PPI 040 MF801 TANK HYDROSTATIC TEST PLAN.pdf

PDF 2 MB Posted

Attached to
MCON P2002 Manchester Tank Farm Improvements, Manchester Fuel Depot, Fleet Logistics Center Puget Sound, Manchester, WA
Solicitation number
N4425523R1503
Issued by

About this file

This document is a hydrostatic test plan for two fuel storage tanks at the Manchester Fuel Depot, part of the Fleet Logistics Center Puget Sound in Manchester, Washington. The plan outlines requirements for hauling potable water by barge to fill the tanks, performing leak tests in accordance with API 650 standards, monitoring water quality during the multi-week testing period, recycling water between tanks where possible, and removing water from the site by barge for off-site disposal following testing. Coordination is required with facility operators for barge access, use of existing piping to convey water, and all environmental permitting for water disposal. Settlement readings will be taken before, during and after testing, which must last a minimum of 72 hours per tank.

View the file

Other files

File Type Posted
N4425523R1503-0007 SF30 -Final.pdf PDF
Amendment 0007 PPI Responses.pdf PDF
PPI Responses Amend 0006.pdf PDF
N4425523R1503-0006 SF30.pdf PDF
PPI 095 01 45 00.00 20.pdf PDF
PPI 035 33 56 21.17.pdf PDF
PPI 086 Manchester Pier Loading Criteria.pdf PDF
N4425523R1503-0005 SF30 Final .pdf PDF
PPI Log Amendment 0005.pdf PDF
Attachment H Wage Determination Kitsap Heavy Amendment 0005.pdf PDF
PPI 077 01 14 00.pdf PDF
ES502 ELECTRICAL SITE DETAILS - 2 (TANKS)_sealed.pdf PDF
PPI 035 09 97 13.15.pdf PDF
PPI 034 LS Merchantable_Timber Contract_Requirements MAN Phase 2(Pre_Sale).pdf PDF
PPI 072 33 52 23.15.pdf PDF
N4425523R1503-0004 SF30.pdf PDF
P-2002 Manchester Tank Farm Improvements Final GeoTech Report Rev1.pdf PDF
PPI 030 24535 - 50.000 Bl Floor Slab.pdf PDF
PPI 030 24667 - 50.000 Bl Structural Details.pdf PDF
Amendment 0003 PPI Responses.pdf PDF
N4425523R1503-0003 SF30.pdf PDF
N4425523R1503-0002 SF30.pdf PDF
PPI Responses.pdf PDF
Site Visit Log P2002.pdf PDF
Attachment J - SECNAV 5512 - May 2021.pdf PDF
P2002 PPI Spreadsheet Technical.pdf PDF
N4425523R1503-0001 SF30.pdf PDF
Attachments A-B-C-D-E-F-G-H.docx DOCX document
Attachment J Base Access Request Form.xls XLS spreadsheet
Attachment I NAVFAC Northwest BAVR Guide for Industry Contractors and Sponsored Visitors.pdf PDF
Attachment K Small Business Subcontracting Record.docx DOCX document
Attachment H Wage Determinations Kitsap Heavy.pdf PDF
Attachment L Small Business Participation and Commitment Strategy.docx DOCX document
N4425523R1503 P2002 Solicitation.pdf PDF
Show all 34

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

X

X

X

X

X

X

X X

X

X X X

X

X

X X

XXXXXXXXX

X

X

X

X

X

XXXXXXXXXXXXX

F

F

F

F F

F

F F

F

F

F

F

F

F F

F

F F F

F

F

F

F

F

F

F

F

X X X X X

UIT 121

UT

LSH

MOV

MOV

JY

LSL

UI

TE

LE

MOV

1. SEE SHEETS MF001 AND MF002 FOR MECHANICAL LEGEND,

ABBREVIATIONS AND GENERAL NOTES.

2. REFER TO SPECIFICATION SECTION 33 56 21.17 FOR ADDITIONAL

TANK CONSTRUCTION AND TESTING REQUIREMENTS.

3. CONTRACTOR SHALL CLOSELY COORDINATE RECEIPT AND

DISPOSAL OF HYDROSTATIC TEST WATER WITH THE CONTRACTING

OFFICER AND FACILITY FUELS OPERATORS AT LEAST 60 DAYS IN

ADVANCE.

TA

N

K H

YD

R

O

ST

AT

IC

T

ES

T

PL

AN

MF801

JJB RAPJMS

NOTES

RECEIPT OF WATER

1. THE LOCAL MANCHESTER WATER DISTRICT CANNOT PROVIDE THE

VOLUME OF WATER REQUIRED FOR THE HYDROSTATIC TEST OF

TANKS 803 AND 804. THE CONTRACTOR IS RESPONSIBLE FOR

HAULING FRESH WATER BY BARGE TO THE FACILITY FOR TANK

HYDROSTATIC TEST.

2. THE DELIVERY BARGE ARRIVAL AND MOORING MUST BE

COORDINATED WITH THE CONTRACTING OFFICER AND FACILITY

FUELS OPERATORS DUE TO LIMITED PIER ACCESS.

3. WATER USED FOR THE FIRST TANK SHOULD BE RECYCLED TO THE

FULLEST EXTENT POSSIBLE FOR USE IN TESTING SECOND

SUBSEQUENT TANK.

4. TEST WATER SHALL BE POTABLE WATER, FREE FROM CHLORIDES

OR OTHER SUBSTANCES HARMFUL TO THE TANK, AND GENERALLY

FREE OF SEDIMENT. CHLORINE CONTENT SHALL BE LESS THAN

1PPM.

5. BARGES USED FOR CONVEYANCE OF OTHER SUBSTANCES OTHER

THAN WATER SHALL BE CLEANED PRIOR TO USE FOR WATER

DELIVERY TO THE MANCHESTER SITE.

6. APPROXIMATE DISTANCE FROM PIER TO THE NEW TANK 803 IS 2500

FEET. EITHER CONTRACTOR PROVIDED TEMPORARY PUMPS OR ON

BARGE PUMPS SHALL BE USED FOR WATER TRANSFER TO TANKS.

7. CONTRACTOR CAN REQUEST FLCPS OPERATORS TO UTILIZE THE

EXISTING 6-INCH DRAIN LINE PIPING TO CONVEY THE WATER FROM

THE PIER TO THE NEW TANK. CONTRACTOR WILL BE REQUIRED TO

CUT AND PROVIDE TIE-IN TO 6-INCH DRAIN LINE BEHIND

PUMPHOUSE 12 IF USE OF THE EXISTING DRAIN PIPING FOR FILLING

TANKS IS REQUESTED.

8. OPTIONALLY THE CONTRACTOR MAY PROVIDE TEMPORARY PIPING

OR HOSES FROM THE PIER TO THE NEW TANKS AS AN

ALTERNATIVE MEANS OF TRANSFER.

TANK HYDROSTATIC TEST:

1. CONTRACTOR SHALL PERFORM TANK HYDROSTATIC TIGHTNESS

TEST WITH POTABLE WATER IN ACCORDANCE WITH THE

REQUIREMENTS OF API 650 AND SPECIFICATION 33 56 21.17. THE

TESTS SHALL BE PERFORMED AFTER COMPLETION OF ALL NDE

WELD INSPECTIONS BUT PRIOR TO BLAST CLEANING AND

APPLICATION OF THE PROTECTIVE COATING.

2. THE TANKS SHALL BE TESTED TO CONFIRM STRUCTURAL

STRENGTH AND INTEGRITY OF THE TANK AND TO PROVIDE THE

INITIAL SETTLEMENT OF THE FOUNDATIONS.

3. SHELL SETTLEMENT SHALL BE MEASURED BEFORE, DURING AND

AFTER HYDROSTATIC TESTING IN ACCORDANCE WITH

SPECIFICATION 33 56 21.17 AND API 650. THE TEST WATER MUST BE

LEFT IN EACH TANK UNTIL THE TANK FOUNDATION ELEVATION

STABILIZED BUT NO LESS THAN 72 HOURS.

4. TEST WATER SHALL THEN BE TRANSFERRED TO THE SECOND TANK

BY THE CONTRACTOR USING PORTABLE PUMP AND TEMPORARY

PIPING AND HOSES AS REQUIRED.

5. WATER IS EXPECTED TO REMAIN IN THE TANKS LONGER THAN 14

DAYS DUE TO THE LENGTH OF TIME REQUIRED TO FILL FIRST TANK

AND USE OF SAME WATER FOR BOTH TANK'S TESTING.

CONTRACTOR IS RESPONSIBLE FOR MONITORING AND

MAINTAINING WATER QUALITY PER THE REQUIREMENTS OF API 650.

RELEASE OF WATER

1. CONTRACTOR IS PROHIBITED FROM RELEASING THE HYDROSTATIC

TEST WATER TO EITHER THE BASE'S SANITARY OR STORM SEWER

SYSTEMS AT THE COMPLETION OF THE TESTS. ALL TEST WATER

MUST BE TRANSPORTED FROM THE SITE BY BARGE FOR DISPOSAL.

2. THE DISPOSAL BARGE ARRIVAL AND MOORING MUST BE

COORDINATED WITH THE CONTRACTING OFFICER AND FACILITY

FUELS OPERATORS DUE TO LIMITED PIER ACCESS.

3. WATER MUST BE DISPOSED BY THE CONTRACTOR IN A MANNER

WHICH MEETS LOCAL, STATE AND FEDERAL ENVIRONMENTAL

CODES AND REGULATIONS.

4. CONTRACTOR IS RESPONSIBLE FOR ALL PERMITS ASSOCIATED

WITH WATER DISPOSAL.

16057635

FI

LE

N

AM

E:

Z

:\C lie nts \A

NF

\U

SN

av y\N w\

_M an ch es ter

Tn k2

\D es ign \M ec h\S he ets

\17

8M

F8

.dw g

LA

YO

UT

N

AM

E:

T

AN

K

HY

DR

OS

TA

TI

C

TE

ST

P

LA

N

P

LO

TT

ED

: M on da y, Au gu st

, 2

3 - 7:

am

U

SE

R:

js im on

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

C O

M M

AN

D

DES DRW

SY

M

D

ES

C R

IP

TI

O N

D

AT

E

AP

PR

DRAWFORM REVISION: 10 FEBRUARY 2022

CHK

SATISFACTORY TO

APPROVED

ACTIVITY

DATE

FOR COMMANDER NAVFAC

SEAL

A/E INFO

OF

EPROJECT NO.:

FL

EE

T

LO

GI

ST

IC

S

CE

NT

ER

P

UG

ET

S

OU

ND

(F

LC

PS

MA

NC

HE

ST

ER

, W A

1706408

XXXXX

02/09/23

E. ANGELES / K. LYONS

B. NIXON

AS SHOWN

N

AV

FA

C

N O

R

TH

W

ES

T

NA

VA

L B

AS

E

KI

TS

AP

, B

AN

GO

R

SI

LV

ER

DA

LE

, W A

M. BONUS

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

PH

AS

E

M

AN

C H

ES

TE

R T

AN

K

FA

R

M

IM

PR

O

VE

M

EN

TS

(P -2

2)

9400 WARD PARKWAY

KANSAS CITY, MO 64114

816-333-9400

LICENSEE NO. 000165

B. KOPP

PUMP HOUSE 12

FUEL PIER

/0 8/

JJ

B

FI

N

AL

S U

BM

IT

TA

L

/2 8/

JJ

B

AM

EN

D

M

EN

T

TANK 803

TANK 804

A1 WEST PIER VALVE PIT

SCALE: NTS

N

ABOVE GRADE 6-INCH

DRAIN LINE TO TANKS

08/28/2023

File details come from the government source that posted it. Updated .