PPI 035 33 56 21.17.pdf
PDF 122 KB Posted
- Solicitation number
- N4425523R1503
About this file
This document is a technical specification for the construction of a single-wall aboveground fixed-roof steel petroleum storage tank. Key details include requirements for structural steel, piping and fittings, appurtenances, coatings, and field testing. Structural components must meet API Std 650 standards and be designed to withstand wind loads of 108 mph, roof snow loads of 25 psf, and seismic criteria according to API Std 650 Appendix E. The tank roof and supports, nozzles, stairway, and vents are also specified. Extensive quality control, inspection, and testing requirements are outlined, including calibration of tank gauging systems, weld inspection and documentation, hydrostatic and roof/bottom puddle testing, and fill testing to be conducted by the government.
View the file
Other files
Show all 34
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Phase 2 Tank Far m I mpr ovement s ( P2002) N4425522F4025 FLCPS Manchest er , Washi ngt on PN 139588
SECTI ON 33 56 21. 17
SI NGLE WALL ABOVEGROUND FI XED ROOF STEEL POL STORAGE TANK
11/ 18, CHG 1: 11/ 20
PART 1 GENERAL
1. 1 REFERENCES
The publ i cat i ons l i s t ed bel ow f or m a par t of t hi s speci f i cat i on t o t he ext ent r ef er enced. The publ i cat i ons ar e r ef er r ed t o wi t hi n t he t ext by t he basi c desi gnat i on onl y.
AMERI CAN I RON AND STEEL I NSTI TUTE ( AI SI )
AI SI E 1 ( 2011) St eel Pl at e Engi neer i ng Dat a Ser i es
- Desi gn of Pl at e St r uct ur es, Vol umes I & I I
AMERI CAN PETROLEUM I NSTI TUTE ( API )
API MPMS 2. 2A ( 1995; R 2017) Manual of Pet r ol eum Measur ement St andar ds Chapt er 2- Tank Cal i br at i on Sect i on 2A- Measur ement and Cal i br at i on of Upr i ght Cyl i ndr i cal Tanks by t he Manual Tank St r appi ng Met hod
API MPMS 2. 2B ( 1989; R 2019) Manual of Pet r ol eum Measur ement St andar ds Chapt er 2: Tank Cal i br at i on - Sect i on 2B: Cal i br at i on of Upr i ght Cyl i ndr i cal Tanks Usi ng t he Opt i cal Ref er ence Li ne Met hod
API MPMS 2. 2C ( 2002; R 2013) Manual of Pet r ol eum Measur ement St andar ds Chapt er 2: Tank Cal i br at i on - Sect i on 2C - Cal i br at i on of Upr i ght Cyl i ndr i cal Tanks Usi ng t he Opt i cal - Tr i angul at i on Met hod
API MPMS 2. 2D ( 2003; R 2014) Manual of Pet r ol eum Measur ement St andar ds Chapt er 2: Tank Cal i br at i on - Sect i on 2D Cal i br at i on of Upr i ght Cyl i ndr i cal Tanks Usi ng t he I nt er nal El ect r o- Opt i cal Di st ance- Rangi ng Met hod
API RP 2009 ( 2002; R 2007; 7t h Ed) Saf e Wel di ng, Cut t i ng, and Hot Wor k Pr act i ces i n Ref i ner i es, Gasol i ne Pl ant s, and Pet r ochemi cal Pl ant s
API St d 650 ( 2020; Er r at a 1 2021) Wel ded Tanks f or Oi l St or age
API St d 653 ( 2014; Addendum 1 2018) Tank I nspect i on, Repai r , Al t er at i on, and Reconst r uct i on
SECTI ON 33 56 21. 17 Page 1 8/ 28/ 2023 Amendment 0003
AMERI CAN SOCI ETY FOR NONDESTRUCTI VE TESTI NG ( ASNT)
ASNT SNT- TC- 1A ( 2020) Recommended Pr act i ce f or Per sonnel Qual i f i cat i on and Cer t i f i cat i on i n Nondest r uct i ve Test i ng
AMERI CAN SOCI ETY OF MECHANI CAL ENGI NEERS ( ASME)
ASME B16. 5 ( 2020) Pi pe Fl anges and Fl anged Fi t t i ngs NPS 1/ 2 Thr ough NPS 24 Met r i c/ I nch St andar d
ASME B16. 9 ( 2018) Fact or y- Made Wr ought But t wel di ng Fi t t i ngs
ASME B16. 11 ( 2016) For ged Fi t t i ngs, Socket - Wel di ng and Thr eaded
ASME B31. 3 ( 2020) Pr ocess Pi pi ng
AMERI CAN WELDI NG SOCI ETY ( AWS)
AWS A5. 10/ A5. 10M ( 2021) Wel di ng Consumabl es - Wi r e El ect r odes, Wi r es and Rods f or Wel di ng of Al umi num and Al umi num- Al l oys - Cl assi f i cat i on
AWS QC1 ( 2016) Speci f i cat i on f or AWS Cer t i f i cat i on of Wel di ng I nspect or s
ASTM I NTERNATI ONAL ( ASTM)
ASTM A123/ A123M ( 2017) St andar d Speci f i cat i on f or Zi nc ( Hot - Di p Gal vani zed) Coat i ngs on I r on and St eel Pr oduct s
ASTM A325 ( 2014) St andar d Speci f i cat i on f or St r uct ur al Bol t s, St eel , Heat Tr eat ed, 120/ 105 ksi Mi ni mum Tensi l e St r engt h
ASTM B241/ B241M ( 2016) St andar d Speci f i cat i on f or Al umi num and Al umi num- Al l oy Seaml ess Pi pe and Seaml ess Ext r uded Tube
ASTM B247 ( 2020) St andar d Speci f i cat i on f or Al umi num and Al umi num- Al l oy Di e For gi ngs, Hand For gi ngs, and Rol l ed Ri ng For gi ngs
ASTM E329 ( 2021) St andar d Speci f i cat i on f or Agenci es Engaged i n Const r uct i on I nspect i on, Test i ng, or Speci al I nspect i on
NACE I NTERNATI ONAL ( NACE)
NACE SP0178 ( 2007) Desi gn, Fabr i cat i on, and Sur f ace Fi ni sh Pr act i ces f or Tanks and Vessel s t o be Li ned f or I mmer si on Ser vi ce
SECTI ON 33 56 21. 17 Page 2
NATI ONAL ELECTRI CAL MANUFACTURERS ASSOCI ATI ON ( NEMA)
NEMA MG 1 ( 2018) Mot or s and Gener at or s
NATI ONAL FI RE PROTECTI ON ASSOCI ATI ON ( NFPA)
NFPA 70 ( 2020; ERTA 20- 1 2020; ERTA 20- 2 2020; TI A
20- 1; TI A 20- 2; TI A 20- 3; TI A 20- 4)
Nat i onal El ect r i cal Code
U. S. DEPARTMENT OF DEFENSE ( DOD)
MI L- DTL- 5624 ( 2016; Rev W; Not i ce 1 2020) Tur bi ne Fuel , Avi at i on, Gr ades JP- 4 and JP- 5
U. S. NATI ONAL ARCHI VES AND RECORDS ADMI NI STRATI ON ( NARA)
29 CFR 1910. 25 St ai r ways
1. 2 SUBMI TTALS
Gover nment appr oval i s r equi r ed f or submi t t al s wi t h a " G" or " S" c l assi f i cat i on. Submi t t al s not havi ng a " G" or " S" c l assi f i cat i on ar e f or Cont r act or Qual i t y Cont r ol appr oval . Submi t t he f ol l owi ng i n accor dance wi t h Sect i on 01 33 00 SUBMI TTAL PROCEDURES:
SD- 01 Pr econst r uct i on Submi t t al s
Copi es of API Publ i cat i ons
Acknowl edgement of API St d 650
NACE Vi sual Compar at or ; G
Acknowl edgement of Sur f ace Fi ni sh Requi r ement s; G
SD- 02 Shop Dr awi ngs
St eel Tank; G
Tank Bot t om Shi mmi ng and Gr out i ng Pl an; G
Wat er Dr aw- Of f Syst em; G
Pr oduct Saver Tank; G
Channel Mount i ng Pads; G
SD- 03 Pr oduct Dat a
St r uct ur al St eel ; G
Car bon St eel , Pi pe Fi t t i ngs, Fl anges, Gasket s, and Bol t i ng; G
Al umi num Pi pi ng; G
Al umi num Fl anges; G
Gasket s f or Manhol e Cover s, St i l l i ng Wel l Fl anges, and Roof Cent er
SECTI ON 33 56 21. 17 Page 3
Vent ; G
Tank Gr out ; G
Tank Shi ms; G
Sampl e Gauge Hat ch; G
Mechani cal Tape Level Gauge; G
Cent er Roof Vent ; G
St ai r way St ep and Pl at f or m Tr ead Gr at i ng; G
St ai r way Bol t i ng; G
Ant i sei ze Compound; G
SD- 05 Desi gn Dat a
St eel Tank Desi gn; G
SD- 06 Test Repor t s
API St d 653 I nspect i on Repor t s; G
Vi sual Exami nat i on of Ver t i cal Shel l - Seam Tack Wel ds
Vi sual Exami nat i on of I ni t i al Pass of I nt er nal Shel l - t o- Bot t om Wel d
Vacuum Box Test i ng of I nt er nal Shel l - t o- Bot t om I ni t i al Wel d Pass
Vi sual Exami nat i on of Compl et ed I nt er nal and Ext er nal Shel l - t o- Bot t om Wel ds
Radi ogr aphi c Exami nat i on of Shel l But t Wel d
Vi sual Exami nat i on of Shel l But t Wel ds
Vi sual Exami nat i on of Fi l l et Wel ds
Vi sual Exami nat i on of Tank Bot t om Pl at es
Vacuum Box Test i ng of Tank Bot t om Fi l l et Wel d
Pneumat i c Test s of Rei nf or ci ng Pl at es
Hydr ost at i c Test i ng; G
Shel l Set t l ement Measur ement s Taken Bef or e, Dur i ng, and Af t er Hydr ost at i c Test i ng; G
I nt er nal Bot t om El evat i on Readi ngs Taken Bef or e and Af t er Hydr ost at i c Test i ng
Shel l Pl umbness
Shel l Roundness
SECTI ON 33 56 21. 17 Page 4
Maxi mum Local Devi at i ons, Shel l
Ti ght ness Test Recor ds
Tank Bot t om Puddl e Test
Roof Puddl e Test
St i l l i ng Wel l Pl umbness Test
SD- 07 Cer t i f i cat es
Qual i f i cat i ons of Tank Er ect or
Wel di ng Pr ocedur e Speci f i cat i ons ( WPS)
Wel di ng Pr ocedur e Qual i f i cat i on Recor ds ( PQRs)
Wel der Per f or mance Qual i f i cat i on Recor ds ( WPQ)
Tank Cal i br at i on Exper i ence
Wel d I nspect or Cer t i f i cat i on
NDE Per sonnel Cer t i f i cat i on
Qual i f i cat i ons of Test i ng Agency
Qual i f i cat i ons of API St d 653 I nspect or
SD- 09 Manuf act ur er ' s Fi el d Repor t s
Mi l l Test Repor t s; G
I mpact Test Dat a; G
SD- 10 Oper at i on and Mai nt enance Dat a
API St d 653 I nspect i on Repor t s, Dat a Package 2
Tank Cal i br at i on Tabl e, Dat a Package 2
El ect r oni c Cal i br at i on Tabl e, Dat a Package 2
Mai nt enance I nst r uct i ons, Dat a Package 2
Oper at or I nst r uct i ons, Dat a Package 2
Submi t i n accor dance wi t h Sect i on 01 78 23 OPERATI ON AND
MAI NTENANCE DATA.
1. 3 COPI ES OF API PUBLI CATI ONS
Pr ovi de f our copi es of API RP 2009, API St d 650, and API MPMS 2. 2A, API MPMS 2. 2B, API MPMS 2. 2C and API MPMS 2. 2D t o t he Cont r act i ng Of f i cer .
1. 4 RELATED REQUI REMENTS
Mat er i al s, desi gn, f abr i cat i on, wel di ng, er ect i on, t est i ng, and
SECTI ON 33 56 21. 17 Page 5 appur t enances must be i n accor dance wi t h API St d 650 and as i ndi cat ed and speci f i ed her ei n. Submi t acknowl edgement of API St d 650 as r equi r ed st andar d. Pr oduct s t o be st or ed i n t he t ank ar e MI L- DTL- 5624 Gr ade JP- 5 or Di esel ( F- 76) . 05 50 13 MI SCELLANEOUS METAL FABRI CATI ONS and Sect i on 26 20 00 I NTERI OR DI STRI BUTI ON SYSTEM appl y t o t hi s sect i on except as speci f i ed ot her wi se.
1. 5 DESI GN REQUI REMENTS
Desi gn t ank t o r esi st t he f ol l owi ng l oads and f or ces:
a. Wi nd: 108 mph.
b. Desi gn speci f y gr avi t y of l i qui d i s 1. 0 f or hydr ot est wi t h wat er .
c. Desi gn shel l and nozzl es f or a desi gn l i qui d l evel equal t o t ank hi gh- hi gh l evel condi t i on.
d. Roof snow l oad of 25 psf .
1. 5. 1 Sei smi c Desi gn Requi r ement s
Sei smi c l oads and f or ces must be i n accor dance wi t h API St d 650 Appendi x E. See Sheet S- 001 f or sei smi c desi gn par amet er s.
1. 5. 1. 1 Col umns
Pr ovi de t ank wi t h mul t i pl e r oof suppor t col umns. See dr awi ngs f or pr ef er r ed col umn l ocat i ons. Desi gn r oof suppor t col umns t o r esi st t he f or ces caused by s l oshi ng of t he l i qui d cont ent s dur i ng a sei smi c event .
Pr ovi de ext er i or epoxy coat ed r oof suppor t col umn. Pr ovi de col umns wi t h an i ncr eased wal l t hi ckness f or cor r osi on al l owance gr eat er t han t he speci f i ed 1/ 16- i nch t hi ckness.
1. 5. 1. 2 Shel l Hei ght
Shel l hei ght must pr ovi de cl ear ance bet ween t he hi gh- hi gh l i qui d l evel set t i ng and t he f i xed r oof t hat i ncl udes an al l owance of at l east 7 f eet - 1 i nch f or s l oshi ng due t o sei smi c event .
1. 5. 2 Tank Nozzl es
Desi gn t ank nozzl es t o accommodat e ext er nal pi pi ng l oads i n accor dance wi t h API St d 650.
1. 5. 3 Tank Roof
Pr ovi de t ank r oof pl at es, l ap wel ded wi t h i nner pl at es on t op, and at l east 1/ 4 i nch t hi ck ( i ncl udes 1/ 16 i nch cor r osi on al l owance) . Suppor t beams must be desi gned so as t o mi ni mi ze uncoat abl e sur f aces. Pr ovi de sol i d web t ype r oof beams. Open web t r usses ar e not per mi t t ed. Do not at t ach r oof suppor t member s t o t he r oof pl at e. Pr ovi de a r oof wi t h ever y par t havi ng a s l ope of 1- 1/ 2: 12.
1. 5. 3. 1 Emer gency Vent i l at i on
Pr ovi de emer gency vent i l at i on by a f r angi bl e r oof desi gn. The wel d at t achi ng t he r oof pl at e t o t he t op angl e must not be gr eat er t han 3/ 16 i nch.
SECTI ON 33 56 21. 17 Page 6
1. 5. 4 Cor r osi on Al l owance
Pr ovi de cor r osi on al l owance of 1/ 16 i nch i n t hi ckness of st eel f or t he i nt er i or of t he shel l , r oof , and i nt er i or st r uct ur al member s.
1. 5. 5 Desi gn Met al Temper at ur e
API St d 650 0 t o 100 degr ees F.
1. 5. 6 Tank Bot t om
Tank bot t om and annul ar r i ng i f r equi r ed must be as i ndi cat ed. Bot t om pl at es must be l ap wel ded wi t h i nner pl at es on bot t om.
1. 6 QUALI FI CATI ONS OF TANK ERECTOR
The Cont r act or must be r egul ar l y engaged i n t he er ect i on of API St d 650 t anks. The Cont r act or must cer t i f y successf ul compl et i on of at l east 12 f i el d er ect ed API St d 650 abovegr ound t anks i n t he past t hr ee year s. The i nf or mat i on pr ovi ded i n t he Cont r act or ' s cer t i f i cat i on must i ncl ude t he dat e of t he not i ce t o pr oceed, dat e of compl et i on, l ocat i on of t ank, Owner , Owner ' s poi nt of cont act , t ank s i ze, conf i gur at i on ( e. g. , ver t i cal AST, hor i zont al AST) , pr oduct st or ed, and mat er i al of const r uct i on.
1. 6. 1 Wel di ng Qual i f i cat i ons
Submi t Wel di ng Pr ocedur e Speci f i cat i ons ( WPS) , Wel di ng Pr ocedur e Qual i f i cat i on Recor ds ( PQRs) , and Wel der Per f or mance Qual i f i cat i on Recor ds ( WPQ) . Qual i f y al l wel der s on si t e. Compl et e al l WPQs speci f i cal l y f or t hi s pr oj ect . Gi ve t he Cont r act i ng Of f i cer not i ce and oppor t uni t y t o wi t ness each of t he wel der per f or mance qual i f i cat i on t est s 24 hour s i n advance of t he per f or mance of each of t he t est s.
1. 7 TANK CALI BRATI ON EXPERI ENCE
Per f or m cal i br at i on of t he t ank usi ng a qual i f i ed or gani zat i on t hat can cer t i f y t o havi ng per f or med successf ul and accur at e cal i br at i on of at l east ei ght t anks of compar abl e t ype and si ze wi t hi n t he l ast t wo year s.
Submi t cer t i f i ed dat a on t ank cal i br at i on exper i ence.
1. 8 QUALI TY ASSURANCE
1. 8. 1 Del i ver y and St or age Handl i ng
Handl e, st or e, and pr ot ect syst em component s and mat er i al s t o pr event damage bef or e and dur i ng i nst al l at i on i n accor dance wi t h t he manuf act ur er ' s r ecommendat i ons, and as appr oved by t he Cont r act i ng Of f i cer . Repl ace damaged or def ect i ve i t ems.
1. 8. 2 St eel Tank Dr awi ng Requi r ement s
Dr awi ngs f or t he st eel t ank must be pr epar ed, seal ed, s i gned, and dat ed by a r egi st er ed pr of essi onal engi neer . I ncl ude er ect i on di agr ams and det ai l dr awi ngs of t he t ank r oof , shel l pl at es, wi nd gi r der s, openi ngs, and connect i ons f or f i t t i ngs and appur t enances. The st eel t ank dr awi ngs must i ncl ude t he f ol l owi ng:
a. Tank er ect i on det ai l s showi ng di mensi ons, s i zes, t hi ckness, gauges, SECTI ON 33 56 21. 17 Page 7 mat er i al s, f i ni shes, and er ect i on pr ocedur es.
b. Tank component det ai l s t o i ncl ude as a mi ni mum:
( 1) I nt er nal pi pe and f i t t i ngs, i ncl udi ng suppor t s and bear i ng pl at es.
( 2) Tank Bot t om t o f oundat i on gasket .
( 3) Tank Bot t om Shi mmi ng and Gr out i ng pl an and det ai l s.
( 4) Tank Anchor s.
( 5) Locat i on of al ar m and cont r ol swi t ches.
( 6) Locat i on of nozzl es i ncl udi ng nozzl es f or gauges and al ar ms.
( 7) Roof suppor t syst em det ai l s.
( 8) Roof manhol e.
( 9) Cent er r oof vent .
( 10) Shel l manhol es and davi t s.
( 11) St ai r way, i ncl udi ng r epl aceabl e st ai r t r ead i nst al l at i on and pl at f or ms.
( 12) Channel mount i ng pads.
( 13) Tank Dat a Pl at e Pl an and I nf or mat i on.
( 14) Shel l t o bot t om connect i on.
( 15) Tank bot t om t o r i ngwal l i nt er f ace.
( 16) St i l l i ng wel l s.
( 17) Gr oundi ng l ugs.
( 18) Sump.
( 19) Scaf f ol d Cabl e Suppor t .
1. 8. 3 Dat a Requi r ement s
Cal cul at i ons f or t he st eel t ank desi gn must be pr epar ed by a St at e r egi st er ed Pr of essi onal Engi neer . St eel t ank desi gn cal cul at i ons must i ncl ude cal cul at i ons f or t he desi gn of t he shel l , as wel l as cal cul at i ons f or t he desi gn of t he r oof , f r angi bl e r oof connect i on, t ank anchor age and r oof suppor t .
1. 8. 4 Wel d I nspect or Cer t i f i cat i on
Cont r act or must ar r ange f or t he ser vi ces of an i ndependent ( i mpar t i al t hi r d par t y not a par t or af f i l i at ed wi t h Cont r act or or subcont r act or pr i nci pal or subsi di ar y busi nesses) wel d i nspect or cer t i f i ed by t he Amer i can Wel di ng Soci et y t o over see al l wel d t est s and exami nat i ons r equi r ed by API St d 650.
SECTI ON 33 56 21. 17 Page 8
1. 8. 5 Test Repor t s
Test Repor t s must consi st of t he f ol l owi ng:
a. Recor ds made by t he AWS cer t i f i ed i nspect or f or al l dut i es per f or med per par agr aph 4. 2 of AWS QC1.
b. Al l Nondest r uct i ve Exami nat i on ( NDE) ( e. g. ; r adi ogr aph, ul t r asound, et c) r epor t s wi t h uni que wel d I D f or each wel d t est ed.
c. " Wel d Map" . These maps/ dr awi ngs cor r el at e t he shop dr awi ngs submi t t ed t o t he NDE r epor t s. The NDE r epor t t hat shows a wel d number as accept abl e i s cor r el at ed wi t h wel d number on t he dr awi ngs.
Pr ovi de t he l ocat i on of each wel d, what pr ocedur e was used, whi ch wel der made t he wel d, t he r esul t s of t he v i sual t est , and t he r esul t s of t he NDE.
1. 8. 6 I nspect i on and NDE Per sonnel
Al l i nspect i on and NDE per sonnel must be qual i f i ed i n accor dance wi t h t he f ol l owi ng r equi r ement s. The Cont r act or must submi t t he qual i f i cat i ons of al l t he t est i ng per sonnel t hat wi l l per f or m al l f i el d t est s f or r evi ew by t he Cont r act i ng Of f i cer . The qual i f i cat i ons of al l per sonnel on t he j ob s i t e t hat wi l l per f or m wel di ng i nspect i ons and NDE must be submi t t ed f or appr oval . Al l i nspect or s and NDE exami ner s must have a mi ni mum of one- year exper i ence i nspect i ng t he pi pi ng or pl at e mat er i al bei ng used and f i ve year s i n mi l i t ar y or commer ci al f uel i ng syst ems or pet r ol eum r ef i ner i es, power gener at i ng pl ant s, paper mi l l s , or chemi cal pr ocess pl ant s.
1. 8. 6. 1 NDE Per sonnel Cer t i f i cat i on
A wr i t t en pr ocedur e/ qual i t y assur ance pr ogr am f or t he t r ai ni ng, exami nat i on, cer t i f i cat i on, cont r ol and admi ni st r at i on of NDE per sonnel must be est abl i shed. The pr ocedur es must be based on appr opr i at e speci f i c and gener al gui del i nes of t r ai ni ng and exper i ence r ecommended by ASNT SNT- TC- 1A. Submi t pr oof of compl i ance of nondest r uct i ve t est exami ner s wi t h API St d 650 i ncl udi ng, but not l i mi t ed t o, exami ner s per f or mi ng r adi ogr aphi c ( RT) , v i sual ( VT) , penet r ant ( PT) , ul t r asoni c ( UT) , and magnet i c par t i c l e ( MT) t est i ng.
1. 8. 6. 2 Qual i f i cat i ons of Test i ng Agency
The t est i ng agency, t est i ng l abor at or y, t echni cal consul t ant or cont r act or ' s appr oved qual i t y assur ance or gani zat i on must meet t he r equi r ement s of ASTM E329.
1. 8. 7 Qual i f i cat i ons of API St d 653 I nspect or
Cont r act or must ar r ange f or t he ser vi ces of an i ndependent ( i mpar t i al t hi r d par t y not a par t or af f i l i at ed wi t h Cont r act or or subcont r act or pr i nci pal or subsi di ar y busi nesses) API St d 653 i nspect or . API St d 653 I nspect or must have a mi ni mum of f i ve year s of exper i ence. Submi t copy of cur r ent cer t i f i cat e.
SECTI ON 33 56 21. 17 Page 9
PART 2 PRODUCTS
2. 1 MATERI ALS
Conf or m t o t he f ol l owi ng r equi r ement s except t hat mat er i al s not def i ni t el y speci f i ed must conf or m t o API St d 650. Al l mat er i al s must be car bon st eel unl ess ot her wi se not ed.
2. 1. 1 Mat er i al s f or Syst em Component s, Pi pe, and Fi t t i ngs
a. The t ank f i l l l i ne, t ank i ssue l i ne, and t ank l ow suct i on l i ne pi pi ng and f i t t i ngs must be i nt er i or and ext er i or coat ed car bon st eel . Al l val ves i ncl udi ng DBB val ves must be as speci f i ed. Al l pi pi ng and f i t t i ngs 2 i nches and smal l er must be st ai nl ess st eel .
b. Al l pi pi ng and f i t t i ngs i nsi de t he t ank must be ext er i or epoxy coat ed car bon st eel except f or pi pi ng 2 i nches and smal l er whi ch must have an uncoat ed i nt er i or . St i l l i ng wel l and l adder mat er i al must be as i ndi cat ed.
c. Do not wel d st ai nl ess st eel t o car bon st eel , except wher e speci f i cal l y i ndi cat ed or speci f i ed.
d. I f mat er i al s f or syst em component s ar e not speci f i ed, t hey must be st ai nl ess st eel .
e. Pr ovi de st ai nl ess st eel HLV f l oat cont r ol chamber , pi l ot , l evel swi t ch housi ngs, and l evel swi t ch pr obe hol der s.
2. 2 STRUCTURAL STEEL
API St d 650. Pr ovi de mi l l t est r epor t s f or shel l pl at es, shel l nozzl e r ei nf or ci ng pl at es, shel l i nser t pl at es, and al l st eel pl at e used i n const r uct i on of shel l penet r at i ons. Pr ovi de i mpact t est dat a when r equi r ed by API St d 650 f or t he mat er i al gr oup and t hi ckness pr ovi ded.
2. 3 CARBON STEEL, PI PE FI TTI NGS, FLANGES, GASKETS, AND BOLTI NG
Car bon st eel , pi pe f i t t i ngs, f l anges, gasket s, and bol t i ng must be pr ovi ded i n accor dance wi t h Sect i on 33 52 40 FUEL SYSTEMS PI PI NG ( NON- HYDRANT) , except gasket s i nsi de t ank and on r oof nozzl es must be non- asbest os, f uel r esi st ant composi t i on, or pr ef or med t ype. Fl anges must be wel d- neck t ype i n accor dance wi t h ASME B16. 5. Thr eaded f i t t i ngs must conf or m t o ASME B16. 11 ( Cl ass 3000) , and but t - wel ded f i t t i ngs must conf or m t o ASME B16. 9.
2. 4 STAI NLESS STEEL PI PE, FI TTI NGS, FLANGES, GASKETS, AND BOLTI NG
St ai nl ess st eel pi pe, pi pe f i t t i ngs, f l anges, gasket s, and bol t i ng must be pr ovi ded i n accor dance wi t h Sect i on 33 52 40 FUEL SYSTEMS PI PI NG ( NON- HYDRANT) and API St d 650, except : Fl anges must be wel d- neck t ype i n accor dance wi t h ASME B16. 5, t hr eaded f i t t i ngs must conf or m t o ASME B16. 11 ( Cl ass 3000) , and but t - wel ded f i t t i ngs must conf or m t o ASME B16. 9.
2. 5 ALUMI NUM PI PI NG FOR STI LLI NG WELLS
Al umi num pi pe must be ASTM B241/ B241M, al l oy 6061- T6, Schedul e 40 f or pi pe si zes 2 i nches t hr ough 12 i nches; Schedul e 80 f or pi pe si zes 2 i nches and smal l er .
SECTI ON 33 56 21. 17 Page 10
2. 6 BOLTI NG AND ALUMI NUM FLANGES FOR STI LLI NG WELLS
Al umi num f l anges must be ASME B16. 5, Cl ass 150 or Cl ass 300 wher e i ndi cat ed, Fl at Face Type, except al umi num must conf or m t o ASTM B247, al l oy 6061- T6 or al l oy 356- T6. Al umi num f l anges may be wel di ng neck or s l i p- on t ype. Pr ovi de bol t i ng i n accor dance wi t h Sect i on 33 52 40 FUEL SYSTEMS PI PI NG ( NON- HYDRANT) . Pr ovi de el ect r i cal i sol at i on f or separ at i on of di ssi mi l ar met al s.
2. 7 WELDI NG FOR ALUMI NUM PI PI NG
2. 7. 1 Pr ocess f or Al umi num
ASME B31. 3, Gas Tungst en Ar c Wel di ng ( GTAW) Pr ocess or Gas Met al Ar c Wel di ng ( GMAW) Pr ocess. Backi ng r i ngs ar e not per mi t t ed.
2. 7. 2 Al umi num Wel di ng El ect r odes and Rods
AWS A5. 10/ A5. 10M, ER5356 el ect r odes.
2. 8 BOLTI NG FOR SHELL MANHOLE COVERS
Bol t i ng f or shel l manhol es must be i n accor dance wi t h Sect i on 33 52 40
FUEL SYSTEMS PI PI NG ( NON- HYDRANT) .
2. 9 GASKETS FOR MANHOLE COVERS, STI LLI NG WELL FLANGES, AND ROOF CENTER VENT
Pr ovi de composi t i on asbest os- f r ee, f uel and f i r e- r esi st ant gasket s f or shel l manhol e cover s, st i l l i ng wel l f l anges, and r oof cent er vent .
2. 10 TANK BOTTOM TO FOUNDATI ON SEAL
2. 10. 1 Tank Shi ms and Tank Gr out - Anchor ed Tanks
Gr out must be non- shr i nk t ype and consi st of 1 par t Por t l and cement t o 1- 1/ 2 par t s sand by vol ume. Do not use cal c i um chl or i de admi xt ur es. When t he ambi ent t emper at ur e i s expect ed t o f al l bel ow 60 degr ees F wi t hi n t he next 48 hour s, t he cement used must be " hi gh ear l y st r engt h" t ype.
2. 11 I NTERI OR PROTECTI VE COATI NG SYSTEM
Sect i on 09 97 13. 15 LOW VOC POLYSULFI DE I NTERI OR COATI NG OF WELDED STEEL
PETROLEUM FUEL TANKS.
2. 12 EXTERI OR PROTECTI VE COATI NG SYSTEM
Sect i on 09 97 13. 27 HI GH PERFORMANCE COATI NG FOR STEEL STRUCTURES. As i ndi cat ed on Cont r act Dr awi ngs, s l i p r esi st ance coat i ng wal kways wi l l be pr ovi ded on r oof f or saf e oper at or access t o t he sampl e gauge wel l , r oof manhol e, and cent er r oof appur t enances.
2. 13 APPURTENANCES
2. 13. 1 Sampl e Gauge Hat ch
Pr ovi de sampl e gauge hat ch on t op of st i l l i ng wel l wher e i ndi cat ed f or manual gaugi ng. Pr ovi de gasket f or di ssi mi l ar met al pr ot ect i on. The t ank er ect or must measur e t he st i l l i ng wel l gauge hat ch hol d- of f di st ance wi t h
SECTI ON 33 56 21. 17 Page 11 t he t ank empt y, hal f f ul l , and f ul l , and pl ace t he i nf or mat i on on a per manent l y af f i xed mar ker at t ached t o t he sampl e gauge hat ch. Thi s must be per f or med dur i ng t ank f i l l t est i ng. The st i l l i ng wel l gauge hat ch hol d- of f di st ance i s def i ned as t he di st ance f r om t he t ank bot t om dat um pl at e t o t he t op of t he gauge hat ch.
2. 13. 2 Mechani cal Tape Level Gauge
The mechani cal t ape l evel gauge must be at t ached t o t he t ank f l oor by gui dewi r e anchor s and compl et e wi t h al l necessar y i nci dent al pi pe, pul l eys, f i t t i ngs, suppor t s, suppor t br acket s, t ensi on spr i ngs, and gui de wi r e assembl i es. The gauge must aut omat i cal l y pr ovi de t he l ocat i on of t he pr oduct l evel wi t hi n pl us or mi nus 1/ 8 i nch of t he act ual l i qui d l evel .
The head must be made of al umi num and must be mount ed on t he ext er i or of t he t ank shel l appr oxi mat el y 54 i nches above t he t ank bot t om. The head must cont ai n a gl ass cover ed wi ndow compl et e wi t h an i nsi de wi per . The seal s must be made of Tef l on. The shaf t s and gr aduat ed t ape assembl y must be made of st ai nl ess st eel . The t ape dr um must be made of pl ast i c. The t ape must be of suf f i c i ent l engt h t o measur e t he l i qui d l evel f r om t he bot t om t o t he t op of t he st or age t ank. Gauge measur ement s must be gr aduat ed i n 1/ 16 i nch i ncr ement s. The t ape must be car r i ed over pul l eys housed i n el bow assembl i es at each change of di r ect i on.
2. 13. 3 Vent i ng
Pr ovi de t ank vent i ng as i ndi cat ed.
2. 13. 3. 1 Cent er Roof Vent
Pr ovi de open vent at t he cent er or at t he hi ghest el evat i on of t he r oof .
Open vent must have a st ai nl ess st eel weat her hood as i ndi cat ed and st ai nl ess st eel bi r d scr een as i ndi cat ed on t he dr awi ngs wi t h openi ngs wel ded i n pl ace. Weat her hood must be r emovabl e. I nsect scr eens ar e not al l owed.
2. 13. 4 Ci r cumf er ent i al St ai r way and Pl at f or ms
OSHA 29 CFR 1910. 25 St ai r ways. Pr ovi de bol t - on r emovabl e doubl e st r i nger c i r cumf er ent i al st ai r ways as i ndi cat ed. Hot - di p gal vani ze st ai r way i n accor dance wi t h ASTM A123/ A123M Gr ade 100. Al l bol t ed connect i ons must be gal vani zed pr i or t o er ect i on. Hot di p gal vani ze st ai r way and pl at f or m sect i ons af t er al l wel di ng i s compl et e. No wel di ng on t he st ai r way wi l l be per mi t t ed af t er gal vani z i ng. Col d spr ay- on gal vani z i ng i s not al l owed as a subst i t ut e f or hot di p gal vani z i ng or i t s r epai r . Al l c i r cumf er ent i al st ai r component s i ndi cat ed t o be hot di p gal vani zed shal l be pr i med and pai nt ed wi t h same t ank ext er i or epoxy coat i ng.
Pr ovi de st ai r way wi t h r epl aceabl e gal vani zed st ai r way st ep and pl at f or m t r ead gr at i ng. The st ai r way must be of bol t ed const r uct i on t o al l ow f or compl et e r emoval af t er const r uct i on t o avoi d i nt er f er ence wi t h coat i ng oper at i ons. St ai r way bol t i ng must be ASTM A325, hot di pped gal vani zed.
Al l mount i ng br acket s, used t o connect t he st ai r way t o t he t ank, must be wel ded t o t he t ank usi ng seal wel ded mount i ng pl at es and must be coat ed wi t h t he t ank. Pr ovi de one appr oach st ep on t he secondar y cont ai nment concr et e as i ndi cat ed. Pr ovi de shel l mount ed met al bar st ai r way st ep and pl at f or m t r ead gr at i ng wi t h non- sl i p nosi ngs. Suppor t t he st ai r way and pl at f or ms compl et el y on t he shel l of t he t ank wi t h bot t om- of - shel l - mount ed por t i on c l ear of and not st r uct ur al l y suppor t ed or connect ed t o t he gr ound or appr oach st eps. Pr ovi de r i se and r un of st ai r way st eps as i ndi cat ed, SECTI ON 33 56 21. 17 Page 12 adj ust i ng s l i ght l y t o sui t f i nal l ayout of t he t ank and i t s appur t enances, but wi t h r i se and r un consi st ent f r om t he gr ound l evel t o t he t op pl at f or m. Const r uct st ai r way ent i r el y of st eel .
Pr ovi de l andi ngs f or accessi ng t he hi gh l evel al ar m swi t ches, l evel cont r ol f l oat pi l ot chamber , and t ank r oof . Rai l i ngs must be cont i nuous ar ound t he pl at f or ms, except f or access openi ngs, and must be const r uct ed si mi l ar t o t he r oof per i met er guar dr ai l . At access openi ngs, any space wi der t han one i nch bet ween t he t ank and t he pl at f or m must be f l oor ed.
Ends of handr ai l s, guar dr ai l s, and post s must be seal ed by wel di ng.
Guar dr ai l s must be const r uct ed i n wel ded sect i ons and t hei r post s seal wel ded or bol t ed t o t he st r i nger s. Cont i nuousl y but t - wel d pl at f or m guar dr ai l t oeboar ds t o guar d r ai l post s. Do not f i el d wel d gal vani zed mat er i al s.
2. 13. 5 Manhol e Access Pl at f or ms
Pr ovi de pl at f or m f or accessi ng t he l ower shel l manhol e and ci r cumf er ent i al st ai r way as i ndi cat ed and i n accor dance wi t h Sect i on 05 50 13
MI SCELLANEOUS METAL FABRI CATI ONS.
2. 13. 6 Roof Per i met er Guar dr ai l
Const r uct i on of r oof per i met er guar dr ai l must be as- det ai l ed on t he dr awi ngs and i n accor dance wi t h OSHA. Fi ni shi ng of r oof per i met er guar dr ai l must be si mi l ar t o t he st ai r way. Do not f i el d wel d gal vani zed mat er i al s.
2. 13. 7 Wat er Dr aw- Of f Syst em
Pr ovi de a wat er dr aw- of f syst em compl et e wi t h al l syst em component s and cont r ol s and connect ed t o t he AST as i ndi cat ed. Syst em must r emove f uel f r om i t s associ at ed st or age t ank, separ at e t he f uel and wat er by gr avi t y, r et ur n t he f uel back t o t he st or age t ank, and di schar ge t he wat er . The syst em and i t s component s must meet t he r equi r ement s of t he speci f i cat i on her ei n. The syst em must i ncl ude, but i s not l i mi t ed t o, t he f ol l owi ng pi pi ng, f i t t i ngs, val ves, syst em component s, and cont r ol s:
a. Pr oduct Saver Tank: Pr ovi de a 300- gal l on pr oduct saver t ank wi t h t he t ank, pi pi ng and f i t t i ngs packaged and f abr i cat ed as a s i ngl e syst em.
Fabr i cat e f r om Type 304 st ai nl ess st eel wi t h t ank vol ume as i ndi cat ed. Pr ovi de t ank wi t h r emovabl e t op, one- i nch i nl et l i ne, one- i nch dr ai n l i ne, and ot her l i nes as i ndi cat ed, al l wi t h f ul l por t bal l val ves and cam- t ype connect i ons. Pr ovi de concr et e mount i ng pad and anchor t ank t o i t . Gr ound t o dedi cat ed gr oundi ng syst em.
b. Pr ovi de t he pr oduct saver t ank syst em wi t h t ank sump heat i ng syst em.
Syst em must be sel f - r egul at i ng heat t r aci ng sui t abl e f or use i n Cl ass I , Di v i s i on 1, Gr oup D hazar dous envi r onment s. Pr ovi de t her most at f or cont r ol l i ng heat t r aci ng t ur n on by t emper at ur e.
c. Pr oduct Saver Pump: Pump must be a c l ose coupl ed cent r i f ugal havi ng a capaci t y of 20 gpm at not l ess 60 f eet of head and a r equi r ed Net Posi t i ve Suct i on Head of not mor e t han 3 f eet . Pump mot or must be i n accor dance wi t h NEMA MG 1. Al l pump component s i n cont act wi t h f uel must be st ai nl ess st eel . The uni t must be UL l i s t ed and l abel ed f or use i n Cl ass I , Di v i s i on 2, Gr oup D hazar dous envi r onment s as def i ned by NFPA 70, wi t h a maxi mum t emper at ur e r at i ng of " T3" - 392 degr ees F.
The mot or must be non- over l oadi ng at ever y poi nt on t he pump cur ve.
SECTI ON 33 56 21. 17 Page 13
d. Pi pi ng, Val ves, Fi t t i ngs, and I nst r ument s: Pi pe, pi pe f i t t i ngs, f l anges, manual val ves, gasket s, and bol t i ng must be i n accor dance wi t h Sect i on 33 52 40 FUEL SYSTEMS PI PI NG ( NON- HYDRANT) . Mat er i al s of const r uct i on must be as descr i bed i n t hi s speci f i cat i on par agr aph MATERI ALS FOR SYSTEM COMPONENTS, PI PE, AND FI TTI NGS except as modi f i ed her ei n.
e. Cont r ol s: Pr ovi de a combi nat i on mot or st ar t er wi t h cont act or f or wat er dr aw- of f pump cont r ol s, i ndi cat or l i ght s, and ot her equi pment per det ai l on dr awi ngs. Ther e must al so be a power t i e- i n f or f i el d wi r i ng t o sump heat t r aci ng and t her most at .
f . El ect r i cal : Pr ovi de compl et el y pr ewi r ed wi t h s i ngl e poi nt of ser vi ce connect i on at hor sepower r at ed, 3 pol e br eaker . Pr ovi de sui t abl e f or Cl ass I , Di v i s i on 1, Gr oup D ser vi ce.
2. 13. 7. 1 Basi s of Desi gn of Wat er Dr aw- Of f Syst em
The syst em must be ar r anged i n t he same gener al conf i gur at i on as i ndi cat ed. However , t hese ar e not f abr i cat i on dr awi ngs and ar e f or basi s of desi gn onl y. The Cont r act or must be r esponsi bl e f or pr ovi di ng a compl et e and usabl e syst em.
2. 13. 7. 1. 1 Det ai l Dr awi ng
Submi t det ai l ed dr awi ngs showi ng t he Wat er Dr aw- Of f Syst em, i ncl udi ng t ypes, s i zes, l ocat i on, and i nst al l at i on det ai l s f or :
a. Pi pe hanger s and suppor t s.
b. Gr oundi ng.
c. Tank.
d. Pump.
e. Cont r ol s.
f . Val ves.
g. Pi pi ng.
2. 13. 8 Shel l Manhol es
Pr ovi de shel l manhol es, manhol e cover s wi t h f i l l er dr ums, and davi t s as i ndi cat ed. Hi nged cover s ar e not al l owed.
2. 13. 9 Scaf f ol d Cabl e Suppor t
Pr ovi de t wo scaf f ol d cabl e suppor t s on t he t ank r oof i n accor dance wi t h API St d 650. Locat e t he suppor t near t he cent er of t he t ank and i n a manner t hat suppor t ed cabl es wi l l have maxi mum r ange and f l exi bi l i t y of oper at i on wi t h mi ni mum i nt er f er ence wi t h ot her t ank f i t t i ngs.
2. 13. 10 Ant i sei ze Compound
Pr ovi de mar i ne gr ade ant i sei ze compound f or f ast ener s on t ank ext er i or f l anges and bol t ed connect i ons and cover s. On t ank i nt er i or f ast ener s, SECTI ON 33 56 21. 17 Page 14 use oi l onl y.
2. 13. 11 Channel Mount i ng
Pr ovi de seal wel ded channel mount i ng pads wi t h seal wel ded st ai nl ess st eel bol t i ng st uds f or mount i ng channel t o suppor t condui t , t ubi ng, and l evel al ar m t est / dr ai n pi pi ng. Rack t ubi ng, smal l pi pi ng, and condui t par al l el t o t he shel l as i ndi cat ed. Do not mount wi t hi n 7 f eet above st ai r way.
2. 13. 12 Anchor s
When anchor s ar e r equi r ed by API St d 650 pr ovi de wi t h anchor bol t chai r s conf or mi ng t o AI SI E 1 St eel Pl at e Engi neer i ng Dat a and as i ndi cat ed.
PART 3 EXECUTI ON
3. 1 SAFETY PRECAUTI ONS
API RP 2009 f or f i r e and expl osi on hazar d ar eas.
3. 2 API St d 653 I NSPECTI ON REPORTS
The API St d 653 i nspect or must i nspect t he compl et ed t ank i n accor dance wi t h API St d 653 and del i ver a f ul l r epor t t o t he Cont r act i ng Of f i cer .
The r epor t must i ncl ude a r ecor d of ul t r asoni c t hi ckness measur ement s ( UTMs) , excl usi ve of t he coat i ng, of each t ank bot t om pl at e, each bot t om shel l cour se pl at e at 5 r andom l ocat i ons per pl at e, t he shel l al ong t he ci r cumf er ent i al st ai r way at 5 l ocat i ons per shel l cour se. The r ecor d of UTMs must i ncl ude sket ches of t he t ank bot t om pl at e and shel l pl at e l ayout s. The l ocat i on on each pl at e, wher e each ul t r asoni c t hi ckness measur ement ( UTM) i s t aken, must be r ecor ded. Fi ve UTMs must be r ecor ded on each t ank bot t om pl at e and on each l owest shel l cour se pl at e. Fi ve UTMs must be r ecor ded f or each of t he shel l cour ses above t he l owest shel l cour se and must be t aken al ong t he ci r cumf er ent i al st ai r way. The r epor t must i ncl ude t he t ank dat apl at e i nf or mat i on and phot ogr aph of t he t ank dat a pl at e. Pr ovi de el ect r oni c copi es of t he t ank i nspect i on r epor t s t o Ser vi ce Headquar t er s or of f i c i al l y desi gnat ed al t er nat e, Ser vi ce Cont r ol Poi nt s, and DLA- Ener gy. The paper and el ect r oni c copi es of t he r epor t and UTMs must be pr ovi ded t o t he Cont r act i ng Of f i cer f or f i l i ng wi t h t he t ank' s " as- bui l t dr awi ngs. " Ref er t o Sect i on 01 45 00. 00 20 QUALI TY CONTROL f or API St d 653 i nspect or cer t i f i cat i on r equi r ement s.
3. 3 CONSTRUCTI ON
3. 3. 1 Accessi bi l i t y
I nst al l al l wor k so t hat par t s r equi r i ng per i odi c i nspect i on, oper at i on, mai nt enance, and r epai r ar e r eadi l y accessi bl e. I nst al l conceal ed val ves, expansi on j oi nt s, cont r ol s, damper s, and syst em component s r equi r i ng access i n l ocat i ons f r eel y accessi bl e t hr ough access door s.
3. 3. 2 Tank Er ect or Si t e Super i nt endent
Tank er ect or s i t e super i nt endent must be on si t e at al l t i mes dur i ng any wor k by t hat cr ew.
3. 3. 3 Tank
Pr ovi de t ank of wel ded const r uct i on and suppor t t ank on a concr et e r i ng
SECTI ON 33 56 21. 17 Page 15 wal l . On t he si de of t he t ank f ur t hest f r om t he sump, s l ope t he t ank bot t om down t o t he sump appr oxi mat el y 6 i nches f or each 10 f eet of t ank r adi us. But t wel d or l ap wel d bot t om pl at es wi t h t he out er pl at es on t op. Lap annul ar r i ng on t op of bot t om pl at es or but t wel d t o t he bot t om pl at es. Rei nf or ce openi ngs l ar ger t han 2 i nches i n di amet er t hr ough pl at i ng of t he t ank shel l and r oof . Pr ovi de st r uct ur al st i f f eni ng, consi st i ng of r i ngs, t hi cker pl at es, or ot her appr oved means, t o mai nt ai n r oundness when t he t ank i s subj ect ed t o wi nd or sei smi c l oads.
3. 3. 4 Roof Pl at e Seams
Tank r oof pl at e must be l ap wel ded wi t h t he pl at es c l oser t o t he cent er of t he t ank on t op. The under si de of al l r oof pl at es must be caul ked usi ng t he r oof j oi nt seal ant as speci f i ed i n Sect i on 09 97 13. 15.
3. 3. 4. 1 Pr ohi bi t i on of Pr ot ect i ve Coat i ngs on Sur f aces t o be Wel ded
Remove pr ot ect i ve coat i ngs on sur f aces t o be wel ded and on sur f aces wi t hi n one i nch f r om wel d pr epar at i on. " Wel d- t hr ough" i nor gani c z i nc coat i ngs and si mi l ar coat i ngs wi l l not be per mi t t ed.
3. 3. 5 Roof Suppor t s
When col umns ar e pr ovi ded i n t he t ank, pr ovi de col umn base pl at es and 1/ 2 i nch t hi ck bear i ng pl at es. Wel d t he col umns t o t he col umn base pl at es.
Cent er t he col umn base pl at es on t he bear i ng pl at es and wel d t he col umn base cl i p- gui des t o t he bear i ng pl at es. Do not wel d t he col umn base pl at es t o t hei r bear i ng pl at es. Cont i nuousl y seal wel d t he bear i ng pl at es t o t he t ank bot t om so as t o pr ovi de a seal agai nst t he ent r y of wat er or ot her l i qui ds i nt o t he space bet ween t he col umn bear i ng pl at es and t he t ank bot t om. Bear i ng pl at es must be l ar ger t han t he base pl at es by at l east 6 i nches i n ei t her di r ect i on. Pr ovi de seal - wel ded cap pl at es on al l col umns. Roof suppor t col umns must be of pi pe or r ound st r uct ur al t ubi ng.
3. 3. 6 Sur f ace Fi ni shi ng
Pr ovi de Cont r act i ng Of f i cer wi t h NACE vi sual compar at or as descr i bed i n NACE SP0178 Sect i on 5. Fi ni sh i nt er i or sur f aces bef or e hydr ot est i ng, i n accor dance wi t h Sect i on 5 of NACE SP0178 and accompanyi ng Vi sual Compar at or , t o t he condi t i on descr i bed and shown f or NACE Wel d Desi gnat i on " C" wel ds. Fi ni sh ext er i or sur f aces, i n accor dance wi t h Sect i on 5 of NACE SP0178 and accompanyi ng Vi sual Compar at or , t o t he condi t i on descr i bed and shown f or NACE Wel d Desi gnat i on " D" wel ds. Submi t acknowl edgement of sur f ace f i ni sh r equi r ement s. Remove al l wel d spl at t er , shar p cor ner s, edges and poi nt s f r om al l car bon st eel sur f aces bef or e coat i ng.
Cont r act or use of a t empor ar y door sheet openi ng f or access of mobi l e equi pment dur i ng i nt er i or coat i ng appl i cat i on i s accept abl e wi t h pr oper exami nat i on and t est i ng of wel d r epai r ar ea whi ch meet s t he r equi r ement of API St d 650.
3. 3. 7 Tank Bot t om To Foundat i on Seal
Al l anchor ed t anks ar e t o be gr out ed bef or e l oadi ng wi t h wat er or pr oduct and bef or e t i ght eni ng anchor bol t s. Pr epar e t he t op of t he f oundat i on f or shi mmi ng and gr out i ng by r emovi ng al l di r t , sand, and l oose mat er i al .
Pr ovi de one- i nch shi m on t op of f oundat i on at hi gh poi nt and devel op al l ot her shi m st acks t o mat ch t he el evat i on of t he shi m at t he hi gh poi nt of t he f oundat i on. Pl ace shi ms a mi ni mum of 1 1/ 2 i nches i nsi de t he per i met er of t he t ank bot t om and under t he t ank shel l . Do not r et emper
SECTI ON 33 56 21. 17 Page 16
( add wat er ) t o a st i f f eni ng gr out mi x. Pl ace gr out wi t hi n 30 mi nut es af t er mi xi ng wi t h wat er or di scar d t he mi x.
3. 3. 8 At t achment s
Al l ext er i or shel l and r oof at t achment s must be connect ed t o t he t ank usi ng cont i nuousl y wel ded mount i ng pl at es. Mount i ng pl at es must exceed t he si ze of t he at t achment by a mi ni mum of one i nch. Al l mount i ng pl at e cor ner s must have a 2 i nch r adi us. At t achment must be seal wel ded t o t he mount i ng pl at e wi t h st r uct ur al l y sound wel ds of suf f i c i ent s i ze t o suppor t t he i nt ended l oads.
3. 3. 9 Nozzl es
Al l shel l nozzl es must be f l anged t ype. Shel l nozzl es s i zes l ar ger t han 2 i nches must have a r ei nf or ci ng pl at e. Nozzl es f or pi pe connect i ons i nsi de t he t ank must be f l anged i nsi de near t he shel l . Rei nf or ci ng pl at es f or shel l nozzl es must be r ol l ed t o t he cur vat ur e of t he shel l .
3. 3. 10 Tank Bot t om Sump
Wel d sump t o t he under si de of t he t ank bot t om at t he l owest poi nt of t he t ank bot t om as i ndi cat ed.
3. 4 END CONNECTI ONS FOR SYSTEM COMPONENTS, VALVES, PI PE, AND FI TTI NGS
Al l val ve, syst em component s, pi pe and f i t t i ng connect i ons i ncl udi ng, but not l i mi t ed t o, pi pi ng f or t he Wat er Dr aw- Of f Syst em, dr ai ns, t her mal r el i ef s, HLV f l oat pi l ot chamber , and l evel swi t ches must be wel ded or f l anged except as i ndi cat ed. Pi pi ng and f i t t i ngs 2. 5 i nches and l ar ger must be but t wel ded. Pi pi ng and f i t t i ngs 2 i nches and smal l er may be but t wel ded or socket wel ded. Thr eaded connect i ons ar e not al l owed except wher e wel ded or f l anged connect i ons t o appur t enances ar e not avai l abl e,
e. g. , pr essur e gauges, f uel sampl e connect i ons, l evel swi t ch pr obes, HLV f l oat pi l ot chamber .
3. 5 FI ELD QUALI TY CONTROL
The Cont r act i ng Of f i cer wi l l conduct f i el d i nspect i ons and wi t ness f i el d t est s and t r i al oper at i ons speci f i ed i n t hi s sect i on. The Cont r act or must per f or m al l t r i al oper at i ons and f i el d t est s and pr ovi de al l l abor , equi pment and i nci dent al s r equi r ed f or t est i ng.
3. 5. 1 Tank Cal i br at i on Tabl e
Af t er i nst al l at i on of t he t ank i s compl et e, pr ovi de t wo cal i br at i on t abl es st amped by a Pr of essi onal Engi neer , one i n Engl i sh uni t s and one i n met r i c uni t s. Tabl es must be l ami nat ed. Bot h t abl es must show t he vol ume of t he f uel f or al l l i qui d l evel s i n t he t ank st ar t i ng at t he bot t om of t he sump and goi ng up t o t he l evel of t he over f l ow. The Engl i sh uni t cal i br at i on t abl e must show t he vol ume of f uel i n gal l ons and i n bar r el s of 42 gal l ons and t he l evel of t he f uel i n 1/ 16- i nch i ncr ement s. The met r i c t abl e must show t he vol ume of t he f uel i n l i t er s and i n m3 and t he l evel of t he f uel i n 2. 0 mm i ncr ement s. The t abl e must i ncl ude not es at t he bot t om i ndi cat i ng 42 gal l ons = 1 bar r el ; and one ki l ol i t er = one cubi c met er .
Vol ume cal cul at i ons must be i n t he smal l er uni t s. Lar ger uni t s may be obt ai ned by r oundi ng of f . The 0 i nch l evel must be t he l evel of t he bot t om of t he shel l . Level bel ow t he bot t om of t he shel l must be shown i n negat i ve uni t s st ar t i ng at t he bot t om of t he shel l . The l evel of t he
SECTI ON 33 56 21. 17 Page 17 bot t om of t he shel l , al ar m set poi nt s, hi gh l evel shut of f val ve act uat i on poi nt , and t he l evel of t he over f l ows must be i dent i f i ed on t he cal i br at i on t abl e ( st r appi ng char t ) . The t abl e must not i ncl ude t ank vol ume above t he l evel of t he over f l ows. Al so, pr ovi de El ect r oni c Cal i br at i on Tabl e compat i bl e wi t h t he El ect r oni c Aut omat i c Tank Gaugi ng Syst em. Cont act Cont r act i ng Of f i cer f or di r ect i on on r equi r ed f or mat .
3. 5. 1. 1 Tank Cal i br at i on Met hod
The t ank gaugi ng syst ems must be cal i br at ed i n accor dance wi t h t he API Manual of Pet r ol eum Measur ement St andar ds ( API MPMS) f or cr i t i cal measur ement usi ng met hods out l i ned i n one of t he f ol l owi ng chapt er s.
a. API MPMS 2. 2A, Measur ement and Cal i br at i on of Upr i ght Cyl i ndr i cal Tanks by t he Manual St r appi ng Met hod.
b. API MPMS 2. 2B, Cal i br at i on of Upr i ght Cyl i ndr i cal Tanks Usi ng t he Opt i cal Ref er ence Li ne Met hod.
c. API MPMS 2. 2C, Cal i br at i on of Upr i ght Cyl i ndr i cal Tanks Usi ng t he Opt i cal Tr i angul at i on Met hod.
d. API MPMS 2. 2D, Cal i br at i on of Upr i ght Cyl i ndr i cal Tanks Usi ng t he I nt er nal El ect r o- Opt i cal Di st ance Rangi ng Met hod.
3. 5. 2 Wel d I nspect i on
Per f or m i nspect i on of wel ds i n accor dance wi t h API St d 650. I nspect but t wel ds r equi r i ng compl et e penet r at i on and compl et e f usi on by t he r adi ogr aphi c met hod. I nspect r oof suppor t col umn wel ds bel ow desi gn l i qui d l evel by v i sual and dye penet r ant met hods. Submi t t he f ol l owi ng wel d i nspect i on r epor t s t o t he Cont r act i ng Of f i cer :
a. Vi sual exami nat i on of ver t i cal shel l - seam t ack wel ds, i f l ef t i n pl ace, i n but t wel ds.
b. Vi sual exami nat i on of i ni t i al pass of i nt er nal shel l - t o- bot t om wel d.
c. Vacuum box t est i ng of i nt er nal shel l - t o- bot t om i ni t i al wel d pass.
d. Vi sual exami nat i on of compl et ed i nt er nal and ext er nal shel l - t o- bot t om wel ds.
e. Radi ogr aphi c exami nat i on of shel l but t wel d.
( 1) Submi t r epor t s f or i nspect i on of wel ds and r adi ogr aphs t o t he Cont r act i ng Of f i cer .
f . Vi sual exami nat i on of shel l but t wel ds.
g. Vi sual exami nat i on of f i l l et wel ds.
h. Vi sual exami nat i on of t ank bot t om pl at es af t er wel di ng.
i . Vacuum box t est i ng of t ank bot t om f i l l et wel d.
j . Pneumat i c t est s of r ei nf or ci ng pl at es.
SECTI ON 33 56 21. 17 Page 18
3. 5. 3 Repor t s of Ot her Test s and Exami nat i ons
Submi t r epor t s of t he r esul t s of t he f ol l owi ng exami nat i ons and t est s r equi r ed by API St d 650 t o t he cont r act i ng of f i cer :
a. Hydr ost at i c t est i ng.
b. Shel l set t l ement measur ement s t aken bef or e, dur i ng, and af t er hydr ost at i c t est i ng.
c. I nt er nal bot t om el evat i on r eadi ngs t aken bef or e and af t er hydr ost at i c t est i ng.
d. Shel l Pl umbness.
e. Shel l Roundness.
f . Maxi mum l ocal devi at i ons, shel l .
3. 5. 4 Ti ght ness Test s
Per f or m t i ght ness t est s descr i bed under t hi s par agr aph i n accor dance wi t h API St d 650, as modi f i ed her ei n. Per f or m t he t est s af t er f i ni shi ng wel ds i n accor dance wi t h t he par agr aph SURFACE FI NI SHI NG, but pr i or t o bl ast c l eani ng and appl i cat i on of t he pr ot ect i ve coat i ng. Submi t t i ght ness t est r ecor ds t o t he Cont r act i ng Of f i cer .
3. 5. 4. 1 Penet r at i ng Oi l Test
I nspect t ank shel l - t o- bot t om, i nsi de cor ner wel ds usi ng t he penet r at i ng oi l t est pr i or t o any vacuum box t est i ng. Af t er t he i ni t i al i nsi de f i l l et wel d i s made, appl y No. 2 Di esel t o t he out si de of t he i nsi de cor ner wel d ( bef or e t he out si de wel d i s made) . Af t er 4 hour s, i nspect t he i nsi de f i l l et wel d f or oi l penet r at i on t hr ough def ect s. The Cont r act or must cor r ect any def ect s. Remove oi l compl et el y pr i or t o f i ni shi ng wel d j oi nt . Then, compl et e t he r emai nder of t he shel l - t o- bot t om wel d j oi nt .
3. 5. 4. 2 Vacuum Box Test of Tank Bot t om
Per f or m a vacuum box t est of t he t ank bot t om i mmedi at el y af t er i nst al l at i on and af t er compl et i on of t he penet r at i ng oi l t est and pr i or t o i nst al l i ng any col umns. Test seams i n bot t om of t ank and shel l - t o- bot t om j oi nt by appl y i ng a commer ci al soap f i l m and subj ect i ng t he seam t o a vacuum. Use a gl ass t op vacuum box wi t h hypal on or neopr ene seal i ng gasket . Appl y a commer ci al bubbl e f or mi ng sol ut i on t o t he wel d or ar ea t o be t est ed; posi t i on t he vacuum box over t he ar ea and sl owl y pul l a par t i al vacuum. Obser ve t he sol ut i on f i l m f or bubbl e f or mat i on bet ween 0- 2 psi di f f er ent i al pr essur e. Cont i nue t o open t he val ve unt i l a di f f er ent i al pr essur e of 5 psi or 11. 5 f eet of wat er or 10. 2 i nches of mer cur y i s achi eved and hol d f or at l east 20 seconds whi l e cont i nui ng t o obser ve t he sol ut i on f or bubbl es.
3. 5. 4. 3 Hydr ost at i c Test and Set t l ement
Fol l owi ng t he successf ul compl et i on of t he r adi ogr aphi c i nspect i on of t he t ank and pr i or t o i nt er nal coat i ng and connect i ng pr oduct / oper at i ng pi pi ng t o t he t ank, t he t ank shal l be subj ect ed t o a hydr ost at i c wat er f i l l t i ght ness t est . Shel l set t l ement must be measur ed bef or e, dur i ng, and af t er hydr ost at i c t est i ng i n accor dance wi t h API St d 650. Tank shal l be
SECTI ON 33 56 21. 17 Page 19 f i l l ed wi t h wat er t o t he hi gh- hi gh al ar m l i qui d l evel f or t he hydr ost at i c t est .
Pr i or t o f i l l i ng any t ank wi t h t est wat er , t he Cont r act or shal l have t he f ol l owi ng compl et ed:
a. A hydr ost at i c t est i ng schedul e showi ng t he pr ocedur e, sequence and est i mat ed dat es of f i l l i ng and t est i ng of t he t anks, submi t t ed t o, and appr oved by, t he Cont r act i ng Of f i cer .
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .