About this file

This document contains government responses to pre-proposal inquiries regarding solicitation number N4425523R1503 for the MCON P2002 Manchester Tank Farm Improvements project at the Manchester Fuel Depot in Manchester, Washington. The responses clarify requirements for painting miscellaneous metals and interior pipes as specified in section 33 56 21.17 of the project specifications. Offerors are directed to follow the painting requirements outlined in that specification section. The related federal contract opportunity notice provides additional details on the solicitation, including instructions to access the full project specifications and drawings through the Procurement Integrated Enterprise Environment system.

View the file

Other files

File Type Posted
N4425523R1503-0007 SF30 -Final.pdf PDF
Amendment 0007 PPI Responses.pdf PDF
N4425523R1503-0006 SF30.pdf PDF
PPI 095 01 45 00.00 20.pdf PDF
PPI 035 33 56 21.17.pdf PDF
PPI 086 Manchester Pier Loading Criteria.pdf PDF
N4425523R1503-0005 SF30 Final .pdf PDF
PPI Log Amendment 0005.pdf PDF
Attachment H Wage Determination Kitsap Heavy Amendment 0005.pdf PDF
PPI 077 01 14 00.pdf PDF
ES502 ELECTRICAL SITE DETAILS - 2 (TANKS)_sealed.pdf PDF
PPI 035 09 97 13.15.pdf PDF
PPI 034 LS Merchantable_Timber Contract_Requirements MAN Phase 2(Pre_Sale).pdf PDF
PPI 072 33 52 23.15.pdf PDF
PPI 040 MF801 TANK HYDROSTATIC TEST PLAN.pdf PDF
N4425523R1503-0004 SF30.pdf PDF
P-2002 Manchester Tank Farm Improvements Final GeoTech Report Rev1.pdf PDF
PPI 030 24535 - 50.000 Bl Floor Slab.pdf PDF
PPI 030 24667 - 50.000 Bl Structural Details.pdf PDF
Amendment 0003 PPI Responses.pdf PDF
N4425523R1503-0003 SF30.pdf PDF
N4425523R1503-0002 SF30.pdf PDF
PPI Responses.pdf PDF
Site Visit Log P2002.pdf PDF
Attachment J - SECNAV 5512 - May 2021.pdf PDF
P2002 PPI Spreadsheet Technical.pdf PDF
N4425523R1503-0001 SF30.pdf PDF
Attachments A-B-C-D-E-F-G-H.docx DOCX document
Attachment J Base Access Request Form.xls XLS spreadsheet
Attachment I NAVFAC Northwest BAVR Guide for Industry Contractors and Sponsored Visitors.pdf PDF
Attachment K Small Business Subcontracting Record.docx DOCX document
Attachment H Wage Determinations Kitsap Heavy.pdf PDF
Attachment L Small Business Participation and Commitment Strategy.docx DOCX document
N4425523R1503 P2002 Solicitation.pdf PDF
Show all 34

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Gov't

Tracking# Pre‐Proposal Inquiry

Govt Response Requirements:

1) Spec Section, Spec Title, paragraph, page

2) Drawing #

3) See Soliciation Amendment #

Addressed in

Amendment

Number

Response provided in PPI #70 stated to paint all miscellaneous metals. Painting of these same items was not required in Phase 1. Please advise it is the Government’s intent that phase 2 is to be different.

Response to PPI #70 is correct. 0006

Response provided in PP#91 acknowledges 2” stainless steel as not being required to be painted.

Contractor is also inquiring if the remaining interior of pipes inside of the tank need to be painted. Pipes in question are 6” suction, 18” fill and 24” suction; these pipes will not be able to be painted in the field and if coated at manufacturer will have to be held back at weld seams.

Please follow the requirements of specification 33 56 21.17, Part 2.1.1 0006