J-0200000-13_ELINs_(Amendment_0004).xlsx
XLSX spreadsheet 570 KB Posted
- Attached to
- BASE OPERATIONS SUPPORT (BOS) SERVICES AT U. S. NAVAL STATION ROTA, SPAIN Federal contract opportunity
- Solicitation number
- N62470-19-R-2001
About this file
This document is an attachment to a federal solicitation for base operations support services at Naval Station Rota, Spain. The solicitation requires the contractor to provide recurring and non-recurring facility services including facility investment, custodial services, pest control, integrated solid waste management, and grounds maintenance. Recurring work is priced by exhibit line item numbers for services such as preventative maintenance, inspections, and other recurring programs. Non-recurring work is priced as unit priced tasks including change of occupancy maintenance, interior and exterior painting, carpet installation, equipment replacement, and crane services with response times. The solicitation involves the Department of the Navy, Naval Facilities Engineering Command and has a performance period of one base period and four option periods.
J-0200000-13 ELINs (Amendment 0004)
View the file
Other files for this federal contract opportunity
Show all 50
BASE OPERATIONS SUPPORT (BOS) SERVICES AT U. S. NAVAL STATION ROTA, SPAIN has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Base Period - Recurring
| ATTACHMENT J-0200000-13 |
| EXHIBIT LINE ITEM NUMBERS |
| SOLICITATION/CONTRACT # N62470-19-R-2001 |
| EXHIBIT A - BASE PERIOD - RECURRING WORK |
| CLIN 0001 |
| Recurring Work Price - Base Period | |||||
| PROVIDE PRICES TO PERFORM FACILITY SERVICES RECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3 | |||||
| ELINs A001 THROUGH A222 | |||||
| ELIN/ SubELIN | Description | Quantity | Unit of Issue | Unit Price (USD) | Total (USD) |
| CNRE / REGION Recurring Work | ||||
| A001 | Specification 1501000 Facility Management (FP) | |||
| A001AA | Infrastructure Condition Assessment Program (ICAP) (Spec Item 3.1) | 12 | MO | $0.00 |
| A002 | Specification 1502000 Facility Investment (ST) | |||
| Service Orders, Spec Item 3.1 | ||||
| A002AA | Emergency Service Orders (Spec Item 3.1.1) | 12 | MO | $0.00 |
| A002AB | Urgent Service Orders (Spec Item 3.1.2) | 12 | MO | $0.00 |
| A002AC | Routine Service Orders (Spec Item 3.1.3) | 12 | MO | $0.00 |
| Preventive Maintenance Program (PM), Spec Item 3.2 | ||||
| A002AD | Boilers Systems (Spec Item 3.2.1) | 12 | MO | $0.00 |
| A002AE | Vertical Transportation Equipment (VTE) (Spec Item 3.2.2) | 12 | MO | $0.00 |
| A002AF | Exhaust Hoods and Fire Suppression (ANSUL) Systems (Spec Item 3.2.3) | 12 | MO | $0.00 |
| A002AG | Cooling Tower and Evaporative Condense Systems (Spec Item 3.2.4) | 12 | MO | $0.00 |
| A002AH | Uninterrupted Power Systems (UPS) (Spec Item 3.2.5 ) | 12 | MO | $0.00 |
| A002AJ | Propane Tanks Systems (Spec Item 3.2.6 ) | 12 | MO | $0.00 |
| A002AK | Vehicle Traffic Lights and Control Devices (Spec Item 3.2.7) | 12 | MO | $0.00 |
| A002AL | Fuel and POL Systems (Spec Item 3.2.8) | 12 | MO | $0.00 |
| A002AM | Grease Traps and Grease Tank Reservoir (Spec Item 3.2.9 ) | 12 | MO | $0.00 |
| A002AN | Oily Waste and Sewage Collection Holding Tanks (CHT) (Spec Item 3.2.11) | 12 | MO | $0.00 |
| A002AP | Swimming Pool (Spec Item 3.2.13) | 12 | MO | $0.00 |
| A002AQ | Irrigation System (Spec Item 3.2.14) | 12 | MO | $0.00 |
| A002AR | Cathodic Protection Systems (Spec Item 3.2.17) | 12 | MO | $0.00 |
| Inspection, Testing, and Certification Program, Spec Item 3.4 | ||||
| A002AS | Boilers Systems (Spec Item 3.4.1) | 12 | MO | $0.00 |
| A002AT | Boiler Air Emission Testing (Spec Item 3.4.2) | 12 | MO | $0.00 |
| A002AU | Vertical Transportation Equipment (VTE) Certification Support (Spec Item 3.4.3 ) | 12 | MO | $0.00 |
| Other Recurring Services Program, Spec Item 3.5 | ||||
| A002AV | Locksmith Services (Spec Item 3.5.1) | 12 | MO | $0.00 |
| A003 | Specification 1503010 Custodial (FX), Spec Item 3 | |||
| A003AA | Scheduled Custodial Services (Spec Item 3.1) | 12 | MO | $0.00 |
| A003AB | Unscheduled Custodial Services (Spec Item 3.4) | 12 | MO | $0.00 |
| A004 | Specification 1503020 Pest Control (FX), Spec Item 3 | |||
| A004AA | Scheduled Pest Control Services (Spec Item 3.1) | 12 | MO | $0.00 |
| A004AB | Unscheduled Pest Control Services (Spec Item 3.2) | 12 | MO | $0.00 |
| A005 | Specification 1503030 Integrated Solid Waste Management (ISWM) (FX), Spec Item 3 | |||
| A005AA | Solid Waste Collection and Disposal (Spec Items 3.1, 3.2, 3.3, 3.4, 3.5, 3.6, 3.7, 3.8 and 3.9) | 12 | MO | $0.00 |
| A005AB | Recycling Collection and Processing Services (19%) (Spec Item 3.11) | 12 | MO | $0.00 |
| A006 | Specification 1503050 Grounds Maintenance & Landscaping, Spec Item 3 | |||
| A006AA | Improved Grounds - Lawns (Spec Item 3.1) | 12 | MO | $0.00 |
| A006AB | Improved Grounds - Fields (Spec Item 3.1) | 12 | MO | $0.00 |
| A006AC | Operational Areas (Spec Item 3.2.) | 12 | MO | $0.00 |
| A006AD | Debris Removal (Spec Item 3.3) | 12 | MO | $0.00 |
| A006AE | Unscheduled Services - Grounds Maintenance Service Orders (Spec Item 3.5) | 12 | MO | $0.00 |
| A007-A017 | Reserved | |||
| CNRE / REGION Subtotal: | $0.00 |
| Bureau of Medicine and Surgery (BUMED) Recurring Work | ||||
| A018 | Specification 1502000 Facility Investment - BUMED (ST) | |||
| Service Orders, Spec Item 3.1 | ||||
| A018AA | Emergency Service Orders (Spec Item 3.1.1) | 12 | MO | $0.00 |
| A018AB | Emergency Service Orders (Category 1) (Spec Item 3.1.1) | 12 | MO | $0.00 |
| A018AC | Urgent Service Orders (Spec Item 3.1.2) | 12 | MO | $0.00 |
| A018AD | Routine Service Orders (Spec Item 3.1.3) | 12 | MO | $0.00 |
| Integrated Maintenance Program (IMP), Spec Item 3.2 | ||||
| A018AE | HVAC and Refrigeration Systems (Spec Item 3.2.1) | 12 | MO | $0.00 |
| A018AF | HVAC Seasonal Start-Up and Shutdown (Spec Item 3.2.1.1) | 12 | MO | $0.00 |
| A018AG | HVAC Water Testing and Treatment (Spec Item 3.2.1.2) | 12 | MO | $0.00 |
| A018AH | HVAC Direct Digital Control (DDC) Systems (Spec Item 3.2.1.3) | 12 | MO | $0.00 |
| A018AJ | Boilers and Unfired Pressure Vessels (UPVs) (Spec Item 3.2.2) | 12 | MO | $0.00 |
| A018AK | Boiler Seasonal Start-Up and Shutdown (Spec Item 3.2.2.1) | 12 | MO | $0.00 |
| A018AL | Boiler Water Testing and Treatment Services (Spec Item 3.2.2.2) | 12 | MO | $0.00 |
| A018AM | Boiler Water Softener System (Spec Item 3.2.2.3) | 12 | MO | $0.00 |
| A018AN | Domestic Water Systems (Spec Item 3.2.3) | 12 | MO | $0.00 |
| A018AP | Auxiliary Generator and Back-Up Power Systems (Spec Item 3.2.4) | 12 | MO | $0.00 |
| A018AQ | Uninterrupted Power Systems (UPS) (Spec Item 3.2.5) | 12 | MO | $0.00 |
| A018AR | Vertical Transportation Equipment (VTE) (Spec Item 3.2.6) | 12 | MO | $0.00 |
| A018AS | Overhead Doors (Spec Item 3.2.7) | 12 | MO | $0.00 |
| A018AT | Interior Electrical Systems (Spec Item 3.2.8) | 12 | MO | $0.00 |
| A018AU | Medical Gas Systems (Spec Item 3.2.9) | 12 | MO | $0.00 |
