This document outlines the scope of work for item number 962 involving inspection, service, and testing of the impressed current cathodic protection system aboard the USNS ARCTIC. The work includes conducting inspections and assessments both before and after drydocking to evaluate the condition of the system components including anodes, reference electrodes, power supplies and controllers. The contractor must perform all maintenance, testing and repairs in accordance with manufacturer requirements and specifications. Reporting includes submitting condition and service reports documenting inspection findings and certifying the system is safe for operation upon completion of the work. The solicitation number and opportunity description indicate this scope of work is part of a broader solicitation by the Department of the Navy Military Sealift Command for regular overhaul and drydocking of the USNS ARCTIC scheduled for January 2022.

View the file

Other files for this federal contract opportunity

Other files attached to USNS ARCTIC REGULAR OVERHAUL DRY DOCKING 2022, newest first.
File Type Posted
S9555-AR-MMO-010_10_0.pdf PDF
USNS Arctic Master Calibration List.xlsx XLSX spreadsheet
S6161-PQ-FSE-010_3_0.pdf PDF
Machinery Control SystemSSDGLM2500 Sensors.docx DOCX document
Copy of J - 3 Category B Items ARCTIC REV 1.xlsx XLSX spreadsheet
AOE-8 List of Waster Sleeves.xls XLS spreadsheet
Q and A 2.docx DOCX document
0953_A_ANCHORS CHAINS AND LOCKERS 5YR_TAOE_CCSI.docx DOCX document
0966_A_SHAFT ALIGNMENT AND BEARING REACTION CHECKS_TAOE_CSI.docx DOCX document
0967_A_SHAFT ALIGNMENT AND BEARING REACTION CHECKS 3 AND 4_TAOE_CSI.docx DOCX document
0968_A_SHAFT ALIGNMENT AND BEARING REACTION CHECKS (POST SEA TRIAL)_TAOE_CCSI.docx DOCX document
0155_A_TANK VENT INSPECTION (5YR).docx DOCX document
0959_A_UNDERWATER HULL CLEANING AND PAINTING-NWB(10YR)_TAOE_CCSI_REV 1.docx DOCX document
J - 2 Category A Items ARCTIC REV 1.xlsx XLSX spreadsheet
0656_A_LIFE RAFT CERTIFICATION_REV-A-ARCTIC TAOE CCSI.docx DOCX document
0956_A_OVERHAULING SEA VALVES (5YR)_TAOE_CCSI.docx DOCX document
0955_A_STERN TUBE SEAL ASSEMBLY (5YR)(SCSI)_TAOE_CCSI.docx DOCX document
Q and A 1.docx DOCX document
0957_A_PROPELLER CLEAN AND POLISH_ON DOCK (2.5YR)_TAOE_CCSI.docx DOCX document
J - 3 Category B Items ARCTIC REV 1.xlsx XLSX spreadsheet
Arctic 2022 ROH Index REV 1.docx DOCX document
0963_A_SEA CHEST AND MARINE GROWTH PROTECTION (5YR)_TAOE_CCSI.docx DOCX document
0961_FREEBOARD PRESERVATION (5 YR)_TAOE_CCSI.docx DOCX document
WI 0405 REFERENCE TV-DTS SYSTEM PERFORMANCE SPECIFICATION TEST SHEET.docx DOCX document
J - 14 Technical Data Non-Disclosure.docx DOCX document
J - 10 Interport Differential - Arctic Nov MTA 2018.docx DOCX document
J - 11 Dry Dock Evaluation Form.docx DOCX document
J - 9 Disclosure of Lobbying Activities SF-LLL.doc DOC document
J - 7 MSC Ship Repair Facility Survey.doc DOC document
J - 8 Request for Spec Clarification.doc DOC document
J - 12 Past Performance Data.doc DOC document
J - 4 GFM LIST USNS ARCTIC FY 22 ROHDD.xlsx XLSX spreadsheet
J - 13 PAST PERFORMANCE QUESTIONNAIRE.docx DOCX document
J - 2 Category A Items ARCTIC.xls XLS spreadsheet
J - 3 Category B Items ARCTIC.xls XLS spreadsheet
N3220521R4207 ARCTIC Solicitation.docx DOCX document
SYNOPSIS N3220521R4207 USNS ARCTIC ROH 2022.docx DOCX document
SOURCES SOUGHT FOR USNS ARCTIC ROHDD 2022.docx DOCX document
Show all 38

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

USNS ARCTIC

(T-AOE 8)

DRYDOCKING AND UNDOCKINGRFP. NO. N32205-21-R-4207
22 March 2021
ITEM NO. 962Category “A”MSC/N756/CCSI

CATHODIC PROTECTION (5 YR)REV 1

ABSTRACT

The purpose of this item is to inspect, service, and test the Impressed Current Cathodic Protection (ICCP) System.

REFERENCES

1.1 Tech Manual S9633-AC-MMA-010, Cathodic Protective System (ARCTIC) NAVSEA Drawing No. 633-6360989, Cathodic Protection NASSCO Drawing No. 6360989 C PL/440-331-4209 PL, Cathodic Protection Parts List Tech Manual, Chapter 633, S9086-VF-STM-010, Cathodic Protection

ITEM LOCATION/DESCRIPTION

Location/Quantity

Equipment
P/N
Description
Location
Power Supply #1
50012-4-SL
S/N: XXXX
Aux Mach Room
Power Supply #2
50012-2-SL
S/N: XXXX
Cargo Oil Pump Room
Power Supply #3
50012-4-SL
S/N: XXXX
Steering Gear Room
Power Supply #4
50012-2-SL
S/N: XXXX
Steering Gear Room
FWD Controller
34660 Mod III
S/N: XXXX
CCS
AFT Controller
34660 Mod III
S/N: XXXX
CCS
Anode # 1
36480
2-Ft
7-45-0-JJ/FR 61S
Anode # 2
36480
2-Ft
7-45-0-JJ/FR 61P
Anode # 3
36460
8-Ft
7-205-1-JJ/FR 222S
Anode # 4
36460
8-Ft
7-205-2-JJ/FR 222P
Anode # 5
36460
8-Ft
7-395-1-FF/FR 396S
Anode # 6
36460
8-Ft
7-395-2-FF/FR 396P
Anode # 7
36460
8-Ft
5-565-0-F/FR 591S
Anode # 8
36460
8-Ft
5-565-0-F/FR 591P
Anode # 9
36460
4-Ft
6-625-0-F/FR 663S
Anode # 10
36460
4-Ft
6-625-0-F/FR 663P
Anode # 11
36460
8-Ft
4-685-0-F/FR 711S
Reference Cell #1
50910-2L
-
6-132-0-E/FR 143S
Reference Cell #2
50910-2L
-
6-132-0-E/FR 143P
Reference Cell #3
50910-002
-
3-695-1-T/FR 710S
Reference Cell #4
50910-002
-
3-695-2-T/FR 710P
Stbd Shaft Ground Assembly
37000
-
MMR 2
Port Shaft Ground Assembly
37000
-
Shaft Alley

Part Numbers and Location may not reflect current conditions on the ship. Contractor shall verify and submit discrepancies as a condition report.

1.2 Item Description/Manufacturer’s Data

Evoqua ICCP Marine Impressed Current Cathodic Protection System (ARCTIC).

GOVERNMENT FURNISHED EQUIPMENT/MATERIAL/SERVICE: None

NOTES

1.3 The contractor and all subcontractors, regardless of tier must consult the General Technical Requirements (GTR) to determine applicability to this work item. In performance of this work item, the contractor and all subcontractors regardless of tier must comply with the requirements of all applicable GTR’s including but not limited to GTR’s 1 through 7, 22, 23, 24, 28, and 29.

1.4 The contractor and all subcontractors, regardless of tier are advised to review other work items under this contract, including but not limited to Work items 020, 021, XXX and 901 to determine their effect on the work required under this work item. Many of the definitions relating to performance of this work item are found in Work Item 001.

1.5 Several ICCP anode and reference electrode locations are within shipboard tanks. The cost for cleaning and gas-freeing of these tanks is covered under Work Item No. 020 and 021 of this work package.

2.0 QUALITY ASSURANCE REQUIREMENTS: None additional

3.0 STATEMENT OF WORK REQUIRED

3.1 Inspect, service, and test the ICCP Marine Impressed Current Cathodic Protection System identified in section 3.0 using References 2.1 through 2.4 as guidance. Accomplish all tasks using IMO, SOLAS, and the Manufacturer’s requirements as guidance.

3.2 Within three (3) days of vessel arrival and prior to drydocking, conduct an inspection meeting the manufacturer’s design, installation, maintenance instructions and service bulletin requirements. Accomplish the following:

3.2.1 With the assistance of the Chief Engineer, review the monthly ICCP Logs. Identify the optimum reference cell potential. Measure and record the actual hull potential (reference cell voltage). Submit an “as found” report describing the systems history of performance, the optimum and actual hull potential readings to the OMT REP.

NOTE: Ship’s force will continue to log the system readings up to the time the vessel enters the dry dock.

3.2.2 Visually examine the ICCP cabinets, controller, power supplies, shaft-hull millivoltmeter, and reference electrode alarm using References 2.1 through 2.4 as guidance. Note the condition of lights, switches, meters, placards, fans, breakers, wiring, wire connections, and fuses. Tighten any loose connections found and clean the cabinet internals using a small vacuum cleaner and a soft brush.

3.2.3 Inspect the cofferdam and anode gland assemblies for watertight integrity and signs of condensation, leakage, and corrosion.

3.2.4 Inspect the cofferdam and reference electrode stuffing tube assemblies for watertight integrity and signs of condensation, leakage, and corrosion.

3.2.5 Examine the shaft ground assembly including brushes, brush holders, and holding straps.

3.2.6 Inspect the rudder post bonding to the hull.

3.2.7 Perform all system checks, service and maintenance using References 2.1 through 2.4 as guidance. Verify the system and components are within specification and document the results.

WARNING: Hazardous voltages are present in this equipment. Ensure all tag out procedures are using current shipyard instructions as guidance. Failure to comply with tag out procedures could result in injury to personnel and damage to equipment.

CAUTION: Never use a megger to check an anode or reference electrode, which is submerged in water. A voltmeter should be used for this test.

a. Individually test each hull anode. Measure and record the voltage and current found.

b. Individually test each reference electrode. Measure and record the voltage found.

3.2.8 Functionally test the ICCP system in both manual and automatic modes. Demonstrate all features and verify performance using References 2.1 through 2.4 as guidance.

3.2.9 Submit an “as found” report describing the ICCP System history of performance and the optimum and actual hull potential readings to the OMT REP and anticipated repairs and materials needed to restore system to optimal performance.

Coordinate with ship’s force to tag-out the ICCP System just prior to drydocking the vessel.

3.3 With the vessel on drydock, conduct the following using References 2.1 through 2.4 as guidance:

3.3.1 Immediately upon completion of the hull cleaning, hand clean each anode and reference cell.

3.3.2 Inspect the hull and appendages for signs of corrosion.

3.3.3 Inspect the condition of the sacrificial anodes.

3.3.4 Inspect the condition of all impressed current anodes, dielectric shields, and reference electrodes.

NOTE: Capastic repairs are addressed by Work Item 959 – Underwater Hull Painting.

3.3.5 Protect all anodes and reference electrodes.

CAUTION: Do not sand wash, sandblast, or paint the hull anode. Sandblasting will remove the platinum from the strip. Painting will render the anode ineffective. During drydocking period, the anode should be masked off with plywood or heavy cardboard to prevent damage from mechanical cleaning and painting. Remove masking prior to launching hull.

3.3.6 Seal all glands and cofferdams using new gaskets.

3.4 Upon undocking, conduct a final operational test of the Evoqua ICCP Marine Impressed Current Cathodic Protection System in the presence of the OMT REP. Both manual and automatic modes are to be demonstrated. Verify performance using References 2.1 through 2.4 as guidance. Testing of the ICCP System is to meet the manufacturer’s design, installation, maintenance instructions and service bulletin requirements.

3.5 Maintain workspaces in a clean condition during and upon completion of the work requirements. Prevent contamination of any adjacent equipment and spaces.

3.6 Upon completion of all inspections, tests and repairs, return the Evoqua ICCP Marine Impressed Current Cathodic Protection System to a ready for service condition.

3.7 With the assistance of ship’s force, tag-in all required systems and equipment.

3.8 Reports

3.8.1 When inspections, maintenance, servicing and testing reveal any deficiency, a condition report is to be submitted to the OMT REP with recommended repairs and parts required. Submit one (1) electronic copy in Portable Document Format (PDF).

3.8.2 Upon completion of all inspections, maintenance, servicing, and testing, prepare and submit a typewritten Service Report documenting the final “as released” condition of the ICCP System affirming it is safe for use. Submit one (1) electronic copy in Portable Document Format (PDF).

3.8.3 All reports and checklists are to be completed and signed by the person who carried out the inspections, maintenance, servicing, and testing and are to be countersigned by the Company's representative.

3.9 Painting/Lagging

NOTE: Capastic repairs are addressed by the Underwater Hull Paint Work Items 0959 and 0960.

3.9.1 Prepare, prime, paint and restore all new and disturbed surfaces to match surrounding surfaces.

3.10 Manufacturer’s Representative

3.10.1 Provide the services of an OEM authorized field service representative to accomplish all work and testing on the cathodic protection system identified in section 3.0 ensuring compliance with the manufacturer’s standards and performance specifications.

3.10.2 Possible Sources

Evoqua Water Technologies (ARCTIC) 725 Wooten Road Colorado Springs, CO 80915 Phone (800)466-7873 www.evoqua.com Provide the OMT REP with a signed letter of qualification from the Original Equipment Manufacturer and certificate of training for the field service representative for the equipment listed in section 3.0 prior to the start of any work.

3.11 Preparation of Drawings: None additional

4.0 GENERAL REQUIREMENTS: None additional

962-1