F_Section_F_Deliverables_(Amendment_0005).pdf

PDF 226 KB Posted

Attached to
BASE OPERATIONS SUPPORT (BOS) SERVICES AT U. S. NAVAL STATION ROTA, SPAIN Federal contract opportunity
Solicitation number
N62470-19-R-2001
Issued by
Department of the Navy Naval Facilities Engineering Command

About this file

This document outlines the deliverables required under a solicitation for base operations support services at Naval Station Rota, Spain. The contractor will be responsible for providing management and administration, aviation fuel support, family housing services, facility management, facility investment services including maintenance and repair, custodial services, pest control, integrated solid waste management, grounds maintenance and landscaping, and environmental services. Regular reporting requirements include safety plans, preventative maintenance schedules, service reports, inspection results, and training documentation. The contractor must also manage work orders, modernize systems, and comply with environmental regulations. The deliverables detail submission deadlines and distribution requirements for each contract line item.

F Section F Deliverables (Amendment 0005)

View the file

Other files for this federal contract opportunity

Other files attached to BASE OPERATIONS SUPPORT (BOS) SERVICES AT U. S. NAVAL STATION ROTA, SPAIN, newest first.
File Type Posted
J-1502000-01-04_Equipment_and_Systems_Inventory-BUMED_(Amendment_0007).xlsx XLSX spreadsheet
J-0200000-13_Exhibit_Line_Item_Numbers_(ELINs)_(Amendment_0007).xlsx XLSX spreadsheet
J-1502000-00_Facility_Investment_(Amendment_0005).pdf PDF
J-1503030_Integrated_Solid_Waste_Management_(ISWM)_(Amendment_0005).pdf PDF
J-0200000-13_Exhibit_Line_Item_Numbers_(ELINS)_(Amendment_0005).xlsx XLSX spreadsheet
N62470-19-R-2001_Rota_BOS_Amendment_0004.pdf PDF
J-1503030_Integrated_Solid_Waste_Management_(ISWM)_(Amendment_0004).pdf PDF
J-1503010-07.b_Floor_Plans_-_DoDEA_(Amendment_0003).pdf PDF
J-1700000_Transportation_(Amendment_0003).pdf PDF
J-1502000-00-07_Equipment_and_Systems_Inventory_-_DoDEA_(Amendment_0003).xlsx XLSX spreadsheet
J-1502000-01-05.a_Service_Orders_Summary-BUMED.XLSX XLSX spreadsheet
N62470-19-R-2001_Rota_BOS_Amendment_0003.pdf PDF
J-1503030-05_Location_and_Frequency_Historical_Data_(Amendment_0003).xlsx XLSX spreadsheet
J-9_Pre-Proposal_Conference_PowerPoint.pdf PDF
N62470-19-R-2001_Rota_BOS_Amendment_0001.pdf PDF
J-1503010_Custodial_(Amendment_0001).pdf PDF
J-1503020_Pest_Control_(Amendment_0001).pdf PDF
J-5_Full_Time_Equivalent_(FTE)_(Amendment_0001).xlsx XLSX spreadsheet
_J-1501000-04_Characteristic_Meter_Reading_Information.xlsx XLSX spreadsheet
_J-1700000_Transportation.pdf PDF
_J-0200000-13_Exhibit_Line_Item_Number_(ELINs).xlsx XLSX spreadsheet
_J-1401000-03C_FH_Painting_Measurements.xlsx XLSX spreadsheet
_J-1502000-00-04_Equipment_and_Systems_Inventory.xlsx XLSX spreadsheet
_J-1401000-07_FH_Street_Lighting.pdf PDF
_J-1401000-03_FH_Facility_Property_and_Systems_Equipment_Inventory.xlsx XLSX spreadsheet
_J-2_Corporate_Experience_Project_Data_Sheet.docx DOCX document
_J-1402000_Unaccompanied_Housing.pdf PDF
_J-0501030_Aviation_Fuel_Support.pdf PDF
_J-1503010-07.b_Floor_Plans_DoDEA.pdf PDF
_J-1401000_Family_Housing.pdf PDF
_J-1503010-05_Custodial_Service_Classes_and_Frequencies.xlsx XLSX spreadsheet
_J-1503030-05_Location_and_Frequency_Historical_Data.xlsx XLSX spreadsheet
N62470-19-R-2001_Rota_BOS_RFP.pdf PDF
_J-1503010-07_Floor_Plans.pdf PDF
_J-1503030-04_Solid_Waste_Disposal_Historical_Data.pdf PDF
_J-3_Section_B,_Supplies_or_Services_and_Prices.docx DOCX document
_J-1503010-07.a_Floor_Plans_BUMED.pdf PDF
_J-1800000_Environmental.pdf PDF
_J-0200000-06_SERVICE_PROVIDER_INFORMATION.xlsx XLSX spreadsheet
_J-1503020-07.a_Housing_Bait_Control_Points.pdf PDF
_J-7_Work_Pass_Format_Form.pdf PDF
_J-1503050_Grounds_Maintenance_and_Landscaping.pdf PDF
_J-1503010-06_Custodial_Inventory.xlsx XLSX spreadsheet
_J-1501000_Facility_Management.pdf PDF
_J-1502000-01_Facility_Investment-BUMED.pdf PDF
_J-5_Full_Time_Equivalent_(FTE).xlsx XLSX spreadsheet
_J-1502000-01-04_Equipment_and_Systems_Inventory_-_BUMED.xlsx XLSX spreadsheet
_J-4_Pre-Award_Inquiry_Form.xlsx XLSX spreadsheet
_J-1503020_Pest_Control.pdf PDF
_J-8_Representation_Regarding_Certain_Telecommunication_and_Video_Surveillance_Services_or_Equipment.pdf PDF
Show all 50

BASE OPERATIONS SUPPORT (BOS) SERVICES AT U. S. NAVAL STATION ROTA, SPAIN has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT F

SECTION F: DELIVERIES OR PERFORMANCE

DELIVERABLES (See Note 1)

Annex/ Spec Item

Form Attachment

Number Deliverable Title Date (s) of

Submission

Distribution

Frequency Original Copies

(including original)

0200000 Management and Administration 0200000/

2.2.1.2 N/A Request to Work

Outside Government’s Regular Working Hours

At least seven calendar days prior to requested day

KO/COR 2 As Required

0200000/ 2.3.4

N/A Permits and Licenses

Within 15 calendar days after award and any time as requested by the

KO

KO 1 As Specified

0200000/ 2.3.5

N/A Certificate of Insurance

Within 15 calendar days after award

KO 1 As Specified

0200000/ 2.3.11.3

N/A TJC Compliance and Documentation Plan

Within 30 calendar days after award

KO/COR/

Naval Hospital

Facility Department

3 As Specified

0200000/ 2.6.6.1

J-0200000-06 Service Provider Flat-file

At the end of the following work day when updates are required

KO 1 As Required

0200000/ 2.6.6.1

J-0200000-07 Asset Flat-file At the end of the following work day when updates are required

KO 1 As Required

0200000/ 2.6.6.1

J-0200000-08 Asset Specification Flat-file

At the end of the following work day when updates are required

KO 1 As Required

0200000/ 2.6.6.2

N/A Sample Delimited Flat-file

Within 15 calendar days after award

KO 1 As Specified

0200000/ 2.6.6.3

N/A List of Personnel Requiring

MAXIMO

Accounts

Within 15 calendar days after award and within seven calendar days of changes

KO 1 As Specified

Spec Item

Form Attachment

Number Deliverable Title Date (s) of

Submission

Distribution

Frequency Original Copies

(including original)

0200000/ 2.6.7

N/A List of Personnel Requiring DMLSS Accounts

Within 15 calendar days after award and within seven calendar days of changes

KO 1 As Specified

0200000/ 2.6.8

N/A List of Personnel Requiring Schooldude.com® Accounts

Within 15 calendar days after award and within seven calendar days of changes

KO 1 As Specified

0200000/ 2.6.9.1

N/A Quality Management (QM) Plan

Within 15 calendar days after award and within seven calendar days of changes

KO/COR 2 As Specified

0200000/ 2.6.9.2

N/A Quality Inspection and Surveillance File

Upon request during

Government’s regular working hours and within five calendar days of termination of the contract

KO/COR 2 As Specified

0200000/ 2.6.9.3

N/A Contractor Quality Inspection and Surveillance Report

First work day of each month

KO/COR 2 Monthly

0200000/ 2.7.1

N/A List of Key Personnel and Qualifications

Within 15 calendar days after award and 1 calendar day after any updates

KO/COR 2 As Specified

0200000/ 2.7.1

N/A Organizational Chart

Within 15 calendar days after award

KO/COR 2 As Specified

0200000/ 2.7.2.6

N/A Proof of Legal Residency

Prior to be admitted to site of work

KO 1 As Specified

0200000/ 2.7.2.9

N/A Record and Verification of Immunizations

Within 24 hours of request

KO 1 As Specified

Spec Item

Form Attachment

Number Deliverable Title Date (s) of

Submission

Distribution

Frequency Original Copies

(including original)

