Arctic 2022 ROH Index REV 1.docx

DOCX document 218 KB Posted

Attached to
USNS ARCTIC REGULAR OVERHAUL DRY DOCKING 2022 Federal contract opportunity
Solicitation number
N3220521R4207
Issued by
Department of the Navy Military Sealift Command

About this file

This document contains a work item index for the regular overhaul of the USNS ARCTIC scheduled for January 2022. The index outlines over one thousand work items across various systems that a shipyard would be responsible for completing during the overhaul and drydocking. Key areas of work include hull examinations and repairs, machinery maintenance and overhauls, electrical systems testing, lifesaving and firefighting equipment services, and catering equipment inspections. The related federal contract opportunity is a sources sought notice for the overhaul and drydocking with a solicitation release planned. The Military Sealift Command is listed as the contracting agency.

View the file

Other files for this federal contract opportunity

Other files attached to USNS ARCTIC REGULAR OVERHAUL DRY DOCKING 2022, newest first.
File Type Posted
S6161-PQ-FSE-010_3_0.pdf PDF
Machinery Control SystemSSDGLM2500 Sensors.docx DOCX document
Copy of J - 3 Category B Items ARCTIC REV 1.xlsx XLSX spreadsheet
AOE-8 List of Waster Sleeves.xls XLS spreadsheet
Q and A 2.docx DOCX document
S9555-AR-MMO-010_10_0.pdf PDF
USNS Arctic Master Calibration List.xlsx XLSX spreadsheet
0953_A_ANCHORS CHAINS AND LOCKERS 5YR_TAOE_CCSI.docx DOCX document
0966_A_SHAFT ALIGNMENT AND BEARING REACTION CHECKS_TAOE_CSI.docx DOCX document
0967_A_SHAFT ALIGNMENT AND BEARING REACTION CHECKS 3 AND 4_TAOE_CSI.docx DOCX document
0962_A_CATHODIC PROTECTION (5YR)_TAOE_CCSI_REV 1.docx DOCX document
0968_A_SHAFT ALIGNMENT AND BEARING REACTION CHECKS (POST SEA TRIAL)_TAOE_CCSI.docx DOCX document
0155_A_TANK VENT INSPECTION (5YR).docx DOCX document
0959_A_UNDERWATER HULL CLEANING AND PAINTING-NWB(10YR)_TAOE_CCSI_REV 1.docx DOCX document
J - 2 Category A Items ARCTIC REV 1.xlsx XLSX spreadsheet
0656_A_LIFE RAFT CERTIFICATION_REV-A-ARCTIC TAOE CCSI.docx DOCX document
0956_A_OVERHAULING SEA VALVES (5YR)_TAOE_CCSI.docx DOCX document
0955_A_STERN TUBE SEAL ASSEMBLY (5YR)(SCSI)_TAOE_CCSI.docx DOCX document
Q and A 1.docx DOCX document
0957_A_PROPELLER CLEAN AND POLISH_ON DOCK (2.5YR)_TAOE_CCSI.docx DOCX document
J - 3 Category B Items ARCTIC REV 1.xlsx XLSX spreadsheet
0963_A_SEA CHEST AND MARINE GROWTH PROTECTION (5YR)_TAOE_CCSI.docx DOCX document
0961_FREEBOARD PRESERVATION (5 YR)_TAOE_CCSI.docx DOCX document
WI 0405 REFERENCE TV-DTS SYSTEM PERFORMANCE SPECIFICATION TEST SHEET.docx DOCX document
J - 11 Dry Dock Evaluation Form.docx DOCX document
J - 9 Disclosure of Lobbying Activities SF-LLL.doc DOC document
J - 7 MSC Ship Repair Facility Survey.doc DOC document
J - 8 Request for Spec Clarification.doc DOC document
J - 12 Past Performance Data.doc DOC document
J - 4 GFM LIST USNS ARCTIC FY 22 ROHDD.xlsx XLSX spreadsheet
J - 13 PAST PERFORMANCE QUESTIONNAIRE.docx DOCX document
J - 2 Category A Items ARCTIC.xls XLS spreadsheet
J - 3 Category B Items ARCTIC.xls XLS spreadsheet
J - 14 Technical Data Non-Disclosure.docx DOCX document
J - 10 Interport Differential - Arctic Nov MTA 2018.docx DOCX document
N3220521R4207 ARCTIC Solicitation.docx DOCX document
SYNOPSIS N3220521R4207 USNS ARCTIC ROH 2022.docx DOCX document
SOURCES SOUGHT FOR USNS ARCTIC ROHDD 2022.docx DOCX document
Show all 38

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

USNS ARCTIC (T-AOE 8)

FY-22 Regular Overhaul Work Item Index REV 1

RFP NO. N32205-21-R-4207

0001_N_INTENT SCOPE GEN REQUIREMENTS DEFINITIONS REV MAY 16

0002_A_TECHNICAL AND MANUFACTURER REPRESENTATIVES REV 08Nov17

0003_A_APPROACH, BERTH, AND MOORING REQUIREMENTS REV 08Nov17

0004_A_TESTING AND QUALITY ASSURANCE REV 08Nov17

0005_A_NSP_ELECTRICAL SAFETY PROCEDURE REQUIREMENTS, REV FEB 14

0006_A_NSP_HEAVY WEATHER PLAN, REV FEB 14

0007_A_NSP_COLD WEATHER PLAN, REV FEB 14

0010_A_FURNISH OFFICE FOR OMT, REV FEB 14

0011_A_ GENERAL SERVICES FOR SHIP, T AOE, REV FEB 14_ARCTIC MTA

0012_A_TELEPHONE SERVICES, REV FEB 14

0013_A_PROJECT PLANNING AND PRODUCTION STATUS MONITORING REPORTS REV 1-1May18

0014_A_WEIGHT MOMENT REPORT, REV FEB 14

0015_A_ILS, GFM, REV FEB 14

0016_A_FIRE PROTECTION AND SHIPS SAFETY PROGRAM REV 28Sep17

0017_A_HANDLING SHIPS STORES, REV FEB 14

0018_A_DELIVERY AND REDELIVERY, REV MAY 16

0019_A_SHIPBOARD ACCESS, REV AUG 15

0020_A_GAS FREE CERTIFICATES, REV FEB 14

0021_A_CLEAN AND GAS FREE TANKS, VOIDS AND COFFERDAMS, REV OCT 2012_ARCTICROH22_REV1

0022_A_MACHINERY SPACE TURN-OVER, DOCK TRIALS AND SEA TRIALS REV 28Sept17

0023_A_HAZARDOUS WASTE DISPOSAL, REV MAY 16

0024_A_PHYSICAL SECURITY AT PRIVATE CONTRACTOR’S FACILITY 24Oct 2017

100 SERIES

0101_A_SY SUPPORT FOR ABS SPECIAL SURVEY INSPECTION REV1

0103_A_ABS TANK INSPECTION AND TESTING_REV 1

0104_A_KINGPOST SURVEY AND REPAIR

0108_A_MSD TANK FULL COAT_TAOE_CSI

0110_A_WEATHERDECK HANDRAIL REPAIR_REV 1

0111_A_WEATHERDECK DRAIN PIPING REPAIR_REV 1

0113_A_T-AOE STEERING GEAR ROOM ACCESS (TALT 6-18-347)_REV 1

0114_A_GAS TURB INTAKE FILTER CAGE INSTALL (TALT 6-18-388)

0115_A_ REPLACE_REPAIR TOP SIDE STEEL ARCTIC

0155_A_TANK VENT INSPECTION (5YR)

0157_A_POTABLE WATER TANK PRESERVATION

0165_A_BILGE PRESERVATION_TAOE_CCSI_REV 1

0166_A_TANK PRESERVATION

200 SERIES

0201_A_ INSPECT LINE SHAFT BEARINGS ABS

0203_A_FUEL SERVICE SYSTEM RELIEF VALVES AND HOSES GT MODULE (5YR) TAOE CSI

0204_A_GAS TURBINE MODULE HOSE REPLACEMENT (5YR)TAOE CSI

0205_A_GAS TURBINE INTAKE REPAIRS_TAOE_CSI

0207_A_RCC LO SYSTEM RELIEF VALVES AND HOSES (5 YR)_TAOE_CSI

0209_A_RRG AND RCC TEMP REGULATING VALVE OVERHAUL_TAOE_CSI

0211_A_BLEED AIR REGULATING VALVES (5YR)_TAOE_CSI

300 SERIES

0301_A_SSDG CONTROLS - HYDROMECHANICAL SHUTOFF (HMSO) MAINTENANCE (5YR) TAOE_CSI

0307_A_TEST AND CERTIFY AVIATION ELECTRONICS SYSTEM (2.5 YR)_TAOE_CCSI REV 1

0310_A_STUFFING TUBE REPLACEMENT

0351_A_SWITCHBOARD CLEANING (2.5 YR)_TAOE_CSI

0352_A_LOAD CENTER CLEANING (2.5 YR)_TAOE_CCSI

400 SERIES

0403_A_OE82 ANTENNA MAINTENANCE TAOE CSI (2.5YR)_REV 1

0404_A_UHF TRANSCEIVER MAINTENANCE TAOE CSI (5YR)

0405_A_DTS AND DISTRIBUTION SYSTEM GROOM TAOE CSI

0451_A_ANNUAL RADAR INSPECTION_TAOE_CCSI_REV_1

0452_A_ANNUAL ECDIS SERVICE (SCSI)

0454_A_ANNUAL S-VDR RECERTIFICATION TAOE CCSI REV 1

0455_A_ANNUAL RADIO COMMUNICATION EQUIPMENT CERTIFICATION TAOE CCSI REV_1

0456_A_MAGNETIC COMPASS SERVICE (2YR)_TAOE_CCSI

0457_A_EPIRB SHORE BASED MANAGEMENT SYSTEM TAOE CCSI

0458_A_ANTENNA MAINTENANCE (5YR)_TAOE_CCSI

0459_A_ECHO SOUNDER SERVICE (2.5 YR)_TAOE_CCSI

500 SERIES

0505_A_FO PURIFIER HOSE REPLACEMENT (5YR)_TAOE_CSI_REV 1

0506_A_LO PURIFIER HOSE REPLACEMENT (5YR) TAOE CSI

0507_A_HPAC COMPRESSOR HOSE REPLACEMENT (5YR)_TAOE_CSI

0508_A_STEERING GEAR HOSE REPLACEMENT (5 YR)_TAOE_CSI

0509_A_SW SYSTEM HOSE REPLACEMENT (5 YR)_TAOE_CSI REV 1

0513_A_AUXILIARY_BOILER_INSPECTION WITH REFT SURVEY_REV

0515_A_SSDG ENGINE MAJOR OVERHAUL (40K HRS)(SCSI)_TAOE_CSI_REV 1

0517_A_FIRE AND SMOKE DETECTION SYSTEM TALT_6_18_346

0518_A_AIR CONDITIONING_REEFER TESTING AND REPAIR

0555_A_INSPECT, TEST, AND CERTIFY MACHINERY SPACE CRANES AND HOISTS (5 YR)_TAOE_CCSI

0561_A_ INSTRUMENT CALIBRATION AND REPAIR

0562_A_SCBA ANNUAL INSPECTION_TAOE_CCSI_REV 1

0563_A_SCBA COMPRESSOR AND FILLING STATION INSPECTION AND MAINTENANCE_TAOE_CCSI_REV 1

0565_A_FIXED GAS FIRE EXTINGUISHING SYSTEM (1YR)(SCSI)_TAOE_SSCI_REV 1

0567_A_FIXED FOAM FIREFIGHTING SYSTEM INSPECTION AND TEST (1YR)_TAOE_CCSI_REV 1

0568_A_CARGO HOLD SPRINKLER SYSTEM (1 YR)_TAOE_CCSI REV 1

0569_A_FIRE AND SMOKE DETECTION AND ALARM SYSTEM (1 YR)(SCSI)_TAOE_CCSI REV 1

0570_A_PORTABLE FIRE EXTINGUISHER SYSTEM (1 YR)_TAOE_CCSI REV 1

0571_A_FIRE AND SMOKE DAMPER SERVICE (1 YR)_TAOE_CCSI

0572_A_DEEP FAT FRYER GRILL RANGE HOOD FIRE EXTING SYSTEM (1YR)(SCSI)_TAOE_CSI

0573_A_FIRE HOSES (1YR)_TAOE_CCSI_REV 1

600 SERIES

0601_A_GALLEY AND SCULLERY EQUIPMENT INSPECTION AND SERVICE_REV ARCTICROH22

0602_A_LAUNDRY EQUIPMENT SERVICE TAOE CSI_REV A

0606_A_CERTIFICATION OF SPIDERMAN BASKETS (1YR) TAOE CSI

0607_A_CONVERT CO GALLEY TO EXECUTIVE LAUNDRY (T ALT 6-18-333) REV 1

0653_A_ANNUAL RESCUE BOAT AND DAVIT SERVICE TAOE CCSI

0656_A_LIFE RAFT CERTIFICATION_REV-A-ARCTIC TAOE CCSI

0657_A_ACCOMMODATION LADDER INSPECT AND TEST (1YR) TAOE CCSI

0661_A_CARPET REPLACEMENT TAOE CCSI

0662_A_DEEP FAT FRYER INSPECTION (1YR) TAOE CCSI

800 SERIES

0851_A_ANNUAL GALLEY VENT AND GAYLORD HOOD CLEANING_TAOE_CCSI

0852_A_ANNUAL LAUNDRY VENT CLEANING_TAOE_CCSI_REV 1

900 SERIES

0901_A_DOCKING AND UNDOCKING VESSEL_REV-ARCTICROH22_REV 1

0902_A_SEA SUCTION AND DISCHARGE WASTER PIPING (2.5 YR)_TAOE_CSI

0903_A_PROPULSION SHAFTING INSPECTION AND REMOVAL (5 YR)(SCSI)_TAOE_CSI

0904_A_ZINC RENEWAL (5YR)_TAOE_CSI REV 1

0905_A_SPEED LOG MAINTENANCE (5YR) (SCSI)_TAOE_CSI

0906_A_ULTRA SONIC TESTING_REV-ARCTICROH22

0907_A_REPLACE RUDDER BEARINGS_ARCTICROH22_REV 1

0908_A_BILGE KEEL EXAMINATION_REV-ARCTICROH22

0909_A_RUDDERS AND STERN FRAME EXAMINATION_REV-ARCTICROH22

0953_A_ANCHORS, CHAINS AND LOCKERS (5YR)_TAOE_CCSI

0955_A_STERN TUBE SEAL ASSEMBLY (5YR)(SCSI)_TAOE_CCSI

0956_A_OVERHAULING SEA VALVES (5YR)_TAOE_CCSI

0957_A_PROPELLER CLEAN AND POLISH_ON DOCK (2.5YR)_TAOE_CCSI

0959_A_UNDERWATER HULL CLEANING AND PAINTING-NWB(10YR)_TAOE_CCSI_REV 1

0961_FREEBOARD PRESERVATION (5 YR)_TAOE_CCSI

0962_A_CATHODIC PROTECTION (5YR)_TAOE_CCSI_REV 1

0963_A_SEA CHEST AND MARINE GROWTH PROTECTION (5YR)_TAOE_CCSI

0966_A_SHAFT ALIGNMENT AND BEARING REACTION CHECKS_TAOE_CSI

0967_A_SHAFT ALIGNMENT AND BEARING REACTION CHECKS 3 AND 4_TAOE_CSI

0968_A_SHAFT ALIGNMENT AND BEARING REACTION CHECKS (POST SEA TRIAL)_TAOE_CCSI

1000 SERIES

1001_A_INSPECT AND TEST UNREP HP AIR RELIEF VALVES_REV_ARCTIC ROH22

1002_A_SADDLE WINCH AND SADDLE WINCH FOUNDATION REFURBISHMENT -ARCTIC ROH 22

1003_A_GYPSY WINCH FOUNDATION AND WINCH REFURBISHMENT-ARCTIC ROH 22

1004_A_WINCH AND SLIDING BLOCK ELECTRIC BRAKE REPLACEMENT AND WEIGHT TEST-ARCTIC ROH 22

1005_A_SLIDING BLOCK CHAIN REPLACEMENT AND TRANSFER HEAD REFURBISHMENT-ARCTIC ROH 22

1006_A_HEAVY SLIDING BLOCK CHAIN REPLACEMENT AND TRANSFER HEAD REFURBISHMENT-ARCTIC ROH 22

B Items

0025_B_Physical Security at Private Contractor's Facility 24Oct17

0030_B_CONTINUATION OF SERVICES, REV FEB 14 ARCTIC 1

0951_B_DRYDOCKING AND UNDOCKING VESSEL_TAOE_CCSI

0965_B_STEEL RENEWAL_REV_ ARCTICROH22

0969_B_SHELL PLATE WELDING AND REPAIR_REV_ARCTICROH22

image1.png image2.jpeg

File details come from the government source that posted it. Updated .