| A018AV | Medical Air Systems (Spec Item 3.2.210) | 12 | MO | $0.00 |
| A018AW | Medical Vacuum Systems (Spec Item 3.2.11) | 12 | MO | $0.00 |
| A018AX | Fire Protection Systems (Spec Item 3.2.12.1) | 12 | MO | $0.00 |
| A018AY | Fire Rated Doors Systems (Spec Item 3.2.12.2) | 12 | MO | $0.00 |
| A018AZ | Fire Rated Walls Systems (Spec Item 3.2.12.3) | 12 | MO | $0.00 |
| A018BA | Fire / Smoke Damper Systems (Spec Item 3.2.12.4) | 12 | MO | $0.00 |
| A018BB | Emergency and Exit Lighting Systems (Spec Item 3.2.12.5) | 12 | MO | $0.00 |
| A018BC | Interior and Exterior Lighting Systems (Spec Item 3.2.13) | 12 | MO | $0.00 |
| A018BD | Public Address (PA) System (Spec Item 3.2.14) | 12 | MO | $0.00 |
| A018BE | Nurse Call and Code Blue Systems (Spec Item 3.2.15) | 12 | MO | $0.00 |
| A018BF | Infant Security System (Spec Item 3.2.16) | 12 | MO | $0.00 |
| A018BG | Submersible Sump Pump And Sewage Ejector Pump Systems (Spec Item 3.2.17) | 12 | MO | $0.00 |
| A018BH | Electric Water Coolers (Spec Item 3.2.18) | 12 | MO | $0.00 |
| A018BJ | Irrigation System (Spec Item 3.2.19) | 12 | MO | $0.00 |
| A018BK | Differential Pressure Monitor System (Spec Item 3.2.20) | 12 | MO | $0.00 |
| A018BL | Fuel and POL Systems (Spec Item 3.2.21) | 12 | MO | $0.00 |
| Inspection, Testing, and Certification Program, Spec Item 3.3 | ||||
| A018BM | Boilers and UPVs Certification Support (Spec Item 3.3.1) | 12 | MO | $0.00 |
| A018BN | Boiler Air Emission Testing (Spec Item 3.3.2) | 12 | MO | $0.00 |
| A018BP | Vertical Transportation Equipment (VTE) Certification Support (Spec Item 3.3.3) | 12 | MO | $0.00 |
| A018BQ | Interior Electrical Systems Annual Inspection (Spec Item 3.3.4) | 12 | MO | $0.00 |
| Other Recurring Services Program, Spec Item 3.4 | ||||
| A018BR | Lightning Protection Systems (Spec Item 3.4.1) | 12 | MO | $0.00 |
| A018BS | Under Ground (UG) Fuel Storage Tanks (Spec Item 3.4.2) | 12 | MO | $0.00 |
| A018BT | Ceiling Tile Inspection and Replacement Program (Spec Item 3.4.3) | 12 | MO | $0.00 |
| A018BU | Gutter Maintenance (Spec Item 3.4.4) | 12 | MO | $0.00 |
| A018BV | Doors and Windows Annual Inspection and Lubrication (Spec Item 3.4.5) | 12 | MO | $0.00 |
| A018BW | Plaster Cast Trap (Spec Item 3.4.6) | 12 | MO | $0.00 |
| A018BX | Plumbing Systems and Fixtures Leak Control (Spec Item 3.4.7) | 12 | MO | $0.00 |
| A019 | Specification 1503010 Custodial (FX), Spec Item 3 | |||
| A019AA | Scheduled Custodial Services (Spec Item 3.1) | 12 | MO | $0.00 |
| A019AB | MTF Other/Special Cleaning Services (BUMED) (Spec Item 3.3) | 12 | MO | $0.00 |
| A020 | Specification 1503020 Pest Control (FX), Spec Item 3 | |||
| A020AA | Scheduled Pest Control Services (Spec Item 3.1) | 12 | MO | $0.00 |
| A020AB | Unscheduled Pest Control Services (Spec Item 3.2) | 12 | MO | $0.00 |
| A021 | Specification 1503030 Integrated Solid Waste Management (ISWM) (FX), Spec Item 3 | |||
| A021AA | Solid Waste Collection and Disposal (Spec Items 3.1, 3.2, 3.3, 3.4, 3.5) | 12 | MO | $0.00 |
| A021AB | Recycling Collection and Processing Services (2.5%) (Spec Item 3.11) | 12 | MO | $0.00 |
| A022 | Specification 1503050 Grounds Maintenance & Landscaping, Spec Item 3 | |||
| A022AA | Improved Grounds - Lawns (Spec Item 3.1) | 12 | MO | $0.00 |
| A022AB | Improved Grounds - Fields (Spec Item 3.1) | 12 | MO | $0.00 |
| A022AC | Debris Removal (Spec Item 3.3) | 12 | MO | $0.00 |
| A022AD | Storm Drainage Systems (Spec Item 3.4) | 12 | MO | $0.00 |
| A023 | Specification 1800000 Environmental | |||
| A023AA | Collection and Removal of Medical Waste (Spec Item 3.1) | 12 | MO | $0.00 |
| A024-A031 | Reserved | |||
| BUMED Subtotal: | $0.00 |
| Family Housing Recurring Work | ||||
| A032 | Specification 1401000 Family Housing (FH) | |||
| FH Service Orders, Spec Item 3.1.1 | ||||
| A032AA | Emergency Service Orders (Spec Item 3.1.1.1) | 12 | MO | $0.00 |
| A032AB | Routine Service Orders (Spec Item 3.1.1.2) | 12 | MO | $0.00 |
| Project Work Orders, Spec Item 3.1.2 | ||||
| A032AC | Project Work Order Level 1 (Spec Item 3.1.2.1) | 12 | MO | $0.00 |
| A032AD | Project Work Order Level 2 (Spec Item 3.1.2.2) | 12 | MO | $0.00 |
| Preventive Maintenance Program, Spec Item 3.1.3 | ||||
| A032AE | HVAC and Refrigeration System (Spec Item 3.1.3.1) | 12 | MO | $0.00 |
| A032AF | Electrical Water Heater (Spec Item 3.1.3.2) | 12 | MO | $0.00 |
| A032AG | Electrical Panels (Spec Item 3.1.3.3) | 12 | MO | $0.00 |
| A032AH | Dehumidifiers (Spec Item 3.1.3.4) | 12 | MO | $0.00 |
| A032AJ | Exterior Lighting Systems (Spec Item 3.1.3.5) | 12 | MO | $0.00 |
| A032AK | Fire Protection System (Spec Item 3.1.3.6) | 12 | MO | $0.00 |
| Other Recurring Services, Spec Item 3.1.4 | ||||
| A032AL | Housing Unit Awning (Spec Item 3.1.4.1) | 12 | MO | $0.00 |
| A032AM | Photovoltaic Solar Systems (Spec Item 3.1.4.2) | 12 | MO | $0.00 |
| A032AN | Irrigation System (Spec Item 3.1.4.3) | 12 | MO | $0.00 |
| A032AP | Scheduled Roof Cleaning (Spec Item 3.1.4.4) | 12 | MO | $0.00 |
| A032AQ | Cable Television System (Spec Item 3.1.4.5) | 12 | MO | $0.00 |
| A032AR | Ornamental Fountains (Spec Item 3.1.4.6) | 12 | MO | $0.00 |
| A032AS | Rain Water Drainage System (Spec Item 3.1.4.7) | 12 | MO | $0.00 |
| A032AT | Playground Inspections, Maintenanace, and Cleaning Services (Spec Item 3.1.4.8) | 12 | MO | $0.00 |
| Change Of Occupancy Maintenance (CHOC) Services, Spec Item 3.1.5 | ||||
| A032AU | CHOC Services for Units A-1, A-2, B-1, D-1, D-2, E-2, A-1 Extended, A-2 Extended, D-1 Extended and D-2 Extended Units | 12 | MO | $0.00 |
| A032AV | CHOC Services for House Units F, G and H | 12 | MO | $0.00 |
| A032AW | Exterior Paint Services Units A-1, A-2, B-1, D-1, D-2, E-2, A-1 Extended, A-2 Extended, D-1 Extended and D-2 Extended Units | 12 | MO | $0.00 |
| A032AX | Exterior Paint Services Units F, G and H | 12 | MO | $0.00 |
| A033 | Specification 1503010 Custodial (FX), Spec Item 3 | |||
| A033AA | Scheduled Custodial Services (Spec Item 3.1) | 12 | MO | $0.00 |
| A034 | Specification 1503020 Pest Control (FX), Spec Item 3 | |||
| A034AA | Scheduled Pest Control Services (Spec Item 3.1) | 12 | MO | $0.00 |
| A034AB | Unscheduled Pest Control Services (Spec Item 3.2) | 12 | MO | $0.00 |
| A035 | Specification 1503030 Integrated Solid Waste Management (ISWM) (FX), Spec Item 3 | |||
| A035AA | Solid Waste Collection and Disposal Las Palmeras Housing (Spec Items 3.1, 3.2, 3.3, 3.4) | 12 | MO | $0.00 |
| A035AB | Solid Waste Collection and Disposal (Spec Items 3.1, 3.2, 3.3, 3.4, 3.5) | 12 | MO | $0.00 |
| A035AC | Recycling Collection and Processing Services (36.7%) (Spec Item 3.11) | 12 | MO | $0.00 |
| A036 | Specification 1503050 Grounds Maintenance & Landscaping | |||
| A036AA | Improved Grounds - Lawns (Spec Item 3.1) | 12 | MO | $0.00 |
| A036AB | Improved Grounds - Fields (Spec Item 3.1) | 12 | MO | $0.00 |
| A036AC | Debris Removal (Spec Item 3.3) | 12 | MO | $0.00 |
| A036AD | Unscheduled Services - Grounds Maintenance Service Orders (Spec Item 3.6) | 12 | MO | $0.00 |
| EA37-A043 | Reserved | |||
| Family Housing Subtotal: | $0.00 |
| Air Operations Recurring Work | ||||
| A044 | Specification 0501030 Aviation Fuel Support (AO) | |||
| A044AA | Cryogenic Operations and Maintenance (Spec Item 3.1) | 12 | MO | $0.00 |
| A045-A049 | Reserved | |||
| Air Operations Subtotal: | $0.00 |
| USAF 725th Air Mobility Squadron (AMS) Recurring Work | ||||
| A050 | Specification 1502000 Facility Investment (ST) | |||
| Service Orders, Spec Item 3.1 | ||||
| A050AA | Urgent Service Orders (Spec Item 3.1.2) | 12 | MO | $0.00 |
| Preventive Maintenance Program (PM), Spec Item 3.2 | ||||
| A050AB | Fuel & POL Systems (Spec Item 3.2.8) | 12 | MO | $0.00 |
| Other Recurring Services Program, Spec Item 3.4 | ||||
| A050AC | Locksmith Services (Spec Item 3.4.1) | 12 | MO | $0.00 |
| A051 | Specification 1503010 Custodial (FX) | |||
| A051AA | Scheduled Custodial Services (Spec Item 3.1) | 12 | MO | $0.00 |
| A052 | Specification 1503020 Pest Control (FX) | |||
| A052AA | Scheduled Pest Control Services (Spec Item 3.1) | 12 | MO | $0.00 |
| A053 | Specification 1503030 Integrated Solid Waste Management (ISWM) (FX) | |||
| A053AA | Solid Waste Collection and Disposal (Spec Items 3.1, 3.2, 3.3, 3.4, 3.5) | 12 | MO | $0.00 |
| A053AB | Recycling Collection and Processing Services (1.5%) (Spec Item 3.11) | 12 | MO | $0.00 |
| A054 | Specification 1503050 Grounds Maintenance & Landscaping | |||
| A054AA | Improved Grounds - Lawns (Spec Item 3.1) | 12 | MO | $0.00 |
| A054AB | Improved Grounds - Fields (Spec Item 3.1) | 12 | MO | $0.00 |
| A054AC | Debris Removal (Spec Item 3.3) | 12 | MO | $0.00 |
| A055-A063 | Reserved | |||
| USAF 725th AMS Subtotal: | $0.00 |
| USAF 521st Air Mobility Operations Group (AMOG) Recurring Work | ||||
| A064 | Specification 1503010 Custodial (FX), Spec Item 3 | |||
| A064AA | Scheduled Custodial Services (Spec Item 3.1) | 12 | MO | $0.00 |
| A065 | Specification 1503030 Integrated Solid Waste Management (ISWM) (FX) | |||
| A065AA | Solid Waste Collection and Disposal (Spec Items 3.1, 3.2, 3.3, 3.4, 3.5) | 12 | MO | $0.00 |
| A066 | Specification 1503050 Grounds Maintenance & Landscaping | |||
| A066AA | Improved Grounds - Lawns (Spec Item 3.1) | 12 | MO | $0.00 |
| A066AB | Debris Removal (Spec Item 3.3) | 12 | MO | $0.00 |
| A067-A073 | Reserved | |||
| USAF 521st AMOG Subtotal: | $0.00 |
| DeCA Recurring Work | ||||
| A074 | Specification 1502000 Facility Investment (ST) | |||
| Service Orders, Spec Item 3.1 | ||||
| A074AA | Emergency Service Orders (Spec Item 3.1.1) | 12 | MO | $0.00 |
| A075 | Specification 1503020 Pest Control (FX), Spec Item 3 | |||
| A075AA | Scheduled Services (Spec Items 3.1, 3.2) | 12 | MO | $0.00 |
| A076 | Specification 1503030 Integrated Solid Waste Management (ISWM) (FX), Spec Item 3 | |||
| A076AA | Solid Waste Collection and Disposal (Spec Items 3.1, 3.2, 3.3, 3.4, 3.5) | 12 | MO | $0.00 |
| A077-A083 | Reserved | |||
| DeCA Subtotal: | $0.00 |
| Galley Recurring Work | ||||
| A084 | Specification 1502000 Facility Investment (ST) | |||
| Service Orders, Spec Item 3.1 | ||||
| A084AA | Emergency Service Orders (Spec Item 3.1.1) | 12 | MO | $0.00 |
| A084AB | Routine Service Orders (Spec Item 3.1.3) | 12 | MO | $0.00 |
| Preventive Maintenance Program (PM), Spec Item 3.2 | ||||
| A084AC | Boiler Systems (Spec Item 3.2.1) | 12 | MO | $0.00 |
| A084AD | Grease Traps (Spec Item 3.2.9) | 12 | MO | $0.00 |
| A084AE | Food Service Equipment (Spec Item 3.2.15) | 12 | MO | $0.00 |
| A085 | Specification 1503050 Grounds Maintenance & Landscaping | |||
| A085AA | Improved Grounds - Lawns (Spec Item 3.1) | 12 | MO | $0.00 |
| A085AB | Debris Removal (Spec Item 3.3) | 12 | MO | $0.00 |
| A086-A089 | Reserved | |||
| Galley Subtotal: | $0.00 |
| NAVFAC NWCF Recurring Work | ||||
| A090 | Specification 1503030 Integrated Solid Waste Management (ISWM) (FX), Spec Item 3 | |||
| A090AA | Solid Waste Collection and Disposal (Spec Items 3.1, 3.2, 3.3, 3.4, 3.5) | 12 | MO | $0.00 |
| A091 | Specification 1503050 Grounds Maintenance & Landscaping | |||
| A091AA | Improved Grounds - Fields (Spec Item 3.1) | 12 | MO | $0.00 |
| A091AB | Debris Removal (Spec Item 3.3) | 12 | MO | $0.00 |
| A092-A099 | Reserved | |||
| NAVFAC NWCF Subtotal: | $0.00 |
| Utilities (UT) Recurring Work | ||||
| A100 | Specification 1502000 Facility Investment (Sustainment) (ST) | |||
| Service Orders, Spec Item 3.1 | ||||
| A100AA | Emergency Service Orders (Spec Item 3.1.1) | 12 | MO | $0.00 |
| Preventive Maintenance Program (PM), Spec Item 3.2 | ||||
| A100AB | Lift Stations and Sewage Meters (Spec Item 3.2.10) | 12 | MO | $0.00 |
| A100AC | Elevated Water Tank and Cathodic Protection (Spec Item 3.2.12) | 12 | MO | $0.00 |
| Inspection, Testing, and Certification Program, Spec Item 3.3 | ||||
| A100AD | Horizontal Lifeline Systems (Spec Item 3.3.4) | 12 | MO | $0.00 |
| A101 | Specification 1503020 Pest Control (FX), Spec Item 3 | |||
| A101AA | Scheduled Services (Spec Items 3.1) | 12 | MO | $0.00 |
| A102 | Specification 1503030 Integrated Solid Waste Management (ISWM) (FX), Spec Item 3 | |||
| A102AA | Solid Waste Collection and Disposal (Spec Items 3.1, 3.2, 3.3, 3.4, 3.5) | 12 | MO | $0.00 |
| A103-A105 | Reserved | |||
| Utilities (UT) Subtotal: | $0.00 |
| NCTAMS LANT Recurring Work | ||||
| A106 | Specification 1502000 Facility Investment (ST) | |||
| Service Orders, Spec Item 3.1 | ||||
| A106AA | Urgent Service Requests (Spec Item 3.1.2) | 12 | MO | $0.00 |
| Preventive Maintenance Program (PM), Spec Item 3.2 | ||||
| A106AB | Irrigation System (Spec Item 3.5.12) | 12 | MO | $0.00 |
| A107 | Specification 1503010 Custodial (FX), Spec Item 3 | |||
| A107AA | Scheduled Custodial Services (Spec Item 3.1) | 12 | MO | $0.00 |
| A108 | Specification 1503050 Grounds Maintenance & Landscaping | |||
| A108AA | Improved Grounds - Fields (Spec Item 3.1) | 12 | MO | $0.00 |
| A108AB | Debris Removal (Spec Item 3.3) | 12 | MO | $0.00 |
| A109-A111 | Reserved | |||
| NCTAMS LANT Subtotal: | $0.00 |
| Transportation (former BSVE) Recurring Work | ||||
| A112 | Specification 1503030 Integrated Solid Waste Management | |||
| A112AA | Solid Waste Collection and Disposal (Spec Items 3.1, 3.2, 3.3, 3.4, 3.5) | 12 | MO | $0.00 |
| A112AB | Used Tire Disposal (Spec Item 3.9) | 12 | MO | $0.00 |
| A113-A117 | Reserved | |||
| Transportation Subtotal: | $0.00 |
| Fuel Disposition Services (former DRMO) Recurring Work | ||||
| A118 | Specification 1503010 Custodial | |||
| A118AA | Scheduled Custodial Services (Spec Item 3.1) | 12 | MO | $0.00 |
| A119 | Specification 1503030 Integrated Solid Waste Management | |||
| A119AA | Solid Waste Collection and Disposal (Spec Items 3.1, 3.2, 3.3, 3.4, 3.5) | 12 | MO | $0.00 |
| A120-A125 | Reserved | |||
| Fuel Disposition Services Subtotal: | $0.00 |
| Department of Defense Education Activity (DoDEA) Recurring Work | ||||
| A126 | Specification 1502000 Facility Investment (ST) | |||
| Service Orders, Spec Item 3.1 | ||||
| A126AA | Emergency Service Requests (Spec Item 3.1.1) | 12 | MO | $0.00 |
| A126AB | Urgent Service Requests (Spec Item 3.1.2) | 12 | MO | $0.00 |
| A126AC | Routine Service Requests (Spec Item 3.1.3) | 12 | MO | $0.00 |
| Integrated Maintenance Program (IMP), Spec Item 3.3 | ||||
| A126AD | HVAC and Refrigeration Systems (Spec Item 3.3.1) | 12 | MO | $0.00 |
| A126AE | HVAC Seasonal Start-Up and Shutdown (Spec Item 3.3.1.1) | 12 | MO | $0.00 |
| A126AF | HVAC Water Testing and Treatment (Spec Item 3.3.1.2) | 12 | MO | $0.00 |
| A126AG | Boiler Systems and UPVs (Spec Item 3.3.2) | 12 | MO | $0.00 |
| A126AH | Communication Systems (Spec Item 3.3.3) | 12 | MO | $0.00 |
| A126AJ | Fire Protection Systems (Spec Item 3.3.4) | 12 | MO | $0.00 |
| A126AK | Electrical Systems (Spec Item 3.3.5) | 12 | MO | $0.00 |
| A126AL | Emergency and Exit Lighting Systems (Spec Item 3.3.6) | 12 | MO | $0.00 |
| A126AM | Interior and Exterior Lighting Systems (Spec Item 3.3.7) | 12 | MO | $0.00 |
| A126AN | Gas Supply Systems (Spec Item 3.3.8) | 12 | MO | $0.00 |
| A126AP | Food Service Equipment (Spec Item 3.3.9) | 12 | MO | $0.00 |
| A126AQ | Clock Systems (Spec Item 3.3.10) | 12 | MO | $0.00 |
| A126AR | Emergency Eyewash Stations (Spec Item 3.3.11) | 12 | MO | $0.00 |
| A126AS | Irrigation System (Spec Item 3.3.12) | 12 | MO | $0.00 |
| A126AT | Grease Traps (Spec Item 3.3.13) | 12 | MO | $0.00 |
| A126AU | Vertical Transportation Equipment (VTE) (Spec Item 3.3.14) | 12 | MO | $0.00 |
| A126AV | Exhaust Hoods and Fire Suppression (ANSUL) Systems (Spec Item 3.3.15) | 12 | MO | $0.00 |
| A126AW | Fuel and POL Systems (Spec Item 3.3.16) | 12 | MO | $0.00 |
| A126AX | Solar Panel Systems (Spec Item 3.3.17) | 12 | MO | $0.00 |
| Inspection, Testing, and Certification Program, Spec Item 3.4 | ||||
| A126AY | Boilers Systems and UPVs (Spec Item 3.4.1) | 12 | MO | $0.00 |
| A126AZ | Boiler Air Emission Testing (Spec Item 3.4.2) | 12 | MO | $0.00 |
| A126BA | Vertical Transportation Equipment (VTE) Certification Support (Spec Item 3.4.3 ) | 12 | MO | $0.00 |
| Other Recurring Services Program, Spec Item 3.5 | ||||
| A126BB | Structural Facilities Inspection Program (Spec Item 3.5.3) | 12 | MO | $0.00 |
| A126BC | Exterior Site Work Inspection Program (Spec Item 3.5.4) | 12 | MO | $0.00 |
| A126BD | Interior and Exterior Surfaces Inspection Program (Spec Item 3.5.5) | 12 | MO | $0.00 |
| A126BE | Mechanical Systems Inspection Program (Spec Item 3.5.6) | 12 | MO | $0.00 |
| A126BF | Plumbing and Drainage Systems Inspection Program (Spec Item 3.5.7) | 12 | MO | $0.00 |
| A126BG | Playground Inspections, Maintenance, and Cleaning Program (Spec Item 3.5.8) | 12 | MO | $0.00 |
| A127 | Specification 1503010 Custodial (FX) | |||
| A127AA | Scheduled Custodial Services (Spec Item 3.1) | 12 | MO | $0.00 |
| A127AB | Other/Special Cleaning for Schools Facilities (DoDEA) (Spec Item 3.3) | 12 | MO | $0.00 |
| A128 | Specification 1503020 Pest Control (FX) | |||
| A128AA | Scheduled Pest Control Services (Spec Item 3.1) | 12 | MO | $0.00 |
| A128AB | Unscheduled Pest Control Services (Spec Item 3.2) | 12 | MO | $0.00 |
| A129 | Specification 1503030 Integrated Solid Waste Management (ISWM) (FX) | |||
| A129AA | Solid Waste Collection and Disposal (Spec Items 3.1, 3.2, 3.3, 3.4, 3.5) | 12 | MO | $0.00 |
| A130 | Specification 1503050 Grounds Maintenance & Landscaping (FX) | |||
| A130AA | Improved Grounds - Lawns (Spec Item 3.1) | 12 | MO | $0.00 |
| A130AB | Debris Removal (Spec Item 3.3) | 12 | MO | $0.00 |
| A130AC | Grounds Maintenance Service Orders (Spec Item 3.5) | 12 | MO | $0.00 |
| A130AD | Additional Grounds Maintenance Services - DoDEA (Spec Item 3.6) | 12 | MO | $0.00 |
| A131-A137 | Reserved | |||
| DoDEA Subtotal: | $0.00 |
| Naval Criminal Investigative Service (NCIS) Recurring Work | ||||
| A138 | Specification 1503010 Custodial (FX) | |||
| A138AA | Scheduled Custodial Services (Spec Item 3.1) | 12 | MO | $0.00 |
| A139 | Specification 1503030 Integrated Solid Waste Management (ISWM) (FX) | |||
| A139AA | Solid Waste Collection and Disposal (Spec Items 3.1, 3.2, 3.3, 3.4, 3.5) | 12 | MO | $0.00 |
| A140-A145 | Reserved | |||
| NCIS Subtotal: | $0.00 |
| Credit Union Recurring Work | ||||
| A146 | Specification 1503010 Custodial (FX) | |||
| A146AA | Scheduled Custodial Services (Spec Item 3.1) | 12 | MO | $0.00 |
| A147-A149 | Reserved | |||
| Credit Union Subtotal: | $0.00 |
| Air Operations N327 Recurring Work | ||||
| A150 | Specification 1503010 Custodial (FX) | |||
| A150AA | Custodial Services (Spec Items 3.1) (86%) | 12 | MO | $0.00 |
| A151 | Specification 1503030 Integrated Solid Waste Management (ISWM) (FX) | |||
| A151AA | Solid Waste Collection and Disposal (Spec Items 3.1, 3.2, 3.3, 3.4, 3.5) (86%) | 12 | MO | $0.00 |
| A152-A157 | Reserved | |||
| AIR OPS N327 Subtotal: | $0.00 |
| NEPMU7 Recurring Work | ||||
| A158 | Specification 1503030 Integrated Solid Waste Management (ISWM) (FX) | |||
| A158AA | Solid Waste Collection and Disposal (Spec Items 3.1, 3.2, 3.3, 3.4, 3.5) | 12 | MO | $0.00 |
| A159-A165 | Reserved | |||
| NEPMU7 Subtotal: | $0.00 |
| DFSP ROTA (former DLA) Recurring Work | ||||
| A166 | Specification 1502000 Facility Investment (ST) | |||
| Service Orders, Spec Item 3.1 | ||||
| A166AA | Emergency Service Orders (Spec Item 3.1.1) | 12 | MO | $0.00 |
| A166AB | Urgent Service Orders (Spec Item 3.1.2) | 12 | MO | $0.00 |
| A166AC | Routine Service Orders (Spec Item 3.1.3) | 12 | MO | $0.00 |
| Preventive Maintenance Program (PM), Spec Item 3.2 | ||||
| A166AD | Fuel and POL Systems (Spec Item 3.2.8) | 12 | MO | $0.00 |
| Integrated Maintenance Program (IMP), Spec Item 3.3 | ||||
| A166AE | Aircraft Refueling Hydrant System Electrical Controls and Fire Suppression Systems (Spec Item 3.3.18) | 12 | MO | $0.00 |
| A167-A169 | Reserved | |||
| DFSP ROTA Subtotal: | $0.00 |
| SURFLANT SHIP SERVICES Recurring Work | ||||
| A170 | Specification 1502000 Facility Investment (ST) | |||
| Preventive Maintenance Program (PM), Spec Item 3.2 | ||||
| A170AA | Oily Waste and Sewage Collection Holding Tanks (CHT) (Spec Item 3.2.11) | 12 | MO | $0.00 |
| Other Recurring Services Program, Spec Item 3.5 | ||||
| A170AB | Crane Services (Spec Item 3.5.2) | 12 | MO | $0.00 |
| A171 | Specification 1503030 Integrated Solid Waste Management (ISWM) (FX) | |||
| A171AA | Solid Waste Collection and Disposal (Spec Items 3.1, 3.2, 3.3, 3.4, 3.5, 3.10) | 12 | MO | $0.00 |
| A172 | Specification 1800000 Environmental (EC) | |||
| A172AA | Regulated Medical Waste Collection and Disposal (Spec Item 3.1) | 12 | MO | $0.00 |
| A173-A175 | Reserved | |||
| SURFLANT SHIP SERVICES Subtotal: | $0.00 |
| DMA/AFN Recurring Work | ||||
| A176 | Specification 1503030 Integrated Solid Waste Management (ISWM) (FX) | |||
| A176AA | Solid Waste Collection and Disposal (Spec Items 3.1, 3.2, 3.3, 3.4, 3.5) | 12 | MO | $0.00 |
| A177 | Specification 1503050 Grounds Maintenance and Landscaping (FX) | |||
| A177AA | Improved Grounds - Fields (Spec Item 3.1) | 12 | MO | $0.00 |
| A177AB | Debris Removal (Spec Item 3.3) | 12 | MO | $0.00 |
| A179-A181 | Reserved | |||
| DMA/AFN Subtotal: | $0.00 |
| ENVIRONMENTAL Recurring Work | ||||
| A182 | Specification 1800000 Environmental | |||
| A182AA | Sampling and Laboratory Services (Spec Item 3.3) | 12 | MO | $0.00 |
| A183-A187 | Reserved | |||
| ENVIRONMENTAL Subtotal: | $0.00 |
| N3 SMALL ARM RANGE Recurring Work | ||||
| A188 | Specification 1800000 Environmental (EC) | |||
| A188AA | Range Preventive Maintenance (PM) Program (Bldgs 1994 and 3310) (Spec Item 3.2) | 12 | MO | $0.00 |
| A189-A191 | Reserved | |||
| SMALL ARM RANGE Subtotal: | $0.00 |
| EODMU8 Recurring Work | ||||
| A192 | Specification 1503030 Integrated Solid Waste Management (ISWM) (FX) | |||
| A192AA | Solid Waste Collection and Disposal (Spec Items 3.1, 3.2, 3.3, 3.4, 3.5) | 12 | MO | $0.00 |
| A193-A197 | Reserved | |||
| EODMU8 Subtotal: | $0.00 |
| NCTE Recurring Work | ||||
| A198 | Specification 1503010 Custodial (FX) | |||
| A198AA | Scheduled Custodial Services (Spec Item 3.1) | 12 | MO | $0.00 |
| A199-A203 | Reserved | |||
| NCTE Subtotal: | $0.00 |
| RECYCLING Recurring Work | ||||
| A204 | Specification 1502000 Facility Investment (ST) | |||
| Preventive Maintenance Program (PM), Spec Item 3.2 | ||||
| A204AA | Recycling Service Equipment (Spec Item 3.2.17) | 12 | MO | $0.00 |
| A205 | Specification 1503030 Integrated Solid Waste Management (ISWM) (FX) | |||
| A205AA | Recycling Collection and Processing Services (40.3%) (Spec Item 3.11) | 12 | MO | $0.00 |
| A206-A209 | Reserved | |||
| RECYCLING Subtotal: | $0.00 |
| PORT OPS Recurring Work | ||||
| A210 | Specification 1503010 Custodial (FX) | |||
| A210AA | Scheduled Custodial Services (Spec Item 3.1) | 12 | MO | $0.00 |
| A211-A215 | Reserved | |||
| PORT OPS Subtotal: | $0.00 |
| NAVFAC Atlantic (SESEF) Recurring Work | ||||
| A216 | Specification 1503010 Custodial (FX) | |||
| A216AA | Scheduled Custodial Services (Spec Item 3.1) | 12 | MO | $0.00 |
| A217 | Specification 1503050 Grounds Maintenance & Landscaping (FX) | |||
| A217AA | Improved Grounds - Lawns (Spec Item 3.1) | 12 | MO | $0.00 |
| A217AB | Debris Removal (Spec Item 3.3) | 12 | MO | $0.00 |
| A218-A221 | Reserved | |||
| NAVFAC Atlantic (SESEF) Subtotal: | $0.00 |
| NETC - Recurring Work | ||||
| A222 | Specification 1503010 Custodial (FX), Spec Item 3 | |||
| A222AA | Scheduled Custodial Services (Spec Item 3.1) | 12 | MO | $0.00 |
NETC SUBTOTAL: $0.00
TOTAL FOR LINE ITEM 0001 - BASE PERIOD - RECURRING WORK (ELINs A001 - A222) $0.00
&"Times New Roman,Regular"&10Page &P of &N
Base Period - Non-Recurring
| ATTACHMENT J-0200000-13 |
| EXHIBIT LINE ITEM NUMBERS |
| SOLICITATION/CONTRACT # N62470-19-R-2001 |
| EXHIBIT A - BASE PERIOD - NON-RECURRING WORK |
| CLIN 0002 |
| EXHIDIT D - DLIN 0002 |
| Non-Recurring Work Price - Base Period | |||||||
| PROVIDE PRICES TO PERFORM NON-RECURRING WORK SERVICES - IN ACCORDANCE WITH SECTION C, SPEC ITEM 4 | |||||||
| ELINs A700 THROUGH A1013 | |||||||
| ELIN | Short Description | Long Description | Estimated Quantity | Unit of Issue | Unit Price (USD) | Extended Price (USD) | |
| UNIT PRICED TASK (UPT) WORK | |||||||
| Specification 1401000 - Family Housing (FH) | |||||||
| A701 | Change of Occupancy Maintenance (COM) at Las Palmeras | Provide labor, management, supervision, tools, material and equipment to perform Change of Occupancy Maintenance including all requirements per FH Change of Occupancy Maintenance Tasks provided in J-1401000-10, at the ordered location. The Contractor shall ensure that housing units are clean, fully equipped, operable and habitable. Complete all work within 3 working days during COM or as specified in the order. | |||||
| 50 | EA | $0.00 | |||||
| A702 | Change of Occupancy Maintenance (COM) at Las Palmeras Type G and H (4 bedrooms) | Provide labor, management, supervision, tools, material and equipment to perform Change of Occupancy Maintenance including all requirements per FH Change of Occupancy Maintenance Tasks provided in J-1401000-10, at the ordered location. The Contractor shall ensure that housing units are clean, fully equipped, operable and habitable. Complete all work within 3 working days during COM or as specified in the order. | |||||
| 30 | EA | $0.00 | |||||
| A703 | Fireplace and Chimney Maintenance for Family Housing Unit | Provide labor, management, supervision, tools, material and equipment required to perform fireplace and chimney maintenance. Maintenance shall include: (a) Inspect the outside parts of chimney and any connection points or any visible structural damage; (b) Inspect the firebox for loose refractory bricks and degraded mortar or any other visible structural damage; (c) Inspect the mortar crown for cracks, breaks or missing/damaged steel screen. If any deficiency is detected, they shall be repaired immediately; (d) Check damper for proper operation; (e) Inspect and check the flue pipe for cracks and breaks or is blocked by debris or creosote build up; (f) Clean the flue pipe, firebox, smoke shelf, elbows, and connector pipes to remove harmful products, creosote and soot. This shall be done from both outside and inside the house. If occasionally there is creosote buildup that cannot be removed by brushing, authorized chemicals may be used to alter the composition of the hardened creosote and turn it into a powdery substance that can be easily removed. Use of a vacuum to clean up ashes is not permitted due to live coals may remain in those ashes; (g) After cleaning, check chimney has enough draft to pull smoke out quickly and provide enough oxygen for hot and complete burning of wood to occur. Check excessive heat carries away from combustible items. The Contractor shall notify in writing any deficiency found. Complete all work within 3 working days or as specified in the order. | 20 | EA | $0.00 | ||
| A704 | Complete Interior Painting for Vacant Housing Unit - Las Palmeras Type A-1 Unit (3 bedrooms) | Provide labor, management, supervision, tools, material and equipment required to perform complete interior painting for vacant Housing unit Type A-1, located at Las Palmeras. The Contractor shall paint in accordance with UFGS 09 90 00 Paints and Coatings (08-2008). Paint shall be special anti mold paint and matching exiting colors. Unit measurement is provided in 1401000 Section J. Complete all work within 3 working days or as specified in the order. | 12 | EA | $0.00 | ||
| A705 | Complete Interior Painting for Vacant Housing Unit - Las Palmeras Type A-2 Unit (3 bedrooms) | Provide labor, management, supervision, tools, material and equipment required to perform complete interior painting for vacant Housing Unit Type A-2, located at Las Palmeras. The Contractor shall paint in accordance with UFGS 09 90 00 Paints and Coatings (08-2008). Paint shall be special anti mold paint and matching exiting colors. Unit measurement is provided in 1401000 Section J. Complete all work within 3 working days or as specified in the order. | 12 | EA | $0.00 | ||
| A706 | Complete Interior Painting for Vacant Housing Unit - Las Palmeras Type B-1 Unit (4 bedrooms) | Provide labor, management, supervision, tools, material and equipment required to perform complete interior painting for vacant Housing Unit Type B-1, located at Las Palmeras. The Contractor shall paint in accordance with UFGS 09 90 00 Paints and Coatings (08-2008). Paint shall be special anti mold paint and matching exiting colors. Unit measurement is provided in 1401000 Section J. Complete all work within 3 working days or as specified in the order. | 12 | EA | $0.00 | ||
| A707 | Complete Interior Painting for Vacant Housing Unit - Las Palmeras Type B-2 Unit (4 bedrooms) | Provide labor, management, supervision, tools, material and equipment required to perform complete interior painting for vacant Housing Unit Type B-2, located at Las Palmeras. The Contractor shall paint in accordance with UFGS 09 90 00 Paints and Coatings (08-2008). Paint shall be special anti mold paint and matching exiting colors. Unit measurement is provided in 1401000 Section J. Complete all work within 3 working days or as specified in the order. | 12 | EA | $0.00 | ||
| A708 | Complete Interior Painting for Vacant Housing Unit - Las Palmeras Type D-1 Unit (3 bedrooms) | Provide labor, management, supervision, tools, material and equipment required to perform complete interior painting for vacant Housing Unit Type D-1, located at Las Palmeras. The Contractor shall paint in accordance with UFGS 09 90 00 Paints and Coatings (08-2008). Paint shall be special anti mold paint and matching exiting colors. Unit measurement is provided in 1401000 Section J. Complete all work within 3 working days or as specified in the order. | 20 | EA | $0.00 | ||
| A709 | Complete Interior Painting for Vacant Housing Unit - Las Palmeras Type D-2 Unit (3 bedrooms) | Provide labor, management, supervision, tools, material and equipment required to perform complete interior painting for vacant Housing Unit Type D-2, located at Las Palmeras. The Contractor shall paint in accordance with UFGS 09 90 00 Paints and Coatings (08-2008). Paint shall be special anti mold paint and matching exiting colors. Unit measurement is provided in 1401000 Section J. Complete all work within 3 working days or as specified in the order. | 50 | EA | $0.00 | ||
| A710 | Complete Interior Painting for Vacant Housing Unit - Las Palmeras Type E-2 Unit (2 bedrooms) | Provide labor, management, supervision, tools, material and equipment required to perform complete interior painting for vacant Housing Unit Type E-2, located at Las Palmeras. The Contractor shall paint in accordance with UFGS 09 90 00 Paints and Coatings (08-2008). Paint shall be special anti mold paint and matching exiting colors. Unit measurement is provided in 1401000 Section J. Complete all work within 3 working days or as specified in the order. | 8 | EA | $0.00 | ||
| A711 | Complete Interior Painting for Vacant Housing Unit - Las Palmeras Type E-2 Unit | Provide labor, management, supervision, tools, material and equipment required to perform complete interior painting for vacant Housing Unit Type E-2, located at Las Palmeras. The Contractor shall paint in accordance with UFGS 09 90 00 Paints and Coatings (08-2008). Paint shall be special anti mold paint and matching exiting colors. Unit measurement is provided in 1401000 Section J. Complete all work within 3 working days or as specified in the order. | 2 | EA | $0.00 | ||
| A712 | Complete Painting Interior for Vacant Units with No Furniture - Las Palmeras Housing Unit Type G | Provide labor, management, supervision, tools, material and equipment required to perform complete interior painting for vacant Housing Unit Type G at Las Palmeras. The Contractor shall paint in accordance with UFGS 09 90 00 Paints and Coatings (08-2008). Paint shall be special anti mold paint and matching exiting colors. Unit measurement is provided in 1401000 Section J. Complete all work within 3 working days or as specified in the order. | 12 | EA | $0.00 | ||
| A713 | Complete Painting Interior for Vacant Units with No Furniture - Las Palmeras Housing Unit Type H | Provide labor, management, supervision, tools, material and equipment required to perform complete interior painting for vacant Housing Unit Type H at Las Palmeras. The Contractor shall paint in accordance with UFGS 09 90 00 Paints and Coatings (08-2008). Paint shall be special anti mold paint and matching exiting colors. Unit measurement is provided in 1401000 Section J. Complete all work within 3 working days or as specified in the order. | 12 | EA | $0.00 | ||
| A714 | Complete Exterior Painting - Las Palmeras Vacant Housing Unit Type A-1, A-2, B-1, D-1, D-2, E-2, A-1 Extended, A-2 Extended, D-1 Extended and D-2 Extended | Provide labor, management, supervision, tools, material and equipment required to perform complete exterior painting for Las Palmeras Unit Type A-1, A-2, B-1, D-1, D-2, E-2, A-1 Extended, A-2 Extended, D-1 Extended and D-2 Extended. Units are empty with no furniture. Complete all work within 5 working days or as specified in the order. | 50 | EA | $0.00 | ||
| A715 | Complete Exterior Painting - Las Palmeras Vacant Housing Unit Type B-2, F, G & H | Provide labor, management, supervision, tools, material and equipment required to perform complete exterior painting for Las Palmeras Unit Type B-2, F, G & H, empty units with no furniture. Complete all work within 5 working days or as specified in the order. | 25 | EA | $0.00 | ||
| A716 | Provide and Replace Housing Unit Electrical Water Heaters | Provide labor, management, supervision, tools, material and equipment required to provide and replace Housing Unit Electrical Water Heaters. Electrical water heaters included flexors shall be replaced by new electrical water heaters and new flexors. New units shall be of the same capacity and general characteristics as the existing. They shall be efficiency Class A, 240 volts. Complete all work within 3 working days or as specified in the order. | 200 | EA | $0.00 | ||
| A717 | Provide and Replace Main Door in Housing Unit | Provide labor, management, supervision, tools, material and equipment required to provide and replace main door in Housing unit. Aluminum Doors shall conform to NTE, and shall be of the same types and existing finishes. Replacement shall include aluminum doors complete with necessary hardware, fastenings, clips, fins, anchors, glazing beads, glass parts and other appurtenances. Complete all work within 5 working days or as specified in the order. | 25 | EA | $0.00 | ||
| A718 | Provide and Replace Sliding Screen Door in Housing Unit (Back Patios Entrance) | Provide labor, management, supervision, tools, material and equipment required to provide and replace sliding screen door in Housing unit at the back patios entrance. Doors shall conform to NTE, and shall be of the same types and existing finishes. Replacement shall include doors complete with necessary hardware, anchors, screening material and rollers and other appurtenances necessary for complete installation. Complete all work within 5 working days or as specified in the order. | 30 | EA | $0.00 | ||
