_J-0200000-07_ASSET_INFORMATION.xlsx
XLSX spreadsheet 30 KB Posted
- Attached to
- BASE OPERATIONS SUPPORT (BOS) SERVICES AT U. S. NAVAL STATION ROTA, SPAIN Federal contract opportunity
- Solicitation number
- N62470-19-R-2001
About this file
This document contains an asset data template and field definitions for federal contractors to populate with asset information and submit to the Naval Facilities Engineering Command. The template includes 35 required and optional fields to provide details on assets such as identification numbers, descriptions, locations, purchase prices, and maintenance plans. Contractors must submit the asset data in a pipe-delimited flat file formatted according to the position and formatting of the specified fields. The template indicates the asset file interface relates to solicitation N62470-19-R-2001 for base operations support services at U.S. Naval Station Rota, Spain to be awarded by the Department of the Navy Naval Facilities Engineering Command. Relevant assets must be included to transfer information as part of the solicitation response by the specified due date.
Attachment J-0200000-07
View the file
Other files for this federal contract opportunity
Show all 50
BASE OPERATIONS SUPPORT (BOS) SERVICES AT U. S. NAVAL STATION ROTA, SPAIN has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1-Asset File Into
ATTACHMENT J-0200000-07
ASSET INFORMATION
| Interface: Asset File | |
| VERSION #: | V2 |
| Current as of: | 26 April 2017 |
| Version History |
| V1 - Updated to reflect current interface in MAXIMO |
| V2 - Added 3 additional fields (OPT): Asset Comment, PM Program & PM Plan |
| TABS | |
| 1-Asset File Info | This Sheet |
| 2-Asset File Field List | Asset Template Data Format Information |
| 3-Asset File - Template | Sample Excel Format |
2-Asset File Field List
ATTACHMENT J-0200000-07
ASSET INFORMATION
| Interface: Asset File |
| VERSION #:V2 |
| Current as of: 26 April 2017 |
| Position | Name | Required | Length | ||||
| Limit | Data Format Note | Content Notes | MAXIMO Field Name | ||||
| 1 | AssetNum | Y | 25 | ASSETNUM | |||
| 2 | Changed Date | N | MM/DD/YYYY | CHANGEDATE | |||
| 3 | Description | Y | 100 | DESCRIPTION | |||
| 4 | Long Description | N | 1,000 | LONGDESCRIPTION | |||
| 5 | Master System | Y | Must match Value List in Maximo | Value list in REFERENCE SPREADSHEET. | MASTERSYSTEM | ||
| 6 | System | Y | Must match Value List in Maximo | Value list in REFERENCE SPREADSHEET. | SYSTEM | ||
| 7 | Sub-System | Y | Must match Value List in Maximo | Value list in REFERENCE SPREADSHEET. | SUBSYSTEM | ||
| 8 | Location | Y | Must match Value List in Maximo | Value list in REFERENCE SPREADSHEET. | LOCATION | ||
| 9 | Site ID | Y | Must match Value List in Maximo | Value list in REFERENCE SPREADSHEET. | SITEID | ||
| 10 | Work Center (Person Group) | Y | Must match Value List in Maximo | Value list in REFERENCE SPREADSHEET. | PERSONGROUP | ||
| 11 | Asset Type | Y | Must match Value List in Maximo | Value list in REFERENCE SPREADSHEET | ASSETTYPE | ||
| 12 | Asset Quantity | N | Integer | QUANTITY | |||
| 13 | Inventory Category | Y | Must match Value List in Maximo | Value list in REFERENCE SPREADSHEET | INVENTORYCATEGORY | ||
| 14 | Purchase Price | N | Integer | PURCHASEPRICE | |||
| 15 | Budgeted Cost | N | Integer | BUDGETCOST | |||
| 16 | Replacement Cost | Y | Integer | REPLACECOST | |||
| 17 | Meter Group | N | Must match Value List in Maximo | Value list in REFERENCE SPREADSHEET | GROUPNAME | ||
