Attachment L Small Business Participation and Commitment Strategy.docx

DOCX document 20 KB Posted

Attached to
MCON P2002 Manchester Tank Farm Improvements, Manchester Fuel Depot, Fleet Logistics Center Puget Sound, Manchester, WA
Solicitation number
N4425523R1503
Issued by

About this file

This document is an Attachment L Small Business Participation and Commitment Strategy template for the solicitation MCON P2002 Manchester Tank Farm Improvements at the Manchester Fuel Depot for the Naval Facilities Engineering Command. The template requires the offeror to provide estimates for subcontracted and self-performed work, broken down by business type including small disadvantaged, women-owned, HUBZone, veteran-owned, and service-disabled veteran-owned small businesses. It also requires a supplemental narrative to address joint venture details and initiatives to enhance small business participation. The solicitation is for improvements to the Manchester Tank Farm at the Manchester Fuel Depot operated by the Fleet Logistics Center Puget Sound in Manchester, Washington.

View the file

Other files

File Type Posted
N4425523R1503-0007 SF30 -Final.pdf PDF
Amendment 0007 PPI Responses.pdf PDF
PPI Responses Amend 0006.pdf PDF
N4425523R1503-0006 SF30.pdf PDF
PPI 095 01 45 00.00 20.pdf PDF
PPI 035 33 56 21.17.pdf PDF
PPI 086 Manchester Pier Loading Criteria.pdf PDF
N4425523R1503-0005 SF30 Final .pdf PDF
PPI Log Amendment 0005.pdf PDF
Attachment H Wage Determination Kitsap Heavy Amendment 0005.pdf PDF
PPI 077 01 14 00.pdf PDF
ES502 ELECTRICAL SITE DETAILS - 2 (TANKS)_sealed.pdf PDF
PPI 035 09 97 13.15.pdf PDF
PPI 034 LS Merchantable_Timber Contract_Requirements MAN Phase 2(Pre_Sale).pdf PDF
PPI 072 33 52 23.15.pdf PDF
PPI 040 MF801 TANK HYDROSTATIC TEST PLAN.pdf PDF
N4425523R1503-0004 SF30.pdf PDF
P-2002 Manchester Tank Farm Improvements Final GeoTech Report Rev1.pdf PDF
PPI 030 24535 - 50.000 Bl Floor Slab.pdf PDF
PPI 030 24667 - 50.000 Bl Structural Details.pdf PDF
Amendment 0003 PPI Responses.pdf PDF
N4425523R1503-0003 SF30.pdf PDF
N4425523R1503-0002 SF30.pdf PDF
PPI Responses.pdf PDF
Site Visit Log P2002.pdf PDF
Attachment J - SECNAV 5512 - May 2021.pdf PDF
P2002 PPI Spreadsheet Technical.pdf PDF
N4425523R1503-0001 SF30.pdf PDF
Attachments A-B-C-D-E-F-G-H.docx DOCX document
Attachment J Base Access Request Form.xls XLS spreadsheet
Attachment I NAVFAC Northwest BAVR Guide for Industry Contractors and Sponsored Visitors.pdf PDF
Attachment K Small Business Subcontracting Record.docx DOCX document
Attachment H Wage Determinations Kitsap Heavy.pdf PDF
N4425523R1503 P2002 Solicitation.pdf PDF
Show all 34

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT L

SMALL BUSINESS PARTICIPATION AND COMMITMENT STRATEGY

(OFFEROR’S NAME)

(ADDRESS)

Solicitation or Contract Number (Title of the Project) (Location) (Date Prepared)

INSERT INTRODUCTION/EXECUTIVE SUMMARY (Up to 2 pages maximum)

SMALL BUSINESS PARTICIPATION AND COMMITMENT STRATEGY – (Base and Option Years)

1. Estimated value of all planned subcontracting$________________
____% of contract
2. Estimated value of all work to be self-performed$________________
____% of contract
3. Total value of the proposal (sum of 1. and 2. above)$________________
100% of contract

4. Subcontracts for products and services to be awarded under this project.

1. Self-Performed Work:

TYPE OF SERVICE/PRODUCT $ VALUE OF WORK

TOTAL: $________________
PERCENTAGE OF CONTRACT VALUE (line 3) _________%

If the Offeror is a small business, the Government will add self-performed work to the appropriate category(ies) in c. (1) through c. (6) below to calculate overall small business participation rates.

1. Other Than Small (OTS) Business Subcontracts**

NAME OF COMPANY* TYPE OF SERVICE/PRODUCT $ VALUE OF SUBCONTRACT

TOTAL: $________________
PERCENTAGE OF CONTRACT VALUE (line 3) ________%

1. Small Business (SB) Subcontracts

NAME OF COMPANY* TYPE OF SERVICE/PRODUCT $ VALUE OF SUBCONTRACT

TOTAL: $________________
PERCENTAGE OF CONTRACT VALUE (line 3) ________%

(1) SMALL DISADVANTAGED BUSINESSES: (SDB)

NAME OF COMPANY* TYPE OF SERVICE/PRODUCT $ VALUE OF SUBCONTRACT

TOTAL: $________________
PERCENTAGE OF CONTRACT VALUE (line 3) ________%

(2) WOMEN-OWNED SMALL BUSINESSES: (WOSB)

NAME OF COMPANY* TYPE OF SERVICE/PRODUCT $ VALUE OF SUBCONTRACT

TOTAL: $_______________
PERCENTAGE OF CONTRACT VALUE (line 3) ________%

(3) HISTORICALLY UNDERUTILIZED BUSINESS ZONE (HUBZone) CONCERN:

NAME OF COMPANY* TYPE OF SERVICES $ VALUE OF SUBCONTRACT

TOTAL: $________________
PERCENTAGE OF CONTRACT VALUE (line 3) _________%

(4) VETERAN OWNED SMALL BUSINESS: (VOSB)

NAME OF COMPANY* TYPE OF SERVICES $ VALUE OF SUBCONTRACT

TOTAL: $________________
PERCENTAGE OF CONTRACT VALUE (line 3) __________%

(5) SERVICE-DISABLED VETERAN OWNED SMALL BUSINESS: (SDVOSB)

NAME OF COMPANY* TYPE OF SERVICES $ VALUE OF SUBCONTRACT

TOTAL: $________________
PERCENTAGE OF CONTRACT VALUE (line 3) ________%

(6) ABILITYONE PROGRAM ORGANIZATIONS

NAME OF ORG* TYPE OF SERVICES $ VALUE OF SUBCONTRACT

TOTAL: $________________
PERCENTAGE OF CONTRACT VALUE (line 3) _________%

* For each company/organization listed, describe the nature of commitment to subcontract and whether or not it is legally binding. If unknown/to be determined, so indicate.

** Include any subcontracts to Historically Black Colleges and Universities/Minority Institutions (HBCU/MI) in the OTS Business listing.

NOTES:

1. The dollar sum of lines 4.b and 4.c (excluding (1)-(6)) must equal line 1.

2. Lines 4.c. (1) through 4.c. (6) identify various subcategories of small businesses. Subcontracts to companies that qualify in multiple categories must be reported under each category. For example: A $100,000 subcontract to ABC, a woman-owned, small disadvantaged business that is also a certified HUBZone concern, will be reported as $100,000 on line 4.c., SB, line 4.c. (1), SDB, line 4.c. (2), WOSB and line 4.c.(3), HUBZone concern.

3. Subcontracts to qualified nonprofit agencies participating in the AbilityOne Program are considered small business subcontracts for the purposes of this strategy and any associated small business subcontracting plan.

INSERT SUPPLEMENTAL NARRATIVES (limited to five pages) TO ADDRESS JOINT VENTURE PARTICULARS AND OTHER STRATEGY ELEMENTS SUCH AS THE NATURE OF COMMITMENTS/AGREEMENTS COVERING POST AWARD ROLES, SPECIFIC INITIATIVES AND TOOLS TO ENHANCE SMALL BUSINESS PARTICIPATION AND CAPABILITIES AND HOW SMALL BUSINESS PARTICIPATION RATES WERE DETERMINED.

CONTRACT LEVEL PERFORMANCE SUMMARY

This document summarizes participation (total contract performance, including self-performance and subcontracted efforts) by type of business entity in terms of both dollar value and percentage of total contract value.

Base

Option 1

Option 2

TOTAL

DOLLARS

Total contract value

OTS Business*

SB*

SDB

WOSB

HUBZone SB

VOSB

SDVOSB

ABILITYONE

PERCENTAGES (of total contract value)

OTS Business*

SB*

OTSB + SB

100
%
100
%
100
%
100
%

SDB

WOSB

HUBZone SB

VOSB

SDVOSB

ABILITYONE

Include additional option years if applicable

* The sums of the “OTS Business” and “SB” dollars lines (excluding subcategories) must equal the associated dollar values on the “Total dollar value of this contract” line. The sum of “OTS Business” and “SB” percentage lines (again, excluding subcategories) must equal 100% and represent all work to be performed under the contract.

File details come from the government source that posted it. Updated .