| A719 | Provide and Replace Sliding Screen Window in Housing Unit | Provide labor, management, supervision, tools, material and equipment required to provide and replace sliding screen window in Housing unit. Screen windows shall conform to NTE, and shall be of the same types and existing finishes. Replacement shall include screen windows complete with necessary hardware, anchors, screening material and other appurtenances necessary for complete installation. Complete all work within 5 working days or as specified in the order. | 15 | EA | $0.00 | ||
| A720 | Provide and Replace Laundry Room Door in Housing Unit | Provide labor, management, supervision, tools, material and equipment required to provide and replace laundry room door in Housing unit. Doors shall conform to NTE, and shall be of the same types and existing finishes. Replacement shall include doors complete with necessary hardware, fastenings, clips, fins, anchors, glazing beads, and other appurtenances necessary for complete installation. Complete all work within 5 working days or as specified in the order. | 10 | EA | $0.00 | ||
| A721 | Provide and Replace Closet Doors in Housing Unit | Provide labor, management, supervision, tools, material and equipment required to provide and replace closet door in Housing unit. Replacement shall be performed in accordance with NTE -PPM. Work shall include replacement of the door and all hardware, of the same type as existing, and all required painting. Doors and surfaces damaged during the work performance shall be painted and repaired matching original condition. Complete all work within 5 working days or as specified in the order. | 70 | EA | $0.00 | ||
| A722 | Provide and Replace Interior Wooden Doors in Housing Unit | Provide labor, management, supervision, tools, material and equipment required to provide and replace interior wooden door in Housing unit. Replacement shall be performed in accordance with NTE -PPM. Work shall include replacement of the door and all hardware, of the same type as existing, and all required painting. Doors and surfaces damaged during the work performance shall be painted and repaired matching original conditions. Complete all work within 5 working days or as specified in the order. | 75 | EA | $0.00 | ||
| A723 | Provide and Replace Housing Actual Window Type | Provide labor, management, supervision, tools, material and equipment required to provide and replace window in Housing unit. Aluminum Windows shall conform to NTE and shall be of the same types and of the same existing finishes. Replacement shall include aluminum windows/doors complete with necessary hardware, fastenings, clips, fins, anchors, glazing beads, roll up shutter (only windows) and other appurtenances necessary for complete installation and proper operation. Complete all work within 5 working days or as specified in the order. | 24 | EA | $0.00 | ||
| A724 | Provide and Replace Patio Gates in Housing Unit | Provide labor, management, supervision, tools, material and equipment required to provide and replace patio gate in Housing unit. Patio gates shall conform to NTE, and shall be of the same types and of the same existing finishes. Replacement shall include doors complete with necessary hardware, fastenings, clips, fins, anchors, glazing beads, and other appurtenances necessary for complete installation. Complete all work within 5 working days or as specified in the order. | 30 | EA | $0.00 | ||
| A725 | Replace Housing Actual Rolling Persianas Type | Replace rolling persianas by new matching existing including mechanisms and cords. Complete all work within 5 working days or as specified in the order. | 30 | EA | $0.00 | ||
| A726 | Replace Housing Actual Rolling Screen Types | Aluminum Windows Screens shall be made to exact window measurements. Insect screening material and system shall be equal or approved greater quality. Complete all work within 5 working days or as specified in the order. | 30 | EA | $0.00 | ||
| A727 | Provide and Replace Kitchen Countertop in Housing Unit | Provide labor, management, supervision, tools, material and equipment to replace a kitchen countertop to include removal of existing top, removal and reinstallation of sink, and installation of new granite top as specified, sealing/grouting of joints per manufacturer's recommend actions, 10 centimeter back splash, and drip edge at the ordered location. Type, color and pattern shall match existing. Complete all work within 3 working days or as specified in the order. | 15 | EA | $0.00 | ||
| A728 | Replace Housing Mixing Valves (Faucets) | Provide labor, management, supervision, tools, material and equipment required to perform replacement of faucet mixing valves. Mixing valves shall be replaced as per existing with Spanish made replacements. Mixing valves shall be “RS” brand or equal approved. Installation shall include the complete mixing valve with all connectors and other appurtenances necessary for complete installation. Complete all work within 3 working days or as specified in the order. | 12 | EA | $0.00 | ||
| A729 | Replace Housing Shower Basin | Provide labor, management, supervision, tools, material and equipment required to perform replacement of shower basin. New porcelain vitrified shower basin shall be installed on a cement mortar bed. Drain line shall be connected to the drainage system. Glazed tiles shall be installed around new basin and on shower stall walls. The top of the installed basin shall not exceed 15 centimeters. Shower basin shall be “Roca” brand or equal approved. installation shall include shower basin complete with all connectors and other appurtenances necessary for complete installation and proper operation. Installation shall be performed in accordance with the U.S. National Standard Plumbing Code. Complete all work within 3 working days or as specified in the order. | 20 | EA | $0.00 | ||
| A730 | Replace Housing Bathtub | Provide labor, management, supervision, tools, material and equipment required to perform replacement of bathtub. The Contractor shall: 1. Remove existing wash hand-basin to be reinstalled when this work has been finished; 2. Remove existing soap dish and water mixer, located beside existing bathtub; 3. Remove existing bathtub (1.70 m x 0.70 m) and demolish small brick wall (1.73 x 0.40 lm) situated under bathtub and remove the debris from the jobsite; 4. Build two small walls (approx.0.70 m x 0.40 m) on bathroom walls, as needed. These walls shall support new bathtub; 5. Install new bathtub "Continental" model (170 x 70 cm) by ROCA; 6. Repair damaged walls with wall ceramic tiles (approx. 1.75 sqm) matching the existing ones around the new bathtub; 7. Install the existing water mixer and soap dish; 8. Repair damaged walls (approx. 0.40sqm) due to the installation of water mixer hose shower and soap dish, as needed; 9. Install existing wash hand basin; 10. Clean up job site. Complete all work within 5 working days or as specified in the order. | 30 | EA | $0.00 | ||
| A731 | Replace Housing Kitchen Sinks | Provide labor, management, supervision, tools, material and equipment required to remove existing and replace with new kitchen sink. Kitchen sink shall conform to ASME/ANSI A112.19.3M, 20-gage stainless steel with integral mounting rim, two compartments with ledge back and undersides coated with sound dampening material. Provide top-mounted \ASME A112.18.1M\ copper alloy faucets 1.5 gal/min, swing spout with aerator, and stainless steel drain outlets with cup strainers. Kitchen sink shall be “TEKA” brand Model E60-2C or equal approved. Replacement shall include kitchen sink complete with all connectors and other appurtenances necessary for complete installation and proper operation. Installation shall be performed in accordance with the U.S. National Standard Plumbing Code. Sinks shall be with garbage disposal mounting opening matching existing. Complete all work within 3 working days or as specified in the order. | 6 | EA | $0.00 | ||
| A732 | Replace Pleated Retractable Side Pull Screen Door | Provide labor, management, supervision, tools, material and equipment required to remove existing and replace with new pleated retractable side pull screen door. The works shall consist in the installation of a pleated retractable side pull screen door at kitchen/laundry door. All frame hardware (cassette, tracks, handles, etc) shall be white baked enamel aluminum and all mounting hardware (bolts, screws, etc) shall be stainless steel. Mesh shall be fiberglass made. Complete all work within 5 working days or as specified in the order. | 50 | EA | $0.00 | ||
| A733 | Removal of Vinyl Floor Tiles In Empty Units with No Furniture | Provide labor, management, supervision, tools, material and equipment required to remove vinyl floor tiles. The Contractor shall remove the existing floor covering as required by the Government. The Government will annotate on the order when the vinyl is to be retained by the Government or to be disposed by the Contractor off base. If the Government elects not to install new floor, the Contractor shall leave the floor clean and free of debris after removing existing vinyl floor. Complete all work within 3 working days or as specified in the order. | 5,100 | SM | $0.00 | ||
| A734 | Provide and Install New Continuous and Level Vinyl Tiled Floor | Provide labor, management, supervision, tools, material and equipment required to remove old and install newly provided vinyl tiled floor. The Contractor shall provide and install new continuous and level vinyl tiled floor along the whole designated area of the house unit including: | |||||
| - Surface preparation of existing ceramic tiled flooring for the installation of new vinyl tiles flooring, including the required leveling mortar and primer application; - New 48 x 7.25 inches vinyl tiles, designed for mentioned type of installation, with an approx. overall thickness of 3.5 mm, provided with rubber underlayment and adequate for wet locations and very intensive use, matching the recently installed flooring in Housing Unit #1227 or similar approved by customer; - The replacement of existing ceramic baseboards and floor transition strips, with new adequate ones for the new vinyl flooring. New baseboards with approx. dimensions of 14 x 14 mm in wet areas and 15 x 80 mm in the other ones, matching those installed in Housing unit or similar approved by customer; - The required modifications on all affected interior doors that need to be adapted to new flooring. Complete all work within 5 working days or as specified in the order. | 2,500 | SM | $0.00 | ||||
| A735 | Removal of Ceramic Floor Tiles in Vacant Housing Units with No Furniture | Provide labor, management, supervision, tools, material and equipment required to remove ceramic floor tiles. The Contractor shall remove all existing ceramic floor tiles, base tiles, and chip off old cement mortar when so requested from the location marked on the sketch and/or drawing provided. Complete all work within 3 working days or as specified in the order. | 2,500 | SM | $0.00 | ||
| A736 | Installation of Ceramic Floor Tiles in Vacant Housing Units with No Furniture | Provide labor, management, supervision, tools, material and equipment required to provide and install new ceramic floor tiles. Install in accordance with UFGS 09 30 00 Ceramic Tile, Quarry Tile and Paver Tile. Material shall match existing. Complete all work within 3 working days or as specified in the order. | 2,500 | SM | $0.00 | ||
| A737 | Replacement of Breda Tiles Regular Tile (33x33 cm) - Exterior Housing Surfaces | Provide labor, management, supervision, tools, material and equipment required to provide and install new Breda tiles size 33x33 cm. Install in accordance with UFGS 09 30 00 Ceramic Tile, Quarry Tile and Paver Tile. Material shall match existing. Work shall include all different existing installation layouts. Complete all work within 3 working days or as specified in the order. | 2,500 | SM | $0.00 | ||
| A738 | Installation of Cenefa Tile - Exterior Housing Surfaces | Provide labor, management, supervision, tools, material and equipment required to install new cenefa tiles. Install in accordance with UFGS 09 30 00 Ceramic Tile, Quarry Tile and Paver Tile. Material shall match existing. Complete all work within 3 working days or as specified in the order. | |||||
| 150 | LM | $0.00 | |||||
| A739 | Exterior Housing Surfaces: Step Tile | Provide labor, management, supervision, tools, material and equipment required to install new step tile, in exterior Housing surfaces. Install in accordance with UFGS 09 30 00 Ceramic Tile, Quarry Tile and Paver Tile. Material shall match existing. Complete all work within 3 working days or as specified in the order. | 150 | LM | $0.00 | ||
| A740 | Exterior Housing Surfaces: Baseboards | Provide labor, management, supervision, tools, material and equipment required to install new baseboard, in exterior Housing surfaces. Install in accordance with UFGS 09 30 00 Ceramic Tile, Quarry Tile and Paver Tile. Material shall match existing. Complete all work within 3 working days or as specified in the order. | 150 | LM | $0.00 | ||
| A741 | Installation of Window Sill Tile - Exterior Housing Surfaces | Provide labor, management, supervision, tools, material and equipment required to install new window sill tiles, in exterior Housing unit surfaces. Install in accordance with UFGS 09 30 00 Ceramic Tile, Quarry Tile and Paver Tile. Material shall match existing in any format and quality. Complete all work within 3 working days or as specified in the order. | 150 | LM | $0.00 |
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .