrane Services (Spec Item 3.5.2)12MO$0.00
A171Specification 1503030 Integrated Solid Waste Management (ISWM) (FX)
A171AASolid Waste Collection and Disposal (Spec Items 3.1, 3.2, 3.3, 3.4, 3.5, 3.10)12MO$0.00
A172Specification 1800000 Environmental (EC)
A172AARegulated Medical Waste Collection and Disposal (Spec Item 3.1)12MO$0.00
A173-A175Reserved
SURFLANT SHIP SERVICES Subtotal:$0.00
DMA/AFN Recurring Work
A176Specification 1503030 Integrated Solid Waste Management (ISWM) (FX)
A176AASolid Waste Collection and Disposal (Spec Items 3.1, 3.2, 3.3, 3.4, 3.5)12MO$0.00
A177Specification 1503050 Grounds Maintenance and Landscaping (FX)
A177AAImproved Grounds - Fields (Spec Item 3.1)12MO$0.00
A177ABDebris Removal (Spec Item 3.3)12MO$0.00
A179-A181Reserved
DMA/AFN Subtotal:$0.00
ENVIRONMENTAL Recurring Work
A182Specification 1800000 Environmental
A182AASampling and Laboratory Services (Spec Item 3.3)12MO$0.00
A183-A187Reserved
ENVIRONMENTAL Subtotal:$0.00
N3 SMALL ARM RANGE Recurring Work
A188Specification 1800000 Environmental (EC)
A188AARange Preventive Maintenance (PM) Program (Bldgs 1994 and 3310) (Spec Item 3.2)12MO$0.00
A189-A191Reserved
SMALL ARM RANGE Subtotal:$0.00
EODMU8 Recurring Work
A192Specification 1503030 Integrated Solid Waste Management (ISWM) (FX)
A192AASolid Waste Collection and Disposal (Spec Items 3.1, 3.2, 3.3, 3.4, 3.5)12MO$0.00
A193-A197Reserved
EODMU8 Subtotal:$0.00
NCTE Recurring Work
A198Specification 1503010 Custodial (FX)
A198AAScheduled Custodial Services (Spec Item 3.1)12MO$0.00
A199-A203Reserved
NCTE Subtotal:$0.00
RECYCLING Recurring Work
A204Specification 1502000 Facility Investment (ST)
Preventive Maintenance Program (PM), Spec Item 3.2
A204AARecycling Service Equipment (Spec Item 3.2.17)12MO$0.00
A205Specification 1503030 Integrated Solid Waste Management (ISWM) (FX)
A205AARecycling Collection and Processing Services (40.3%) (Spec Item 3.11)12MO$0.00
A206-A209Reserved
RECYCLING Subtotal:$0.00
PORT OPS Recurring Work
A210Specification 1503010 Custodial (FX)
A210AAScheduled Custodial Services (Spec Item 3.1)12MO$0.00
A211-A215Reserved
PORT OPS Subtotal:$0.00
NAVFAC Atlantic (SESEF) Recurring Work
A216Specification 1503010 Custodial (FX)
A216AAScheduled Custodial Services (Spec Item 3.1)12MO$0.00
A217Specification 1503050 Grounds Maintenance & Landscaping (FX)
A217AAImproved Grounds - Lawns (Spec Item 3.1)12MO$0.00
A217ABDebris Removal (Spec Item 3.3)12MO$0.00
A218-A221Reserved
NAVFAC Atlantic (SESEF) Subtotal:$0.00
NETC - Recurring Work
A222Specification 1503010 Custodial (FX), Spec Item 3
A222AAScheduled Custodial Services (Spec Item 3.1)12MO$0.00

NETC SUBTOTAL: $0.00

TOTAL FOR LINE ITEM 0001 - BASE PERIOD - RECURRING WORK (ELINs A001 - A222) $0.00

&"Times New Roman,Regular"&10Page &P of &N

Base Period - Non-Recurring

ATTACHMENT J-0200000-13
EXHIBIT LINE ITEM NUMBERS
SOLICITATION/CONTRACT # N62470-19-R-2001
EXHIBIT A - BASE PERIOD - NON-RECURRING WORK
CLIN 0002
EXHIDIT D - DLIN 0002
Non-Recurring Work Price - Base Period
PROVIDE PRICES TO PERFORM NON-RECURRING WORK SERVICES - IN ACCORDANCE WITH SECTION C, SPEC ITEM 4
ELINs A700 THROUGH A1013
ELINShort DescriptionLong DescriptionEstimated QuantityUnit of IssueUnit Price (USD)Extended Price (USD)
UNIT PRICED TASK (UPT) WORK
Specification 1401000 - Family Housing (FH)
A701Change of Occupancy Maintenance (COM) at Las PalmerasProvide labor, management, supervision, tools, material and equipment to perform Change of Occupancy Maintenance including all requirements per FH Change of Occupancy Maintenance Tasks provided in J-1401000-10, at the ordered location. The Contractor shall ensure that housing units are clean, fully equipped, operable and habitable. Complete all work within 3 working days during COM or as specified in the order.