| 18 | Belongs To (Parent) | N | Must match an existing ASSETNUM in Maximo. | Asset Number of Parent. The asset and its parent can't be created in the same file | PARENT | ||
| 19 | Contract Number | N | 25 | Appended to LONGDESCRIPTION | |||
| 20 | Task/Delivery Order Number | N | 25 | Appended to LONGDESCRIPTION | |||
| 21 | Drawing Reference ID | N | 25 | Appended to LONGDESCRIPTION | |||
| 22 | Warranty Expiration Date | N | MM/DD/YYYY | Appended to LONGDESCRIPTION | |||
| 23 | Status Date | N | LEAVE BLANK | Leave blank/Do Not Use | STATUSDATE | ||
| 24 | Installation Date | Y | MM/DD/YYYY | INSTALLDATE | |||
| 25 | Asset Status | N | Must match Value List in Maximo | Value list in REFERENCE SPREADSHEET. | STATUS | ||
| 26 | CLASSSTRUCTUREID | N | Must match Value List in Maximo | Value list in REFERENCE SPREADSHEET | CLASSSTRUCTUREID | ||
| 27 | Job Plan Code | N | 25 | Appended to LONGDESCRIPTION | |||
| 28 | Equipment Tag Number | N | 25 | Appended to LONGDESCRIPTION | |||
| 29 | Additional Loc Info | N | 250 | ADDLOCINFO | |||
| 30 | Manufacturer | N | Must match Value List in Maximo | Value list in REFERENCE SPREADSHEET | MANUFACTURER | ||
| 31 | Model Number | N | 25 | MODEL | |||
| 32 | Serial Number | N | 25 | SERIALNUM | |||
| 33 | Asset Comment | N | 100 | ASSETCOMMENT | |||
| 34 | Standard Eval Results | ||||||
| (PM Plan) | N | 15 | Values Depend on Asset Type (i.e. UTILITIES, FACILITIES) | Not required, but will default to N/A or NTE if left blank. Valid values determined by Asset Type (Position 11) | STANDARDEVAL | ||
| 35 | PM Standard Applies | ||||||
| (PM Program) | N | 15 | Values Depend on Asset Type (i.e. UTILITIES, FACILITIES) | Not required, but will default to N/A or NTE if left blank. Valid values determined by Asset Type (Position 11) | PMSTANDARD | ||
| N/A |
3-Asset File Template
| ATTACHMENT J-0200000-07 | ||
| ASSET INFORMATION | ATTACHMENT J-0200000-XX |
ASSET INFORMATION
| Interface: Asset File | ||||||||||||||||||||||||||||||||||||
| VERSION #: V2 | ||||||||||||||||||||||||||||||||||||
| Current as of: 26 April 2017 | ||||||||||||||||||||||||||||||||||||
| Position | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 15 | 16 | 17 | 18 | 19 | 20 | 21 | 22 | 23 | 24 | 25 | 26 | 27 | 28 | 29 | 30 | 31 | 32 | 33 | 34 | 35 | |
| Name | AssetNum | Changed Date | Description | Long Description | Master System | System | Sub-System | Location | Site ID | Work Center (Person Group) | Asset Type | Asset Quantity | Inventory Category | Purchase Price | Budgeted Cost | Replacement Cost | Meter Group | Belongs To (Parent) | Contract Number | Task/Delivery Order Number | Drawing Reference ID | Warranty Expiration Date | Status Date | Installation Date | Asset Status | CLASSSTRUCTUREID | Job Plan Code | Equipment Tag Number | Additional Loc Info | Manufacturer | Model | Serial # | Asset Comment | PM Plan | PM Program | |
| Required Field(s) | ||||||||||||||||||||||||||||||||||||
| (on new Asset) | Y | N | Y | N | Y | Y | Y | Y | Y | Y | Y | N | Y | N | N | Y | N | N | N | N | N | N | N | Y | N | N | N | N | N | N | N | N | N | N | N |
NOTES:
• ONLY COLUMNs 1-35, and rows containing data should be be included in the FLAT-FILE SUBMISSION;
• Pipe Delimited (.txt) - | (Pipe is at the end of the column, before the return. Must have 35 PIPEs per row.)
• New assets & asset updates (to different assets) can be completed at the same time. An asset can't be created and updated at the same time.
File details come from the government source that posted it. Updated .