0200000/ 2.7.3

N/A Contractor Labor Hours (eCMRA) Report

No later than 31 October

KO 1 Annually for labor executed during the period of performance during each

Government fiscal year (FY)

0200000/ 2.8.1

N/A Employee List Within 15 calendar days after award and within seven calendar days of changes

KO/COR 2 As Required

0200000/ 2.8.8

N/A Personnel Security Investigation (PSI), Fingerprint Card (FD87), and OF- 306 Declaration for Federal Employment

Prior to employee access to sensitive unclassified information

KO/

Security Manager

1 As Required

0200000/ 2.8.8

Government-provided

Completed Personnel Security Investigation Documentation

Prior to be admitted to site of work

KO/COR 2 As Specified and then Annually

0200000/ 2.9.1

N/A Accident Prevention Plan

Within 15 calendar days after award and within seven calendar days of changes

KO/COR 2 As Specified

0200000/ 2.9.2

N/A Activity Hazard Analysis

Together with the Accident

Prevention Plan and for changes

KO/COR 2 As Specified

0200000/ 2.9.3

N/A Occupational Risk and Compliance Plans and Programs

Together with the Accident

Prevention Plan and for changes

KO/COR 2 As Specified

0200000/ 2.9.5

N/A NAVFAC

Contractor Incident Reporting System

(CIRS)

Within five calendar days of accident

KO/COR 2 As Required

0200000/ 2.9.5

J-0200000-04 Weight Handling Equipment Accident Report (Crane and Rigging Gear)

Within 30 calendar day of accident

KO/COR 2 As Required

Spec Item

Form Attachment

Number Deliverable Title Date (s) of

Submission

Distribution

Frequency Original Copies

(including original)

0200000/ 2.9.5

J-0200000-04 Crane and Rigging Gear Near Miss Report

Within 30 calendar day of accident

KO/COR 2 As Required

0200000/ 2.9.7

N/A Monthly On-Site Labor Report

First work day of each month

KO 1 Monthly

0200000/ 2.9.8

N/A Host Nation Citations and Violations Corrective Action Report

Within 48 hours after receiving a citation

KO/COR 2 As Required

0200000/ 2.9.8

N/A OSHA Citations and Violations Corrective Action Report

Within 48 hours after receiving a citation

KO/COR 2 As Required

0200000/ 2.9.10

N/A Safety Certifications

Within 15 calendar days after award and as old certifications expire

KO/COR 2 As Specified

0200000/ 2.10.1.1

N/A Water Conservation Plan

Within 15 calendar days after award and for changes

KO/COR 2 As Specified

0200000/ 2.10.2.1

N/A Sampling Plan Within 24 hours following sampling event and when resampling is required

KO/COR 2 As Specified

0200000/ 2.10.2.2

N/A Class I and II ODS Report

Within 24 hours following disposal

KO/COR 2 As Required

0200000/ 2.10.2.3

J-0200000-04 Solid Waste Management Report

Quarterly with recycling weight ticket receipts

KO/COR 2 As Required

0200000/ 2.10.2.8

J-0200000-04 Emergency Planning and Community Right to Know Act (EPCRA) Report

Within 15 calendar days after contract award and not less than 10 working days prior to planned use of hazardous material

KO/COR 2 As Specified

Spec Item

Form Attachment

Number Deliverable Title Date (s) of

Submission

Distribution

Frequency Original Copies

(including original)

0200000/ 2.10.2.7

N/A Spill Report Within 48 hours after spill

KO/COR 2 As Specified

0200000/ 2.10.2.8

J-0200000-04 Contractor Hazardous Material Inventory Log

Within 15 calendar days after the end of each calendar year and at termination of the contract

KO/COR 2 Annually

0200000/ 2.10.2.12

N/A Asbestos Containing Material (ACM) Notification

Written notification within 24 hours of discovery

KO/COR 2 As Specified

0200000/ 2.10.2.12

N/A Hazardous Air Pollutant (HAP) Tracking Form

Monthly and Semi-Annually

KO/COR 2 As Specified

0200000/ 2.10.3

N/A Sustainable Procurement and Practices Plan

Within 15 calendar days after award and within 15 calendar days after exercised option periods

KO 1 Annually

0200000/ 2.10.3

N/A Delivery of Services Report

Annually KO/COR 2 As Specified

0200000/ 2.10.3.2

N/A Recovered Material Certification

As Specified KO and COR 2 When a product containing recovered materials is equal to or better than the original and could be used

0200000/ 2.14.1

N/A Detailed Scope of Work and Detailed Estimate

Within two work days

KO and COR 2 As Required

0200000/ 2.14.3

N/A Inventory Update Report

When requested and at the end of each contract period

KO/COR 2 As Specified

0200000/ 2.15.1.1

N/A FedMall Non- Recurring Work Report

Monthly KO 1 As Specified

0200000/ 2.15.2.1

N/A Non-Recurring Work Preparation of Proposals

Within two working days following receipt of request

KO and COR 1 As required

Spec Item

Form Attachment

Number Deliverable Title Date (s) of

Submission

Distribution

Frequency Original Copies

(including original)

0501030 – Aviation Fuel Support 0501030/

2.2.1 N/A

Certification, Training, and Licensing

Within 15 days after award or as requested by the KO

KO/COR 2 Once for initial submittal, then as requested

0501030/ 2.3.1

N/A The Product Quality Surveillance Plan

Within 30 days of contract award

KO/COR 2 Once and Updated as Required

0501030/

3.1

N/A Standard Operating Procedures

Within 30 days after contract start and within five days of any changes

KO/COR and On-Site

3 Once and Updated as Required

3.1

N/A Notification of Unsafe Conditions Report

Upon discovery of unsafe conditions

KO/COR 2 As Specified

3.1.2.3

N/A FAS Reports, Pass Down Logs, and Daily Summary Reports

Daily Government Fuel

Accounting Office

1 As Specified

3.1.3

N/A PM Program Within 30 days of contract award

KO/COR 2 Once and Updated as Required

0501030/ 3.1.3

N/A Monthly PM Schedule

First day of following month

KO/COR 2 Monthly

0501030/ 3.1.3.1

N/A Maintenance Report

Within first 2 working day of completing maintenance

KO/COR/Fuel Officer

3 As Specified

1401000 – Family Housing 1401000/

2.2.1 N/A Certification, Training, and Licensing

Within 15 days after award or as requested by the KO

KO/COR/

Housing Officer

3 Once for initial submittal, then as requested

1401000/ 2.3.3

N/A “Tenant Not Home” Card Sample

15 days after award/

As Required

KO/COR/

Housing Officer

3 As Specified

1401000/ 3.1

N/A Residents’ Evaluations and Comments Sample Form

15 days after award/

As Required

KO/COR/

Housing Officer

3 As Specified

1401000/ 3.1.1

N/A Monthly Service Order Summary Report

First work day of each month

KO/COR/

Housing Officer

3 Monthly

Spec Item

Form Attachment

Number Deliverable Title Date (s) of

Submission

Distribution

Frequency Original Copies

(including original)

1401000/ 3.1.2

N/A Monthly Work Order Summary Report

First work day of each month

KO/COR/

Housing Officer

3 Monthly

1401000/ 3.1.3

N/A Preventive Maintenance (PM) Program

30 calendar days after contract award

KO/COR/

Housing Officer

3 Annually

1401000/ 3.1.3

N/A Monthly PM Work Schedule and Unaccomplished Maintenance Report

Five work days prior to the beginning of each month

KO/COR/

Housing Officer

3 Monthly

1401000/ 3.1.4

N/A Other Recurring Services Program Plan

30 calendar days after contract award

KO/COR/

Housing Officer

3 Annually

1401000/ 3.1.4.4

N/A Roof Cleaning Schedule

Within 15 calendar days prior to contract start

KO/COR/

Housing Officer

3 Annually and five calendar days prior to implementing any changes to the schedule 1401000/

3.1.4.7 N/A Rain Water

Drainage Systems Inspection and Cleaning Schedule

Within 15 calendar days prior to contract start

KO/COR/

Housing Officer

3 Annually and five calendar days prior to implementing any changes to the schedule 1401000/

3.1.5 N/A COM Inspection

Report At completion of each COM

KO/COR/

Housing Officer

3 As Specified

1501000 Facility Management 1501000/

2.3.1 N/A System Access

Personnel Listing Within 30 calendar days after contract award

COR/KO 2 Upon award and any change in personnel

1501000/ 3.2.1

N/A MAXIMO Asset Changes Report

By COB the third workday of each month

COR/KO and

FMD

3 Monthly

1502000-00 Facility Investment 1502000/

Licensing

Within 15 days after award or as requested by the KO

KO/COR 2 Once for initial submittal, then as requested

Spec Item

Form Attachment

Number Deliverable Title Date (s) of

Submission

Distribution

Frequency Original Copies

(including original)

1502000/ 2.3.5

N/A Third Party Certifications

Prior to purchase of any material that will come in contact with water for human consumption

KO/COR 2 As Specified

1502000/

N/A Monthly Maintenance Summary Report

Within first 2 working day of each month

KO/COR 2 Monthly

1502000/ 3.1

N/A Monthly Service Order Summary Report

First work day of each month

KO/COR 2 Monthly

1502000/ 3.1

N/A Weekly Service Order Summary Report

First work day of each week

KO/COR 2 Monthly

1502000/ 3.2

Preventive Maintenance (PM) Program

30 calendar days after contract award

KO/COR 2 Annually

1502000/ 3.2

N/A Monthly PM Schedule

Five work days prior to the beginning of each month

KO/COR 2 Monthly

1502000/ 3.2

N/A Monthly Unaccomplished PM Report

Five work days prior to the beginning of each month

KO/COR 2 Monthly

1502000/ 3.2.8

N/A Fuel and POL Systems Maintenance Report

Within first 2 working day of completing maintenance

KO/COR/Fuel Officer

3 As Specified

1502000/ 3.2.9

Grease Traps and Grease Tank Reservoir Annual Work Schedule and Monthly Work Plan

30 calendar days after contract award/ Five work days prior to the beginning of each month

KO/COR 2 As Specified

1502000/ 3.2.11

N/A Weight Tickets As Specified KO/COR 2 With Invoice/ Monthly

1502000/ 3.3

N/A Integrated Maintenance Program (IMP)

30 calendar days after contract award

KO/COR 2 Annually

Spec Item

Form Attachment

Number Deliverable Title Date (s) of

Submission

Distribution

Frequency Original Copies

(including original)

1502000/ 3.3

N/A Integrated Maintenance Program (IMP) (by school area/facility)

45 calendar days after contract award

KO/COR/

Facility

Manager

3 Annually

1502000/ 3.3

N/A Monthly IMP Schedule and IMP Maintenance and Repair Status

Five work days prior to the beginning of each month

KO/COR 2 Monthly

1502000/ 3..3

N/A IMP Deficiency Report

Within twenty-four (24) hours upon identification of deficiency(s)

KO/COR/

Facility

Manager

3 Annually

1502000/ 3.3.1.2

HVAC Water Testing and Treatment Program

Within 30 days following contract award

KO/COR 2 Annually

1502000/ 3.3.1.2

Treatment Test Reports

Within 2 working days from work completion

KO/COR 2 As Specified

1502000/ 3.3.13

Grease Trap Annual Work Schedule and Monthly Work Plan

30 calendar days after contract award/ Five work days prior to the beginning of each month

KO/COR 2 As Specified

1502000/ 3.3.16

N/A Fuel and POL Systems Maintenance Report

Within first 2 working day of completing maintenance

KO/COR/Fuel Officer

3 As Specified

1502000/ 3.4

Inspection, Testing, and Certification Program Summary Report

30 calendar days after contract award

KO/COR 2 As Specified

1502000/

Inspection, testing and certification Schedule and Copy of all Equipment Certifications

30 calendar days after contract award/ Within 2 working days from testing/ certification

KO/COR 2 As Specified

1502000/ 3.4.2

Boiler Air Emission Testing Report

Within 2 working days from testing/ certification

Spec Item

Form Attachment

Number Deliverable Title Date (s) of

Submission

Distribution

Frequency Original Copies

(including original)

1502000/ 3.5

Other Recurring Services Program Plan

30 calendar days after contract award

KO/COR 2 Annually

1502000/ 3.5

Summary Report

Within 2 working days from work completion

KO/COR 2 As Specified

1502000-01 Facility Investment-BUMED 1502000-

01/ 2.2

Licensing

Within 15 days after award and within four hours of request

KO/COR/

Naval Hospital

Facility Department

3 Once for initial submittal, then As

Requested

1502000- 01/

2.4.2

N/A The Joint Commission Compliance and Documentation Plan

Within 30 calendar days following award and whenever changes occur

KO/COR/

Naval Hospital

Facility Department

3 As Specified

1502000- 01/

N/A Monthly Maintenance Summary Report

Within first 2 working day of each month

KO/COR/

Naval Hospital

Facility Department

3 Monthly

1502000/ 3.1

N/A Weekly Service Order Summary Report

First work day of each week

KO/COR/

Naval Hospital

Facility Department

3 Monthly

1502000/

Integrated Maintenance Program Plan

30 calendar days after contract award

KO/COR/

Naval Hospital

Facility Department

3 Annually

1502000/

Treatment Report

Within first 2 working day of each month

KO/COR/

Naval Hospital

Facility Department

3 Monthly

1502000/ 3.2

N/A Monthly IMP Schedule and IMP Maintenance and Repair Status

Five work days prior to the beginning of each month

KO/COR/

Naval Hospital

Facility Department

3 Monthly

1502000/ 3.2.1.3

N/A DDC Maintenance Report

Five work days prior to the beginning of each month

KO/COR/

Naval Hospital

Facility Department

3 Monthly

1502000/ 3.2.2.2

Boiler Water

Treatment Program

Within 30 days following contract award

KO/COR/

Naval Hospital

Facility Department

3 Annually

Spec Item

Form Attachment

Number Deliverable Title Date (s) of

Submission

Distribution

Frequency Original Copies

(including original)

1502000/ 3.2.14

Public Address (PA) System IMP

Within 45 calendar days prior to contract start and annually

KO/COR/

Naval Hospital

Facility Department

3 Annually

1502000/ 3.2.14

Public Address (PA) System Changes on the One-Line Drawings

Within 12 months of contract start and when changes occur

KO/COR/

Naval Hospital

Facility Department

3 Monthly

1502000/ 3.2.15

Nurse Call and Code Blue System

IMP

Within 45 calendar days prior to contract start and annually

KO/COR/

Naval Hospital

Facility Department

3 Monthly

1502000/ 3.2.15

Nurse Call and Code Blue System Changes on the One-Line Drawings

Within 12 months of contract start and when changes occur

KO/COR/

Naval Hospital

Facility Department

3 Monthly

1502000/ 3.2.10/11

N/A Medical Air, Gas and Vacuum Systems Maintenance Report

First work day of each month

KO/COR/

Naval Hospital

Facility Department

3 Monthly

1502000/ 3.2.16

Infant Security System IMP

Within 45 calendar days prior to contract start and annually

KO/COR/

Naval Hospital

Facility Department

3 Monthly

1502000/ 3.2.16

Infant Security System Changes on the One-Line Drawings

Within 12 months of contract start and when changes occur

KO/COR/

Naval Hospital

Facility Department

3 Monthly

1502000/ 3.2.21

Fuel and POL Systems Maintenance Report

Five work days prior to the beginning of each month

KO/COR/

Naval Hospital

Fuel Officer

3 Monthly

1502000/ 3.3

Inspection, Testing, and Certification Program Summary Report

Within 2 working days from testing/ certification

KO/COR/

Naval Hospital

Facility Department

3 Monthly

1502000/ 3.3

Inspection, testing and certification schedule

First work day of each month

KO/COR/

Naval Hospital

Facility Department

3 Monthly

Spec Item

Form Attachment

Number Deliverable Title Date (s) of

Submission

Distribution

Frequency Original Copies

(including original)

1502000/ 3.3.2

The Contractor shall submit a Boiler Air Emission Testing Report

Within 2 working days from testing/ certification

KO/COR/

Naval Hospital

Facility Department

3 Monthly

1502000/

Plan

30 calendar days after contract award

KO/COR/

Naval Hospital

Facility Department

3 Annually

1502000/

Summary Report

Monthly KO/COR/ Naval Hospital

Facility Department

3 As Specified

1502000/ 3.4.3

Ceiling Tile Maintenance Report

Monthly KO/COR/ Naval Hospital

Facility Department

3 As Specified

1503010 Custodial 1503010/

2.2.1 N/A Pathogen Training

Certificates Upon request KO 1 Upon Request

1503010/ 2.4.1

Health Official Note

Prior to returning to work

KO/COR 2 As Specified

1503010/

N/A Annual Work Schedule

Within 30 calendar days following award and whenever changes occur

KO/COR 2 Annually

1503010/

N/A Monthly Work Plan

First work day of each month

KO/COR 2 Monthly

1503010/ 3.1.3.2

N/A Proposed Cleaning Products Samples and Technical Documentation

Within 15 calendar days after award

KO/COR 2 As Specified

1503010/ 3.1.3.2

N/A Proposed Restroom Supplies Samples and Technical Documentation

Within 15 calendar days after award

KO/COR 2 As Specified

1503010/ 3.4

N/A Unscheduled Services Report

First work day of each month for the previous month

KO/COR 2 Monthly

1503020 Pest Control

Spec Item

Form Attachment

Number Deliverable Title Date (s) of

Submission

Distribution

Frequency Original Copies

(including original)

1503020/ 2.2.1

N/A Copy of Spanish Government Certification for Contractor Personnel

15 calendar days prior to start of work.

Copies of renewed certifications shall also be submitted

KO/COR 2 As Required

1503020/ 2.2.1

N/A Copy of Required Pest Control Training Certification for Contractor Personnel

15 calendar days prior to start of work.

Copies of renewed certifications shall also be submitted

KO/COR 2 As Required

1503020/ 2.3.1

N/A Copy of Local/State Business License

Prior to contract award. Copies of renewed licenses shall also be submitted

KO 1 As Required

1503020/ 2.3.2

N/A Permits 5 days prior to the start of work requiring permits

KO/COR 2 As Required

1503020/ 2.3.4

N/A Ultra-Low Volume (ULV) Equipment Calibration and Droplet Analysis Report

15 days prior to the start of work and thereafter every 50 hours of

ULV equipment use

KO/COR 2 As Required

1503020/ 2.3.5

N/A Planned Pesticide Use Sheets including Pesticide Labels and Safety Data Sheets (SDS)

15 days prior to the start of work and 5 business days in advance prior to use of any substitute product

KO/COR 2 1 for each pesticide per pest As Required

1503020/ 2.3.5

N/A Proposed Changes in Pesticide Usage Request

15 business days in advance prior to use of any substitute product

Spec Item

Form Attachment

Number Deliverable Title Date (s) of

Submission

Distribution

Frequency Original Copies

(including original)

1503020/ 2.4

N/A Pest Management Record

Electronically within 1 day of each pest management operation

KO/

COR

2 As Required

1503020/ 2.4

N/A Report of Pest Management Operations

Electronically once per month by the 15th of the following month (Example: July data must be submitted by August 15)

KO/COR 2 Monthly

1503020/

N/A Contractor's Work Plan (CWP)

15 days prior to the start of work

KO/COR 2 Annually

1503020/

N/A Report of Conditions Conducive to Pest Infestation

1 working day after citing conditions

KO/COR 2 As Required

1503020/ 3.2.1

N/A Report of Pest Control Service Orders

Electronically once per month by the 15th of the following month (Example: July data must be submitted by August 15)

KO/COR 2 Monthly

1503030 Integrated Solid Waste Management 1503030/

2.3.1 N/A Weight Tickets As Specified KO/COR 2 With Invoice/

Monthly 1503030/

2.3.2 N/A Permits and

Licenses Within 15 days after award KO 1 As Required

1503030/ 3.1

N/A Solid Waste Collection Schedule

Within 30 calendar days following award and whenever changes occur

KO/COR 2 As Specified

1503030/ 3.4

N/A Sample of Containers

15 days after award/

As Required

1503050 Grounds Maintenance and Landscaping

Spec Item

Form Attachment

Number Deliverable Title Date (s) of

Submission

Distribution

Frequency Original Copies

(including original)

1503050/

Licensing

Within 15 calendar days prior to start of work. Copies of renewed certifications shall also be submitted

KO/COR 2 Annually and As Required by Section H

1503050/ 2.3.1.1

Business Licensing Within 15 calendar days prior to contract start/Copies of renewed licenses shall also be submitted

KO/COR 2 As Required

1503050/ 2.3.1.4

Planned Pesticide/ Herbicide Use Sheets including Pesticide/ Herbicide Labels and Safety Data Sheets (SDS)

Within 15 calendar days prior to contract start and at least

10 business days for any proposed changes

KO, COR,

PPMC

3 Annually for each pesticide/herbicide, As Required

1503050/ 2.3.1.5

N/A Pest Management Operations Report

Electronically by the 15th of the following month (Example: July data must be submitted by

August 15) on the format approved by

PMC.

KO, COR,

PPMC

2 Monthly

1503050/ 2.3.4

N/A Equipment Approval Request for Use Around Ammunition Bunkers

Before Commencing

Any Work / As Required

KO/COR 2 As Specified

1503050/ 2.3.2

N/A Permits Within 15 calendar days prior to start of work.

Spec Item

Form Attachment

Number Deliverable Title Date (s) of

Submission

Distribution

Frequency Original Copies

(including original)

1503050/ 2.3.9.1

N/A Water Conservation Plan

Within 15 calendar days prior to contract start

KO/COR 2 Annually and five calendar days prior to implementing changes to the schedule 1503050/

N/A Weight Tickets With Invoice KO/COR 2 As Specified

1503050/

J-1503050-04 Recycling Reporting Form

As Specified KO/COR 2 With each invoice

1503050/

N/A SDS sheets, catalog cut sheets, samples of all proposed fertilizers, and mulch

Prior to bringing on-board installation and prior to use

KO/COR 2 As Required

1503050/

N/A Contractor Work Schedules

Within 15 calendar days prior to contract start

KO/COR 2 Annually and five calendar days prior to implementing any changes to the schedule 1503050/

3.1 and 3.6.2.2

N/A Soil Analysis Test Results and Proposed Fertilizer

15 days after receipt of the test results by the Contractor

KO/COR 2 As Specified

1503050/ 3.1.1.3

N/A Soil Analysis Within 15 days after receipt of the test results by the Contractor

KO/COR 2 As Required

1503050/ 3.1.1.3

N/A Top Dressing and Over Seeding Seed Type

Within 15 calendar days prior to contract start

KO/COR 2 Annually and five calendar days prior to implementing changes to the schedule 1503050/

3.2 N/A Operational Areas

Maintenance Schedule (as part of the Contractor Work Schedules)

Within 15 calendar days prior to contract start

KO/COR 2 Annually and five calendar days prior to implementing any changes to the schedule 1503050/

3.3 N/A Debris Removal

Schedule (as part of the Contractor Work Schedules)

Within 15 calendar days prior to contract start

KO/COR 2 Annually and five calendar days prior to implementing any changes to the schedule

Spec Item

Form Attachment

Number Deliverable Title Date (s) of

Submission

Distribution

Frequency Original Copies

(including original)

1503050/ 3.5

N/A Grounds Maintenance Service Order Summary of Completion Report

By the fifth day of each month

KO/COR 2 Monthly

1800000 Environmental 1800000/

2.2.1 N/A Training Plan 15 days after

award/ Annually

KO/

Installation

Environmental Office

2 Annually

1800000/ 2.2.1

N/A Training Documentation

15 days after award/

Annually

KO/

Installation

Environmental Office

2 Once

1800000/ 2.3.1.1

N/A Laboratory Accreditation Documentation

Within 30 days of contract award for review and approval

KO/COR/

Waste Water

Program Manager

3 As Specified

1800000/ 2.3.1.1

N/A Final Validated Wastewater Sampling Reports

Within 30 days of the samples arriving at the lab

KO/COR/

Waste Water

Program Manager

3 As Specified

1800000/ 2.3.2

N/A Health and Safety Plan

Within 15 days after contract award for review and approval

KO/

Installation

Environmental Office

2 Once and any time a change is made

1800000/ 2.3.3

N/A OHS Spill Response and Preparedness Implementation Plan

Within 15 days after contract award for review and approval

KO/

Installation

Environmental Office

2 Once and any time a change is made

1800000/ 3.1.3

N/A Final Disposal Documentation (Signed)

Within seven

(7) days from the collection and off-site transportation

KO/

Installation

Environmental Office

2 As Specified

1800000/ 3.3

N/A Sampling Plan Within 30 days after contract/

Annually

KO/

Installation

Environmental Office

2 Annually

1800000/ 3.3.1

N/A Sample Collection Logs

7 days after sampling

KO/

Installation

Environmental Office

2 As Required

Spec Item

Form Attachment

Number Deliverable Title Date (s) of

Submission

Distribution

Frequency Original Copies

(including original)

1800000/ 3.3.2

N/A Laboratory Analysis Reports

14 days after receipt of sample

KO/

Installation

Environmental Office

2 As Required

1800000/ 3.3.1

N/A Final Recycling/Disposal Documentation

7 days from collection and off-site transportation

KO/

Installation

Environmental Office

1 Monthly

Notes: All deliverables shall be in Microsoft Office (Word/Excel) electronic format (email and on CD) unless otherwise specified.

File details come from the government source that posted it. Updated .