0963_A_SEA CHEST AND MARINE GROWTH PROTECTION (5YR)_TAOE_CCSI.docx

DOCX document 26 KB Posted

Attached to
USNS ARCTIC REGULAR OVERHAUL DRY DOCKING 2022
Solicitation number
N3220521R4207
Issued by

About this file

This document outlines requirements for inspection and maintenance of the marine growth protection system in multiple sea chests aboard the USNS Arctic. The contractor will inspect the Cathelco anode system prior to drydocking to assess condition and estimate remaining anode life. In drydock, the contractor will visually inspect each anode, replacing any with less than two and a half years of remaining life. The contractor will also tag-out and protect the system, then inspect and test it before undocking. Post-undocking, the contractor will energize the anodes and verify proper operation, providing a report to the Military Sealift Command. The solicitation number provided is N3220521R4207 for the USNS Arctic's regular overhaul and drydocking scheduled for January 2022, to be awarded by the Department of the Navy's Military Sealift Command.

View the file

Other files

File Type Posted
Q and A 2.docx DOCX document
S6161-PQ-FSE-010_3_0.pdf PDF
USNS Arctic Master Calibration List.xlsx XLSX spreadsheet
Copy of J - 3 Category B Items ARCTIC REV 1.xlsx XLSX spreadsheet
Machinery Control SystemSSDGLM2500 Sensors.docx DOCX document
S9555-AR-MMO-010_10_0.pdf PDF
AOE-8 List of Waster Sleeves.xls XLS spreadsheet
0961_FREEBOARD PRESERVATION (5 YR)_TAOE_CCSI.docx DOCX document
J - 2 Category A Items ARCTIC REV 1.xlsx XLSX spreadsheet
0959_A_UNDERWATER HULL CLEANING AND PAINTING-NWB(10YR)_TAOE_CCSI_REV 1.docx DOCX document
0967_A_SHAFT ALIGNMENT AND BEARING REACTION CHECKS 3 AND 4_TAOE_CSI.docx DOCX document
WI 0405 REFERENCE TV-DTS SYSTEM PERFORMANCE SPECIFICATION TEST SHEET.docx DOCX document
0956_A_OVERHAULING SEA VALVES (5YR)_TAOE_CCSI.docx DOCX document
0966_A_SHAFT ALIGNMENT AND BEARING REACTION CHECKS_TAOE_CSI.docx DOCX document
0968_A_SHAFT ALIGNMENT AND BEARING REACTION CHECKS (POST SEA TRIAL)_TAOE_CCSI.docx DOCX document
0962_A_CATHODIC PROTECTION (5YR)_TAOE_CCSI_REV 1.docx DOCX document
0656_A_LIFE RAFT CERTIFICATION_REV-A-ARCTIC TAOE CCSI.docx DOCX document
0953_A_ANCHORS CHAINS AND LOCKERS 5YR_TAOE_CCSI.docx DOCX document
0955_A_STERN TUBE SEAL ASSEMBLY (5YR)(SCSI)_TAOE_CCSI.docx DOCX document
0155_A_TANK VENT INSPECTION (5YR).docx DOCX document
0957_A_PROPELLER CLEAN AND POLISH_ON DOCK (2.5YR)_TAOE_CCSI.docx DOCX document
Q and A 1.docx DOCX document
J - 3 Category B Items ARCTIC REV 1.xlsx XLSX spreadsheet
Arctic 2022 ROH Index REV 1.docx DOCX document
J - 12 Past Performance Data.doc DOC document
J - 10 Interport Differential - Arctic Nov MTA 2018.docx DOCX document
J - 8 Request for Spec Clarification.doc DOC document
J - 14 Technical Data Non-Disclosure.docx DOCX document
J - 11 Dry Dock Evaluation Form.docx DOCX document
J - 7 MSC Ship Repair Facility Survey.doc DOC document
J - 9 Disclosure of Lobbying Activities SF-LLL.doc DOC document
J - 4 GFM LIST USNS ARCTIC FY 22 ROHDD.xlsx XLSX spreadsheet
J - 13 PAST PERFORMANCE QUESTIONNAIRE.docx DOCX document
J - 3 Category B Items ARCTIC.xls XLS spreadsheet
J - 2 Category A Items ARCTIC.xls XLS spreadsheet
N3220521R4207 ARCTIC Solicitation.docx DOCX document
SYNOPSIS N3220521R4207 USNS ARCTIC ROH 2022.docx DOCX document
SOURCES SOUGHT FOR USNS ARCTIC ROHDD 2022.docx DOCX document
Show all 38

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

USNS ARCTIC

(T-AOE 8)

DRYDOCKING AND UNDOCKINGRFP. NO. N32205-21-R-4207
18 April 2021
ITEM NO. 963Category “A”MSC/N756/CCSI

SEA CHEST AND MARINE GROWTH PROTECTION (2.5 YR)

ABSTRACT:

1.1. This item describes the inspection of the Cathelco anode type marine growth inhibitor system in all sea chests.

REFERENCES:

1.2. Cathelco Drawing 105559M/68433

1.3. MSC Drawing Nr. 8498021 USNS Arctic Sea Chest Protection System Arrangement and Details

ITEM LOCATION/DESCRIPTION:

1.4. Locations:

1.4.1. MMR 1.

1.4.2. MMR 2.

1.4.3. JP5 Pump Room

1.4.4. AMR Pump Room.

1.5. Description:

1.5.1. MMR 1.

a. Central SW Cooling Pump No's 1 & 2, Hi & Low Suctions.

b. SSDG SW Cooling Pump No's 3 & 5, High & Low Suctions.

c. Evaporator No’s 1 Feed Pump Suction.

d. Fire Pump 5 & 6 Suction.

1.5.2. MMR 2.

a. Central SW Cooling Pump No's 3 & 4, High & Low Suctions.

b. SSDG SW Cooling Pump No's 2 & 4, High & Low Suctions.

c. Evaporator No’s 2 Feed Pump Suction.

d. Fire Pump 7 & 8 Suction.

1.5.3. JP5 Pump Room.

a. Fire Pump 3 & 4 Suction.

1.5.4. AMR Pump Room.

a. Fire Pump 1 & 2 Suction.

b. SSDG SW Cooling Pump No 1 Suction.

c. AC SW Cooling Pumps No's 1, 2 & 3, Port & Starboard Suctions.

GOVERNMENT FURNISHED EQUIPMENT/MATERIAL/SERVICES: None

NOTES:

1.6. The contractor and all subcontractors, regardless of tier, must consult the General Technical Requirements to determine applicability to this Work Item. In performance of this Work Item, the contractor and all subcontractors, regardless of tier, must comply with the requirements of all applicable GTR’s.

1.7. The contractor and all subcontractors, regardless of tier, are advised to review all other Work Items under this contract to determine their effect on the work required under this Work Item. Many of the definitions relating to performance of this work item are found in Work Item 001.

1.8. This item must be performed while in dry dock due to the penetration of the sea chests.

1.9. Each anode uses the same Flange Mounting Sleeve however the anode varies according to the sea chest.

QUALITY ASSURANCE REQUIREMENTS: None Additional

STATEMENT OF WORK REQUIRED:

1.10. Perform and operational inspection of the system prior to the ship going into Dock.

1.10.1. Provide an as found condition report noting findings to MSCREP.

1.11. Once ship is docked and the sea chest are opened and cleaned. Perform a visual inspection of the anodes to determine anode consumption and estimate of remaining life.

1.11.1. Anodes having less than 2.5 years of operational life or other abnormalities shall be recommended for replacement.

a. For bidding purposes assume that five anodes will require replacements. Replacements anodes will be provided by the government.

1.12. With the assistance of ship’s force. Tag-out and Lock-Out system prior to entering dock.

1.13. At the completion of the inspection wrap and protect anodes so that they will not be affected by preservation and repair efforts on the sea chests.

1.13.1. Remove protective measures and perform visual and electrical checks on the anodes prior to undocking.

1.14. Once anodes are submersed lite-off system and adjust current to each anode. Verify proper operation of the system.

1.14.1. Provide As-released report to MSCREP following waterborne inspection and adjustments of system. Report shall provide list anodes that were replaced if any.

1.15. Manufacturer's Representative: Provide the services of an authorized OEM representative for inspection and repair.

GENERAL REQUIREMENTS: None Additional 0963 - 4