50EA$0.00
A702Change of Occupancy Maintenance (COM) at Las Palmeras Type G and H (4 bedrooms)Provide labor, management, supervision, tools, material and equipment to perform Change of Occupancy Maintenance including all requirements per FH Change of Occupancy Maintenance Tasks provided in J-1401000-10, at the ordered location. The Contractor shall ensure that housing units are clean, fully equipped, operable and habitable. Complete all work within 3 working days during COM or as specified in the order.
30EA$0.00
A703Fireplace and Chimney Maintenance for Family Housing UnitProvide labor, management, supervision, tools, material and equipment required to perform fireplace and chimney maintenance. Maintenance shall include: (a) Inspect the outside parts of chimney and any connection points or any visible structural damage; (b) Inspect the firebox for loose refractory bricks and degraded mortar or any other visible structural damage; (c) Inspect the mortar crown for cracks, breaks or missing/damaged steel screen. If any deficiency is detected, they shall be repaired immediately; (d) Check damper for proper operation; (e) Inspect and check the flue pipe for cracks and breaks or is blocked by debris or creosote build up; (f) Clean the flue pipe, firebox, smoke shelf, elbows, and connector pipes to remove harmful products, creosote and soot. This shall be done from both outside and inside the house. If occasionally there is creosote buildup that cannot be removed by brushing, authorized chemicals may be used to alter the composition of the hardened creosote and turn it into a powdery substance that can be easily removed. Use of a vacuum to clean up ashes is not permitted due to live coals may remain in those ashes; (g) After cleaning, check chimney has enough draft to pull smoke out quickly and provide enough oxygen for hot and complete burning of wood to occur. Check excessive heat carries away from combustible items. The Contractor shall notify in writing any deficiency found. Complete all work within 3 working days or as specified in the order.20EA$0.00
A704Complete Interior Painting for Vacant Housing Unit - Las Palmeras Type A-1 Unit (3 bedrooms)Provide labor, management, supervision, tools, material and equipment required to perform complete interior painting for vacant Housing unit Type A-1, located at Las Palmeras. The Contractor shall paint in accordance with UFGS 09 90 00 Paints and Coatings (08-2008). Paint shall be special anti mold paint and matching exiting colors. Unit measurement is provided in 1401000 Section J. Complete all work within 3 working days or as specified in the order.12EA$0.00
A705Complete Interior Painting for Vacant Housing Unit - Las Palmeras Type A-2 Unit (3 bedrooms)Provide labor, management, supervision, tools, material and equipment required to perform complete interior painting for vacant Housing Unit Type A-2, located at Las Palmeras. The Contractor shall paint in accordance with UFGS 09 90 00 Paints and Coatings (08-2008). Paint shall be special anti mold paint and matching exiting colors. Unit measurement is provided in 1401000 Section J. Complete all work within 3 working days or as specified in the order.12EA$0.00
A706Complete Interior Painting for Vacant Housing Unit - Las Palmeras Type B-1 Unit (4 bedrooms)Provide labor, management, supervision, tools, material and equipment required to perform complete interior painting for vacant Housing Unit Type B-1, located at Las Palmeras. The Contractor shall paint in accordance with UFGS 09 90 00 Paints and Coatings (08-2008). Paint shall be special anti mold paint and matching exiting colors. Unit measurement is provided in 1401000 Section J. Complete all work within 3 working days or as specified in the order.12EA$0.00
A707Complete Interior Painting for Vacant Housing Unit - Las Palmeras Type B-2 Unit (4 bedrooms)Provide labor, management, supervision, tools, material and equipment required to perform complete interior painting for vacant Housing Unit Type B-2, located at Las Palmeras. The Contractor shall paint in accordance with UFGS 09 90 00 Paints and Coatings (08-2008). Paint shall be special anti mold paint and matching exiting colors. Unit measurement is provided in 1401000 Section J. Complete all work within 3 working days or as specified in the order.12EA$0.00
A708Complete Interior Painting for Vacant Housing Unit - Las Palmeras Type D-1 Unit (3 bedrooms)Provide labor, management, supervision, tools, material and equipment required to perform complete interior painting for vacant Housing Unit Type D-1, located at Las Palmeras. The Contractor shall paint in accordance with UFGS 09 90 00 Paints and Coatings (08-2008). Paint shall be special anti mold paint and matching exiting colors. Unit measurement is provided in 1401000 Section J. Complete all work within 3 working days or as specified in the order.20EA$0.00
A709Complete Interior Painting for Vacant Housing Unit - Las Palmeras Type D-2 Unit (3 bedrooms)Provide labor, management, supervision, tools, material and equipment required to perform complete interior painting for vacant Housing Unit Type D-2, located at Las Palmeras. The Contractor shall paint in accordance with UFGS 09 90 00 Paints and Coatings (08-2008). Paint shall be special anti mold paint and matching exiting colors. Unit measurement is provided in 1401000 Section J. Complete all work within 3 working days or as specified in the order.50EA$0.00
A710Complete Interior Painting for Vacant Housing Unit - Las Palmeras Type E-2 Unit (2 bedrooms)Provide labor, management, supervision, tools, material and equipment required to perform complete interior painting for vacant Housing Unit Type E-2, located at Las Palmeras. The Contractor shall paint in accordance with UFGS 09 90 00 Paints and Coatings (08-2008). Paint shall be special anti mold paint and matching exiting colors. Unit measurement is provided in 1401000 Section J. Complete all work within 3 working days or as specified in the order.8EA$0.00
A711Complete Interior Painting for Vacant Housing Unit - Las Palmeras Type E-2 UnitProvide labor, management, supervision, tools, material and equipment required to perform complete interior painting for vacant Housing Unit Type E-2, located at Las Palmeras. The Contractor shall paint in accordance with UFGS 09 90 00 Paints and Coatings (08-2008). Paint shall be special anti mold paint and matching exiting colors. Unit measurement is provided in 1401000 Section J. Complete all work within 3 working days or as specified in the order.2EA$0.00
A712Complete Painting Interior for Vacant Units with No Furniture - Las Palmeras Housing Unit Type GProvide labor, management, supervision, tools, material and equipment required to perform complete interior painting for vacant Housing Unit Type G at Las Palmeras. The Contractor shall paint in accordance with UFGS 09 90 00 Paints and Coatings (08-2008). Paint shall be special anti mold paint and matching exiting colors. Unit measurement is provided in 1401000 Section J. Complete all work within 3 working days or as specified in the order.12EA$0.00
A713Complete Painting Interior for Vacant Units with No Furniture - Las Palmeras Housing Unit Type HProvide labor, management, supervision, tools, material and equipment required to perform complete interior painting for vacant Housing Unit Type H at Las Palmeras. The Contractor shall paint in accordance with UFGS 09 90 00 Paints and Coatings (08-2008). Paint shall be special anti mold paint and matching exiting colors. Unit measurement is provided in 1401000 Section J. Complete all work within 3 working days or as specified in the order.12EA$0.00
A714Complete Exterior Painting - Las Palmeras Vacant Housing Unit Type A-1, A-2, B-1, D-1, D-2, E-2, A-1 Extended, A-2 Extended, D-1 Extended and D-2 ExtendedProvide labor, management, supervision, tools, material and equipment required to perform complete exterior painting for Las Palmeras Unit Type A-1, A-2, B-1, D-1, D-2, E-2, A-1 Extended, A-2 Extended, D-1 Extended and D-2 Extended. Units are empty with no furniture. Complete all work within 5 working days or as specified in the order.50EA$0.00
A715Complete Exterior Painting - Las Palmeras Vacant Housing Unit Type B-2, F, G & HProvide labor, management, supervision, tools, material and equipment required to perform complete exterior painting for Las Palmeras Unit Type B-2, F, G & H, empty units with no furniture. Complete all work within 5 working days or as specified in the order.25EA$0.00
A716Provide and Replace Housing Unit Electrical Water HeatersProvide labor, management, supervision, tools, material and equipment required to provide and replace Housing Unit Electrical Water Heaters. Electrical water heaters included flexors shall be replaced by new electrical water heaters and new flexors. New units shall be of the same capacity and general characteristics as the existing. They shall be efficiency Class A, 240 volts. Complete all work within 3 working days or as specified in the order.200EA$0.00
A717Provide and Replace Main Door in Housing UnitProvide labor, management, supervision, tools, material and equipment required to provide and replace main door in Housing unit. Aluminum Doors shall conform to NTE, and shall be of the same types and existing finishes. Replacement shall include aluminum doors complete with necessary hardware, fastenings, clips, fins, anchors, glazing beads, glass parts and other appurtenances. Complete all work within 5 working days or as specified in the order.25EA$0.00
A718Provide and Replace Sliding Screen Door in Housing Unit (Back Patios Entrance)Provide labor, management, supervision, tools, material and equipment required to provide and replace sliding screen door in Housing unit at the back patios entrance. Doors shall conform to NTE, and shall be of the same types and existing finishes. Replacement shall include doors complete with necessary hardware, anchors, screening material and rollers and other appurtenances necessary for complete installation. Complete all work within 5 working days or as specified in the order.30EA$0.00
A719Provide and Replace Sliding Screen Window in Housing UnitProvide labor, management, supervision, tools, material and equipment required to provide and replace sliding screen window in Housing unit. Screen windows shall conform to NTE, and shall be of the same types and existing finishes. Replacement shall include screen windows complete with necessary hardware, anchors, screening material and other appurtenances necessary for complete installation. Complete all work within 5 working days or as specified in the order.15EA$0.00
A720Provide and Replace Laundry Room Door in Housing UnitProvide labor, management, supervision, tools, material and equipment required to provide and replace laundry room door in Housing unit. Doors shall conform to NTE, and shall be of the same types and existing finishes. Replacement shall include doors complete with necessary hardware, fastenings, clips, fins, anchors, glazing beads, and other appurtenances necessary for complete installation. Complete all work within 5 working days or as specified in the order.10EA$0.00
A721Provide and Replace Closet Doors in Housing UnitProvide labor, management, supervision, tools, material and equipment required to provide and replace closet door in Housing unit. Replacement shall be performed in accordance with NTE -PPM. Work shall include replacement of the door and all hardware, of the same type as existing, and all required painting. Doors and surfaces damaged during the work performance shall be painted and repaired matching original condition. Complete all work within 5 working days or as specified in the order.70EA$0.00
A722Provide and Replace Interior Wooden Doors in Housing UnitProvide labor, management, supervision, tools, material and equipment required to provide and replace interior wooden door in Housing unit. Replacement shall be performed in accordance with NTE -PPM. Work shall include replacement of the door and all hardware, of the same type as existing, and all required painting. Doors and surfaces damaged during the work performance shall be painted and repaired matching original conditions. Complete all work within 5 working days or as specified in the order.75EA$0.00
A723Provide and Replace Housing Actual Window TypeProvide labor, management, supervision, tools, material and equipment required to provide and replace window in Housing unit. Aluminum Windows shall conform to NTE and shall be of the same types and of the same existing finishes. Replacement shall include aluminum windows/doors complete with necessary hardware, fastenings, clips, fins, anchors, glazing beads, roll up shutter (only windows) and other appurtenances necessary for complete installation and proper operation. Complete all work within 5 working days or as specified in the order.24EA$0.00
A724Provide and Replace Patio Gates in Housing UnitProvide labor, management, supervision, tools, material and equipment required to provide and replace patio gate in Housing unit. Patio gates shall conform to NTE, and shall be of the same types and of the same existing finishes. Replacement shall include doors complete with necessary hardware, fastenings, clips, fins, anchors, glazing beads, and other appurtenances necessary for complete installation. Complete all work within 5 working days or as specified in the order.30EA$0.00
A725Replace Housing Actual Rolling Persianas TypeReplace rolling persianas by new matching existing including mechanisms and cords. Complete all work within 5 working days or as specified in the order.30EA$0.00
A726Replace Housing Actual Rolling Screen TypesAluminum Windows Screens shall be made to exact window measurements. Insect screening material and system shall be equal or approved greater quality. Complete all work within 5 working days or as specified in the order.30EA$0.00
A727Provide and Replace Kitchen Countertop in Housing UnitProvide labor, management, supervision, tools, material and equipment to replace a kitchen countertop to include removal of existing top, removal and reinstallation of sink, and installation of new granite top as specified, sealing/grouting of joints per manufacturer's recommend actions, 10 centimeter back splash, and drip edge at the ordered location. Type, color and pattern shall match existing. Complete all work within 3 working days or as specified in the order.15EA$0.00
A728Replace Housing Mixing Valves (Faucets)Provide labor, management, supervision, tools, material and equipment required to perform replacement of faucet mixing valves. Mixing valves shall be replaced as per existing with Spanish made replacements. Mixing valves shall be “RS” brand or equal approved. Installation shall include the complete mixing valve with all connectors and other appurtenances necessary for complete installation. Complete all work within 3 working days or as specified in the order.12EA$0.00
A729Replace Housing Shower BasinProvide labor, management, supervision, tools, material and equipment required to perform replacement of shower basin. New porcelain vitrified shower basin shall be installed on a cement mortar bed. Drain line shall be connected to the drainage system. Glazed tiles shall be installed around new basin and on shower stall walls. The top of the installed basin shall not exceed 15 centimeters. Shower basin shall be “Roca” brand or equal approved. installation shall include shower basin complete with all connectors and other appurtenances necessary for complete installation and proper operation. Installation shall be performed in accordance with the U.S. National Standard Plumbing Code. Complete all work within 3 working days or as specified in the order.20EA$0.00
A730Replace Housing BathtubProvide labor, management, supervision, tools, material and equipment required to perform replacement of bathtub. The Contractor shall: 1. Remove existing wash hand-basin to be reinstalled when this work has been finished; 2. Remove existing soap dish and water mixer, located beside existing bathtub; 3. Remove existing bathtub (1.70 m x 0.70 m) and demolish small brick wall (1.73 x 0.40 lm) situated under bathtub and remove the debris from the jobsite; 4. Build two small walls (approx.0.70 m x 0.40 m) on bathroom walls, as needed. These walls shall support new bathtub; 5. Install new bathtub "Continental" model (170 x 70 cm) by ROCA; 6. Repair damaged walls with wall ceramic tiles (approx. 1.75 sqm) matching the existing ones around the new bathtub; 7. Install the existing water mixer and soap dish; 8. Repair damaged walls (approx. 0.40sqm) due to the installation of water mixer hose shower and soap dish, as needed; 9. Install existing wash hand basin; 10. Clean up job site. Complete all work within 5 working days or as specified in the order.30EA$0.00
A731Replace Housing Kitchen SinksProvide labor, management, supervision, tools, material and equipment required to remove existing and replace with new kitchen sink. Kitchen sink shall conform to ASME/ANSI A112.19.3M, 20-gage stainless steel with integral mounting rim, two compartments with ledge back and undersides coated with sound dampening material. Provide top-mounted \ASME A112.18.1M\ copper alloy faucets 1.5 gal/min, swing spout with aerator, and stainless steel drain outlets with cup strainers. Kitchen sink shall be “TEKA” brand Model E60-2C or equal approved. Replacement shall include kitchen sink complete with all connectors and other appurtenances necessary for complete installation and proper operation. Installation shall be performed in accordance with the U.S. National Standard Plumbing Code. Sinks shall be with garbage disposal mounting opening matching existing. Complete all work within 3 working days or as specified in the order.6EA$0.00
A732Replace Pleated Retractable Side Pull Screen DoorProvide labor, management, supervision, tools, material and equipment required to remove existing and replace with new pleated retractable side pull screen door. The works shall consist in the installation of a pleated retractable side pull screen door at kitchen/laundry door. All frame hardware (cassette, tracks, handles, etc) shall be white baked enamel aluminum and all mounting hardware (bolts, screws, etc) shall be stainless steel. Mesh shall be fiberglass made. Complete all work within 5 working days or as specified in the order.50EA$0.00
A733Removal of Vinyl Floor Tiles In Empty Units with No FurnitureProvide labor, management, supervision, tools, material and equipment required to remove vinyl floor tiles. The Contractor shall remove the existing floor covering as required by the Government. The Government will annotate on the order when the vinyl is to be retained by the Government or to be disposed by the Contractor off base. If the Government elects not to install new floor, the Contractor shall leave the floor clean and free of debris after removing existing vinyl floor. Complete all work within 3 working days or as specified in the order.5,100SM$0.00
A734Provide and Install New Continuous and Level Vinyl Tiled FloorProvide labor, management, supervision, tools, material and equipment required to remove old and install newly provided vinyl tiled floor. The Contractor shall provide and install new continuous and level vinyl tiled floor along the whole designated area of the house unit including:
- Surface preparation of existing ceramic tiled flooring for the installation of new vinyl tiles flooring, including the required leveling mortar and primer application; - New 48 x 7.25 inches vinyl tiles, designed for mentioned type of installation, with an approx. overall thickness of 3.5 mm, provided with rubber underlayment and adequate for wet locations and very intensive use, matching the recently installed flooring in Housing Unit #1227 or similar approved by customer; - The replacement of existing ceramic baseboards and floor transition strips, with new adequate ones for the new vinyl flooring. New baseboards with approx. dimensions of 14 x 14 mm in wet areas and 15 x 80 mm in the other ones, matching those installed in Housing unit or similar approved by customer; - The required modifications on all affected interior doors that need to be adapted to new flooring. Complete all work within 5 working days or as specified in the order.2,500SM$0.00
A735Removal of Ceramic Floor Tiles in Vacant Housing Units with No FurnitureProvide labor, management, supervision, tools, material and equipment required to remove ceramic floor tiles. The Contractor shall remove all existing ceramic floor tiles, base tiles, and chip off old cement mortar when so requested from the location marked on the sketch and/or drawing provided. Complete all work within 3 working days or as specified in the order.2,500SM$0.00
A736Installation of Ceramic Floor Tiles in Vacant Housing Units with No FurnitureProvide labor, management, supervision, tools, material and equipment required to provide and install new ceramic floor tiles. Install in accordance with UFGS 09 30 00 Ceramic Tile, Quarry Tile and Paver Tile. Material shall match existing. Complete all work within 3 working days or as specified in the order.2,500SM$0.00
A737Replacement of Breda Tiles Regular Tile (33x33 cm) - Exterior Housing SurfacesProvide labor, management, supervision, tools, material and equipment required to provide and install new Breda tiles size 33x33 cm. Install in accordance with UFGS 09 30 00 Ceramic Tile, Quarry Tile and Paver Tile. Material shall match existing. Work shall include all different existing installation layouts. Complete all work within 3 working days or as specified in the order.2,500SM$0.00
A738Installation of Cenefa Tile - Exterior Housing SurfacesProvide labor, management, supervision, tools, material and equipment required to install new cenefa tiles. Install in accordance with UFGS 09 30 00 Ceramic Tile, Quarry Tile and Paver Tile. Material shall match existing. Complete all work within 3 working days or as specified in the order.
150LM$0.00
A739Exterior Housing Surfaces: Step TileProvide labor, management, supervision, tools, material and equipment required to install new step tile, in exterior Housing surfaces. Install in accordance with UFGS 09 30 00 Ceramic Tile, Quarry Tile and Paver Tile. Material shall match existing. Complete all work within 3 working days or as specified in the order.150LM$0.00
A740Exterior Housing Surfaces: BaseboardsProvide labor, management, supervision, tools, material and equipment required to install new baseboard, in exterior Housing surfaces. Install in accordance with UFGS 09 30 00 Ceramic Tile, Quarry Tile and Paver Tile. Material shall match existing. Complete all work within 3 working days or as specified in the order.150LM$0.00
A741Installation of Window Sill Tile - Exterior Housing SurfacesProvide labor, management, supervision, tools, material and equipment required to install new window sill tiles, in exterior Housing unit surfaces. Install in accordance with UFGS 09 30 00 Ceramic Tile, Quarry Tile and Paver Tile. Material shall match existing in any format and quality. Complete all work within 3 working days or as specified in the order.150LM$0.00

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .