PPI 035 09 97 13.15.pdf
PDF 206 KB Posted
- Solicitation number
- N4425523R1503
About this file
This document is a technical specification section outlining requirements for applying a low VOC polysulfide interior coating system to welded steel petroleum fuel tanks.
The specification requires applying a two-component polysulfide modified novolac epoxy coating system with a minimum dry film thickness of 24 mils and maximum of 30 mils. Surface preparation must be to SSPC SP10/NACE No. 2 near-white metal blast standard with a 2-3 mil angular profile. Environmental conditions during blast cleaning, application and initial cure are tightly controlled. The contractor must provide monitoring equipment and maintain temperature, humidity and dew point within specified ranges. Inspection includes testing for soluble salts, oil and grease contamination before and after blast cleaning. The contractor must develop detailed procedures and quality control plans and provide certified personnel for blast cleaning, application and inspection.
View the file
Other files
Show all 34
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Phase 2 Tank Far m I mpr ovement s ( P2002) N4425522F4025 FLCPS Manchest er , Washi ngt on PN 139588
SECTI ON 09 97 13. 15
LOW VOC POLYSULFI DE I NTERI OR COATI NG OF WELDED STEEL PETROLEUM FUEL TANKS
02/ 15, CHG 2: 08/ 17
PART 1 GENERAL
1. 1 REFERENCES
The publ i cat i ons l i s t ed bel ow f or m a par t of t hi s speci f i cat i on t o t he ext ent r ef er enced. The publ i cat i ons ar e r ef er r ed t o wi t hi n t he t ext by t he basi c desi gnat i on onl y.
AMERI CAN PETROLEUM I NSTI TUTE ( API )
API St d 653 ( 2014; Addendum 1 2018) Tank I nspect i on, Repai r , Al t er at i on, and Reconst r uct i on
ASTM I NTERNATI ONAL ( ASTM)
ASTM D56 ( 2016a) St andar d Test Met hod f or Fl ash Poi nt by Tag Cl osed Cup Test er
ASTM D93 ( 2019) St andar d Test Met hods f or Fl ash- Poi nt by Pensky- Mar t ens Cl osed Cup Test er
ASTM D185 ( 2007; R 2012) St andar d Test f or Coar se Par t i c l es i n Pi gment s
ASTM D476 ( 2015) Dr y Pi gment ar y Ti t ani um Di oxi de Pi gment s
ASTM D523 ( 2014; R 2018) St andar d Test Met hod f or Specul ar Gl oss
ASTM D714 ( 2002; R 2017) St andar d Test Met hod f or Eval uat i ng Degr ee of Bl i st er i ng of Pai nt s
ASTM D1141 ( 1998; R 2013) St andar d Pr act i ce f or t he Pr epar at i on of Subst i t ut e Ocean Wat er
ASTM D1210 ( 2005; R 2014) Fi neness of Di sper si on of Pi gment - Vehi c l e Syst ems by Hegman- Type Gage
ASTM D1475 ( 2013) St andar d Test Met hod f or Densi t y of Li qui d Coat i ngs, I nks, and Rel at ed Pr oduct s
ASTM D1640 ( 2003; R 2009) Dr yi ng, Cur i ng, or Fi l m For mat i on of Or gani c Coat i ngs at Room Temper at ur e
ASTM D2196 ( 2010) St andar d Test Met hods f or Rheol ogi cal Pr oper t i es of Non- Newt oni an Mat er i al s by Rot at i onal ( Br ookf i el d t ype) Vi scomet er
ASTM D2240 ( 2015; E 2017) St andar d Test Met hod f or
SECTI ON 09 97 13. 15 Page 1 8/ 28/ 2023 Amendment 0003
Rubber Pr oper t y - Dur omet er Har dness
ASTM D2369 ( 2010; R 2015; E 2015) Vol at i l e Cont ent of Coat i ngs
ASTM D2370 ( 1998; R 2010) Tensi l e Pr oper t i es of Or gani c Coat i ngs
ASTM D2698 ( 2005) St andar d Test Met hod f or Det er mi nat i on of t he Pi gment Cont ent of Sol vent - Reduci bl e Pai nt s by Hi gh- Speed Cent r i f ugi ng
ASTM D2794 ( 1993; R 2019) St andar d Test Met hod f or Resi st ance of Or gani c Coat i ngs t o t he Ef f ect s of Rapi d Def or mat i on ( I mpact )
ASTM D2805 ( 2011) St andar d Test Met hod f or Hi di ng Power of Pai nt s by Ref l ect omet r y
ASTM D3276 ( 2015; E 2016) St andar d Gui de f or Pai nt i ng I nspect or s ( Met al Subst r at es)
ASTM D3278 ( 1996; R 2011) Fl ash Poi nt of Li qui ds by Smal l Scal e Cl osed- Cup Appar at us
ASTM D3335 ( 1985a; R 2020) Low Concent r at i ons of Lead, Cadmi um, and Cobal t i n Pai nt by At omi c Absor pt i on Spect r oscopy
ASTM D3718 ( 1985a; R 2015) Low Concent r at i ons of Chr omi um i n Pai nt by At omi c Absor pt i on Spect r oscopy
ASTM D3925 ( 2002; R 2015) Sampl i ng Li qui d Pai nt s and Rel at ed Pi gment ed Coat i ngs
ASTM D3960 ( 2005; R 2013) Det er mi ni ng Vol at i l e Or gani c Compound ( VOC) Cont ent of Pai nt s and Rel at ed Coat i ngs
ASTM D4285 ( 1983; R 2018) I ndi cat i ng Oi l or Wat er i n Compr essed Ai r
ASTM D4400 ( 1999; E 2012; R 2012) Sag Resi st ance of Pai nt s Usi ng a Mul t i not ch Appl i cat or
ASTM D4541 ( 2017) St andar d Test Met hod f or Pul l - Of f St r engt h of Coat i ngs Usi ng Por t abl e Adhesi on Test er s
ASTM D7334 ( 2008; R 2013) St andar d Pr act i ce f or Sur f ace Wet t abi l i t y of Coat i ngs, Subst r at es and Pi gment s by Advanci ng Cont act Angl e Measur ement
ASTM D7588 ( 2011) St andar d Gui de f or FT- I R Fi nger pr i nt i ng of a Non- Aqueous Li qui d Pai nt as Suppl i ed i n t he Manuf act ur er ’ s
SECTI ON 09 97 13. 15 Page 2
Cont ai ner
I NTERNATI ONAL ORGANI ZATI ON FOR STANDARDI ZATI ON ( I SO)
I SO 9001 ( 2015) Qual i t y Management Syst ems- Requi r ement s
NACE I NTERNATI ONAL ( NACE)
NACE SP0178 ( 2007) Desi gn, Fabr i cat i on, and Sur f ace Fi ni sh Pr act i ces f or Tanks and Vessel s t o be Li ned f or I mmer si on Ser vi ce
NACE SP0188 ( 1999; R 2006) Di scont i nui t y ( Hol i day) Test i ng of New Pr ot ect i ve Coat i ngs on Conduct i ve Subst r at es
NACE TM0174 ( 2002) Labor at or y Met hods f or t he Eval uat i on of Pr ot ect i ve Coat i ngs and Li ni ng Mat er i al s on Met al l i c Subst r at es i n I mmer si on Ser vi ce - I t em No: 21206
SOCI ETY FOR PROTECTI VE COATI NGS ( SSPC)
SSPC 7/ NACE No. 4 ( 2007) Br ush- Of f Bl ast Cl eani ng
SSPC AB 1 ( 2015; E 2017) Mi ner al and Sl ag Abr asi ves
SSPC AB 2 ( 2015; E 2016) Cl eanl i ness of Recycl ed Fer r ous Met al l i c Abr asi ve
SSPC AB 3 ( 2003; E 2004) Fer r ous Met al l i c Abr asi ve
SSPC Gui de 12 ( 1998; E 2004) Gui de f or I l l umi nat i on of I ndust r i al Pai nt i ng Pr oj ect s
SSPC PA 1 ( 2016) Shop, Fi el d, and Mai nt enance Coat i ng of Met al s
SSPC PA 2 ( 2015; E 2018) Pr ocedur e f or Det er mi ni ng Conf or mance t o Dr y Coat i ng Thi ckness Requi r ement s
SSPC PA 17 ( 2012; E 2012) Pr ocedur e f or Det er mi ni ng Conf or mance t o St eel Pr of i l e/ Sur f ace Roughness/ Peak Count Requi r ement s
SSPC QP 1 ( 2019) St andar d Pr ocedur e f or Eval uat i ng t he Qual i f i cat i ons of I ndust r i al / Mar i ne Pai nt i ng Cont r act or s ( Fi el d Appl i cat i on t o Compl ex I ndust r i al St eel St r uct ur es and Ot her Met al Component s)
SSPC QP 5 ( 2012) St andar d Pr ocedur e f or Eval uat i ng t he Qual i f i cat i ons of Coat i ng and Li ni ng I nspect i on Compani es
SSPC QS 1 ( 2015) St andar d Pr ocedur e f or Eval uat i ng a Cont r act or ' s Advanced Qual i t y Management
SECTI ON 09 97 13. 15 Page 3
Syst em
SSPC SP 1 ( 2015) Sol vent Cl eani ng
SSPC SP 10/ NACE No. 2 ( 2007) Near - Whi t e Bl ast Cl eani ng
SSPC SP COM ( 2016; E 2017) Sur f ace Pr epar at i on Comment ar y f or St eel and Concr et e Subst r at es
SSPC VI S 1 ( 2002; E 2004) Gui de and Ref er ence Phot ogr aphs f or St eel Sur f aces Pr epar ed by Dr y Abr asi ve Bl ast Cl eani ng
SOCI ETY OF AUTOMOTI VE ENGI NEERS I NTERNATI ONAL ( SAE)
SAE AMS- STD- 595A ( 2017) Col or s used i n Gover nment Pr ocur ement
U. S. NATI ONAL ARCHI VES AND RECORDS ADMI NI STRATI ON ( NARA)
29 CFR 1910- SUBPART Z Toxi c and Hazar dous Subst ances
29 CFR 1910. 134 Respi r at or y Pr ot ect i on
29 CFR 1910. 1000 Ai r Cont ami nant s
29 CFR 1926. 59 Hazar d Communi cat i on
1. 2 DEFI NI TI ONS
Def i ni t i ons ar e pr ovi ded t hr oughout t hi s Sect i on, gener al l y i n t he par agr aph wher e used, and denot ed by capi t al l et t er s. The f ol l owi ng def i ni t i ons ar e used t hr oughout t hi s Sect i on:
a. CEI LI NG - i nt er i or t ank sur f aces t hat ext end f r om t he hor i zont al pl ane at t he desi gnat ed maxi mum f uel l i ne upwar d, i ncl udi ng t he upper por t i on of t he t ank shel l ( wal l s) , col umns, st r uct ur al st eel , t he under si de of t he r oof pl at es and ot her st eel component s i n t hi s ar ea.
b. SHELL - i nt er i or t ank sur f aces t hat ext end al ong t he ver t i cal t ank wal l s bet ween t he hor i zont al pl anes appr oxi mat el y 40 i nches above t he shel l t o bot t om j oi nt upwar d t o t he hor i zont al pl ane at t he desi gnat ed f uel l i ne, i ncl udi ng col umns, wal l pl at es, and ot her st eel component s i n t hi s ar ea.
c. FLOOR - i nt er i or t ank sur f aces bel ow t he hor i zont al pl ane appr oxi mat el y 40 i nches above t he shel l t o bot t om j oi nt , i ncl udi ng col umns, wal l pl at es, pi pi ng, pi pe suppor t s, bot t om pl at es, and ot her st eel component s i n t hi s ar ea.
1. 3 SUBMI TTALS
Gover nment appr oval i s r equi r ed f or submi t t al s wi t h a " G" or " S" c l assi f i cat i on. Submi t t al s not havi ng a " G" or " S" c l assi f i cat i on ar e f or Cont r act or Qual i t y Cont r ol appr oval . Submi t t he f ol l owi ng i n accor dance wi t h Sect i on 01 33 00 SUBMI TTAL PROCEDURES:
SD- 05, Desi gn Dat a
SECTI ON 09 97 13. 15 Page 4
Envi r onment al Cont r ol Syst em
Use of Door Sheet Access Way; G
SD- 06 Test Repor t s
Coat i ngs Qual i f i cat i on I nspect i on Repor t s
Non- met al l i c Abr asi ve Qual i f i cat i on Test Repor t s; G
Met al l i c Abr asi ve Qual i f i cat i on Test Repor t s
Coat i ng Sampl e Test Repor t s
Abr asi ve Sampl e Test Repor t s
I nspect i on Repor t For ms
Dai l y I nspect i on Repor t s
Recycl ed Met al l i c Abr asi ve Fi el d Test Repor t s ( Dai l y and Weekl y)
SD- 07 Cer t i f i cat es
Cont r act Er r or s, Omi ssi ons, and Ot her Di scr epanci es
Cor r ect i ve Act i on Pr ocedur es
I mpl ement Cor r ect i ve Act i on
Coat i ng Wor k Pl an; G
Coat i ng Mat er i al s; G
Non- met al l i c Abr asi ve; G
Met al l i c Abr asi ve; G
Qual i f i cat i ons of Cer t i f i ed I ndust r i al Hygi eni st ( CI H) ; G
Qual i f i cat i ons of I ndi v i dual s Per f or mi ng Abr asi ve Bl ast i ng; G
Qual i f i cat i ons of I ndi v i dual s Appl y i ng Coat i ngs; G
Qual i f i cat i ons of I ndi v i dual s Oper at i ng Pl ur al Component Equi pment
Qual i f i cat i ons of Cer t i f i ed Pr ot ect i ve Coat i ngs Speci al i st ( PCS) ; G
Qual i f i cat i ons of Coat i ng I nspect i on Company; G
Qual i f i cat i ons of QC Speci al i st Coat i ng I nspect or ; G
Qual i f i cat i ons of Test i ng Labor at or y f or Coat i ngs; G
Qual i f i cat i ons of Test i ng Labor at or y f or Abr asi ve
Qual i f i cat i ons of Coat i ng Cont r act or s; G
SECTI ON 09 97 13. 15 Page 5
Roof Joi nt Seal ant Mat er i al s; G
Roof Joi nt Seal ant Compat i bi l i t y ; G
Pr ot ect i ve Coat i ng Speci al i st ( PCS) ; G
Pr e- Appl i cat i on Meet i ng
SD- 08 Manuf act ur er ' s I nst r uct i ons
Roof Joi nt Seal ant I nst r uct i ons; G
Coat i ng Syst em I nst r uct i ons; G
SD- 11 Cl oseout Submi t t al s
Di sposal of Used Abr asi ve; G
I nspect i on Logbook; G
1. 4 QUALI TY ASSURANCE
1. 4. 1 Cont r act Er r or s, Omi ssi ons, and Ot her Di scr epanci es
Submi t al l er r or s, omi ssi ons, and ot her di scr epanci es i n cont r act document s t o t he Cont r act i ng Of f i cer wi t hi n 30 days of cont r act awar d f or al l wor k cover ed i n t hi s Sect i on, ot her t han t he wor k t hat wi l l not be uncover ed unt i l a l at er dat e. Al l such di scr epanci es must be addr essed and r esol ved, and t he Coat i ng Wor k Pl an modi f i ed, pr i or t o begi nni ng t he I ni t i al and Fol l ow- Up phases of wor k. Di scr epanci es t hat become appar ent onl y af t er wor k i s uncover ed must be i dent i f i ed at t he ear l i est di scover abl e t i me and submi t t ed f or r esol ut i on. Schedul e t i me ( Fl oat ) shoul d be bui l t i nt o t he pr oj ect schedul e at t hose poi nt s wher e ol d wor k i s t o be uncover ed or wher e access i s not avai l abl e dur i ng t he f i r st 30 days af t er awar d, t o al l ow f or r esol ut i on of cont r act di scr epanci es.
1. 4. 2 Cor r ect i ve Act i on ( CA)
CA must be i ncl uded i n t he Qual i t y Cont r ol Pl an.
1. 4. 2. 1 Cor r ect i ve Act i on Pr ocedur es
Devel op pr ocedur es f or det er mi ni ng t he r oot cause of each non- compl i ance, devel opi ng a pl an t o el i mi nat e t he r oot cause so t hat t he non- compl i ance does not r ecur , and f ol l owi ng up t o ensur e t hat t he r oot cause was el i mi nat ed. Devel op Cor r ect i ve Act i on Request ( CAR) f or ms f or i ni t i at i ng CA, and f or t r acki ng and document i ng each st ep.
1. 4. 2. 2 I mpl ement Cor r ect i ve Act i on
The Cont r act or must t ake act i on t o i dent i f y and el i mi nat e t he r oot cause of each non- compl i ance so as t o pr event r ecur r ence. These pr ocedur es must appl y t o non- compl i ance i n t he wor k, and t o non- compl i ance i n t he QC Syst em. Cor r ect i ve act i ons must be appr opr i at e t o t he ef f ect s of t he non- compl i ance encount er ed. Each CAR must be ser i al i zed, t r acked i n a Log t o compl et i on and accept ance by t he Cont r act i ng Of f i cer , and r et ai ned i n pr oj ect r ecor ds. The Cor r ect i ve Act i on Log, showi ng st at us of each CAR, must be submi t t ed t o t he Cont r act i ng Of f i cer mont hl y. A CAR may be i ni t i at ed by ei t her t he Cont r act or or t he Cont r act i ng Of f i cer . The
SECTI ON 09 97 13. 15 Page 6
Cont r act i ng Of f i cer must appr ove each CAR at t he r oot cause i dent i f i cat i on st age, t he pl an f or el i mi nat i on st age, and t he cl ose out st age af t er ver i f i cat i on t hat t he r oot cause has been el i mi nat ed.
1. 4. 3 Coat i ng Wor k Pl an
a. Thi s wor k pl an must be consi der ed as par t of t he Qual i t y Cont r ol Pl an.
b. Pr ovi de pr ocedur es f or r evi ewi ng cont r act document s i mmedi at el y af t er awar d t o i dent i f y er r or s, omi ssi ons, and di scr epanci es so t hat any such i ssues can be r esol ved pr i or t o pr oj ect pl anni ng and devel opment of det ai l ed pr ocedur es.
c. Pr ovi de pr ocedur es f or ver i f i cat i on of key pr ocesses dur i ng I ni t i al Phase t o ensur e t hat cont r act r equi r ement s can be met .
Key pr ocesses must i ncl ude sur f ace pr epar at i on, coat i ng appl i cat i on and cur i ng, i nspect i on, and document at i on, and any ot her pr ocess t hat mi ght adver sel y i mpact or der l y pr ogr essi on of wor k.
d. Pr ovi de pr ocedur es f or al l phases of coat i ng oper at i ons, i ncl udi ng pl anned wor k, r ewor k, r epai r , i nspect i on, and document at i on.
Addr ess mobi l i zat i on and set up, sur f ace pr epar at i on, coat i ng appl i cat i on, coat i ng i ni t i al cur e, t r acki ng and cor r ect i on of non- compl i ant wor k, and demobi l i zat i on. Coor di nat e wor k pr ocesses wi t h heal t h and saf et y pl ans and conf i ned space ent r y pl ans. For each pr ocess, pr ovi de pr ocedur es t hat i ncl ude appr opr i at e wor k i nst r uct i ons, mat er i al and equi pment r equi r ement s, per sonnel qual i f i cat i ons, cont r ol s, and pr ocess ver i f i cat i on pr ocedur es.
Pr ovi de pr ocedur es f or i nspect i ng wor k t o ver i f y and document compl i ance wi t h cont r act r equi r ement s, i ncl udi ng i nspect i on f or ms and checkl i st s, and accept ance and r ej ect i on cr i t er i a.
e. Pr ovi de pr ocedur es f or cor r ect i ng non- compl i ant wor k. Det ai l ed pr ocedur es ar e r equi r ed i n advance t o avoi d del ays i n meet i ng over coat wi ndows as wel l as t o avoi d del ays i n pr oduct i on.
Pr ovi de pr ocedur es f or r epai r i ng def ect s i n t he coat i ng f i l m, such as r uns, dr i ps, sags, hol i days, over spr ay, as wel l as how t o cor r ect coat i ng t hi ckness non- compl i ance, any ot her ar eas of r epai r or r ewor k t hat mi ght be adver sel y af f ect ed by del ays i n pr epar i ng and appr ovi ng new pr ocedur es.
f . I f a pr ocedur e i s based on a pr oposed or appr oved r equest f or devi at i on, t he devi at i on must be r ef er enced. Changes t o pr ocedur es must be not ed by submi t t al number and dat e appr oved, c l ear l y del i neat i ng ol d r equi r ement s and new r equi r ement s, so t hat t he r ecor ds pr ovi de a cont i nuous l og of r equi r ement s and pr ocedur es.
1. 4. 4 Desi gn Dat a
1. 4. 4. 1 Envi r onment al Cont r ol Syst em
Submi t desi gn det ai l s of t he pr oposed envi r onment al cont r ol syst em t o i ncl ude vent i l at i on, humi di t y cont r ol , and t emper at ur e r egul at i on.
Pr ovi de cal cul at i ons f or humi di t y cont r ol dur i ng separ at e sur f ace pr epar at i on and coat i ng appl i cat i on pr ocedur es, vent i l at i on r equi r ement s dur i ng coat i ng appl i cat i on, and maxi mum al l owabl e coat i ng appl i cat i on
SECTI ON 09 97 13. 15 Page 7 r at es t o coi nci de wi t h vent i l at i on. I ncl ude basi s of desi gn dat a on l ocal condi t i ons. Pr ovi de equi pment l ayout sket ches and pr ocedur es showi ng f unct i on of each pi ece of equi pment and f ai l - saf e measur es. A Cer t i f i ed I ndust r i al Hygi eni st must appr ove cal cul at i ons, wor k pr ocedur es and per sonal pr ot ect i ve equi pment .
1. 4. 4. 2 Use of Door Sheet Access WayDel et ed
I f use of a door sheet access way i s desi r ed, submi t desi gn dr awi ngs and cal cul at i ons t hat addr ess al l aspect s of t he door sheet openi ng i n accor dance wi t h API St d 653 and API St d 650, i ncl udi ng cut t i ng of door sheet , t ank st abi l i zat i on, door sheet r epl acement , wel d t est i ng, and f i nal accept ance. A r egi st er ed engi neer must appr ove al l cal cul at i ons and pr ocedur es pr i or t o submi t t al f or gover nment appr oval .
1. 4. 5 Test Repor t s
1. 4. 5. 1 Coat i ngs Qual i f i cat i on I nspect i on Repor t s
Submi t t est r esul t s f r om i ndependent l abor at or y f or mat er i al r equi r ed i n par agr aph COATI NG MATERI ALS. Sampl es must have been t est ed wi t hi n t he l ast t wo year s. Not e t hat t hi s t est i ng i s f or t he pur pose of pr equal i f y i ng t he coat i ng mat er i al .
1. 4. 5. 2 Met al l i c Abr asi ve Qual i f i cat i on Test Repor t s
Submi t r esul t s f or abr asi ve as r equi r ed i n par agr aph 4 REQUI REMENTS of SSPC AB 3. Submi t t est r esul t s f r om i ndependent l abor at or y of r epr esent at i ve sampl es of each abr asi ve t o be used on t he j obsi t e.
Sampl es must have been t est ed wi t hi n t he l ast t hr ee year s. Not e t hat t hi s t est i ng i s f or t he pur pose of pr equal i f y i ng t he abr asi ve.
1. 4. 5. 3 Recycl ed Met al l i c Abr asi ve Fi el d Test Repor t s ( Dai l y and Weekl y)
Submi t t est r esul t s f r om i ndependent l abor at or y of dai l y and weekl y Qual i t y Cont r ol t est i ng r equi r ed by SSPC AB 2, as modi f i ed i n par agr aph
ABRASI VE.
1. 4. 5. 4 Non- met al l i c Abr asi ve Qual i f i cat i on Test Repor t s
Submi t r esul t s f or abr asi ve as r equi r ed i n par agr aph 4 REQUI REMENTS of SSPC AB 1. Submi t t est r esul t s f r om i ndependent l abor at or y of r epr esent at i ve sampl es of each abr asi ve t o be used on t he j obsi t e.
Sampl es must have been t est ed wi t hi n t he l ast t hr ee year s. Not e t hat t hi s t est i ng i s f or t he pur pose of pr equal i f y i ng t he abr asi ve.
1. 4. 6 Qual i f i cat i ons
1. 4. 6. 1 Qual i f i cat i ons of Cer t i f i ed I ndust r i al Hygi eni st ( CI H)
Submi t name, addr ess, t el ephone number , FAX number , and e- mai l addr ess of t he i ndependent t hi r d par t y CI H. Submi t document at i on t hat hygi eni st i s cer t i f i ed by t he Amer i can Boar d of I ndust r i al Hygi ene i n compr ehensi ve pr act i ce, i ncl udi ng cer t i f i cat i on number and dat e of cer t i f i cat i on/ r ecer t i f i cat i on. Pr ovi de evi dence of exper i ence wi t h hazar ds i nvol ved i n i ndust r i al coat i ng appl i cat i on wor k.
SECTI ON 09 97 13. 15 Page 8
1. 4. 6. 2 Qual i f i cat i ons of Cer t i f i ed Pr ot ect i ve Coat i ngs Speci al i st ( PCS)
Submi t name, addr ess, t el ephone number , FAX number , and e- mai l addr ess of t he i ndependent t hi r d par t y PCS. Submi t document at i on t hat t he speci al i st i s cer t i f i ed by SSPC: The Soci et y f or Pr ot ect i ve Coat i ngs ( SSPC) as a PCS, i ncl udi ng cer t i f i cat i on number and dat e of cer t i f i cat i on/ r ecer t i f i cat i on. I f t he PCS i s empl oyed by t he same coat i ng i nspect i on company t o whi ch t he coat i ng i nspect or i s empl oyed, t hi s does not v i ol at e t he i ndependent t hi r d- par t y r equi r ement s. The PCS must r emai n cer t i f i ed dur i ng t he ent i r e pr oj ect , and t he Cont r act i ng Of f i cer must be not i f i ed of any change i n cer t i f i cat i on st at us wi t hi n 10 days of t he change. The PCS must not be t he desi gnat ed coat i ng i nspect or .
1. 4. 6. 3 Qual i f i cat i ons of Coat i ng I nspect i on Company
Submi t document at i on t hat t he coat i ng i nspect i on company per f or mi ng al l coat i ng i nspect i on f unct i ons i s cer t i f i ed by SSPC t o t he r equi r ement s of SSPC QP 5 pr i or t o cont r act awar d. The coat i ng i nspect i on company submi t t ed and appr oved must r emai n and not changed t hr ough compl et i on of t he cont r act . The coat i ng i nspect i on company must r emai n so cer t i f i ed f or t he dur at i on of t he coat i ng wor k. I f a coat i ng i nspect i on company' s cer t i f i cat i on expi r es, t he f i r m wi l l not be al l owed t o per f or m any i nspect i on f unct i ons, and al l sur f ace pr epar at i on and coat i ng appl i cat i on wor k must st op, unt i l t he cer t i f i cat i on i s r ei ssued. Request s f or ext ensi on of t i me f or any del ay t o t he compl et i on of t he pr oj ect due t o an i nact i ve cer t i f i cat i on wi l l not be consi der ed and l i qui dat ed damages wi l l appl y. Not i f y t he Cont r act i ng Of f i cer of any change i n coat i ng i nspect i on company cer t i f i cat i on st at us. Not i f y t he Cont r act i ng Of f i cer of al l schedul ed and unannounced on si t e i nspect i ons f r om SSPC and f ur ni sh a copy of al l i nspect i on r epor t s.
1. 4. 6. 4 Qual i f i cat i ons of QC Speci al i st Coat i ng I nspect or
Submi t document at i on t hat each coat i ng i nspect or i s empl oyed, and qual i f i ed t o SSPC QP 5, Level I I I , by t he sel ect ed coat i ng i nspect i on company. Each i nspect or must r emai n empl oyed by t he coat i ng i nspect i on company whi l e per f or mi ng any coat i ng i nspect i on f unct i ons. I n addi t i on t o t he handwr i t t en r ecor ds, t he i nspect or must empl oy t he el ect r oni c r epor t i ng pr ogr am Tr uQC or equi val ent as out l i ned i n Tabl e I I I . The Admi ni st r at or must be t he desi gnat ed Gover nment Repr esent at i ve f or t he pr oj ect .
1. 4. 6. 5 Qual i f i cat i ons of I ndi v i dual s Per f or mi ng Abr asi ve Bl ast i ng
Submi t name, addr ess, and t el ephone number of each per son t hat wi l l be per f or mi ng abr asi ve bl ast i ng. Submi t document at i on t hat each bl ast er i s qual i f i ed by SSPC t o t he SSPC CAS Coat i ng Appl i cat i on Speci al i st Level 2 Cer t i f i cat i on Pr ogr am ( I nt er i m St at us) . Each bl ast er must r emai n cer t i f i ed dur i ng t he ent i r e per i od of abr asi ve bl ast i ng, and t he Cont r act i ng Of f i cer must be not i f i ed of any change i n qual i f i cat i on st at us. NOTE: I nt er i m st at us wi l l be accept abl e up t o 30 Sep 2017.
Af t er 30 Sep 2017 Ful l St at us i s r equi r ed.
1. 4. 6. 6 Qual i f i cat i ons of I ndi v i dual s Appl y i ng Coat i ngs
Submi t name, addr ess, and t el ephone number of each per son t hat wi l l be appl y i ng coat i ngs. Submi t document at i on t hat each appl i cat or i s qual i f i ed by SSPC t o t he SSPC CAS Coat i ng Appl i cat i on Speci al i st Level 2 Cer t i f i cat i on Pr ogr am ( I nt er i m St at us) . Each appl i cat or must r emai n
SECTI ON 09 97 13. 15 Page 9 cer t i f i ed dur i ng t he ent i r e per i od of coat i ng appl i cat i on, and t he Cont r act i ng Of f i cer must be not i f i ed of any change i n qual i f i cat i on st at us. NOTE: I nt er i m st at us wi l l be accept abl e up t o 30 Sep 2017.
Af t er 30 Sep 2017 Ful l St at us i s r equi r ed.
1. 4. 6. 7 Qual i f i cat i ons of I ndi v i dual s Oper at i ng Pl ur al Component Equi pment
Submi t name, addr ess, and t el ephone number of each per son t hat wi l l be oper at i ng pl ur al component equi pment . Submi t document at i on t hat each oper at or i s qual i f i ed by SSPC C 14 Mar i ne Pl ur al Component Pr ogr am ( MPCAC- C14) . Each oper at or must r emai n cer t i f i ed dur i ng t he ent i r e per i od of coat i ng appl i cat i on, and t he Cont r act i ng Of f i cer must be not i f i ed of any change i n qual i f i cat i on st at us.
1. 4. 6. 8 Qual i f i cat i ons of Test i ng Labor at or y f or Coat i ngs
Submi t name, addr ess, t el ephone number , FAX number , and e- mai l addr ess of t he i ndependent t hi r d par t y l abor at or y sel ect ed t o per f or m t est i ng of coat i ng sampl es f or compl i ance wi t h speci f i cat i on r equi r ement s. Submi t document at i on t hat l abor at or y i s r egul ar l y engaged i n t est i ng of pai nt sampl es f or conf or mance wi t h speci f i cat i ons, and t hat empl oyees per f or mi ng t est i ng ar e qual i f i ed.
1. 4. 6. 9 Qual i f i cat i ons of Test i ng Labor at or y f or Abr asi ve
Submi t name, addr ess, t el ephone number , FAX number , and e- mai l addr ess of t he i ndependent t hi r d par t y l abor at or y sel ect ed t o per f or m t est i ng of abr asi ve f or compl i ance wi t h speci f i cat i on r equi r ement s. Submi t document at i on t hat l abor at or y has exper i ence i n t est i ng sampl es of abr asi ve f or conf or mance wi t h speci f i cat i ons, and t hat empl oyees per f or mi ng t est i ng ar e qual i f i ed.
1. 4. 6. 10 Qual i f i cat i ons of Coat i ng Cont r act or s
Al l Cont r act or s and Subcont r act or s t hat per f or m sur f ace pr epar at i on or coat i ng appl i cat i on must be cer t i f i ed t o SSPC QP 1 and SSPC QS 1 pr i or t o cont r act awar d, and must r emai n cer t i f i ed whi l e accompl i shi ng any sur f ace pr epar at i on or coat i ng appl i cat i on. The pai nt i ng Cont r act or s and pai nt i ng Subcont r act or s must r emai n so cer t i f i ed f or t he dur at i on of t he pr oj ect .
I f a Cont r act or ' s or Subcont r act or ' s cer t i f i cat i on expi r es, t he f i r m wi l l not be al l owed t o per f or m any wor k unt i l t he cer t i f i cat i on i s r ei ssued.
Request s f or ext ensi on of t i me f or any del ay t o t he compl et i on of t he pr oj ect due t o an i nact i ve cer t i f i cat i on wi l l not be consi der ed and l i qui dat ed damages wi l l appl y. Not i f y t he Cont r act i ng Of f i cer of any change i n Cont r act or cer t i f i cat i on st at us. Not i f y t he Cont r act i ng Of f i cer of al l schedul ed and unannounced on si t e audi t s f r om SSPC and f ur ni sh a copy of al l audi t r epor t s.
1. 4. 6. 11 Roof Joi nt Seal ant Mat er i al s
Pr ovi de manuf act ur er ' s cer t i f i cat i on of conf or mance t o cont r act r equi r ement s.
1. 4. 6. 12 Roof Joi nt Seal ant Compat i bi l i t y
Pr ovi de manuf act ur er ' s cer t i f i cat i on t hat t he sel ect ed j oi nt seal ant i s compat i bl e wi t h t he coat i ng mat er i al s.
SECTI ON 09 97 13. 15 Page 10
1. 4. 6. 13 Coat i ng Mat er i al s
Pr ovi de manuf act ur er ' s cer t i f i cat i on of conf or mance t o cont r act r equi r ement s.
1. 4. 6. 14 Non- met al l i c Abr asi ve
Pr ovi de manuf act ur er ' s cer t i f i cat i on t hat t he mat er i al s ar e cur r ent l y appr oved by t he Naval Sea Syst ems Command and l i s t ed on t he Qual i f i ed Pr oduct s Li st ( QPL) f or t he speci f i ed mat er i al s.
1. 4. 6. 15 Met al l i c Abr asi ve
Pr ovi de manuf act ur er ' s cer t i f i cat i on of conf or mance t o cont r act r equi r ement s and pr ovi de copi es of t est r esul t s.
1. 4. 7 Pr ot ect i ve Coat i ng Speci al i st ( PCS)
The PCS must be consi der ed a QC Speci al i st and must r epor t t o t he QC Manager , as speci f i ed i n Sect i on 01 45 00. 00 10 01 01 45 00. 00 20 QUALI TY CONTROL. The PCS must appr ove al l submi t t al s pr i or t o submi ssi on t o t he QC Manager f or appr oval or submi ssi on t o t he gover nment f or appr oval .
1. 4. 8 Pr e- Appl i cat i on Meet i ng
Af t er appr oval of submi t t al s but pr i or t o t he i ni t i at i on of coat i ng wor k, Cont r act or r epr esent at i ves, i ncl udi ng at a mi ni mum, pr oj ect super i nt endent and QC manager , pai nt f or eman, coat i ng i nspect or , and PCS must have a pr e- appl i cat i on coat i ng pr epar at or y meet i ng. Thi s meet i ng must be i n addi t i on t o t he pr e- const r uct i on conf er ence. Speci f i c i t ems addr essed must i ncl ude: Cor r ect i ve act i on r equi r ement s and pr ocedur es, coat i ng wor k pl an, saf et y pl an, coor di nat i on wi t h ot her Sect i ons, i nspect i on st andar ds, i nspect i on r equi r ement s and t ool s, t est pr ocedur es, envi r onment al cont r ol syst em, saf et y pl an, and t est l ogs. Not i f y Cont r act i ng Of f i cer at l east t en days pr i or t o meet i ng.
1. 5 PRODUCT DATA
1. 5. 1 Roof Joi nt Seal ant I nst r uct i ons
Submi t manuf act ur er ' s pr i nt ed i nst r uct i ons i ncl udi ng det ai l ed mi xi ng and appl i cat i on pr ocedur es, mi ni mum and maxi mum appl i cat i on t emper at ur es, and cur i ng pr ocedur es. I ncl ude Saf et y Dat a Sheet s ( SDS) f or mat er i al s t o be used at t he j ob s i t e i n accor dance wi t h 29 CFR 1926. 59.
1. 5. 2 Coat i ng Syst em I nst r uct i ons
Submi t manuf act ur er ' s pr i nt ed i nst r uct i ons i ncl udi ng det ai l ed mi xi ng and appl i cat i on pr ocedur es, number and t ypes of coat s r equi r ed, mi ni mum and maxi mum appl i cat i on t emper at ur es, and cur i ng pr ocedur es. I ncl ude Saf et y Dat a Sheet s ( SDS) f or mat er i al s t o be used at t he j ob s i t e i n accor dance wi t h 29 CFR 1926. 59.
1. 6 DELI VERY AND STORAGE
Shi p, st or e, and handl e mat er i al s i n accor dance wi t h SSPC PA 1, and as modi f i ed i n t hi s Sect i on. Mai nt ai n t emper at ur e i n st or age spaces bet ween 40 and 85 degr ees F, and ai r t emper at ur e mor e t han 5 degr ees F above t he dew- poi nt at al l t i mes. I nspect mat er i al s f or damage pr i or t o use and
SECTI ON 09 97 13. 15 Page 11 r et ur n non- compl i ant mat er i al s t o manuf act ur er . Remove mat er i al s wi t h expi r ed shel f l i f e f r om gover nment pr oper t y i mmedi at el y and not i f y t he Cont r act i ng Of f i cer .
I f mat er i al s ar e appr oachi ng shel f l i f e expi r at i on and an ext ensi on i s desi r ed, sampl es may be sent t o t he manuf act ur er , al ong wi t h compl et e r ecor ds of st or age condi t i ons, wi t h a r equest f or shel f l i f e ext ensi on.
I f t he manuf act ur er f i nds t he sampl es and st or age dat a sui t abl e f or shel f l i f e ext ensi on, t he manuf act ur er may i ssue an ext ensi on, r ef er enci ng t he pr oduct eval uat i on and t he r evi ew of st or age r ecor ds.
1. 7 COATI NG HAZARDS
Ensur e t hat empl oyees ar e t r ai ned i n al l aspect s of t he saf et y pl an.
Speci f i ed coat i ngs may have pot ent i al heal t h hazar ds i f i ngest ed or i mpr oper l y handl ed. The coat i ng manuf act ur er ' s wr i t t en saf et y pr ecaut i ons must be f ol l owed t hr oughout mi xi ng, appl i cat i on, and cur i ng of t he coat i ngs. Dur i ng t ank cl eani ng, c l eanup, sur f ace pr epar at i on, and pai nt appl i cat i on phases, ensur e t hat empl oyees ar e pr ot ect ed f r om t oxi c and hazar dous chemi cal agent s whi ch exceed concent r at i ons i n 29 CFR 1910. 1000.
Compl y wi t h r espi r at or y pr ot ect i on r equi r ement s i n 29 CFR 1910. 134. The CI H must appr ove wor k pr ocedur es and per sonal pr ot ect i ve equi pment .
1. 8 WORK SEQUENCE
Coat t ank i nt er i or f ol l owi ng t ank t i ght ness t est i ng.
1. 9 JOB SI TE REFERENCES
Make avai l abl e t o t he Cont r act i ng Of f i cer at l east one copy each of API St d 653, ASTM D3276, ASTM D3925, ASTM D4285, NACE SP0178 and compani on vi sual compar at or , NACE SP0188, SSPC SP COM, SSPC SP 1, SSPC 7/ NACE No. 4, SSPC SP 10/ NACE No. 2, SSPC PA 1, SSPC PA 2, SSPC PA 17, SSPC Gui de 12, SSPC VI S 1, SSPC CAS, SSPC C 14, SSPC QP 1, SSPC QS 1, and an SSPC Cer t i f i ed Cont r act or Eval uat i on For m wher e appl i cabl e ( I SO 9001 wher e appl i cabl e) at t he j ob s i t e.
PART 2 PRODUCTS
2. 1 ROOF JOI NT SEALANT
I ndust r i al gr ade, t wo component , mi ni mum 95 per cent sol i ds by vol ume, pol ysul f i de t ype caul k i ng mat er i al t hat has a mi ni mum hi st or y of 10 year s accept abl e ser vi ce i n f uel t anks. Seal ant must be compat i bl e wi t h t he coat i ng and sui t abl e f or di r ect appl i cat i on t o pr epar ed st eel sur f aces.
Seal ant must cont ai n no mor e t han 0. 06 per cent by dr y wei ght Lead, no mor e t han 0. 06 per cent by dr y wei ght Cadmi um, and no mor e t han 0. 00 per cent by dr y wei ght Chr omi um.
2. 2 COATI NG SYSTEM
Al t er nat e syst ems or pr oduct s wi l l not be consi der ed. Al l coat i ng mat er i al s must be suppl i ed by one suppl i er . The ent i r e coat i ng syst em i s i nt ended t o be appl i ed i n t he f i el d. Al t er nat i vel y, sur f ace pr epar at i on may be accompl i shed i n t he shop, f ol l owi ng al l t emper at ur e, humi di t y, and t est i ng r equi r ement s l i s t ed her ei n, f ol l owed by an appl i cat i on of a hol d- pr i mer . Upon compl et i on of f i el d f abr i cat i on, al l shop- appl i ed coat i ngs must be r emoved, sur f aces pr epar ed t o SSPC SP 10/ NACE No. 2, and t he speci f i ed coat i ng syst em appl i ed. Adj ust al l shop pr epar at i on t o
SECTI ON 09 97 13. 15 Page 12 avoi d conf l i c t s wi t h f i nal sur f ace pr epar at i on r equi r ement s.
2. 2. 1 Coat i ng Mat er i al s
Modi f i ed epoxy novol ac pol ysul f i de coat i ng mat er i al s compl yi ng wi t h Tabl e I and Tabl e I I . The f i r st and f i ni sh coat mat er i al s ar e i dent i cal except t hat t he coat s must be i n cont r ast i ng col or s t o al l ow i dent i f i cat i on.
Not e t hat t he qual i f i cat i on t est i ng r equi r es i mmer si on t est i ng f or s i x mont hs.
2. 3 COATI NG SAMPLE COLLECTI ON AND SHI PPI NG KI T
Pr ovi de 2 k i t s t hat cont ai ns one quar t can f or t he base and act i vat or of each SZC mat er i al , an appr opr i at el y s i zed can f or each act i vat or , di ppi ng cups f or each component t o be sampl ed, a shi ppi ng box si zed f or t he sampl es t o be shi pped, and packi ng mat er i al . Ext r act 2 sampl es of each component , mar k cans f or t he appr opr i at e component s i ncl udi ng manuf act ur er s name, addr ess, bat ch number s, bat ch si ze shi pped t o t he pr oj ect s i ght and dat e of manuf act ur e. St or e i n QC Manager ' s of f i ce unt i l compl et i on of pr oj ect . I f unf or eseen coat i ng i ssues ar i se shi p 1 compl et e sampl e ( i ncl udi ng base and act i vat or ) wi t h al l bat ch i nf or mat i on t o t he pr e- chosen appr oved I ndependent l abor at or y f or eval uat i on. I ncl ude al l per t i nent i nf or mat i on f r om t he pr oj ect . The QC Manager i s t o ar r ange pi ck- up and shi ppi ng t o t he appr oved coat i ng t est i ng l abor at or y.
2. 4 ABRASI VE SAMPLE COLLECTI ON AND SHI PPI NG KI T
Pr ovi de a k i t t hat cont ai ns one sui t abl e pl ast i c bag or cont ai ner f or each sampl e t o be col l ect ed. Mar k cont ai ner s f or t he appr opr i at e component .
Pr ovi de shi ppi ng document s, i ncl udi ng ei t her pr e- pai d shi ppi ng or a shi pper number t hat can be used by t he QC Manager t o ar r ange pi ckup, addr essed t o t he appr oved coat i ng t est i ng l abor at or y.
2. 5 TEST KI TS
2. 5. 1 Test Ki t f or Measur i ng Chl or i de, Sul f at e and Ni t r at e I ons on St eel and Coat ed Sur f aces
Pr ovi de t est k i t s cal l ed CHLOR* TEST CSN Sal t s, as manuf act ur ed by CHLOR* RI D I nt er nat i onal I nc. of Chandl er , Ar i zona ( www. chl or - r i d. com) or equal . An " equal " t est k i t must meet t he f ol l owi ng r equi r ement s:
a. Ki t cont ai ns al l mat er i al s, suppl i es, t ool s and i nst r uct i ons f or f i el d t est i ng and on- si t e quant i t at i ve eval uat i on of chl or i de, sul f at e and ni t r at e i ons;
b. Ki t ext r act sol ut i on i s aci di c, f act or y pr e- measur ed, pr e- packaged, and of uni f or m concent r at i on;
c. Ki t component s and sol ut i ons ar e mer cur y f r ee and envi r onment al l y f r i endl y;
d. Ki t cont ai ns new mat er i al s and sol ut i ons f or each t est ext r act i on;
e. Ext r act i on t est cont ai ner ( vessel , s l eeve, cel l ) cr eat es a seal ed, encapsul at ed envi r onment dur i ng sal t i on ext r act i on;
f . Test ext r act cont ai ner i s sui t abl e f or t est i ng t he f ol l owi ng st eel sur f aces: Hor i zont al ( up/ down conf i gur at i on) , ver t i cal , f l at , cur ved, SECTI ON 09 97 13. 15 Page 13 smoot h, pi t t ed, and r ough;
g. Al l sal t i on concent r at i ons ar e di r ect l y measur ed i n mi cr ogr ams per squar e cent i met er .
2. 5. 2 Test Ki t f or Measur i ng Chl or i des i n Abr asi ves
Pr ovi de t est k i t s cal l ed CHLOR* TEST- A, as manuf act ur ed by CHLOR* RI D I nt er nat i onal I nc. of Chandl er , Ar i zona ( www. chl or - r i d. com) , or equal . To be consi der ed f or appr oval as an " equal " t est k i t , each pr oposed t est k i t must :
a. Be a compl et el y sel f - cont ai ned t est k i t wi t h al l mat er i al s, suppl i es, t ool s and i nst r uct i ons t o t ake t est s and i dent i f y r esul t s;
b. Use i dent i f i abl e, consi st ent , f act or y pr e- measur ed t est ext r act sol ut i on;
c. Pr ovi de f or t est i ng equal vol umes of abr asi ve and t est sol ut i on;
d. Pr ovi de f or t aki ng di r ect measur ement s of t he chl or i de i on i n par t s per mi l l i on ( PPM) , wi t hout usi ng conver si on char t s or t abl es;
e. Pr ovi de al l new component s f or ext r act i on and t i t r at i on f or each t est ;
f . Pr ovi de a f act or y seal ed t i t r at i on devi ce f or each t est ;
g. Use t he ext r act sampl i ng cont ai ner as t he t i t r at i on cont ai ner .
2. 5. 3 Test Ki t f or I dent i f y i ng Ami ne Bl ush on Epoxy Sur f aces
Test k i t must meet t he f ol l owi ng r equi r ement s:
a. Be a compl et el y sel f - cont ai ned f i el d t est k i t wi t h al l mat er i al s, suppl i es, t ool s and i nst r uct i ons t o per f or m t est s and i ndi cat e t he pr esence of unr eact ed ami nes;
b. Use an i dent i f i abl e, consi st ent , uni f or m, pr e- packaged, f act or y pr e- measur ed i ndi cat i ng sol ut i on;
c. Ki t cont ai ns no mer cur y or l ead and i s envi r onment al l y f r i endl y;
d. Ki t cont ai ns a sol ut i on of an unr eact ed ami ne f or t he pur pose of " sel f checki ng" t he i ndi cat or sol ut i on;
2. 6 ABRASI VE
The r ef er enced abr asi ve speci f i cat i ons have maxi mum l i mi t s f or sol ubl e sal t s cont ami nat i on, however , t hi s maxi mum l evel of cont ami nat i on does not guar ant ee t hat cont ami nat i on wi l l not be t r ansf er r ed t o t he st eel sur f ace dur i ng abr asi ve bl ast i ng. Ot her f act or s such as on- si t e handl i ng and r ecycl i ng can al l ow cont ami nat i on of abr asi ve. Cont r act or s ar e caut i oned t o ver i f y t hat t he chosen abr asi ve, al ong wi t h wor k and st or age pr ocesses, al l ow t he f i nal sur f ace cl eanl i ness r equi r ement s t o be achi eved.
Successf ul t est i ng of chl or i des i n abr asi ve does not negat e t he f i nal accept ance t est i ng of st eel sur f aces.
I nt er pr et SSPC AB 1 t o i ncl ude t he meani ng t hat abr asi ve mat er i al cont ai ns a maxi mum one per cent by wei ght of any t oxi c subst ance l i s t ed i n ei t her
SECTI ON 09 97 13. 15 Page 14
Tabl e Z- 1, Z- 2, or Z- 3 or 29 CFR 1910- SUBPART Z, wi t h t he except i on of i ner t or nui sance dust mat er i al s, ar seni c, ber yl l i um, cadmi um, cobal t , l ead, mer cur y, r hodi um, s i l ver , t el l ur i um, t hal l i um, and ur ani um.
2. 6. 1 Non- met al l i c Abr asi ve
Conf or m t o SSPC AB 1, Cl ass A except t hat :
a. The gr oss gamma r adi oact i v i t y must not exceed 5 pi cocur i es per gr am.
b. The maxi mum al l owabl e chl or i de cont ent i s 7 par t s per mi l l i on ( ppm) as measur ed wi t h t he t est k i t descr i bed i n t he par agr aph TEST KI T FOR MEASURI NG CHLORI DES I N ABRASI VES. Modi f y t he r equi r ement s of SSPC AB 2 t o subst i t ut e r equi r ement f or one chl or i de t est f or each " WATER SOLUBLE CONTAMI NANTS" t est r equi r ed.
c. The maxi mum al l owabl e Chr omi um and Cadmi um cont ent of t he wor k mi x must be l ess t han 0. 1 per cent by wt . when t est ed i n accor dance wi t h ASTM D3718 f or Chr omi um and ASTM D3335 f or Cadmi um. Modi f y t he r equi r ement s of SSPC AB 2 t o add r equi r ement f or one Chr omat e t est and one Cadmi um t est f or each " LEAD" t est r equi r ed.
Use abr asi ve t hat i s speci f i cal l y sel ect ed and gr aded t o pr ovi de a shar p, angul ar pr of i l e t o t he speci f i ed dept h. Do not use ungr aded abr asi ve.
Make adj ust ment s t o pr ocesses or abr asi ve gr adat i on t o achi eve speci f i ed sur f ace pr of i l e. Recycl ed non- met al l i c abr asi ve must meet al l r equi r ement s of t he speci f i cat i on each t i me t hat i t i s pl aced i n t he bl ast pot .
2. 6. 2 Met al l i c Abr asi ve
2. 6. 2. 1 New and Remanuf act ur ed St eel Gr i t
Conf or m t o t he chemi cal and physi cal pr oper t i es of SSPC AB 3 Cl ass 1 ( St eel ) onl y, except t hat t he gr oss gamma r adi oact i v i t y must not exceed 5 pi cocur i es per gr am. Cl ass 2 ( I r on) abr asi ve must not be used.
To devel op a sui t abl e wor k mi x f r om new st eel abr asi ve, a mi ni mum of 200 t o 400 r ecycl es i s r equi r ed, t her ef or e, i t i s advant ageous f or a Cont r act or t o use r emanuf act ur ed st eel gr i t or gr i t r ecl ai med f r om a pr evi ous pr oj ect . Such gr i t must be consi der ed t o conf or m i f i t can be t r aced t o new gr i t conf or mi ng t o SSPC AB 3 Cl ass 1 and i t meet s al l c l eanl i ness r equi r ement s of SSPC AB 3 Cl ass 1 when br ought t o t he cur r ent j obsi t e. Submi t one r epr esent at i ve sampl e of t hi s wor k mi x t o t he l abor at or y f or t est i ng, al ong wi t h sampl es of new mat er i al . Accept ance and use of t hi s wor k mi x must not be used t o j ust i f y any devi at i on f r om sur f ace pr epar at i on r equi r ement s.
2. 6. 2. 2 Recycl ed St eel Gr i t
Abr asi ve medi a must conf or m t o t he chemi cal and physi cal pr oper t i es of SSPC AB 2 except t hat :
a. The maxi mum al l owabl e chl or i de cont ent i s 7 par t s per mi l l i on ( ppm) as measur ed wi t h t he t est k i t descr i bed i n ar t i c l e ent i t l ed " Test Ki t f or Measur i ng Chl or i des i n Abr asi ves. " Modi f y t he r equi r ement s of SSPC AB 2t o subst i t ut e r equi r ement f or one chl or i de t est f or each " WATER SOLUBLE CONTAMI NANTS" t est r equi r ed.
SECTI ON 09 97 13. 15 Page 15
b. The maxi mum al l owabl e Chr omi um and Cadmi um cont ent of t he wor k mi x must be 0. 1 per cent by wt . when t est ed i n accor dance wi t h ASTM D3718 f or Chr omi um and ASTM D3335 f or Cadmi um. Modi f y t he r equi r ement s of SSPC AB 2 t o add r equi r ement f or one Chr omat e t est and one Cadmi um t est f or each " LEAD" t est r equi r ed.
PART 3 EXECUTI ON
Per f or m al l wor k, r ewor k, and r epai r i n accor dance wi t h appr oved pr ocedur es i n t he Coat i ng Wor k Pl an.
3. 1 DOOR SHEET ACCESS WAYDELETED
A door sheet may be cut out of a t ank t o f aci l i t at e per sonnel and equi pment access. The door sheet must be r emoved i n accor dance wi t h API St d 653 and API St d 650, i ncl udi ng al l st r uct ur al , wel di ng, t est i ng, and eval uat i on r equi r ement s. Af t er compl et i on of coat i ng CEI LI NG and SHELL and pr i or t o pr epar at i on and coat i ng of FLOOR, t he door sheet must be i nst al l ed, t est ed, and accept ed. The door sheet and sur r oundi ng ar eas must be sur f aced i n accor dance wi t h Sect i on 4 of NACE SP0178, and accompanyi ng Vi sual Compar at or , t o t he condi t i on descr i bed and shown f or NACE Wel d Sur f ace Pr epar at i on Desi gnat i on " C" wel ds f or i nt er i or sur f aces and " D" Wel ds f or ext er i or sur f aces. The door sheet and t he f eat her ed ar eas of t he SHELL must be pr epar ed and coat ed wi t h t he FLOOR i n accor dance wi t h al l r equi r ement s of t hi s Sect i on. The Cont r act or i s r esponsi bl e f or cut t i ng out t he door sheet , st abi l i z i ng t he t ank or openi ngs whi l e t he door sheet i s out , r epl aci ng t he door sheet , and t est i ng t he r epl aced door sheet usi ng qual i f i ed engi neer i ng and t est i ng ser vi ces. Per f or m t ank t i ght ness t est i ng af t er coat i ng wher e a door sheet access way was i nst al l ed f or t hi s pr oj ect .
3. 2 COATI NG AND ABRASI VE SAMPLE COLLECTI ON AND TESTI NG
Sampl e and t est mat er i al s del i ver ed t o t he j obsi t e. Not i f y Cont r act i ng Of f i cer t hr ee days i n advance of sampl i ng. The QC Manager , and ei t her t he PCS or coat i ng i nspect or , must wi t ness al l sampl i ng.
3. 2. 1 Coat i ng Sampl e Col l ect i on
Pr ovi de 2 sampl e col l ect i on k i t s as r equi r ed i n par agr aph COATI NG SAMPLE COLLECTI ON AND SHI PPI NG KI T. Fr om each l ot , obt ai n a one quar t sampl e of each base mat er i al , and pr opor t i onal sampl es of each act i vat or based on mi x r at i o, by r andom sel ect i on f r om seal ed cont ai ner s i n accor dance wi t h ASTM D3925. Pr i or t o sampl i ng, mi x cont ent s of each seal ed cont ai ner t o ensur e uni f or mi t y. As an al t er nat i ve t o col l ect i ng smal l sampl es f r om ki t s, ent i r e k i t s may be r andoml y sel ect ed and shi pped t o l abor at or y, obser vi ng al l r equi r ement s f or wi t nessi ng and t r aceabi l i t y . For pur poses of qual i t y conf or mance i nspect i on, a l ot i s def i ned as t hat quant i t y of mat er i al s f r om a si ngl e, uni f or m bat ch pr oduced and of f er ed f or del i ver y at one t i me. A bat ch i s def i ned as t hat quant i t y of mat er i al pr ocessed by t he manuf act ur er at one t i me and i dent i f i ed by number on t he l abel .
I dent i f y sampl es by desi gnat ed name, speci f i cat i on number , bat ch number , pr oj ect cont r act number , sampl e dat e, i nt ended use, and quant i t y i nvol ved. The QC Manager wi l l t ake possessi on of t he packaged sampl es and hol d unt i l i nst r uct ed t o cont act a shi ppi ng company t o ar r ange f or pi ckup, and r el i nqui sh t he sampl es onl y t o t he shi ppi ng r epr esent at i ve f or shi pment t o t he appr oved l abor at or y f or t est i ng as r equi r ed by par agr aph
COATI NG SAMPLE TEST REPORTS.
SECTI ON 09 97 13. 15 Page 16
3. 2. 2 Abr asi ve Sampl e Col l ect i on
Pr ovi de a sampl e col l ect i on k i t as r equi r ed i n par agr aph ABRASI VE SAMPLE COLLECTI ON AND SHI PPI NG KI T. For pur poses of qual i t y conf or mance i nspect i on, a l ot must consi st of al l abr asi ve mat er i al s of t he same t ype f r om a si ngl e, uni f or m bat ch pr oduced and of f er ed f or del i ver y at one t i me. Obt ai n sampl es of each abr asi ve l ot usi ng t he sampl i ng t echni ques and schedul e of t he r el evant SSPC AB st andar d r ef er ence. The addi t i on of any subst ance t o a bat ch must const i t ut e a new l ot . I dent i f y sampl es by desi gnat ed name, speci f i cat i on number , l ot number , pr oj ect cont r act number , sampl e dat e, i nt ended use, and quant i t y i nvol ved. The QC Manager wi l l t ake possessi on of t he packaged sampl es, cont act t he shi ppi ng company t o ar r ange f or pi ckup, and r el i nqui sh t he sampl es onl y t o t he shi ppi ng r epr esent at i ve f or shi pment t o t he appr oved l abor at or y f or t est i ng as r equi r ed by par agr aph ABRASI VE SAMPLE TEST REPORTS.
3. 2. 3 Coat i ng Sampl e Test Repor t s
Submi t t est r esul t s f or each l ot of coat i ng mat er i al del i ver ed t o t he j obsi t e. Test sampl es of coat i ng mat er i al f or compl i ance wi t h r equi r ement s of Tabl e I . Rej ect ent i r e bat ch r epr esent ed by sampl es t hat f ai l one or mor e t est s, sel ect new l ot s, and t est sampl es.
3. 2. 4 Abr asi ve Sampl e Test Repor t s
Submi t t est r esul t s f or each l ot of abr asi ve del i ver ed t o t he j obsi t e.
Test sampl es of met al l i c abr asi ve t o t he r equi r ement s of par agr aph REQUI REMENTS of SSPC AB 3, except par agr aph 4. 1. 5 DURABI LI TY. Test sampl es of non- met al l i c abr asi ve t o t he r equi r ement s of par agr aph REQUI REMENTS of SSPC AB 1. Rej ect ent i r e l ot r epr esent ed by sampl es t hat f ai l one or mor e t est s, sel ect new l ot s, and t est sampl es.
3. 3 LI GHTI NG
Pr ovi de l i ght i ng f or al l wor k ar eas as pr escr i bed i n SSPC Gui de 12.
3. 4 ENVI RONMENTAL CONDI TI ONS
3. 4. 1 Tank Cont ai nment
Mai nt ai n ext er i or t ank cont ai nment i n f ul l wor ki ng condi t i on dur i ng i nt er i or sur f ace pr epar at i on, coat i ng appl i cat i on, and i ni t i al cur i ng t o ai d i n mai nt ai ni ng i nt er i or envi r onment al condi t i ons.
3. 4. 2 Cont r ol Syst em Requi r ement s
Pr ovi de and ut i l i ze dehumi di f i cat i on and vent i l at i on equi pment t o cont r ol humi di t y, t emper at ur e, and vapor l evel s i n t ank f r om begi nni ng of abr asi ve bl ast i ng t hr ough coat i ng appl i cat i on and f or 16 hour s af t er t he l ast coat i ng i s appl i ed. Syst em must mai nt ai n vapor concent r at i ons at or bel ow 10 per cent of Lower Expl osi ve Li mi t ( LEL) . Syst em may i ncor por at e any combi nat i on of sol i d desi ccant and di r ect expansi on r ef r i ger at i on equi pment . No l i qui d, gr anul ar , cal c i um chl or i de, or l i t hi um chl or i de dr yi ng syst ems wi l l be accept ed. Use onl y el ect r i c, i ndi r ect f i r ed combust i on, i ndi r ect f r i c t i on, or st eam coi l auxi l i ar y heat er s. Syst em must be compat i bl e wi t h r emoval of dust and sol vent vapor s, and must have f ai l - saf e measur es t o ensur e r el i abi l i t y dur i ng oper at i ons.
SECTI ON 09 97 13. 15 Page 17
3. 4. 3 Aut omat ed Moni t or i ng Requi r ement s
Pr ovi de cont i nuous moni t or i ng of DH equi pment , and t emper at ur e, r el at i ve humi di t y, and dew poi nt dat a at per t i nent poi nt s on t he st r uct ur e, dur i ng sur f ace pr epar at i on, coat i ng appl i cat i on, and i ni t i al cur e.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .