This document is Amendment 0007 to Solicitation N4425523R1503 for the MCON P2002 Manchester Tank Farm Improvements project at the Manchester Fuel Depot in Manchester, WA. The amendment updates the wage determination applicable to the contract, providing the updated wage rates and publication date. It also incorporates responses to various pre-proposal inquiries. The solicitation is for construction services to make improvements to the tank farm at the Manchester Fuel Depot. Offers must be submitted electronically through the Procurement Integrated Enterprise Environment (PIEE) Solicitation Module. The original solicitation number is N4425523R1503, with a proposal due date of July 27, 2023 and a contract start date of March 19, 2024. The contract will be a firm-fixed price type, with any wage rate adjustments based solely on the delta between the contractor's original proposal and the updated wage determination in effect at time of award.

View the file

Other files

File Type Posted
Amendment 0007 PPI Responses.pdf PDF
PPI Responses Amend 0006.pdf PDF
N4425523R1503-0006 SF30.pdf PDF
PPI 095 01 45 00.00 20.pdf PDF
PPI 035 33 56 21.17.pdf PDF
PPI 086 Manchester Pier Loading Criteria.pdf PDF
N4425523R1503-0005 SF30 Final .pdf PDF
PPI Log Amendment 0005.pdf PDF
Attachment H Wage Determination Kitsap Heavy Amendment 0005.pdf PDF
PPI 077 01 14 00.pdf PDF
ES502 ELECTRICAL SITE DETAILS - 2 (TANKS)_sealed.pdf PDF
PPI 035 09 97 13.15.pdf PDF
PPI 034 LS Merchantable_Timber Contract_Requirements MAN Phase 2(Pre_Sale).pdf PDF
PPI 072 33 52 23.15.pdf PDF
PPI 040 MF801 TANK HYDROSTATIC TEST PLAN.pdf PDF
N4425523R1503-0004 SF30.pdf PDF
P-2002 Manchester Tank Farm Improvements Final GeoTech Report Rev1.pdf PDF
PPI 030 24535 - 50.000 Bl Floor Slab.pdf PDF
PPI 030 24667 - 50.000 Bl Structural Details.pdf PDF
Amendment 0003 PPI Responses.pdf PDF
N4425523R1503-0003 SF30.pdf PDF
N4425523R1503-0002 SF30.pdf PDF
PPI Responses.pdf PDF
Site Visit Log P2002.pdf PDF
Attachment J - SECNAV 5512 - May 2021.pdf PDF
P2002 PPI Spreadsheet Technical.pdf PDF
N4425523R1503-0001 SF30.pdf PDF
Attachments A-B-C-D-E-F-G-H.docx DOCX document
Attachment J Base Access Request Form.xls XLS spreadsheet
Attachment I NAVFAC Northwest BAVR Guide for Industry Contractors and Sponsored Visitors.pdf PDF
Attachment K Small Business Subcontracting Record.docx DOCX document
Attachment H Wage Determinations Kitsap Heavy.pdf PDF
Attachment L Small Business Participation and Commitment Strategy.docx DOCX document
N4425523R1503 P2002 Solicitation.pdf PDF
Show all 34

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

Previous edition unusable

N44255

P2002 BULK FUEL STORAGE TANKS PHASE 2, MANCHESTER FUEL DEPOT, MANCHESTER, WA

See Page 2 for description of amendment.

NAVFAC NORTHWEST

ATTN: EMILY EASTERDAY

1101 TAUTOG CIRCLE, SUITE 316

SILVERDALE, WASHINGTON 98315-1101

See Items 6

J

N44255-23-R-1503

1 3

03/19/2024

07/27/2023

N44255-23-R-1503 Amendment 0007

SUMMARY OF CHANGES

AMENDMENT 0007

1. N4425523R1503 Solicitation, Section 00 73 00 – Supplementary Conditions, Task Order Specific has been updated as follows:

Remove:

State County Construction

Type

WD# Mod # Publication Date

Washington Kitsap Heavy WA20230071

0 06 JAN 2023

Replace With:

Add:

WAGE ADJUSTMENTS TO CONTRACTS AND TASK ORDERS: If the solicitation for a contract or Task Order does not contain the construction wages in effect at time of award, the wages applicable at time of award, shall be modified into the contract or Task Order award as required by FAR 22.404-9.

To effect an adjustment to the contract or Task Order price, it is incumbent upon the contractor to provide evidence of the actual change to the awarded proposal’s price. The contractor and/or its subcontractors shall provide, at a minimum, certified original bid documents that clearly show the total wage adjustment requested, wage rates used to develop the proposal and the number of hours for that changed labor rate.

The contractor shall also provide any Collective Bargaining Agreements in effect on the contract/Task

Order. The Contracting Officer reserves the right to request any other data deemed necessary to support the requested wage change. No other documentation is acceptable for the purposes of establishing a change to the offeror or its subcontractor’s original proposal. The original wage rate used in the proposal for any adjustment cannot be less than the wages stated on the solicitation’s final wage determination.

A changed wage determination is not sufficient to require an adjustment to the awarded price of a contract or Task Order. A wage adjustment to this firm fixed-priced contract or Task Order shall be based solely on the delta of the wages used to form the contractor’s proposal and

2. N4425523R1503 incorporates responses to various Pre-Proposal Inquiries (PPIs), attached herein.

(End of Summary of Changes)

State County Construction Type WD# Mod # Publication Date

Washington Kitsap Heavy WA20240071 1 02 FEB 2024

N44255-23-R-1503 Amendment 0007