About this file

This document is an amendment to a solicitation for the MCON P2002 Manchester Tank Farm Improvements project at the Manchester Fuel Depot in Manchester, WA. The Navy is seeking offers for improvements to steel tanks 803 and 804 including new foundations, liners, cathodic protection, and leak detection systems. Bidders must also provide clean water for hydrostatic testing and disposal of the test water. The solicitation schedules optional line items for a CCTV system, automatic tank gauging system, and additional costs for testing and disposal of contaminated soils or fuel-impacted concrete that may be encountered. Offerors must acknowledge receipt of this amendment by the specified date and time. The amendment replaces the previous pricing schedule and includes responses to pre-proposal inquiries relating to structural details and floor slabs.

View the file

Other files

File Type Posted
N4425523R1503-0007 SF30 -Final.pdf PDF
Amendment 0007 PPI Responses.pdf PDF
PPI Responses Amend 0006.pdf PDF
N4425523R1503-0006 SF30.pdf PDF
PPI 095 01 45 00.00 20.pdf PDF
PPI 035 33 56 21.17.pdf PDF
PPI 086 Manchester Pier Loading Criteria.pdf PDF
N4425523R1503-0005 SF30 Final .pdf PDF
PPI Log Amendment 0005.pdf PDF
Attachment H Wage Determination Kitsap Heavy Amendment 0005.pdf PDF
PPI 077 01 14 00.pdf PDF
ES502 ELECTRICAL SITE DETAILS - 2 (TANKS)_sealed.pdf PDF
PPI 035 09 97 13.15.pdf PDF
PPI 034 LS Merchantable_Timber Contract_Requirements MAN Phase 2(Pre_Sale).pdf PDF
PPI 072 33 52 23.15.pdf PDF
PPI 040 MF801 TANK HYDROSTATIC TEST PLAN.pdf PDF
N4425523R1503-0004 SF30.pdf PDF
P-2002 Manchester Tank Farm Improvements Final GeoTech Report Rev1.pdf PDF
PPI 030 24535 - 50.000 Bl Floor Slab.pdf PDF
PPI 030 24667 - 50.000 Bl Structural Details.pdf PDF
Amendment 0003 PPI Responses.pdf PDF
N4425523R1503-0002 SF30.pdf PDF
PPI Responses.pdf PDF
Site Visit Log P2002.pdf PDF
Attachment J - SECNAV 5512 - May 2021.pdf PDF
P2002 PPI Spreadsheet Technical.pdf PDF
N4425523R1503-0001 SF30.pdf PDF
Attachments A-B-C-D-E-F-G-H.docx DOCX document
Attachment J Base Access Request Form.xls XLS spreadsheet
Attachment I NAVFAC Northwest BAVR Guide for Industry Contractors and Sponsored Visitors.pdf PDF
Attachment K Small Business Subcontracting Record.docx DOCX document
Attachment H Wage Determinations Kitsap Heavy.pdf PDF
Attachment L Small Business Participation and Commitment Strategy.docx DOCX document
N4425523R1503 P2002 Solicitation.pdf PDF
Show all 34

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

Previous edition unusable

N44255

P2002 BULK FUEL STORAGE TANKS PHASE 2, MANCHESTER FUEL DEPOT, MANCHESTER, WA

See Page 2 for description of amendment.

NAVFAC NORTHWEST

ATTN: EMILY EASTERDAY

1101 TAUTOG CIRCLE, SUITE 316

SILVERDALE, WASHINGTON 98315-1101

See Items 6

J

N44255-23-R-1503

1 2

09/01/2023

07/27/2023

N44255‐23‐R‐1503 Amendment 0003

SUMMARY OF CHANGES

The following have been added by full text:

AMENDMENT 0003

1. N4425523R1503 P2002 Solicitation, Section 00 10 00 – Solicitation is hereby revised to replace the schedule of prices as follows.

Remove:

The Schedule of Prices provided by Amendment 0001 is hereby removed in its entirety, and replaced as follows.

Replace:

SCHEDULE OF PRICES

Line Item

Description QTY

UNIT OF

MEASURE

UNIT

COST

SUB-

TOTAL

TOTAL

CLIN

PRICE

BASE PRICE: Total Price (0001AA through 0001AD) for the entire base work for Project P2002 Manchester Tank Farm Improvements Phase 2 in accordance with the drawings and specifications, complete.

1 EA $________

0001AA-

0001AE

0001AA

Subtotal of Base Price for the entire work for Steel Tanks 803 and 804 complete in accordance with the drawings and specifications, but excluding work provided in another Priced line Item.

2 EA $_______ $_______

0001AB

Subtotal of Base Price for concrete foundations, impervious liner, sand fill, cathodic protection, leak detection under steel tanks 803 and 804 complete in accordance with the drawings and specifications, but excluding work provided in another Priced line Item.

2 EA

0001AC

Subtotal of Base Price for clean water including but not limited barge(s) for hydrostatic pressure test for tanks 803 and 804 complete in accordance with the drawings and specifications, but excluding work provided in another Priced line Item.

5,880,000 GAL $_______ $_______

Line Item

Description QTY

UNIT OF

MEASURE

UNIT

COST

SUB-

TOTAL

TOTAL

CLIN

PRICE

0001AD

Subtotal of Base Price for disposing of hydrostatic test water from CLIN 0001AC including but not limited to barge(s) and any disposal fees complete in accordance with the drawings and specifications, but excluding work provided in another

CLIN.

5,880,000 GAL

0001AE

Subtotal of Base Price for All Other Base Price items complete in accordance with the drawings and specifications, but excluding work provided in another Subtotal of Base Priced line Item (0001AA through

0001AC).

1 EA

OPTION CLINS 0002 -

0005: The Government has the unilateral right to exercise the below Option CLINs. CLIN 0002 and 0003 can be exercised within 365 days from contract award. CLIN 0004 and 0005 can be exercised within 910 days of contract award in accordance with 52.217-7

OPTION FOR

INCREASED

QUANTITY –

SEPARATELY PRICED

LINE ITEM (MAR 1989),

see Section 00 70 00, Conditions of the Contract.

Options may be awarded at the same time, separately or not at all.

Option

Option Item No. 1: Price for providing all work in connection with the CCTV System ( cameras, monitor, recorder, programming, and accessories), complete in accordance with the drawings and specifications, but excluding work provided in another Priced line item.

1 EA

Line Item

Description QTY

UNIT OF

MEASURE

UNIT

COST

SUB-

TOTAL

TOTAL

CLIN

PRICE

Option

Option Item No. 2: Price for providing all work in connection with the Automatic Tank Gauging (ATG) system, complete in accordance with the drawings and specifications, but excluding work provided in another Priced line item.

1 EA $_______

Option

Unit Price is the additional cost associated for testing, removal, and disposal of contaminated stockpiled soils complete in accordance with the drawings, specifications, and actual soil test report, but excluding work provided in another line item. (Non hazardous soil disposal shall be included in the base bid).

100 CY $_______ $_______ $_______

Option

Unit Price is the additional cost associated for testing, removal, and disposal of disposal of fuel impacted concrete with volume of concrete in accordance with the drawings, specifications, and actual soil test report, but excluding work provided in another line item. (Non-hazardous concrete disposal shall be included in the base bid).

1,420 CY $_______ $_______ $_______

Total Proposed Price CLINS 0001-0005 $__________________

2. This amendment incorporates responses to various Pre-Proposal Inquiries (PPIs), attached herein.

(End Summary of Changes)

Attachments:

PPI Responses PPI 030 24667 - 50,000 Bl Structural Details PPI 030 24535 - 50,000 Bl Floor Slab

File details come from the government source that posted it. Updated .