This document contains a performance specification test sheet for a marine stabilized TV-DTS antenna system. It outlines inspection and testing procedures to verify proper operation of below deck equipment, above deck equipment, control and RF cabling, and system parameters. Performance tests include determining compass offset, recording system parameters from the ADE and IMU, powering up and verifying software and basic operation, testing axis operation of the pedestal and IMU, operational configuration including satellite selection and acquisition, and requirements for findings, observations and signatures upon completion.

The related federal contract opportunity is a pre-solicitation notice seeking sources for the regular overhaul and dry docking of the USNS ARCTIC in January 2022 to be conducted by the Department of the Navy Military Sealift Command.

View the file

Other files for this federal contract opportunity

Other files attached to USNS ARCTIC REGULAR OVERHAUL DRY DOCKING 2022, newest first.
File Type Posted
Copy of J - 3 Category B Items ARCTIC REV 1.xlsx XLSX spreadsheet
S9555-AR-MMO-010_10_0.pdf PDF
USNS Arctic Master Calibration List.xlsx XLSX spreadsheet
AOE-8 List of Waster Sleeves.xls XLS spreadsheet
Q and A 2.docx DOCX document
S6161-PQ-FSE-010_3_0.pdf PDF
Machinery Control SystemSSDGLM2500 Sensors.docx DOCX document
J - 2 Category A Items ARCTIC REV 1.xlsx XLSX spreadsheet
0656_A_LIFE RAFT CERTIFICATION_REV-A-ARCTIC TAOE CCSI.docx DOCX document
0956_A_OVERHAULING SEA VALVES (5YR)_TAOE_CCSI.docx DOCX document
0955_A_STERN TUBE SEAL ASSEMBLY (5YR)(SCSI)_TAOE_CCSI.docx DOCX document
Q and A 1.docx DOCX document
0957_A_PROPELLER CLEAN AND POLISH_ON DOCK (2.5YR)_TAOE_CCSI.docx DOCX document
J - 3 Category B Items ARCTIC REV 1.xlsx XLSX spreadsheet
Arctic 2022 ROH Index REV 1.docx DOCX document
0963_A_SEA CHEST AND MARINE GROWTH PROTECTION (5YR)_TAOE_CCSI.docx DOCX document
0961_FREEBOARD PRESERVATION (5 YR)_TAOE_CCSI.docx DOCX document
0953_A_ANCHORS CHAINS AND LOCKERS 5YR_TAOE_CCSI.docx DOCX document
0966_A_SHAFT ALIGNMENT AND BEARING REACTION CHECKS_TAOE_CSI.docx DOCX document
0967_A_SHAFT ALIGNMENT AND BEARING REACTION CHECKS 3 AND 4_TAOE_CSI.docx DOCX document
0962_A_CATHODIC PROTECTION (5YR)_TAOE_CCSI_REV 1.docx DOCX document
0968_A_SHAFT ALIGNMENT AND BEARING REACTION CHECKS (POST SEA TRIAL)_TAOE_CCSI.docx DOCX document
0155_A_TANK VENT INSPECTION (5YR).docx DOCX document
0959_A_UNDERWATER HULL CLEANING AND PAINTING-NWB(10YR)_TAOE_CCSI_REV 1.docx DOCX document
J - 8 Request for Spec Clarification.doc DOC document
J - 12 Past Performance Data.doc DOC document
J - 14 Technical Data Non-Disclosure.docx DOCX document
J - 10 Interport Differential - Arctic Nov MTA 2018.docx DOCX document
J - 4 GFM LIST USNS ARCTIC FY 22 ROHDD.xlsx XLSX spreadsheet
J - 13 PAST PERFORMANCE QUESTIONNAIRE.docx DOCX document
J - 2 Category A Items ARCTIC.xls XLS spreadsheet
J - 3 Category B Items ARCTIC.xls XLS spreadsheet
J - 11 Dry Dock Evaluation Form.docx DOCX document
J - 9 Disclosure of Lobbying Activities SF-LLL.doc DOC document
J - 7 MSC Ship Repair Facility Survey.doc DOC document
N3220521R4207 ARCTIC Solicitation.docx DOCX document
SYNOPSIS N3220521R4207 USNS ARCTIC ROH 2022.docx DOCX document
SOURCES SOUGHT FOR USNS ARCTIC ROHDD 2022.docx DOCX document
Show all 38

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TV-DTS SYSTEM PERFORMANCE SPECIFICATION TEST SHEETS

SHIP:

Date of Inspection: _____________ Location of Ship: _____________

MARINE STABILIZED TV-DTS ANTENNA SYSTEM

System S/N

BELOW DECKS EQUIPMENT (BDE)

BDE Location:

(Comp. Name/Number)

ABOVE DECK EQUIPMENT (ADE)

ADE Location (Deck):

EQUIPMENT SERIAL NUMBER

Antenna Control Unit (AL-7200-3M) Uninterruptible Power Supply _______________ Servo Driver Unit (AL-7200-2-SDU) Inertial Measurement Unit (AL-7200-IMU) X/Y Pedestal (AL-7204-1) Radome (17-0502) Base (17-1347) Reflector (96732/Q) C-Band Feed Assy (18-0300)

C LNB

Filter C LNB (Spare) Ku-Band Feed Assy GPS Antenna Interlock Assembly SDU/IMU Cable __________

SYSTEM PARAMETERS

AL-7200-IMU-Mk _______________

IMU PPR

IMU X Offset IMU Y Offset

X MTR PPR NUM

Y MTR PPR NUM

X DEN

Y DEN

X RG. Offset Y RG. Offset X RG. Scale Offset Y RG. Scale Offset Z RG. Scale Offset

Pedestal PPR Pedestal X Offset Pedestal Y Offset

1.0 SYSTEM STATUS (SAT/UNSAT – If UNSAT, see Comments)

1.1INITIAL SYSTEM EXAMINATION
A.Below Deck Equipment (BDE)
ACU Condition:ڤ SAT ڤ UNSAT
Software Version:ڤ SAT ڤ UNSAT
Satfile Updated:ڤ SAT ڤ UNSAT
B.Above Deck Equipment (ADE)
Pedestal Condition:ڤ SAT ڤ UNSAT
SDU Condition:ڤ SAT ڤ UNSAT
IMU Condition:ڤ SAT ڤ UNSAT
C.Control & RF Cabling
Control Cables:ڤ SAT ڤ UNSAT
Rack Jumpers:ڤ SAT ڤ UNSAT
RF Cables:ڤ SAT ڤ UNSAT

1.2 INSPECTION COMMENTS: _____________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

2.0SYSTEM GROOM
A.BDE Modifications & Upgrades
LCD/TFT Front Panel Cleaningڤ SAT ڤ UNSAT
Software Upgradedڤ SAT ڤ UNSAT
Satellite Database Updateڤ SAT ڤ UNSAT
Filters Cleanedڤ SAT ڤ UNSAT
B.ADE Modifications & Upgrades
IMU (Desiccant &/or Belt Replacement)ڤ SAT ڤ UNSAT
SDU (Desiccant Replacement)ڤ SAT ڤ UNSAT
X/Y Pedestalڤ SAT ڤ UNSAT
GPS Antennaڤ SAT ڤ UNSAT
C-Band Filter Assemblyڤ SAT ڤ UNSAT
Antenna Tripod Alignmentڤ SAT ڤ UNSAT
Interlock Assemblyڤ SAT ڤ UNSAT

3. PERFORMANCE TEST

The following test will be conducted to verify the proper operation of the TV-DTS equipment as a functional system.

CodeDescription
SATInstalled-Acceptable
UNSATUnacceptable-Requires correction
N/ANot Applicable

3.1 EQUIPMENT TEST AND VERIFICATION

The test results must demonstrate that each test scenario has been completed and is in compliance with the stated objective. Indication of “satisfactory” for each test will constitute a successful test scenario.

3.2DETERMINE COMPASS OFFSET (Difference between ship’s heading and System Zero).
Offset:____
Gyro Interface Type:____
3.3RECORD FOLLOWING FROM ADE
IMU X Offset____
IMU Y Offset____
IMU PPR____
RG-X____
RG-Y____
RG-Z____
Pedestal X____
Pedestal Y____
Pedestal PPR____

3.4 POWER UP SYSTEM ڤ SAT ڤ UNSAT

Open the ACU front-panel door and turn ON the power switch. Ensure that the Banner/Self-Test screen appears for a period of 10 seconds. (A 10-to-0 countdown is displayed).

3.4 .1 SOFTWARE VERIFICATION

List installed system application software with version information in the space below.

Software Version: ________

3.4.2 ACU Power-Up

Ensure that after the self-test procedure is successfully completed, the display switches automatically to the Basic Operation screen. Verify the following:

A. Compass reading corresponds to Ships Heading. ڤ SAT ڤ UNSAT B. GPS reading is accurate for Ships Present

Location.ڤ SAT ڤ UNSAT
C. Current mode is Standby.ڤ SAT ڤ UNSAT
D. IMU Status is Unlocked.ڤ SAT ڤ UNSAT

3.4.3 System Axis Operation

A. From the Basic Operation Screen press the “O” key to go to Operation Screen.

B.Enter Password. (Operation Screen Appears).ڤ SAT ڤ UNSAT
C.Select “M” for MAINTENANCE SCREEN.ڤ SAT ڤ UNSAT
C.Select “S” for SELECT WINDOWڤ SAT ڤ UNSAT Select Pedestal – X.ڤ SAT ڤ UNSAT
F.Go to Configure mode and Verify:
1.Encoder Offset____
2.Encoder PPR____
G. Go to MODڤ SAT ڤ UNSAT
H.Select Slew.ڤ SAT ڤ UNSAT
J.Slowly, Slew X-axis NEG and POS.ڤ SAT ڤ UNSAT

(Checking movement of X-axis).

K.Select Encoder Initialization, and Verify:
1.Zero Flashingڤ SAT ڤ UNSAT
2.Positions Changesڤ SAT ڤ UNSAT
3.Flashing Zero disappearsڤ SAT ڤ UNSAT
L.Ensure Antenna is in 0:0 Position for X-axis.ڤ SAT ڤ UNSATSelect Pedestal –Y.ڤ SAT ڤ UNSAT
N.Go to Configure mode, and Verify:
1. Encoder Offset____
2. Encoder PPR____
O.Go to MODڤ SAT ڤ UNSAT
P.Select Slew.ڤ SAT ڤ UNSAT
Q.Slowly, Slew Y-axis NEG and POS.ڤ SAT ڤ UNSAT

(Checking movement of Y-axis).

R.Go to MODڤ SAT ڤ UNSAT
S.Select Encoder Initialization and Verify:
1. Zero Flashingڤ SAT ڤ UNSAT
2. Position Changesڤ SAT ڤ UNSAT
3. Flashing Zero disappearsڤ SAT ڤ UNSAT
T.Ensure antenna is in 0:0 position for X and Y-axis (ZENITH). Select IMU Alignment and verify.ڤ SAT ڤ UNSAT
1. Inclinometer X or RG-X____
2. Inclinometer Y or RG-Y____
3. RG-Z____
V.Select IMU-X.
W.Go to Configure mode, and Verify:
1. Encoder Offset____
2. Encoder PPR____
X. Go to MODڤ SAT ڤ UNSAT
Y. Y.Select Slew.ڤ SAT ڤ UNSAT

(Checking movement of X axis).

Z. Slowly, Slew X axis Neg. and POS.ڤ SAT ڤ UNSAT
AA. Go to MODڤ SAT ڤ UNSAT

BB. Select Encoder Initialization and Verify:

1.Zero Flashingڤ SAT ڤ UNSAT
2.Position Changingڤ SAT ڤ UNSAT
3.Flashing Zero disappearsڤ SAT ڤ UNSAT
CC. Select IMU-Y.ڤ SAT ڤ UNSAT

DD. Go to configure mode and Verify:

1. Encoder Offset____
2. Encoder PPR____
EE. Go to MODڤ SAT ڤ UNSAT
FF. Select Slew.ڤ SAT ڤ UNSAT
GG. Slowly, Slew Y axis NEG and POS.ڤ SAT ڤ UNSAT (Checking movement of Y axis).
HH. Go to MODڤ SAT ڤ UNSAT
II.Select encoder Initialization and Verify:
1.Zero Flashingڤ SAT ڤ UNSAT
2.Position Changingڤ SAT ڤ UNSAT
3.Flashing Zero disappearsڤ SAT ڤ UNSAT
JJ. Ensure IMU is in 0:0 position for X andڤ SAT ڤ UNSAT

Y axis.

KK. Press the “Esc” key and return to the operation screen. ڤ SAT ڤ UNSAT

3.5OPERATIONAL CONFIGURATION
A.Press the “T” key for System Configuration.ڤ SAT ڤ UNSAT Compass Setup
1.Select correct Gyro type.________
2.Enter Compass Offset.________
3.Enter Filter value (normally 1)ڤ SAT ڤ UNSAT
C.Press the “S” key to select a Satellite.ڤ SAT ڤ UNSAT
D.Select desired Satellite. (Listed below are satellites

with receivers normally supplied to copy signal) C band 21.5 Deg. West AFRTS Ku Band 100 Deg. West DSS C Band 180 Deg. West AFRT

E.Select Desired Tracking Channel.________
Select “M” to go to Maintenance Screen.ڤ SAT ڤ UNSAT
Select “S” to Select Receiver.ڤ SAT ڤ UNSAT

Verify the following:

1. Tuner Used________
2.Channel Frequency________

(Calculate frequency required for selected Satellite and Channel)

3.LNB VoltageDISABLED
4.Band Width (18 MHz)ڤ SAT ڤ UNSAT
5.Band (C or Ku).C- BAND

I. Verify correct feed assembly on the antenna (C-Ku). ڤ SAT ڤ UNSAT

3.6SATELLITE ACQUISITION
3.6.1AUTOMATIC OPERATION
A.Press the “O” key and Select Restart and Verify:

1. System Performing an Automatic Restart.

a. System Mode: Encoder Initialization is being performed. (Last up to 40 Seconds).

1. Antenna (X and Y axis) is moved to the 0:0 (ZENITH) Position.

2. IMU Achieves 0:0 Position.

b. System Mode: Changes to IMU Initialization. (Lasts 240 - 360 Seconds). IMU Status chances from unlocked to locked.System mode will then change to Point-to –Satellite, then to acquire if a an AGC signal is achieved above the set threshold mode will then change to Step-track. If a picture was achieved on the TV at this time the system offset is relatively close. Perform the following checks to fine tune the Compass offset.
c.Mode: select Point-to-Satellite.

Verify the following:

1.Antenna TargetAz. = _____, El. = _____
2.Antenna position changes in Azimuth and

Elevation. When Antenna Target is achieved,

Antenna Stops.ڤ SAT ڤ UNSAT
d.AGC level_____
e.Change mode to STEP-TRACK system should search for the Highest AGC level at the selected tracking frequency. The AGC reading should be above the threshold setting if not reset threshold to 2 to 3 dB below AGC if a picture has be received.
f.Picture on TV Monitor present.ڤ SAT ڤ UNSAT

(Press menu on Power-Vu for system status)

1. Record BER_____
2. Record Signal Level_____
3. Record AFC_____
3.7AUTOMATIC RESTART
A.After achieving a satisfactory picture on the monitor.

1. Change system to Auto Restart mode.

2. Determine a new stow position if required X = ____ AND Y =_____

3. Verify operation and settings for the following modes in both C and Ku band operation:

a. Step-Track

b. Search

c. Box Scan

4. Verify the following system settings

a. Satellite Database set for

(1) C and Ku operation

(2) Minimum elevation 10 Deg

b. GPS default location set to present ships location

5. Save: System, Maintenance, and Operation.

6. Stow Antenna.

7. Back-Up configuration to 3.5” floppy disk.

8. Restart system and verify Automatic Operation sequence from Basic Operations screen.

a. Mode:Encoder initialization (40 seconds)
b. Mode:IMU initialization (240-360 seconds)

c. IMU Status: IMU locked

d. Mode:Point-to Satellite
e. Mode:Acquire
f. Mode:Step-track
9. Picture/Lock Achievedڤ SAT ڤ UNSAT
10. Antenna Deviation._____

4.0 FINDINGS/OBSERVATIONS:

FE Name:_________________________
FE Signature:_________________________

[Additional Comments on Back of Inspection Sheet]