PPI 072 33 52 23.15.pdf
PDF 86 KB Posted
- Solicitation number
- N4425523R1503
About this file
This document provides specifications for welding on petroleum, oil, and lubricant (POL) service piping systems. It outlines requirements for welding procedures, welder qualifications, inspections, testing, and defect repair. Welding must be performed according to qualified procedures using qualified welders and welding operators. All joints must be welded unless otherwise indicated. Welds must meet minimum standards for visual inspection, magnetic particle examination, and liquid penetrant examination. Radiographic testing is required on field welds at a frequency of at least 10% of total welds. Defective welds must be repaired according to specification by qualified welders using qualified procedures and re-inspected to ensure defects have been eliminated. The interior of piping must be kept clean before and after installation.
View the file
Other files
Show all 34
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Phase 2 Tank Far m I mpr ovement s ( P2002) N4425522F4025 FLCPS Manchest er , Washi ngt on PN 139588
SECTI ON 33 52 23. 15
POL SERVI CE PI PI NG WELDI NG
11/ 18
PART 1 GENERAL
1. 1 REFERENCES
The publ i cat i ons l i s t ed bel ow f or m a par t of t hi s speci f i cat i on t o t he ext ent r ef er enced. The publ i cat i ons ar e r ef er r ed t o wi t hi n t he t ext by t he basi c desi gnat i on onl y.
AMERI CAN SOCI ETY FOR NONDESTRUCTI VE TESTI NG ( ASNT)
ASNT SNT- TC- 1A ( 2020) Recommended Pr act i ce f or Per sonnel Qual i f i cat i on and Cer t i f i cat i on i n Nondest r uct i ve Test i ng
AMERI CAN SOCI ETY OF MECHANI CAL ENGI NEERS ( ASME)
ASME B31. 3 ( 2020) Pr ocess Pi pi ng
ASME BPVC SEC V ( 2017) BPVC Sect i on V- Nondest r uct i ve Exami nat i on
AMERI CAN WELDI NG SOCI ETY ( AWS)
AWS A2. 4 ( 2012) St andar d Symbol s f or Wel di ng, Br azi ng and Nondest r uct i ve Exami nat i on
AWS A3. 0M/ A3. 0 ( 2020) St andar d Wel di ng Ter ms and Def i ni t i ons
AWS A5. 1/ A5. 1M ( 2012) Speci f i cat i on f or Car bon St eel El ect r odes f or Shi el ded Met al Ar c Wel di ng
AWS A5. 4/ A5. 4M ( 2012) Speci f i cat i on f or St ai nl ess St eel El ect r odes f or Shi el ded Met al Ar c Wel di ng
AWS A5. 9/ A5. 9M ( 2017) Wel di ng Consumabl es- Wi r e El ect r odes, St r i p El ect r odes, Wi r es, and Rods f or Ar c Wel di ng of St ai nl ess and Heat Resi st i ng St eel s- Cl assi f i cat i on
AWS A5. 18/ A5. 18M ( 2021) Speci f i cat i on f or Car bon St eel El ect r odes and Rods f or Gas Shi el ded Ar c Wel di ng
AWS A5. 22/ A5. 22M ( 2012) Speci f i cat i on f or St ai nl ess St eel Fl ux Cor ed and Met al Cor ed Wel di ng El ect r odes and Rods
AWS A5. 32/ A5. 32M ( 2021) Wel di ng Consumabl es- Gases and Gas Mi xt ur es f or Fusi on Wel di ng and Al l i ed Pr ocesses
AWS C5. 5/ C5. 5M ( 2003) Recommended Pr act i ces f or Gas
SECTI ON 33 52 23. 15 Page 1 8/ 28/ 2023 Amendment 0003
Tungst en Ar c Wel di ng
AWS D1. 1/ D1. 1M ( 2020; Er r at a 1 2021) St r uct ur al Wel di ng Code - St eel
AWS D10. 4 ( 1986; R 2000) Recommended Pr act i ces f or Wel di ng Aust eni t i c Chr omi um- Ni ckel St ai nl ess St eel Pi pi ng and Tubi ng
AWS D10. 7/ D10. 7M ( 2008) Gui de f or t he Gas Shi el ded Ar c Wel di ng of Al umi num and Al umi num Al l oy Pi pe
AWS D10. 10/ D10. 10M ( 2021) Recommended Pr act i ces f or Local Heat i ng of Wel ds i n Pi pi ng and Tubi ng
AWS D10. 11M/ D10. 11 ( 2007) Gui de f or Root Pass Wel di ng of Pi pe Wi t hout Backi ng
AWS D10. 12M/ D10. 12 ( 2000) Gui del i ne f or Wel di ng Mi l d St eel Pi pe
AWS QC1 ( 2016) Speci f i cat i on f or AWS Cer t i f i cat i on of Wel di ng I nspect or s
AWS WHB- 4. 9 ( 2010) Wel di ng Handbook, Vol ume 4 - Mat er i al s and Appl i cat i ons Par t 1
AWS Z49. 1 ( 2012) Saf et y i n Wel di ng and Cut t i ng and Al l i ed Pr ocesses
1. 2 DEFI NI TI ONS
Def i ni t i ons must be i n accor dance wi t h AWS A3. 0M/ A3. 0 except as f ol l ows:
a. Wel d s l ag i s def i ned as t he cr yst al l i ne r esi due r emai ni ng on t he wel d sur f ace f ol l owi ng a wel d pr ocedur e whi ch uses f l ux as a shi el di ng met hod.
b. POL ser vi ce pi pi ng consi st s of pi pi ng and component s used f or pet r ol eum, oi l and l ubr i cant s ( POL) under pr essur e or gr avi t y f or ce i ncl udi ng modi f i cat i ons t o exi st i ng hydr ant f uel i ng syst ems.
1. 3 SUBMI TTALS
Gover nment appr oval i s r equi r ed f or submi t t al s wi t h a " G" or " S" c l assi f i cat i on. Submi t t al s not havi ng a " G" or " S" c l assi f i cat i on ar e f or Cont r act or Qual i t y Cont r ol appr oval . Submi t t he f ol l owi ng i n accor dance wi t h Sect i on 01 33 00 SUBMI TTAL PROCEDURES:
SD- 01 Pr econst r uct i on Submi t t al s
Wel di ng Pr ocedur e Speci f i cat i ons ( WPS) ; G
Wel der Per f or mance Qual i f i cat i on ( WPQ) ; G
Pr ocedur e Qual i f i cat i on Recor d ( PQR) ; G
Wel di ng Oper at i ons; G
SECTI ON 33 52 23. 15 Page 2
NDE Wel d I nspect i on Test Pl an; G
SD- 02 Shop Dr awi ngs
POL Ser vi ce Pi pi ng; G
SD- 06 Test Repor t s
Wel di ng Repor t s
Exami nat i ons, I nspect i ons and Test s
SD- 07 Cer t i f i cat es
Qual i f i cat i ons; G
1. 4 GENERAL REQUI REMENTS
Thi s sect i on cover s t he wel di ng of Pet r ol eum, Oi l and Lubr i cant ( POL) Ser vi ce syst ems. Devi at i ons f r om appl i cabl e codes, appr oved pr ocedur es, and appr oved det ai l dr awi ngs wi l l not be per mi t t ed wi t hout pr i or wr i t t en appr oval by t he Cont r act i ng Of f i cer . Mat er i al s or component s wi t h wel ds made of f s i t e wi l l not be accept ed i f t he wel di ng does not conf or m t o t he r equi r ement s of t hi s speci f i cat i on, unl ess ot her wi se speci f i ed.
Pr ocedur es must be devel oped by t he Cont r act or f or wel di ng al l met al s i ncl uded i n t he wor k. Wel di ng must not be st ar t ed unt i l wel di ng pr ocedur es, wel der s, and wel di ng oper at or s have been qual i f i ed.
Qual i f i cat i on t est i ng must be per f or med by an appr oved t est i ng l abor at or y, or by t he Cont r act or i f appr oved by t he Cont r act i ng Of f i cer . Cost s of such t est i ng must be bor ne by t he Cont r act or . The Cont r act i ng Of f i cer must be not i f i ed at l east one week i n advance of t he t i me and pl ace of t he t est s. I f t he Cont r act i ng Of f i cer el ect s t o wi t ness t he t est s, t he qual i f i cat i on t est s must be per f or med at or near t he wor ksi t e. The Cont r act or must mai nt ai n cur r ent r ecor ds of t he t est r esul t s obt ai ned i n t he wel di ng pr ocedur e, wel di ng oper at or , wel der per f or mance qual i f i cat i ons, and nondest r uct i ve exami nat i on ( NDE) pr ocedur es r eadi l y avai l abl e at t he s i t e f or exami nat i on by t he Cont r act i ng Of f i cer . The pr ocedur es f or maki ng t r ansi t i on wel ds bet ween di f f er ent mat er i al s or bet ween pl at es or pi pes of di f f er ent wal l t hi cknesses must be qual i f i ed.
Unl ess ot her wi se speci f i ed, t he choi ce of wel di ng pr ocess must be t he r esponsi bi l i t y of t he Cont r act or . I t shoul d be not ed t hat ASME B31. 3 i ncor por at es by r ef er ence, ot her r equi r ement s of ASME Sect i on V, Sect i on I X and speci f i c AWS r equi r ement s.
1. 5 PERFORMANCE
The Cont r act or wi l l be r esponsi bl e f or t he qual i t y of al l j oi nt pr epar at i on, wel di ng, and exami nat i on. Al l mat er i al s used i n t he wel di ng oper at i ons must be cl ear l y i dent i f i ed and r ecor ded. The i nspect i on and t est i ng def i ned i n t hi s speci f i cat i on ar e mi ni mum r equi r ement s.
Addi t i onal i nspect i on and t est i ng must be t he r esponsi bi l i t y of t he Cont r act or when he deems i t necessar y t o achi eve t he qual i t y r equi r ed.
1. 6 QUALI FI CATI ONS
Wel di ng pr ocedur es, wel der s, and wel di ng oper at or s pr evi ousl y qual i f i ed by t est may be accept ed f or t he wor k wi t hout r equal i f i cat i on, pr ovi ded t hat al l of t he f ol l owi ng condi t i ons ar e f ul f i l l ed:
SECTI ON 33 52 23. 15 Page 3
a. Copi es of t he wel di ng pr ocedur e speci f i cat i ons ( WPS) , t he pr ocedur e qual i f i cat i on r ecor d ( PQR) r ecor d, and t he wel der per f or mance qual i f i cat i on ( WPQ) ar e submi t t ed and appr oved i n accor dance wi t h par agr aph SUBMI TTALS.
b. Test i ng was per f or med by an appr oved t est i ng l abor at or y or appr oved t echni cal consul t ant or by t he Cont r act or ' s appr oved qual i t y assur ance or gani zat i on.
c. The wel di ng pr ocedur es, wel der s, and wel di ng oper at or s wer e qual i f i ed i n accor dance wi t h ASME B31. 3 and base mat er i al s, f i l l er mat er i al s, el ect r odes, equi pment , and pr ocesses conf or med t o t he appl i cabl e r equi r ement s of t hi s speci f i cat i on.
d. The r equi r ement s of par agr aph RENEWAL OF QUALI FI CATI ON bel ow ar e met and r ecor ds showi ng name of empl oyer and per i od of empl oyment usi ng t he pr ocess f or whi ch qual i f i ed ar e submi t t ed as evi dence of conf or mance.
1. 6. 1 Wel di ng Oper at i ons
The Cont r act or must pr ovi de a descr i pt i on of how t he cr i t i cal wel di ng oper at i ons wi l l be accompl i shed. Pr ovi de t he wel di ng pr ocedur es t o be used f or each oper at i on, t he sequence of wel di ng t o mi ni mi ze heat di st or t i on, sequence of wel di ng pi pi ng sect i ons bot h i n t he t r ench and out si de, machi ne wel di ng i f used, and mul t i pl e wel der s on same pi pe wel d.
Submi t det ai l ed pr ocedur es whi ch def i ne met hods of compl i ance t o cont r act dr awi ngs and speci f i cat i ons.
1. 6. 2 Wel di ng Pr ocedur e Speci f i cat i on and Pr ocedur e Qual i f i cat i on Recor ds
The Cont r act or must r ecor d i n det ai l and must qual i f y t he Wel di ng Pr ocedur e Speci f i cat i ons f or ever y pr oposed wel di ng pr ocedur e.
Qual i f i cat i on f or each wel di ng pr ocedur e must conf or m t o t he r equi r ement s of ASME B31. 3 and t o t hi s speci f i cat i on. The wel di ng pr ocedur es must speci f y back pur ge gas r equi r ement s, end pr epar at i on f or but t wel ds i ncl udi ng cl eani ng, al i gnment , and r oot openi ngs. Pr eheat , i nt er pass t emper at ur e cont r ol , and post heat t r eat ment of wel ds must be as r equi r ed by appr oved wel di ng pr ocedur es, unl ess ot her wi se i ndi cat ed or speci f i ed.
Copi es of t he wel di ng pr ocedur e speci f i cat i ons and wel d pr ocedur e qual i f i cat i on r ecor d r esul t s f or each t ype of wel di ng r equi r ed must be submi t t ed i n accor dance wi t h par agr aph SUBMI TTALS. Appr oval of any pr ocedur e does not r el i eve t he Cont r act or of t he sol e r esponsi bi l i t y f or pr oduci ng accept abl e wel ds. Wel di ng pr ocedur es must be i dent i f i ed i ndi v i dual l y and must be r ef er enced on t he POL ser vi ce pi pi ng shop dr awi ngs. Submi t det ai l dr awi ngs showi ng l ocat i on, l engt h, and t ype of wel ds; and i ndi cat i ng pr ewel d and post wel d heat t r eat ment and NDE as r equi r ed. The dr awi ngs must show t he wel di ng pr ocedur e speci f i cat i on ( WPS) t o be used at each wel d l ocat i on.
1. 6. 3 Wel der and Wel di ng Oper at or Per f or mance
Each wel der and wel di ng oper at or assi gned t o wor k must be qual i f i ed i n accor dance wi t h ASME B31. 3.
1. 6. 3. 1 Cer t i f i cat i on
Bef or e assi gni ng wel der s or wel di ng oper at or s t o t he wor k, t he Cont r act or must pr ovi de t he Cont r act i ng Of f i cer wi t h t hei r names t oget her wi t h
SECTI ON 33 52 23. 15 Page 4 cer t i f i cat i on t hat each i ndi v i dual i s per f or mance- qual i f i ed as speci f i ed.
The cer t i f i cat i on must st at e t he t ype of wel di ng and posi t i ons f or whi ch each i s qual i f i ed, t he code and wel di ng pr ocedur e speci f i cat i on under whi ch each i s qual i f i ed, dat e qual i f i ed, and t he f i r m and i ndi v i dual cer t i f y i ng t he qual i f i cat i on t est s. The Cont r act or must pr ovi de a summar y t abl e showi ng al l wel der s and t he WPS wi t h whi ch t hey ar e qual i f i ed t o wel d.
1. 6. 3. 2 I dent i f i cat i on
Each par t i cul ar wel d must be i dent i f i ed wi t h t he per sonal number , l et t er , or symbol assi gned t o each wel der or wel di ng oper at or . To i dent i f y wel ds, wr i t t en r ecor ds i ndi cat i ng t he l ocat i on of wel ds made by each wel der or wel di ng oper at or must be submi t t ed, and each wel der or wel di ng oper at or must appl y t he per sonal mar k adj acent t o t he wel ds usi ng a r ubber st amp or f el t - t i pped mar ker wi t h per manent , weat her pr oof i nk or ot her met hods appr oved by t he Cont r act i ng Of f i cer t hat do not def or m t he met al .
I dent i f i cat i on by di e st amps or el ect r i c et cher s wi l l not be al l owed.
1. 6. 3. 3 Renewal of Qual i f i cat i on
Requal i f i cat i on of a wel der or wel di ng oper at or must be r equi r ed under any of t he f ol l owi ng condi t i ons:
a. When a wel der or wel di ng oper at or has not used t he speci f i c wel di ng pr ocedur e f or a per i od of 3 mont hs; t he per i od may be ext ended t o 6 mont hs i f t he wel der or wel di ng oper at or has been empl oyed on anot her wel di ng pr ocedur e.
b. When a wel der or wel di ng oper at or has not wel ded wi t h any pr ocedur e dur i ng a per i od of 3 mont hs, al l t he per sonal qual i f i cat i ons must be consi der ed expi r ed, i ncl udi ng any ext ensi on by v i r t ue of a. above.
c. Ther e i s speci f i c r eason t o quest i on t he per son' s abi l i t y t o make wel ds t hat wi l l meet t he r equi r ement s of t he speci f i cat i ons.
d. The wel der or wel di ng oper at or was qual i f i ed by an empl oyer , ot her t han t hose f i r ms per f or mi ng wor k under t hi s cont r act , and a qual i f i cat i on t est has not been t aken wi t hi n t he pr ecedi ng 12 mont hs.
e. Renewal of qual i f i cat i on f or a speci f i c wel di ng pr ocedur e under condi t i ons a. , b. , and d. , above, needs t o be made on onl y a s i ngl e t est j oi nt or pi pe of a t hi ckness, posi t i on, or mat er i al r equi r ed by t he wel di ng pr ocedur e speci f i cat i ons t o r eest abl i sh t he wel der ' s or wel di ng oper at or ' s qual i f i cat i on f or t he pr evi ous qual i f i cat i on.
1. 6. 4 Test Repor t s
Test r epor t s must consi st of t he f ol l owi ng.
a. Recor ds made by t he AWS cer t i f i ed i nspect or f or al l dut i es per f or med per par agr aph 4. 2 of AWS QC1.
b. Al l NDE ( r adi ogr aph) r epor t s wi t h uni que wel d I D f or each wel d t est ed.
c. " Wel d Maps" . These maps/ dr awi ngs cor r el at e t he shop dr awi ngs submi t t ed t o t he NDE r epor t s. The NDE r epor t t hat shows a wel d number as accept abl e i s cor r el at ed wi t h wel d number on t he dr awi ngs.
SECTI ON 33 52 23. 15 Page 5
d. Pr ovi de t he l ocat i on of each wel d, what pr ocedur e was used, whi ch wel der di d t he wel d, t he r esul t s of t he v i sual t est , and t he r esul t s of t he NDE.
1. 6. 5 I nspect i on and NDE Per sonnel
Cont r act or must pr ovi de a commer ci al l y i ndependent or gani zat i on f or al l wel d exami nat i ons. Al l i nspect i on and NDE per sonnel must be qual i f i ed i n accor dance wi t h t he f ol l owi ng r equi r ement s. The cont r act or must submi t t he qual i f i cat i ons of al l t he t est i ng per sonnel t hat wi l l per f or m al l f i el d t est s f or r evi ew by t he Cont r act i ng Of f i cer . The qual i f i cat i ons of al l per sonnel on t he j ob s i t e t hat wi l l per f or m wel di ng i nspect i ons and NDE must be submi t t ed f or appr oval . Al l i nspect or s and NDE per sonnel must have a mi ni mum of one year exper i ence i nspect i ng t he pi pi ng mat er i al bei ng used and f i ve year s i n mi l i t ar y or commer ci al ai r cr af t hydr ant f uel i ng syst ems or t r uck f uel i ng syst ems, pet r ol eum r ef i ner i es, power gener at i ng pl ant s, or chemi cal pr ocess pl ant s.
1. 6. 5. 1 I nspect or Cer t i f i cat i on
Vi sual wel di ng i nspect or s must be qual i f i ed i n accor dance wi t h AWS QC1.
1. 6. 5. 2 NDE Per sonnel
NDE per sonnel must be cer t i f i ed Level I I i n accor dance wi t h ASME Sect i on V, ASME B31. 3 and ASNT SNT- TC- 1A f or each NDE pr ocedur e he i s r equi r ed t o use, and a wr i t t en pr ocedur e f or t he cont r ol and admi ni st r at i on of NDE per sonnel t r ai ni ng, exami nat i on, and cer t i f i cat i on must be est abl i shed.
The pr ocedur es must be based on appr opr i at e speci f i c and gener al gui del i nes of t r ai ni ng and exper i ence r ecommended by ASNT SNT- TC- 1A.
Shoul d t he NDE exami ner al so be a wel der , t hat i ndi v i dual i s di squal i f i ed f r om exami ni ng t hei r own wor k.
1. 7 DELI VERY, STORAGE, AND HANDLI NG
Al l f i l l er met al s, el ect r odes, and ot her wel di ng mat er i al s must be del i ver ed t o t he s i t e i n manuf act ur er s ' or i gi nal packages and st or ed i n a dr y space unt i l used. Packages must be pr oper l y l abel ed and desi gned t o gi ve maxi mum pr ot ect i on f r om moi st ur e and t o i nsur e saf e handl i ng.
1. 7. 1 Mat er i al Cont r ol
Mat er i al s must be st or ed i n a cont r ol l ed access and cl ean, dr y ar ea t hat i s weat her t i ght and i s mai nt ai ned at a t emper at ur e r ecommended by t he manuf act ur er . The mat er i al s must not be i n cont act wi t h t he f l oor and must be st or ed on wooden pal l et s or cr i bbi ng.
