P2002 PPI Spreadsheet Technical.pdf
PDF 183 KB Posted
- Solicitation number
- N4425523R1503
About this file
This document contains responses to pre-proposal inquiries for solicitation number N4425523R1503 from the Department of the Navy Naval Facilities Engineering Command. The solicitation is for improvements to the Manchester Tank Farm at the Manchester Fuel Depot in Manchester, Washington. Services required include construction of aboveground fuel storage facilities with tanks over 50,000 barrels, demolition and removal of underground fuel tanks over 35,000 barrels, construction of secondary containment structures, cathodic protection systems, and automatic tank gauging and fuel handling equipment. The response document clarifies evaluation criteria and technical requirements, such as extending the timeframe for relevant project experience from 10 to 12 years and allowing ductile iron control valves. The pre-proposal inquiry deadline is 7 calendar days before the solicitation due date unless otherwise amended.
View the file
Other files
Show all 34
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Gov't Tracking#
Pre‐Proposal Inquiry
Govt Response Requirements:
1) Spec Section, Spec Title, paragraph, page
2) Drawing #
3) See Soliciation Amendment #
Addressed in Amendment Number
Please confirm that “CLIN 0003 and 0004 can be exercised within 910 days of contract award in accordance with 52.217‐7” should state “CLIN 0004 and 0005 can be exercised within 910 days of contract award in accordance with 52.217‐7” If so, please provide an updated schedule of prices.
Refer to the updated Schedule of Prices and revised 52.217‐7 provided by Amendment 0001. 0001
Attachment K was provided but was not included in the solicitation instructions. Please advise.
To be addressed in future amendment.
Attachment L was provided but was not included in the solicitation instructions. Please advise.
To be addressed in future amendment.
Page 12 of the solicitation states: Small Business Subcontracting Plan. In accordance with FAR 19.703, large businesses are required to submit an acceptable small business subcontracting plan that meets the requirements of FAR 19.704 prior to award utilizing the format provided in Attachment C. The subcontracting plan (if applicable) shall be submitted electronically via email to emily.m.easterday.civ@us.navy.mil with a copy to jodus.d.hortin.civ@us.navy.mil no later than 2:00 pm PST two business days after the due date for submitting the proposal. Please confirm this referenced due date for the subcontracting plan would be Wednesday, September 6, 2023 with the Labor Day holiday on Monday, September 4, 2023.
Confirmed 0001
Page 13 Price Instructions (a) Price instructions goes from item (i) to item (iii). Please clarify if there is missing content that should be item (ii) or if that item was just inadvertently missed.
No missing content 0001
Page 13 Price Instructions There is no mention of the price schedule in the price instructions. Should this be included immediately after the
SF1442?
Price schedule is on page 3‐4 of the solicitation 0001
Page 13 Price Instructions (iv) Completed Representations and Certifications, including the supplemental certifications provided in Section 00600 of the solicitation, are current and posted in SAM; There is no Section 00600 provided in the solicitation, can you please provide that via amendment?
See Amendment 0001 0001
Solicitation Page 15 of 77 Section 00 21 16 B. Evaluation Factors for Award
(b) Technical Factors: (1) Factor 1 – Corporate Experience:
Complexity: 1st paragraph, 2nd Sentence ‐ “Projects submitted for the Offeror shall be substantially complete (owner can occupy facility) within ten (10) years preceding the original date of issuance of this solicitation”.
Question: An Offeror is required to demonstrate experience with the construction of 50,000 barrel fuel tanks on a minimum of 2 and a maximum of 5 construction projects in order to be deemed technically acceptable for this project. Furthermore, these construction projects are required to be no older than ten (10) years. 50,000 barrel tanks are not constructed frequently in this industry. We request that the timeframe for recent and relevant construction projects be extended from ten (10) years to twelve (12) years. Please advise as soon as possible if this is acceptable.
Solicitation Section 00 21 16 has been revised by Amendment 0001 to reflect that 12 years is acceptable. 0001
Pre‐Proposal Inquiry
Govt Response Requirements:
1) Spec Section, Spec Title, paragraph, page
2) Drawing #
3) See Soliciation Amendment #
Addressed in Amendment Number
Solicitation Page 15 of 77 Section 00 21 16 B. Evaluation Factors for Award
(b) Technical Factors: (1) Factor 1 – Corporate Experience:
Scope: 2nd Paragraph – “Demolition and removal of underground fuel storage tanks with individual volumes no less than 35,000 barrels”.
Question: Demolition and removal of underground fuel storage tanks that are 35,000 barrels or larger are very uncommon in this industry. We request the tank demolition requirement be modified slightly per one for the two options presented below:
Option 1: Demolition and removal of underground or aboveground fuel storage tanks with individual volumes no less than 35,000 barrels
OR
Option 2: Demolition and removal of underground fuel storage tanks with individual volumes no less than 14,000 barrels
Please advise if this modification is acceptable as soon as possible
No change. 0001
(Pg 15 of Solicitation)‐ Section 00 21 16 ‐ Instructions to Proposers, paragraph B. EVALUATION FACTORS FOR AWARD, Factor 1 Corporate Experience, Scope Element No. 1 requires Construction of above ground fuel storage facilities with transfer pipelines for liquid fuel with minimum individual tank storage volume (capacity) of 50,000 barrels of fuel storage. The 50,000‐barrel size criteria is not common and will significantly limit competition on this project.
We request the Government consider reducing the tank fuel storage size criteria from 50,000 barrels to 40,000 barrels to allow greater competition as there have been very few bulk fuels projects constructed over the past 10 years requiring greater than 40,000‐barrel fuel storage tanks. Additionally, the actual design and construction materials/methods to construct a 40,000‐barrel tank are nearly identical to that of a 50,000‐barrel tank.
No change 0001
Pre‐Proposal Inquiry
Govt Response Requirements:
1) Spec Section, Spec Title, paragraph, page
2) Drawing #
3) See Soliciation Amendment #
Addressed in Amendment Number
(Pg 15 of Solicitation) ‐ Section 00 21 16 ‐ Instructions to Proposers, paragraph B. EVALUATION FACTORS FOR AWARD, Factor 1 Corporate Experience states “Every project shall meet at least one scope element, and the corresponding minimum size of 50,000 barrels of fuel storage. Failure to meet all of the criteria will result in an unacceptable rating” Note, there are 5 scope elements identified and scope elements 2, 4 and 5 do not specify a minimum size criterion (i.e. tank capacity):
1) Construction of above ground fuel storage facilities with transfer pipelines for liquid fuel with minimum individual tank storage volume (capacity) of 50,000 barrels of fuel storage.
2) Construction of fuel tank secondary containment structures.
3) Demolition and removal of underground fuel storage tanks with individual volumes no less than 35,000 barrels.
4) Cathodic protection of field erected aboveground tanks and associated constructed fuel systems.
5) Automatic Tank Gauging (ATG) & Automatic Fuel Handling Equipment (AFHE) System installation with instrumentation and controls integration. Please confirm that scope elements 2, 4 and 5 do not have corresponding minimum size requirements (i.e. tank capacity).
Confirmed. Solicitation Section 00 21 16 has been revised accordingly by Amendment 0001. 0001
PROPOSAL INSTRUCTIONS Page 10 Pre‐Proposal Inquiries. Offerors who determine that the technical and/or contractual requirements of this RFP require clarification shall submit all questions in writing. The pre‐proposal inquiry format is provided as Attachment A, Pre Proposal Inquiry Form. Pre‐Proposal Inquiries shall be submitted via email to Emily.m.easterday.civ@us.navy.mil with a copy to jodus.d.hortin.civ@us.navy.mil. Pre proposal inquiries will be accepted up to 7 days prior to solicitation due date unless specified otherwise via amendment. Please clarify if it is 7 business days or calendar days, thank you!
It is calendar days. 0001
The dwg shows (2) each 6” Double Block and Bleed (DBB) plug valves at the West pier valve pit and (1) DBB valve at Valve Pit 6. Is the Contractor responsible for providing these (3) 6” DBB valves?
Spec 33 52 43.14, paragraph 2.2.1.1, “Bodies, Bonnets, and Covers” The Spec requires internally electroless nickel plated (ENP) cast steel (WCB)/(LCB) or cast stainless steel (ASTM A743) control valves. Internally electroless nickel plated Ductile Iron control valves were allowed on phase 1. The contract requires ANSI Class 150# 14” control valves. 14” cast steel and cast stainless steel control valves are extremely expensive and have a long lead time due to the fact they are not regularly manufactured. We are requesting that ENP ductile iron be allowed for Phase 2 due to cost and availability of cast steel and cast stainless steel. 14” ENP ductile iron control valves are more readily available and cost less due to the amount of volume that have been manufactured.
Pre‐Proposal Inquiry
Govt Response Requirements:
1) Spec Section, Spec Title, paragraph, page
2) Drawing #
3) See Soliciation Amendment #
Addressed in Amendment Number
Attachments:
PPI Responses Attachment J – SECNAV 5512/1 (MAY 2021)