PPI 034 LS Merchantable_Timber Contract_Requirements MAN Phase 2(Pre_Sale).pdf

PDF 2 MB Posted

Attached to
MCON P2002 Manchester Tank Farm Improvements, Manchester Fuel Depot, Fleet Logistics Center Puget Sound, Manchester, WA
Solicitation number
N4425523R1503
Issued by

About this file

This document outlines requirements for a timber sale contract supporting the Manchester Tank Farm Improvements Phase 2 project. The Navy will appraise approximately 16.9 thousand board feet of merchantable timber located within the construction limits totaling 3.77 acres across three areas. The contractor must mark clearing limits, notify the Navy forester for appraisal, and purchase appraised timber from the government prior to removal. The contractor is responsible for any damaged trees and must pay damages according to the appraisal. Requirements are also provided for disposal of unmerchantable woody debris, compliance with state safety standards for logging operations, and export restrictions on unprocessed timber.

View the file

Other files

File Type Posted
N4425523R1503-0007 SF30 -Final.pdf PDF
Amendment 0007 PPI Responses.pdf PDF
PPI Responses Amend 0006.pdf PDF
N4425523R1503-0006 SF30.pdf PDF
PPI 095 01 45 00.00 20.pdf PDF
PPI 035 33 56 21.17.pdf PDF
PPI 086 Manchester Pier Loading Criteria.pdf PDF
N4425523R1503-0005 SF30 Final .pdf PDF
PPI Log Amendment 0005.pdf PDF
Attachment H Wage Determination Kitsap Heavy Amendment 0005.pdf PDF
PPI 077 01 14 00.pdf PDF
ES502 ELECTRICAL SITE DETAILS - 2 (TANKS)_sealed.pdf PDF
PPI 035 09 97 13.15.pdf PDF
PPI 072 33 52 23.15.pdf PDF
PPI 040 MF801 TANK HYDROSTATIC TEST PLAN.pdf PDF
N4425523R1503-0004 SF30.pdf PDF
P-2002 Manchester Tank Farm Improvements Final GeoTech Report Rev1.pdf PDF
PPI 030 24535 - 50.000 Bl Floor Slab.pdf PDF
PPI 030 24667 - 50.000 Bl Structural Details.pdf PDF
Amendment 0003 PPI Responses.pdf PDF
N4425523R1503-0003 SF30.pdf PDF
N4425523R1503-0002 SF30.pdf PDF
PPI Responses.pdf PDF
Site Visit Log P2002.pdf PDF
Attachment J - SECNAV 5512 - May 2021.pdf PDF
P2002 PPI Spreadsheet Technical.pdf PDF
N4425523R1503-0001 SF30.pdf PDF
Attachments A-B-C-D-E-F-G-H.docx DOCX document
Attachment J Base Access Request Form.xls XLS spreadsheet
Attachment I NAVFAC Northwest BAVR Guide for Industry Contractors and Sponsored Visitors.pdf PDF
Attachment K Small Business Subcontracting Record.docx DOCX document
Attachment H Wage Determinations Kitsap Heavy.pdf PDF
Attachment L Small Business Participation and Commitment Strategy.docx DOCX document
N4425523R1503 P2002 Solicitation.pdf PDF
Show all 34

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MANCHESTER TANK FARM IMPROVEMENT PHASE 2 P-856

REQUIREMENTS FOR PROJECTS THAT IMPACT TREES OR OTHER

FOREST PRODUCTS

September 11, 2023

An estimated appraised value of $6,230 for approximately 16.9 mbf of merchantable forest products were reviewed within the construction limits of this project.

Marking clearing limits: In support of obtaining an accurate forest products appraisal the contractor shall mark on the ground the approved clearing limits. Marking shall be done in a manner that from any marker at least one marker ahead and one marker behind are clearly visible any season of the year. Markers shall be placed to maintain clear visibility between markers for at least 3 months.

The contractor shall notify the Navy Forester via the Contracting Officer when the limits of clearing have been marked and approved.

Within 30 calendar days following notification, a Navy Forester shall make a final appraisal of forest products to be removed within the marked clearing limits and provide the appraised value to the Contracting Officer.

Purchase of Forest Products: Marketable forest products must be purchased by the contractor from the government in advance of removal.

There are marketable forest products, export restricted, on and adjacent to this construction site. The Contractor is required to pay the Government full market value for all trees “taken” or damaged under the construction contract. “Take” is defined as toppled, cut, removed, damaged or wasted by contractor activities.

The actual price to the contractor will be based on an appraisal by a Navy Forester to the extent of the marked and approved limits of clearing. The forest products will be sold on an “as is” basis and the non-negotiable, neutrally determined timber value will be based on rates established twice yearly by the Washington State Department of Revenue.

Applicable clearing limits are shown on the approved project design in place at the time of the forest products appraisal. Only the merchantable forest products within the approved limits for clearing or otherwise defined by the Contracting Officer and appraised by the Navy Forester are to be removed. The cost to purchase or pay taxes on forest products may not, in any fashion, be included as a reimbursable expense associated with the construction contract. (The government may not pay for property it already owns.)

Damages: The contractor shall immediately notify the Navy Forester via the Contracting Officer when trees planned for retention are damaged and pay for damages at current rates. Damage is defined as removal of an area of bark exceeding more than 28 square inches per location from the roots, stem, or top of a tree or breaking off the top of any tree. In the event of damage to retained trees inside or outside the limits of clearing, the contractor shall pay to the government the full value of such trees within 30 days of receiving a damage value appraisal from a Navy Forester via the Contracting Officer.

Damaged trees shall not be cut or removed unless the Navy Forester determines they present a safety hazard and removal is approved by the Contracting Officer.

Damages Continued:

Contractor damaged tree seedlings and saplings outside the clearing limits or on un-landscaped or undeveloped lands within the clearing limits shall be replaced in kind by the contractor in early spring (February). Damage includes uprooting, pushing over, scarring or any mechanical damage to seedlings or saplings that threaten their survival.

The contractor shall implement measures to ensure survival of replacement seedlings or saplings for one full year, replanting if mortality occurs. A Navy Forester may be contacted to provide expertise in determining the number, species, location and timing of planting.

Payment: The contractor shall, prior to removal of forest products, provide to the Contracting Officer (for processing by the Navy Forester) payment for appraised forest products in the form of a check, certified check, cashier’s check or money order payable to the “U.S. Treasury”. Electronic payment through Pay.gov may be completed by contacting Navy Forester for instructions. The Navy Forester will provide a Bill of Sale via the Contracting Officer for appraised timber within 10 working days of when payment received is successfully deposited.

Unmerchantable Woody Debris: Generally, tree limbs, tops, stumps, brush etc. that are not marketable forest products or required for retention as part of the contract shall be appropriately disposed of off the installation. Relocation of woody debris to installation undeveloped or forested areas is not allowed unless the requirements of installation environmental, planning, fire and forestry personnel (e.g. location, depth, extent, etc.) via the Contracting Officer, are obtained in advance of placement. Likewise, project generated chipped debris may not be deposited in undeveloped areas inside or outside the project clearing limits without first complying with the requirements of Navy personnel listed above via the Contracting Officer.

Timber Sale Safety: During timber sale operations, contractors shall implement all safety controls necessary to ensure protection for the life and health of employees, prevent accidents and damage to persons or property and comply with safety requirements in the State of Washington “Safety Standards for Logging Operations” (WAC 296-54) in addition to required compliance with the EMS-385. Responsibility for safe timber removal operations rests with the contractor. The Navy Forester shall be provided the opportunity to provide input to aspects of the safety plan or activity hazard analysis associated with removal of forest products.

Export Restrictions: This contract is subject to the Forest Resources Conservation and Shortage Relief Act of 1990 (P.L. 101-382:10 Stat. 714-726; 16 U.S.C. 620 et. seq.).

Unprocessed Offered Timber shall not be exported from the United States nor used in direct or indirect substitution for unprocessed timber exported from private lands by the Purchaser or any person defined in Section 493 (16 U.S.C. 620e) of the Act. Timber in the following form will be considered unprocessed: (a) trees or portions of trees or other roundwood not processed to standards and specifications suitable for end product use;

(b) lumber, construction timbers, or cants intended for remanufacturing not meeting standards defined in Section 493 (16 U.S.C. 620e) of the Act; and (c) Aspen or other pulpwood bolts exceeding 100 inches in length.

Timber Excess Tax. In accordance with the State of Washington's House Bill No. 1245, effective August 1, 1982, all timber harvested off of Public Lands is subject to a timber excise tax. The tax is payable quarterly by the Purchaser of this timber sale, who must report to the Washington State Department of Revenue the volume, species, and value of timber harvested on forms provided by the State. Questions regarding the timber excise tax are directed to Washington State Department of Revenue, Forest Tax Supervisor in Olympia, Washington (360) 753-2871.

A

B

C

.MANCHESTER PHASE 2 TIMBER VICINITY MAP

MANCHESTER FUEL DEPOT

SW SEC 15 T24N., R02E. W.M.

150 0 15075 Feet

LINE SYM AREAS ACERS

White Dash Phase 1 Construction limit Yellow Dash Phase 2 Construction Limit Red Dash Area A Appraised Timber 2.21 Red Dash Area B Appraised Timber 1.06 Red Dash Area C Appraised Timber 0.5

LS Merchantable_Timber Contract_Requirements MAN Phase 2(Pre_Sale)
MAN PHASE 2 TIMBER MAP