1. 7. 1. 1 Damaged Cont ai ner s
Low- hydr ogen st eel el ect r odes must be st or ed i n t hei r seal ed shi ppi ng cont ai ner . I f t he seal i s damaged dur i ng shi pment or st or age, and t he damage i s not i mmedi at el y det ect ed, t he cover ed el ect r odes i n t hat cont ai ner must be r ebaked i n accor dance wi t h t he manuf act ur er ' s i nst r uct i ons pr i or t o i ssuance or must be di scar ded. I f a cont ai ner i s damaged i n st or age and t he damage i s wi t nessed, t he el ect r odes f r om t hat cont ai ner must be i mmedi at el y pl aced i n a st or age oven. The st or age oven t emper at ur e must be as r ecommended by t he manuf act ur er or t he wel di ng mat er i al speci f i cat i on.
SECTI ON 33 52 23. 15 Page 6
1. 7. 1. 2 Par t i al I ssues
When a cont ai ner of cover ed el ect r odes i s opened and onl y a por t i on of t he cont ent i s i ssued, t he r emai ni ng por t i on must , wi t hi n t he l i mi t s est abl i shed by AWS D1. 1/ D1. 1M be pl aced i n a st or age oven.
1. 7. 2 Damaged Mat er i al s
Mat er i al s whi ch ar e damaged must be di scar ded. Cover ed el ect r odes whi ch ar e oi l or wat er - soaked, di r t y, or on whi ch t he f l ux has separ at ed f r om t he wi r e must be di scar ded.
1. 8 SYMBOLS
Symbol s must be i n accor dance wi t h AWS A2. 4.
1. 9 SAFETY
Saf et y pr ecaut i ons must conf or m t o AWS Z49. 1.
PART 2 PRODUCTS
2. 1 WELDI NG MATERI ALS
Wel di ng mat er i al s f or car bon st eel , and st ai nl ess st eel and al umi num must compl y wi t h AWS WHB- 4. 9. Wel di ng equi pment , el ect r odes, wel di ng wi r e, shi el di ng and backi ng gas, and f l uxes must be capabl e of pr oduci ng sat i sf act or y wel ds when used by a qual i f i ed wel der or wel di ng oper at or usi ng qual i f i ed wel di ng pr ocedur es. Al l f i el d gi r t h r oot pass wel ds must be made wi t h non- cover ed el ect r odes or wel di ng wi r e. Al l r oot passes must be made wi t h shi el di ng and backi ng gas. Ext er nal wel ds on t he pi pe such as at t achi ng pi pe suppor t s may be made wi t h cover ed el ect r odes or wel di ng wi r e. El ect r odes, wel di ng wi r e and/ or f l uxes must be i n accor dance wi t h Tabl e 1.
TABLE I
AWS Pr ocess Al l oy Consumabl e Use
( Exampl es) ( 1)
AWS A5. 1/ A5. 1M SMAW Low Car bon E7018 Fi l l
AWS A5. 4/ A5. 4M SMAW St ai nl ess E308L, E309L Fi l l
AWS A5. 9/ A5. 9M GTAW St ai nl ess ER308L, ER309L Root and Fi l l
AWS A5. 18/ A5. 18M GTAW Low Car bon E70S- 3, E70S- 6 Root and Fi l l
AWS A5. 22/ A5. 22M GTAW St ai nl ess E308LT1- 1 Root ( Backi ng and Shi el di ng Gas Requi r ed)
AWS A5. 32/ A5. 32M GTAW Al l Shi el di ng Gas
SECTI ON 33 52 23. 15 Page 7
TABLE I
AWS Pr ocess Al l oy Consumabl e Use
( Exampl es) ( 1)
Not e( 1) : The consumabl e mat er i al desi gnat i ons shown ar e exampl es onl y and ar e not i nt ended t o l i mi t t he Cont r act or ' s sel ect i on of consumabl e mat er i al s.
PART 3 EXECUTI ON
3. 1 WELDI NG OPERATI ONS
Wel di ng must be per f or med i n accor dance wi t h qual i f i ed pr ocedur es usi ng qual i f i ed wel der s and wel di ng oper at or s. Wel di ng must not be done when t he qual i t y of t he compl et ed wel d coul d be i mpai r ed by t he pr evai l i ng wor ki ng or weat her condi t i ons. The Cont r act i ng Of f i cer must det er mi ne when weat her or wor ki ng condi t i ons ar e unsui t abl e f or wel di ng. Wel di ng of hanger s, suppor t s, and pl at es t o st r uct ur al member s must conf or m t o Sect i on 05 05 23. 16 STRUCTURAL WELDI NG.
Wel di ng must be per f or med i n accor dance wi t h ASME B31. 3 and t he appl i cabl e por t i ons of AWS D10. 4, AWS D10. 7/ D10. 7M, AWS D10. 10/ D10. 10M, AWS D10. 11M/ D10. 11, AWS D10. 12M/ D10. 12, and AWS C5. 5/ C5. 5M.
Al l j oi nt s unl ess i ndi cat ed ot her wi se, i n car bon st eel and st ai nl ess st eel pi pi ng syst ems must be wel ded. Unl ess ot her wi se appr oved, al l gi r t h wel ds must be compl et e penet r at i on gr oove wel ds made i n accor dance wi t h qual i f i ed wel di ng pr ocedur es. The r oot pass on st ai nl ess st eel and car bon st eel pi pe must be by t he GTAW pr ocess.
a. Wel d Pr epar at i on must compl y wi t h t he r equi r ement s of ASME B31. 3 and t he qual i f i ed Wel di ng Pr ocedur e Speci f i cat i on. The use of " r i ce paper " as pur ge bl ocks i s not per mi t t ed. Cont r act or must submi t al t er nat e met hod f or appr oval .
b. Backi ng Ri ngs. The use of backi ng r i ngs f or maki ng or r epai r i ng wel ds wi l l not be per mi t t ed.
3. 1. 1 Base Met al Pr epar at i on
Oxy- f uel cut t i ng must not be used on aust eni t i c st ai nl ess st eel or nonf er r ous mat er i al s.
Mechani cal gr i ndi ng of t her mal cut ends must be used t o r emove t he heat af f ect ed ar ea but shoul d be l i mi t ed t o maxi mum 1/ 8 i nch.
3. 1. 2 Wel d Joi nt Fi t - Up
Par t s t hat ar e t o be j oi ned by wel di ng must be f i t t ed, al i gned, and r et ai ned i n posi t i on dur i ng t he wel di ng oper at i on by t he use of bar s, j acks, c l amps, or ot her mechani cal f i x t ur es. End wel ds must be pr oper l y al i gned pr i or t o wel di ng i n accor dance wi t h Chapt er V of ASME B31. 3. Al l socket - wel ded j oi nt s must be pr oper l y f i t t ed wi t h gaps bet ween t he pi pe and t he bot t om of t he socket i n accor dance wi t h ASME B31. 3. Cont r act or must i mpl ement a pr ogr am t o ensur e gaps ar e pr oper l y measur ed and document ed. Wel ded t empor ar y at t achment s must not be used except when i t
SECTI ON 33 52 23. 15 Page 8 i s i mpr act i cal t o use mechani cal f i x t ur es. When t empor ar y at t achment s ar e used, t hey must be t he same mat er i al as t he base met al , and must be compl et el y r emoved by gr i ndi ng or t her mal cut t i ng af t er t he wel di ng oper at i on i s compl et ed. I f t her mal cut t i ng i s used, t he at t achment must be cut t o not l ess t han 1/ 4 i nch f r om t he member and t he bal ance r emoved by gr i ndi ng. Af t er t he t empor ar y at t achment has been r emoved, t he ar ea must be vi sual l y exami ned.
3. 1. 3 But t Wel d Joi nt Spaci ng
But t wel d j oi nt s must be spaced a mi ni mum of 6 i nches apar t . Measur ement must be t aken f r om t he t oe of t he f i r st wel d t o t he t oe of t he second wel d. The measur ement must be t aken at t he c l osest poi nt bet ween t he wel ds when vi sual l y i nspect ed. I f spaci ng i s not possi bl e due t o exi st i ng condi t i ons, a r educt i on i n spaci ng t o not l ess t han 2 i nches may be made.
3. 1. 4 Pr eheat and I nt er pass Temper at ur es
Pr eheat t emper at ur es must meet t he r equi r ement s speci f i ed by ASME B31. 3.
However , i n no case wi l l t he pr eheat be bel ow 50 degr ees F f or f er r i t i c st eel or aust eni t i c st ai nl ess st eel , or 32 degr ees F f or nonf er r ous al l oys. The maxi mum i nt er pass t emper at ur es must not exceed 300 degr ees F f or aust eni t i c st ai nl ess st eel s, ni ckel al l oys, and copper al l oys; and 500 degr ees F f or car bon st eel s. Pr eheat t echni ques must be such as t o ensur e t hat t he f ul l t hi ckness of t he wel d j oi nt pr epar at i on and or adj acent base mat er i al , at l east 3 i nches i n al l di r ect i ons, i s at t he speci f i ed t emper at ur e. Pr eheat i ng by i nduct i on or r esi st ance met hods i s pr ef er r ed.
When f l ame heat i ng i s used, onl y a neut r al f l ame must be empl oyed.
Oxy- f uel heat i ng must not be used on aust eni t i c st ai nl ess st eel ; however , ai r - f uel heat i ng i s accept abl e i f cont r ol l ed t o ensur e t hat t he sur f ace t emper at ur e does not exceed 150 degr ees F. I nt er pass t emper at ur es must be checked on t he sur f ace of t he component wi t hi n one i nch of t he wel d gr oove and at t he st ar t i ng l ocat i on of t he next wel d pass, and f or a di st ance of about 6 i nches ahead of t he wel d, but not on t he ar ea t o be wel ded.
3. 1. 5 Pr oduct i on Wel di ng I nst r uct i ons
a. Wel di ng must not be done when t he ambi ent t emper at ur e i s l ower t han 0 degr ees F.
b. Wel di ng i s not per mi t t ed on sur f aces t hat ar e wet or cover ed wi t h i ce, when snow or r ai n i s f al l i ng on t he sur f aces t o be wel ded, or dur i ng per i ods of hi gh wi nds, unl ess t he wel der s and t he wor k ar e pr oper l y pr ot ect ed.
c. Gases f or pur gi ng and shi el di ng must be wel di ng gr ade and must have a dew poi nt of mi nus 40 degr ees F or l ower .
d. Back pur ges ar e r equi r ed f or aust eni t i c st ai nl ess st eel s and nonf er r ous al l oys wel ded f r om one si de and must be set up such t hat t he f l ow of gas f r om t he i nl et t o t he out l et or i f i ce passes acr oss t he ar ea t o be wel ded. The oxygen cont ent of t he gas exi t i ng f r om t he pur ge vent must be l ess t han 2 per cent pr i or t o wel di ng. The f l ow r at e must be t hat r equi r ed by t he appr oved wel d pr ocedur e speci f i cat i on.
e. The pur ge on gr oove wel ds must be mai nt ai ned f or at l east t wo passes or 3/ 16 i nch whi chever i s gr eat er .
SECTI ON 33 52 23. 15 Page 9 f . Removabl e pur ge dam mat er i al s must be made of expandabl e or f l exi bl e pl ugs, such as Pl exi gl as, pl ywood ( whi ch must be dr y when used) . Wood dams must be ki l n- dr i ed qual i t y. Pur ge dams must not be made of pol yvi nyl al cohol .
g. Any wel di ng pr ocess whi ch r equi r es t he use of ext er nal gas shi el di ng must not be done i n a dr af t or wi nd unl ess t he wel d ar ea i s pr ot ect ed by a shel t er . Thi s shel t er must be of mat er i al and shape appr opr i at e t o r educe wi nd vel oci t y i n t he v i c i ni t y of t he wel d t o a maxi mum of 5 mph ( 440 f pm) .
h. Tack wel ds t o be i ncor por at ed i n t he f i nal wel ds must have t hei r ends t aper ed by gr i ndi ng or wel di ng t echni que. Tack wel ds t hat ar e cr acked or def ect i ve must be r emoved and t he gr oove must be r et acked pr i or t o wel di ng. Tempor ar y t ack wel ds must be r emoved, t he sur f ace gr ound smoot h, and vi sual l y i nspect ed. For l ow- al l oy and har denabl e hi gh- al l oy st eel s, t he ar ea must be magnet i c par t i c l e exami nat i on i nspect ed.
i . Gr i ndi ng of compl et ed wel ds i s t o be per f or med onl y t o t he ext ent r equi r ed f or NDE, i ncl udi ng any i nser vi ce exami nat i on, and t o pr ovi de wel d r ei nf or cement wi t hi n t he r equi r ement s of ASME B31. 3. I f t he sur f ace of t he wel d r equi r es gr i ndi ng, r educi ng t he wel d or base mat er i al bel ow t he mi ni mum r equi r ed t hi ckness must be avoi ded.
Mi ni mum wel d ext er nal r ei nf or cement must be f l ush bet ween ext er nal sur f aces.
j . Each qual i f i ed wel der must be assi gned an i dent i f i cat i on symbol . Al l wel ds must be per manent l y mar ked wi t h t he symbol of t he i ndi v i dual who made t he wel d.
3. 1. 6 Post wel d Heat Tr eat ment
a. When r equi r ed post wel d heat t r eat ment must be per f or med i n accor dance wi t h ASME B31. 3. Temper at ur es f or l ocal post wel d heat t r eat ment must be measur ed cont i nuousl y by t her mocoupl es i n cont act wi t h t he wel dment .
b. Post wel d heat t r eat ment of l ow- al l oy st eel s, when r equi r ed, must be per f or med i mmedi at el y upon compl et i on of wel di ng and pr i or t o t he t emper at ur e of t he wel d f al l i ng bel ow t he pr eheat t emper at ur e.
However , post wel d heat t r eat ment may be post poned af t er t he compl et i on of t he wel d, i f , i mmedi at el y af t er t he wel d i s compl et ed, i t i s mai nt ai ned at a mi ni mum t emper at ur e of 300 degr ees F or t he pr eheat t emper at ur e, whi chever i s gr eat er , f or 2- hour s per one i nch of wel d t hi ckness.
3. 2 EXAMI NATI ONS, I NSPECTI ONS AND TESTS
Wel d i nspect i on and NDE must be per f or med by t he Cont r act or t o det ect sur f ace and i nt er nal di scont i nui t i es i n compl et ed wel ds. The ser vi ces of a qual i f i ed commer ci al i nspect i on or t est i ng l abor at or y or t echni cal consul t ant meet i ng t he r equi r ement s of par agr aph I NSPECTI ON AND NDE PERSONNEL, appr oved by t he Cont r act i ng Of f i cer , must be empl oyed by t he Cont r act or . Al l compl et ed wel ds must be vi sual l y i nspect ed i n accor dance wi t h t he v i sual i nspect i on r equi r ement s of ASME B31. 3 and AWS D1. 1/ D1. 1M.
Radi ogr aphi c, Li qui d penet r ant or Magnet i c par t i c l e exami nat i on must be r equi r ed as i ndi cat ed bel ow. When i n- pr ocess wel d qual i t y cont r ol i s r equi r ed f or t i e- i n wel ds, i t must be per f or med i n accor dance wi t h ASME B31. 3. When i nspect i on and t est i ng i ndi cat es di squal i f y i ng def ect s
SECTI ON 33 52 23. 15 Page 10 i n a wel d j oi nt , t he wel d must be r epai r ed by a qual i f i ed wel der i n accor dance wi t h par agr aph CORRECTI ONS AND REPAI RS. The Cont r act or must submi t wel d i nspect i on and NDE f i el d t est i ng r epor t s t o t he Cont r act i ng Of f i cer .
The per son per f or mi ng t he wel d i nspect i on must per f or m t he f ol l owi ng:
a. Ver i f y t hat t he base mat er i al s and consumabl e wel di ng mat er i al s conf or m t o t he speci f i cat i ons and t hat wel di ng f i l l er met al s used ar e as speci f i ed f or each base mat er i al .
b. Ver i f y t hat t he wel di ng equi pment t o be used f or t he wor k i s appr opr i at e f or use wi t h t he wel di ng pr ocedur e speci f i cat i on and has t he capabi l i t y t o meet t he appl i cabl e r equi r ement s of t he wel di ng pr ocedur e.
c. Ver i f y t hat onl y appr oved or qual i f i ed wel di ng pr ocedur es ar e used f or t he wor k.
d. Ver i f y t hat t he edge pr epar at i on or j oi nt geomet r y meet t he r equi r ement s of t he wel di ng pr ocedur e and dr awi ngs.
e. Ver i f y t hat t he speci f i ed f i l l er met al s ar e used and t hat f i l l er met al s ar e mai nt ai ned i n pr oper condi t i on, per r equi r ement s, or as r ecommended by t he manuf act ur er .
f . Ver i f y t hat t he t echni que and per f or mance of each wel der , wel di ng oper at or , and t ack wel der ar e as speci f i ed.
g. Ver i f y t hat t he wor k conf or ms t o r equi r ement s of t he appl i cabl e st andar ds, dr awi ngs, or ot her document s.
h. Ver i f y t hat t he wor k i nspect ed i s i dent i f i ed and document ed i n accor dance wi t h speci f i ed r equi r ement s.
i . Pr epar e c l ear and conci se r epor t s and ver i f y t hat r ecor ds of t he r esul t s of exami nat i ons ar e mai nt ai ned.
j . Ver i f y t he appr oved WPS pr e- heat and post heat pr ocedur es ar e bei ng used.
3. 2. 1 Vi sual I nspect i on
Wel d j oi nt s must be i nspect ed vi sual l y as f ol l ows:
a. Bef or e wel di ng - f or compl i ance wi t h r equi r ement s f or j oi nt pr epar at i on, al i gnment and f i t - up, and cl eanl i ness i n accor dance wi t h
ASME B31. 3.
b. Dur i ng wel di ng - f or cr acks and conf or mance t o t he appr oved wel di ng pr ocedur e onl y when i n- pr ocess wel d qual i t y cont r ol i s r equi r ed by
ASME ASME B31. 3.
c. Af t er wel di ng - f or cr acks, cont our and f i ni sh, bead r ei nf or cement , under cut t i ng, over l ap, wel d s l ag on t he i nt er i or of t he pi pe and si ze of wel ds i n accor dance wi t h ASME B31. 3 and AWS D1. 1/ D1. 1M. Vi sual exami nat i on of t he i nt er i or of t he pi pe may be per f or med by any of t he r emot e means al l owed by ASME BPVC SEC V, v i sual i nspect i on. Vi sual
SECTI ON 33 52 23. 15 Page 11 exami nat i on of t he wel d must be per f or med pr i or t o any ot her NDE exami nat i ons as r equi r ed by t hi s speci f i cat i on.
3. 2. 2 NDE Test i ng Fr equency
Pi pe f i el d wel ds, i ncl udi ng hi gh poi nt vent pi pe t ees, i nser t but t wel ded wel d- o- l et s, and l ow poi nt dr ai n pi pe, must be exami ned by r adi ogr aphi c met hods at t he f r equency of i nspect i on c l ar i f i ed bel ow. Al l socket wel ds and sock- o- l et s or wel d- o- l et s t o pi pe wel ds must be exami ned wi t h ei t her magnet i c par t i c l e or l i qui d penet r ant met hods, i n addi t i on t o t he v i sual exami nat i ons. The ser vi ces of a qual i f i ed commer ci al or t est i ng l abor at or y appr oved by t he Cont r act i ng Of f i cer must be empl oyed by t he Cont r act or f or t est i ng of pi pi ng wel ds. Cost s of t est i ng, i ncl udi ng r et est i ng of r epai r ed wel ds, must be bor ne by t he Cont r act or .
a. Pr ovi de sel ect r andom r adi ogr aphi c t est i ng i n accor dance wi t h ASME B31. 3 f or al l abovegr ound pi pi ng. The i nspect i on must i ncl ude an exami nat i on of wel ds made by each wel di ng oper at or or wel der . Not l ess t han 10 per cent of pr oj ect t ot al wel ds shal l be exami ned.
Cont r act or shal l submi t t o t he Cont r act i ng Of f i cer f or Gover nment r evi ew and appr oval t he NDE Wel d I nspect i on Test Pl an whi ch def i nes t he t est l ot gr oupi ngs whi ch wi l l each r ecei ve 10 per cent i nspect i on f or appr oval . Test l ot gr oupi ngs shal l r epr esent al l di f f er ent wel di ng envi r onment s and pr ocedur es and shal l i ncl ude as a mi ni mum shop wel ds, wor k l aydown ar e wel ds, and t i e- i n wel ds. I f t he t est i ng r eveal s t hat any wel ds f ai l t o meet mi ni mum qual i t y r equi r ement s, an addi t i onal per cent of t he wel ds i n t hat same gr oup must be i nspect ed i n accor dance wi t h ASME B31. 3. I f al l of t he addi t i onal wel ds i nspect ed meet t he qual i t y r equi r ement s, t he ent i r e gr oup of wel ds r epr esent ed must be accept ed and t he def ect i ve wel ds must be r epai r ed. I f any of t he addi t i onal wel ds i nspect ed al so f ai l t o meet t he qual i t y r equi r ement s, t hat ent i r e gr oup of wel ds must be r ej ect ed. The r ej ect ed wel ds must be r emoved and r ewel ded, or t he r ej ect ed wel ds must be 100 per cent i nspect ed and al l def ect i ve wel d ar eas r emoved and r ewel ded.
3. 2. 3 NDE Test i ng
NDE must be as r equi r ed by ASME B31. 3 and i n accor dance wi t h wr i t t en pr ocedur es. Pr ocedur es f or r adi ogr aphi c, l i qui d penet r ant and magnet i c par t i c l e t est s and met hods must conf or m t o ASME BPVC SEC V. Onl y Radi ogr aphy ar e accept abl e t est met hods f or but t wel ded j oi nt s. The appr oved pr ocedur e must be demonst r at ed t o t he sat i sf act i on of t he Cont r act i ng Of f i cer . I n addi t i on t o t he i nf or mat i on r equi r ed i n ASME BPVC SEC V, t he wr i t t en pr ocedur es must i ncl ude t he t i mi ng of t he NDE i n r el at i on t o t he wel di ng oper at i ons and saf et y pr ecaut i ons.
The ser vi ces of a commer ci al l y i ndependent qual i f i ed t est i ng agency appr oved by t he Cont r act i ng Of f i cer must be empl oyed by t he Cont r act or f or t est i ng of pi pi ng wel ds. Cost s of t est i ng, i ncl udi ng r et est i ng of r epai r ed wel ds, must be bor ne by t he Cont r act or . Wel d r i ppl es or sur f ace i r r egul ar i t i es t hat mi ght mask or be conf used wi t h t he r adi ogr aphi c i mage of any obj ect i onabl e def ect must be r emoved by gr i ndi ng and, or ot her sui t abl e mechani cal means. The wel d sur f ace must be mer ged smoot hl y wi t h t he base met al sur f ace.
3. 2. 4 I nspect i on and Test s by t he Gover nment
The Gover nment may per f or m i nspect i on and suppl ement al nondest r uct i ve or
SECTI ON 33 52 23. 15 Page 12 dest r uct i ve t est s as deemed necessar y. The cost of suppl ement al NDE wi l l be bor ne by t he Gover nment . The cor r ect i on and r epai r of def ect s and t he r eexami nat i on of wel d r epai r s must be per f or med by t he Cont r act or at no addi t i onal cost t o t he Gover nment . I nspect i on and t est s wi l l be per f or med as r equi r ed f or v i sual i nspect i on and NDE, except t hat dest r uct i ve t est s may be r equi r ed al so. When dest r uct i ve t est s ar e or der ed by t he Cont r act i ng Of f i cer and per f or med by t he Cont r act or and t he speci mens or ot her suppl ement al exami nat i ons i ndi cat e t hat t he mat er i al s and wor kmanshi p do not conf or m t o t he cont r act r equi r ement s, t he cost of t he t est s, cor r ect i ons, and r epai r s must be bor ne by t he Cont r act or . When t he speci mens or ot her suppl ement al exami nat i ons of dest r uct i ve t est s i ndi cat e t hat mat er i al s or wor kmanshi p do conf or m t o t he speci f i cat i on r equi r ement s, t he cost of t he t est s and r epai r s wi l l be bor ne by t he Gover nment . When dest r uct i ve t est s ar e made, r epai r s must be made by qual i f i ed wel der s or wel di ng oper at or s usi ng wel di ng pr ocedur es whi ch wi l l devel op t he f ul l st r engt h of t he member s cut . Wel di ng must be subj ect t o i nspect i on and t est s i n t he mi l l , shop, and f i el d. When mat er i al s or wor kmanshi p do not conf or m t o t he speci f i cat i on r equi r ement s, t he wor k may be r ej ect ed at any t i me bef or e f i nal accept ance of t he syst em cont ai ni ng t he wel dment .
3. 3 ACCEPTANCE STANDARDS
Accept ance st andar ds must be i n accor dance wi t h ASME B31. 3 par agr aph
341. 3. 2, Chapt er VI i n addi t i on t o t he f ol l owi ng speci f i ed i t ems.
3. 3. 1 Vi sual
The f ol l owi ng i ndi cat i ons ar e unaccept abl e:
Wel d Sl ag on t he i nt er i or of t he pi pe.
3. 3. 2 Magnet i c Par t i c l e Exami nat i on
The f ol l owi ng r el evant i ndi cat i ons ar e unaccept abl e:
a. Any l i near i ndi cat i ons.
b. Rounded i ndi cat i ons wi t h di mensi ons gr eat er t han 3/ 16 i nch.
c. Four or mor e r ounded i ndi cat i ons i n a l i ne separ at ed by 1/ 16 i nch or l ess edge- t o- edge.
d. Ten or mor e r ounded i ndi cat i ons i n any 6 squar e i nches of sur f ace wi t h t he maj or di mensi on of t hi s ar ea not t o exceed 6 i nches wi t h t he ar ea t aken i n t he most unf avor abl e l ocat i on r el at i ve t o t he i ndi cat i ons bei ng eval uat ed.
3. 3. 3 Li qui d Penet r ant Exami nat i on
I ndi cat i ons wi t h maj or di mensi ons gr eat er t han 1/ 16 of an i nch must be consi der ed r el evant . The f ol l owi ng r el evant i ndi cat i ons ar e unaccept abl e:
a. Any cr acks or l i near i ndi cat i ons.
b. Rounded i ndi cat i ons wi t h di mensi ons gr eat er t han 3/ 16 i nch.
c. Four or mor e r ounded i ndi cat i ons i n a l i ne separ at ed by 1/ 16 i nch or l ess edge- t o- edge.
SECTI ON 33 52 23. 15 Page 13
d. Ten or mor e r ounded i ndi cat i ons i n any 6 squar e i nches of sur f ace wi t h t he maj or di mensi on of t hi s ar ea not t o exceed 6 i nches wi t h t he ar ea t aken i n t he most unf avor abl e l ocat i on r el at i ve t o t he i ndi cat i ons bei ng eval uat ed.
3. 4 CORRECTI ONS AND REPAI RS
Di squal i f y i ng def ect s must be r emoved and r epai r ed as speci f i ed i n ASME B31. 3 unl ess ot her wi se speci f i ed. Di squal i f y i ng def ect s di scover ed bet ween wel d passes must be r epai r ed bef or e addi t i onal wel d mat er i al i s deposi t ed. Af t er def ect r emoval i s compl et e and bef or e r ewel di ng, t he ar ea must be exami ned by t he same t est met hod whi ch f i r st r eveal ed t he def ect t o ensur e t hat t he def ect has been el i mi nat ed. Af t er r ewel di ng, t he r epai r ed ar ea must be r eexami ned by t he same t est met hod or i gi nal l y used f or t hat ar ea. Any i ndi cat i on of a def ect must be r egar ded as a def ect unl ess r eeval uat i on by NDE or by sur f ace condi t i oni ng shows t hat no di squal i f y i ng def ect s ar e pr esent .
3. 4. 1 Def ect Removal
Def ect i ve or unsound wel d j oi nt s must be cor r ect ed by r emovi ng and r epl aci ng t he ent i r e wel d j oi nt , or f or t he f ol l owi ng def ect s cor r ect i ons must be made as f ol l ows:
a. Excessi ve Convexi t y and Over l ap: Reduce by r emoval of excess met al .
b. Excessi ve Concavi t y of Wel d, Under si zed Wel ds, Under cut t i ng: Cl ean and deposi t addi t i onal wel d met al .
c. Excessi ve Wel d Por osi t y, I ncl usi ons, Lack of Fusi on, I ncompl et e Penet r at i on: Remove def ect i ve por t i ons and r ewel d.
d. Cr acks or l i ner i ndi cat i ons i n Wel d or Base Met al : Remove cr ack t hr oughout i t s l engt h, i ncl udi ng sound wel d met al f or a di st ance of t wi ce t he t hi ckness of t he base met al or t wo i nches, whi chever i s l ess, beyond each end of t he cr ack, f ol l owed by t he r equi r ed r ewel di ng. Compl et e r emoval must be conf i r med by magnet i c par t i c l e i nspect i on f or car bon st eel or l i qui d penet r ant i nspect i on f or st ai nl ess st eel . I nspect i on pr ocedur es must compl y wi t h t he r equi r ement s of ASME B31. 3.
e. Poor Fi t - Up: Cut apar t i mpr oper l y f i t t ed par t s, and r ewel d.
3. 4. 1. 1 Met hods of Def ect Removal
The r emoval of wel d met al or por t i ons of t he base met al must be done pr ef er abl y by chi ppi ng, gr i ndi ng, sawi ng, machi ni ng, or ot her mechani cal means. Def ect s al so may be r emoved by t her mal cut t i ng t echni ques. I f t her mal cut t i ng t echni ques ar e used, t he cut sur f aces must be cl eaned and smoot hed by mechani cal means t o r emove t he heat af f ect ed zone. I n addi t i on, a maxi mum of 1/ 8- i nch of met al must be r emoved by mechani cal means f r om t he cut sur f aces of st ai nl ess st eel .
Wher ever a def ect i s r emoved, and r epai r by wel di ng i s not r equi r ed, t he af f ect ed ar ea must be bl ended i nt o t he sur r oundi ng sur f ace el i mi nat i ng shar p not ches, cr evi ces, or cor ner s.
SECTI ON 33 52 23. 15 Page 14
3. 4. 1. 2 Rewel di ng
Repai r wel ds must be made usi ng an el ect r ode or f i l l er wi r e smal l er t han t hat used i n maki ng t he or i gi nal wel d. Rewel di ng must be done usi ng qual i f i ed wel di ng pr ocedur es. The sur f ace must be cl eaned bef or e r ewel di ng. Repai r wel ds must meet t he r equi r ement s of t hi s speci f i cat i on.
3. 4. 1. 3 Peeni ng or Caul k i ng
The use of f or ce ( peeni ng) or f or ei gn mat er i al s t o mask, f i l l i n, seal , or di sgui se any wel di ng def ect s must not be per mi t t ed.
3. 5 MAI NTAI NI NG CLEANLI NESS OF PI PI NG
The Cont r act or must keep t he i nt er i or and ends of al l new pi pi ng af f ect ed by t he Cont r act or ' s oper at i ons t hor oughl y c l eaned of f or ei gn mat t er and wat er bef or e and af t er bei ng i nst al l ed. Pi pi ng syst ems must be kept c l ean dur i ng i nst al l at i on by means of pl ugs or ot her appr oved met hods. When wor k i s not i n pr ogr ess, open ends of pi pi ng and f i t t i ngs must be cl osed so t hat no wat er or ot her f or ei gn subst ance wi l l ent er t he pi pes or f i t t i ngs. Pi pi ng must be i nspect ed bef or e pl aci ng i nt o posi t i on. The i nt er i or of each l engt h of pi pe must be cl eaned af t er wel di ng; A swab, wi t h a l eat her or canvas bel t di sc t o f i t t he i nsi de di amet er of pi pe, must be pul l ed t hr ough each l engt h of pi pe af t er wel di ng i n pl ace. I t must be t he Cont r act or ' s r esponsi bi l i t y f or i nsur i ng t hat t he i nt er i or of t he pi pi ng i s f r ee of f or ei gn mat t er i ncl udi ng wel d s l ag when i t i s connect ed i nt o t he syst em.
3. 6 COMMI SSI ONI NG
For commi ssi oni ng of POL ser vi ce pi pi ng syst ems see Sect i on 33 08 55 FUEL
DI STRI BUTI ON SYSTEM START- UP ( NON- HYDRANT) .
- - End of Sect i on - -
SECTI ON 33 52 23. 15 Page 15
| 33 52 23.15 - POL SERVICE PIPING WELDING |
| PART 1 GENERAL |
| 1.1 REFERENCES |
| 1.2 DEFINITIONS |
| 1.3 SUBMITTALS |
| 1.4 GENERAL REQUIREMENTS |
| 1.5 PERFORMANCE |
| 1.6 QUALIFICATIONS |
| 1.6.1 Welding Operations |
| 1.6.2 Welding Procedure Specification and Procedure Qualification Records |
| 1.6.3 Welder and Welding Operator Performance |
| 1.6.3.1 Certification |
| 1.6.3.2 Identification |
| 1.6.3.3 Renewal of Qualification |
| 1.6.4 Test Reports |
| 1.6.5 Inspection and NDE Personnel |
| 1.6.5.1 Inspector Certification |
| 1.6.5.2 NDE Personnel |
| 1.7 DELIVERY, STORAGE, AND HANDLING |
| 1.7.1 Material Control |
| 1.7.1.1 Damaged Containers |
| 1.7.1.2 Partial Issues |
1.7.2 Damaged Materials
| 1.8 SYMBOLS |
| 1.9 SAFETY |
| PART 2 PRODUCTS |
| 2.1 WELDING MATERIALS |
| PART 3 EXECUTION |
| 3.1 WELDING OPERATIONS |
| 3.1.1 Base Metal Preparation |
| 3.1.2 Weld Joint Fit-Up |
| 3.1.3 Butt Weld Joint Spacing |
| 3.1.4 Preheat and Interpass Temperatures |
| 3.1.5 Production Welding Instructions |
| 3.1.6 Postweld Heat Treatment |
| 3.2 EXAMINATIONS, INSPECTIONS AND TESTS |
| 3.2.1 Visual Inspection |
| 3.2.2 NDE Testing Frequency |
| 3.2.3 NDE Testing |
| 3.2.4 Inspection and Tests by the Government |
| 3.3 ACCEPTANCE STANDARDS |
| 3.3.1 Visual |
| 3.3.2 Magnetic Particle Examination |
| 3.3.3 Liquid Penetrant Examination |
| 3.4 CORRECTIONS AND REPAIRS |
| 3.4.1 Defect Removal |
| 3.4.1.1 Methods of Defect Removal |
| 3.4.1.2 Rewelding |
| 3.4.1.3 Peening or Caulking |
| 3.5 MAINTAINING CLEANLINESS OF PIPING |
| 3.6 COMMISSIONING |
File details come from the government source that posted it. Updated .