J - 2 Category A Items ARCTIC REV 1.xlsx

XLSX spreadsheet 33 KB Posted

Attached to
USNS ARCTIC REGULAR OVERHAUL DRY DOCKING 2022 Federal contract opportunity
Solicitation number
N3220521R4207
Issued by
Department of the Navy Military Sealift Command

About this file

This document contains a contractor price breakdown template for Category A items for a regular overhaul and dry docking of the USNS Arctic scheduled for January 2022. The template includes line items for general requirements, hull structure, machinery and propulsion, electrical, communications and navigational aids, auxiliary machinery systems, outfitting and habitability, heating/ventilation/air conditioning, drydocking and undocking, and UNREP gear. It provides columns for labor hours and pricing for both prime and subcontractors. The related federal contract opportunity is a sources sought notice issued by the Department of the Navy's Military Sealift Command for the USNS Arctic's scheduled 2022 regular overhaul and dry docking in January. No other details are provided on pricing terms, response dates, or incumbent.

View the file

Other files for this federal contract opportunity

Other files attached to USNS ARCTIC REGULAR OVERHAUL DRY DOCKING 2022, newest first.
File Type Posted
Copy of J - 3 Category B Items ARCTIC REV 1.xlsx XLSX spreadsheet
AOE-8 List of Waster Sleeves.xls XLS spreadsheet
Q and A 2.docx DOCX document
S9555-AR-MMO-010_10_0.pdf PDF
USNS Arctic Master Calibration List.xlsx XLSX spreadsheet
S6161-PQ-FSE-010_3_0.pdf PDF
Machinery Control SystemSSDGLM2500 Sensors.docx DOCX document
0656_A_LIFE RAFT CERTIFICATION_REV-A-ARCTIC TAOE CCSI.docx DOCX document
0956_A_OVERHAULING SEA VALVES (5YR)_TAOE_CCSI.docx DOCX document
0955_A_STERN TUBE SEAL ASSEMBLY (5YR)(SCSI)_TAOE_CCSI.docx DOCX document
Q and A 1.docx DOCX document
0957_A_PROPELLER CLEAN AND POLISH_ON DOCK (2.5YR)_TAOE_CCSI.docx DOCX document
J - 3 Category B Items ARCTIC REV 1.xlsx XLSX spreadsheet
Arctic 2022 ROH Index REV 1.docx DOCX document
0963_A_SEA CHEST AND MARINE GROWTH PROTECTION (5YR)_TAOE_CCSI.docx DOCX document
0961_FREEBOARD PRESERVATION (5 YR)_TAOE_CCSI.docx DOCX document
WI 0405 REFERENCE TV-DTS SYSTEM PERFORMANCE SPECIFICATION TEST SHEET.docx DOCX document
0953_A_ANCHORS CHAINS AND LOCKERS 5YR_TAOE_CCSI.docx DOCX document
0966_A_SHAFT ALIGNMENT AND BEARING REACTION CHECKS_TAOE_CSI.docx DOCX document
0967_A_SHAFT ALIGNMENT AND BEARING REACTION CHECKS 3 AND 4_TAOE_CSI.docx DOCX document
0962_A_CATHODIC PROTECTION (5YR)_TAOE_CCSI_REV 1.docx DOCX document
0968_A_SHAFT ALIGNMENT AND BEARING REACTION CHECKS (POST SEA TRIAL)_TAOE_CCSI.docx DOCX document
0155_A_TANK VENT INSPECTION (5YR).docx DOCX document
0959_A_UNDERWATER HULL CLEANING AND PAINTING-NWB(10YR)_TAOE_CCSI_REV 1.docx DOCX document
J - 8 Request for Spec Clarification.doc DOC document
J - 12 Past Performance Data.doc DOC document
J - 4 GFM LIST USNS ARCTIC FY 22 ROHDD.xlsx XLSX spreadsheet
J - 13 PAST PERFORMANCE QUESTIONNAIRE.docx DOCX document
J - 2 Category A Items ARCTIC.xls XLS spreadsheet
J - 3 Category B Items ARCTIC.xls XLS spreadsheet
J - 14 Technical Data Non-Disclosure.docx DOCX document
J - 10 Interport Differential - Arctic Nov MTA 2018.docx DOCX document
J - 11 Dry Dock Evaluation Form.docx DOCX document
J - 9 Disclosure of Lobbying Activities SF-LLL.doc DOC document
J - 7 MSC Ship Repair Facility Survey.doc DOC document
N3220521R4207 ARCTIC Solicitation.docx DOCX document
SYNOPSIS N3220521R4207 USNS ARCTIC ROH 2022.docx DOCX document
SOURCES SOUGHT FOR USNS ARCTIC ROHDD 2022.docx DOCX document
Show all 38

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Cat A Items

CATEGORY “A” ITEMS
GENERAL REQUIREMENTPRIME ContractorSUB ContractorGovt Mandated Tech Rep / SubOTHER COSTSTOTAL PRICE
ITEM NO.TITLE CAT A ITEMPRIME L/HLABOR PRICEMATERIAL PRICESUB L/HLABOR PRICEMATERIAL PRICEPriceTOTAL LABOR HOURSTOTAL MATERIAL
CATEGORY "A"
000GENERAL REQUIREMENTS
001Intent, Scope, General Conditions and Definitions- 0$ - 0$0
002Technical and Manufacturer's Representative- 0$ - 0$0
003Approach, Berth, and Mooring Requirements- 0$ - 0$0
004Testing and Quality Assurance- 0$ - 0$0
005Electrical Safety Procedure Requirements- 0$ - 0$0
006Heavy Weather Plan- 0$ - 0$0
007Cold Weather Plan- 0$ - 0$0
010Furnish Office for Office Management Team- 0$ - 0$0
011Furnish General Services- 0$ - 0$0
012Telephone Services- 0$ - 0$0
013Project Planning and Production Status Monitiring Reports- 0$ - 0$0
014Preparation of Weight and Moment Report- 0$ - 0$0
015Integrated Logistics and GFM Support Requirements- 0$ - 0$0
016Fire Protection and Ship's Safety Program- 0$ - 0$0
017Handling Ships Stores- 0$ - 0$0
018Delivery and Re-Delivery of the Vessel- 0$ - 0$0
019Shipboard Access and Security- 0$ - 0$0
020Gas Free Certificates- 0$ - 0$0
021Clean and Gas Free Tanks, Voids, Cofferdams and Spaces- 0$ - 0$0
022Dock Trials and Sea Trial- 0$ - 0$0
023Hazardous Waste Disposal at a Contractor's Facility- 0$ - 0$0
024Phyiscal Security at Private Contractor's Facility- 0$ - 0$0
100HULL STRUCTURE
101Shipyard Support for ABS Special Survey- 0$ - 0$0
103ABS tank Inspection and Testing- 0$ - 0$0
104Kingpost survey and Repair- 0$ - 0$0
108MSD Tank Full Coat (CSI)- 0$ - 0$0
110Weather deck Handrail Repair (CSI)- 0$ - 0$0
111Weather Deck drain Piping repair (CSI))- 0$ - 0$0
113Steering Gear Access Alteration (TALT 6-18-347)- 0$ - 0$0
114Gas Turbine Combustion Air intake Filter Cage (TALT 6-18-388)- 0$ - 0$0
115Replace/Repair Top Side Steel- 0$ - 0$0
155Tank Vent Inspection (ABS) (CSI)- 0$ - 0$0
157Potabl;e Water Tank Preservation Spot repair (VR20-0046)- 0$ - 0$0
165Bilge Preservation (CCSI)- 0$ - 0$0
166Tank Preservation- 0$ - 0$0
200MACHINERY, PROPULSION
201Line Shaft Bearing Open and Inspect- 0$ - 0$0
203Fuel Service System Relef Valves and Hoses-Gas Turbine Module (5YR) (SCSI)- 0$ - 0$0
204Gas Turbine Module Hose Replacement (5YR) (SCSI)- 0$ - 0$0
205Gas Turbine Intake Repairs (CSI)- 0$ - 0$0
207Reversible Converter Coupling (RCC) Lube Oil System Relief Valves and Hoses (5YR) (CSI)- 0$ - 0$0
209RRG and RCC Temperature Regulating Valve Overhaul (CSI)- 0$ - 0$0
211Bleed Air Regulating Valves (5YR) (CSI)- 0$ - 0$0
300ELECTRICAL
301SSDG Controls-Hydromechanical Shutoff (HMSO) Maintenance (5YR) (SCSI) (CCSI)- 0$ - 0$0
307Test and Certify Aviation Electronics System (2.5 YR) (CSI)- 0$ - 0$0
310Stuffing Tube Replacement- 0$ - 0$0
351Switchboard Cleaning (2.5 YR) (CCSI)- 0$ - 0$0
352Load Cneter Cleaning (2.5 YR) (CCSI)- 0$ - 0$0
400COMMUNICATION AND NAVIGATIONAL AIDS
403OE-82 Antenna maintenance (2.5 YR) (CSI)- 0$ - 0$0
404UHF Transceiver Maintenance (5YR) (CSI)- 0$ - 0$0
405DTS and Distribution Groom (CSI)- 0$ - 0$0
451Annual Radar service (CCSI)- 0$ - 0$0
452Annual ECDIS Service (SCSI) (CCSI)- 0$ - 0$0
454Annual VDR Recertification (CCSI)- 0$ - 0$0
455Annual radio Communications Equipment Recertification (CCSI)- 0$ - 0$0
456Magnetic Compass Service (2YR) (CCSI)- 0$ - 0$0
457EPIRB Shore Based- 0$ - 0$0
458Antenna Maintenance (5YR) (CCSI)- 0$ - 0$0
459ECHO Sounder Service (2.5YR) (CCSI)- 0$ - 0$0
500MACHINERY, AUXILIARY SYSTEMS
505FO Purifier Hose Replacement (5YR) (CSI)- 0$ - 0$0
506LO Purifier Hose Replacement (5YR) (CSI)- 0$ - 0$0
507HPAC COMPRESSOR HOSE REPLACEMENT (5YR)_TAOE_CSI- 0$ - 0$0
508Steering Gear Hose Replacement (5YR) (CSI)- 0$ - 0$0
509Sw System Hose Replacement (5YR) (CSI)- 0$ - 0$0
513Auxiliary Boiler Inspection with Reft Survey- 0$ - 0$0
515SSDG ENGINE MAJOR OVERHAUL- 0$ - 0$0
517Fire and Smoke detection System Installation (TALT-6-18-346 & 6-18-350)- 0$ - 0$0
518Air Conditioning and Refrigeration Compressor Test and Repair- 0$ - 0$0
555Inspect, Test and Certifiy Machinery Space cranes and Hoist (5YR) (CCSI)- 0$ - 0$0
561Instrument Calibration and Repair- 0$ - 0$0
562SCBA ANNUAL INSPECTION- 0$ - 0$0
563SCBA Compressor and Filling Station Inspection and Maintenance (1YR) (CCSI)- 0$ - 0$0
565Fixed Gas Firefighting System Inspection and test (1YR) (SCSI (CCSI)- 0$ - 0$0
567Fixed Foam FireFighting System Inspection and test (1YR) (SCSI (CCSI)- 0$ - 0$0
568Cargo Hold Sprinkler System Inspection and Test (1YR) (SCSI)- 0$ - 0$0
569Fire and Smoke Detection and Alarm System (1YR) (SCSI) (CCSI)- 0$ - 0$0
570Potable Fire Extinguisher System (1YR) (CCSI)- 0$ - 0$0
571Fire and Smoke Damper Service (1YR) (SCSI) (CCSI)- 0$ - 0$0
572Deep Fat Fryer and Range Hood Fire Extinguisher System (1YR) (SCSI) (CCSI)- 0$ - 0$0
573Fire Hoses (1YR) (CCSI)- 0$ - 0$0
600OUTFIT, FURNISHINGS AND HABITABILITY
601Galley and Scullery equipment Inspection and Service- 0$ - 0$0
602Laundry Equipment Service (CSI)- 0$ - 0$0
606Certification of Spiderman Baskets (1yr) (CSI)- 0$ - 0$0
607Covert CO Galley to Executive Laundry (TALT 6-18-333)- 0$ - 0$0
653Annual Rescue Boat and Davit Inspection (ABS) (CCSI)- 0$ - 0$0
656Life Rafts and Embarkation Ladder Certification REV-A- 0$ - 0$0
657Accomadation Ladder Inspection (1YR) (CCSI)- 0$ - 0$0
661Carpet Replacement (CCSI)- 0$ - 0$0
662DEEP FAT FRYER INSPECTION (1YR)- 0$ - 0$0
800HEATING, VENTILATION, AND AIR CONDITIONING
851Annual Galley Ventilation and Gaylord Hood Cleaning (CCSI)- 0$ - 0$0
852Annual Laundry Vent Cleaning (CCSI)- 0$ - 0$0
900DRYDOCKING AND UNDOCKING
901Dry Docking and Undocking Vessel- 0$ - 0$0
902Sea suction and Discharge Waster Piping (2.5 YR) (CSI)- 0$ - 0$0
903Propulsion Shafting Inspection and Removal (5 YR) (CSI)- 0$ - 0$0
904Zinc Renewal (5 YR) (CSI)- 0$ - 0$0
905Speed Log Maintenance (5 YR) (CSI)- 0$ - 0$0
906Intrasonic Tsting- 0$ - 0$0
907Replace Port and Starboard Rudder Stock Bearings- 0$ - 0$0
908Bilge Keel Examination- 0$ - 0$0
909Rudder and Stern Frame Examination- 0$ - 0$0
953Anchors, Chains and Lockers (5 YR) (CCSI)- 0$ - 0$0
955Stern Tube Seal Assembly (5 Yr) (SCSI) (CCSI)- 0$ - 0$0
956Overhauling Sea Valves (5 YR) (CCSI)- 0$ - 0$0
957Propeller Clean and Polish - On Dock (2.5 YR) (CCSI)- 0$ - 0$0
959Underwater Hull Cleaning and Painting - Near White Blast (10YR) (CCSI)- 0$ - 0$0
961Freeboar Preservation (5YR) (CCSI)- 0$ - 0$0
962Cathodic Protection (5 YR) (CCSI)- 0$ - 0$0
963Sea Chest and Marine Growth Protection (2.5 YR) ( CCSI)- 0$ - 0$0
966Shaft Alignment and Bearing Reaction Checks (Set 1 and 2) (CCSI)- 0$ - 0$0
967Shaft Alignment and Bearing Reaction (Sets 3 and 4) (5 YR) (CCSI)- 0$ - 0$0
968Shaft Alignment and Bearing Reaction (Post Sea Trail) ( CCSI)- 0$ - 0$0
1000UNREP GEAR
1001Inspect and Test UNREP Relief Valves- 0$ - 0$0
1002Saddle Winch and Winch Foundation Refurbishment- 0$ - 0$0
1003Gypsy winch and Winch foundation Refurbishment- 0$ - 0$0
1004Station Six Winch and Sliding Block Electric Brake Replacement and Weight Test- 0$ - 0$0
1005Sliding Block Chain Replacement and Transfer Head Refurbishment (Standard UNREP Station)- 0$ - 0$0
1006Heavy Sliding Block Chain Replacement and Transfer Head Refurbishment- 0$ - 0$0
USNS ARCTIC (T-AOE 8)CONTRACTOR PRICE BREAKDOWN
&"Arial,Bold"CATEGORY "A" ITEMSN32205-19-R-6012

ATTACHMENT J-2

File details come from the government source that posted it. Updated .