J - 2 Category A Items ARCTIC.xls
XLS spreadsheet 69 KB Posted
- Attached to
- USNS ARCTIC REGULAR OVERHAUL DRY DOCKING 2022 Federal contract opportunity
- Solicitation number
- N3220521R4207
About this file
This document contains a contractor price breakdown template for Category A items required for the regular overhaul and dry docking of the USNS ARCTIC scheduled for January 2022.
The template lists over 100 line items across various ship systems and components requiring maintenance, repair, inspection, testing or replacement. Examples include hull structure repairs and coating, machinery such as gas turbine and propulsion systems, electrical systems, communications and navigation aids, auxiliary machinery, firefighting systems, outfitting and habitability spaces. The template requires contractors to provide pricing details for labor hours and materials for prime, subcontractor and government-mandated technical representatives.
The related federal contract opportunity is a sources sought notice for the scheduled USNS ARCTIC regular overhaul and dry docking in January 2022 to be conducted by the Department of the Navy Military Sealift Command. Contractors are advised to review the Category A price template to understand the full scope of work required.
View the file
Other files for this federal contract opportunity
Show all 38
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Cat A Items
| CATEGORY “A” ITEMS | ||||||||||||
| GENERAL REQUIREMENT | PRIME Contractor | SUB Contractor | Govt Mandated Tech Rep / Sub | OTHER COSTS | TOTAL PRICE | |||||||
| ITEM NO. | TITLE CAT A ITEM | PRIME L/H | LABOR PRICE | MATERIAL PRICE | SUB L/H | LABOR PRICE | MATERIAL PRICE | Price | TOTAL LABOR HOURS | TOTAL MATERIAL | ||
| CATEGORY "A" | ||||||||||||
| 000 | GENERAL REQUIREMENTS | |||||||||||
| 001 | Intent, Scope, General Conditions and Definitions | - 0 | $ - 0 | $0 | ||||||||
| 002 | Technical and Manufacturer's Representative | - 0 | $ - 0 | $0 | ||||||||
| 003 | Approach, Berth, and Mooring Requirements | - 0 | $ - 0 | $0 | ||||||||
| 004 | Testing and Quality Assurance | - 0 | $ - 0 | $0 | ||||||||
| 005 | Electrical Safety Procedure Requirements | - 0 | $ - 0 | $0 | ||||||||
| 006 | Heavy Weather Plan | - 0 | $ - 0 | $0 | ||||||||
| 007 | Cold Weather Plan | - 0 | $ - 0 | $0 | ||||||||
| 010 | Furnish Office for Office Management Team | - 0 | $ - 0 | $0 | ||||||||
| 011 | Furnish General Services | - 0 | $ - 0 | $0 | ||||||||
| 012 | Telephone Services | - 0 | $ - 0 | $0 | ||||||||
| 013 | Project Planning and Production Status Monitiring Reports | - 0 | $ - 0 | $0 | ||||||||
| 014 | Preparation of Weight and Moment Report | - 0 | $ - 0 | $0 | ||||||||
| 015 | Integrated Logistics and GFM Support Requirements | - 0 | $ - 0 | $0 | ||||||||
| 016 | Fire Protection and Ship's Safety Program | - 0 | $ - 0 | $0 | ||||||||
| 017 | Handling Ships Stores | - 0 | $ - 0 | $0 | ||||||||
| 018 | Delivery and Re-Delivery of the Vessel | - 0 | $ - 0 | $0 | ||||||||
| 019 | Shipboard Access and Security | - 0 | $ - 0 | $0 | ||||||||
| 020 | Gas Free Certificates | - 0 | $ - 0 | $0 | ||||||||
| 021 | Clean and Gas Free Tanks, Voids, Cofferdams and Spaces | - 0 | $ - 0 | $0 | ||||||||
| 022 | Dock Trials and Sea Trial | - 0 | $ - 0 | $0 | ||||||||
| 023 | Hazardous Waste Disposal at a Contractor's Facility | - 0 | $ - 0 | $0 | ||||||||
| 024 | Phyiscal Security at Private Contractor's Facility | - 0 | $ - 0 | $0 | ||||||||
| 090 | Daily COVID-19 Prevention and Control Services | - 0 | $ - 0 | $0 | ||||||||
| 100 | HULL STRUCTURE | |||||||||||
| 101 | Shipyard Support for ABS Special Survey | - 0 | $ - 0 | $0 | ||||||||
| 103 | ABS tank Inspection and Testing | - 0 | $ - 0 | $0 | ||||||||
| 104 | Kingpost survey and Repair | - 0 | $ - 0 | $0 | ||||||||
| 108 | MSD Tank Full Coat (CSI) | - 0 | $ - 0 | $0 | ||||||||
| 110 | Weather deck Handrail Repair (CSI) | - 0 | $ - 0 | $0 | ||||||||
| 111 | Weather Deck drain Piping repair (CSI)) | - 0 | $ - 0 | $0 | ||||||||
| 113 | Steering Gear Access Alteration (TALT 6-18-347) | - 0 | $ - 0 | $0 | ||||||||
| 114 | Gas Turbine Combustion Air intake Filter Cage (TALT 6-18-388) | - 0 | $ - 0 | $0 | ||||||||
| 115 | Replace/Repair Top Side Steel | - 0 | $ - 0 | $0 | ||||||||
| 155 | Tank Vent Inspection (ABS) (CSI) | - 0 | $ - 0 | $0 | ||||||||
| 157 | Potabl;e Water Tank Preservation Spot repair (VR20-0046) | - 0 | $ - 0 | $0 | ||||||||
| 165 | Bilge Preservation (CCSI) | - 0 | $ - 0 | $0 | ||||||||
| 166 | Tank Preservation | - 0 | $ - 0 | $0 | ||||||||
| 200 | MACHINERY, PROPULSION | |||||||||||
| 201 | Line Shaft Bearing Open and Inspect | - 0 | $ - 0 | $0 | ||||||||
| 203 | Fuel Service System Relef Valves and Hoses-Gas Turbine Module (5YR) (SCSI) | - 0 | $ - 0 | $0 | ||||||||
| 204 | Gas Turbine Module Hose Replacement (5YR) (SCSI) | - 0 | $ - 0 | $0 | ||||||||
| 205 | Gas Turbine Intake Repairs (CSI) | - 0 | $ - 0 | $0 | ||||||||
| 207 | Reversible Converter Coupling (RCC) Lube Oil System Relief Valves and Hoses (5YR) (CSI) | - 0 | $ - 0 | $0 | ||||||||
| 209 | RRG and RCC Temperature Regulating Valve Overhaul (CSI) | - 0 | $ - 0 | $0 | ||||||||
| 211 | Bleed Air Regulating Valves (5YR) (CSI) | - 0 | $ - 0 | $0 | ||||||||
| 300 | ELECTRICAL | |||||||||||
| 301 | SSDG Controls-Hydromechanical Shutoff (HMSO) Maintenance (5YR) (SCSI) (CCSI) | - 0 | $ - 0 | $0 | ||||||||
| 307 | Test and Certify Aviation Electronics System (2.5 YR) (CSI) | - 0 | $ - 0 | $0 | ||||||||
| 310 | Stuffing Tube Replacement | - 0 | $ - 0 | $0 | ||||||||
| 351 | Switchboard Cleaning (2.5 YR) (CCSI) | - 0 | $ - 0 | $0 | ||||||||
| 352 | Load Cneter Cleaning (2.5 YR) (CCSI) | - 0 | $ - 0 | $0 | ||||||||
| 400 | COMMUNICATION AND NAVIGATIONAL AIDS | |||||||||||
| 403 | OE-82 Antenna maintenance (2.5 YR) (CSI) | - 0 | $ - 0 | $0 | ||||||||
| 404 | UHF Transceiver Maintenance (5YR) (CSI) | - 0 | $ - 0 | $0 | ||||||||
| 405 | DTS and Distribution Groom (CSI) | - 0 | $ - 0 | $0 | ||||||||
| 451 | Annual Radar service (CCSI) | - 0 | $ - 0 | $0 | ||||||||
| 452 | Annual ECDIS Service (SCSI) (CCSI) | - 0 | $ - 0 | $0 | ||||||||
| 454 | Annual VDR Recertification (CCSI) | - 0 | $ - 0 | $0 | ||||||||
| 455 | Annual radio Communications Equipment Recertification (CCSI) | - 0 | $ - 0 | $0 | ||||||||
| 456 | Magnetic Compass Service (2YR) (CCSI) | - 0 | $ - 0 | $0 | ||||||||
| 457 | EPIRB Shore Based | - 0 | $ - 0 | $0 | ||||||||
| 458 | Antenna Maintenance (5YR) (CCSI) | - 0 | $ - 0 | $0 | ||||||||
| 459 | ECHO Sounder Service (2.5YR) (CCSI) | - 0 | $ - 0 | $0 | ||||||||
| 500 | MACHINERY, AUXILIARY SYSTEMS | |||||||||||
| 505 | FO Purifier Hose Replacement (5YR) (CSI) | - 0 | $ - 0 | $0 | ||||||||
| 506 | LO Purifier Hose Replacement (5YR) (CSI) | - 0 | $ - 0 | $0 | ||||||||
| 508 | Steering Gear Hose Replacement (5YR) (CSI) | - 0 | $ - 0 | $0 | ||||||||
| 509 | Sw System Hose Replacement (5YR) (CSI) | - 0 | $ - 0 | $0 | ||||||||
| 513 | Auxiliary Boiler Inspection with Reft Survey | - 0 | $ - 0 | $0 | ||||||||
| 517 | Fire and Smoke detection System Installation (TALT-6-18-346 & 6-18-350) | - 0 | $ - 0 | $0 | ||||||||
| 518 | Air Conditioning and Refrigeration Compressor Test and Repair | - 0 | $ - 0 | $0 | ||||||||
| 555 | Inspect, Test and Certifiy Machinery Space cranes and Hoist (5YR) (CCSI) | - 0 | $ - 0 | $0 | ||||||||
| 561 | Instrument Calibration and Repair | - 0 | $ - 0 | $0 | ||||||||
| 563 | SCBA Compressor and Filling Station Inspection and Maintenance (1YR) (CCSI) | - 0 | $ - 0 | $0 | ||||||||
| 565 | Fixed Gas Firefighting System Inspection and test (1YR) (SCSI (CCSI) | - 0 | $ - 0 | $0 | ||||||||
| 567 | Fixed Foam FireFighting System Inspection and test (1YR) (SCSI (CCSI) | - 0 | $ - 0 | $0 | ||||||||
| 568 | Cargo Hold Sprinkler System Inspection and Test (1YR) (SCSI) | - 0 | $ - 0 | $0 | ||||||||
| 569 | Fire and Smoke Detection and Alarm System (1YR) (SCSI) (CCSI) | - 0 | $ - 0 | $0 | ||||||||
| 570 | Potable Fire Extinguisher System (1YR) (CCSI) | - 0 | $ - 0 | $0 | ||||||||
| 571 | Fire and Smoke Damper Service (1YR) (SCSI) (CCSI) | - 0 | $ - 0 | $0 | ||||||||
| 572 | Deep Fat Fryer and Range Hood Fire Extinguisher System (1YR) (SCSI) (CCSI) | - 0 | $ - 0 | $0 | ||||||||
| 573 | Fire Hoses (1YR) (CCSI) | - 0 | $ - 0 | $0 | ||||||||
| 600 | OUTFIT, FURNISHINGS AND HABITABILITY | |||||||||||
| 601 | Galley and Scullery equipment Inspection and Service | - 0 | $ - 0 | $0 | ||||||||
| 602 | Laundry Equipment Service (CSI) | - 0 | $ - 0 | $0 | ||||||||
| 603 | Deck Covering Installation and Repair | - 0 | $ - 0 | $0 | ||||||||
| 606 | Certification of Spiderman Baskets (1yr) (CSI) | - 0 | $ - 0 | $0 | ||||||||
| 607 | Covert CO Galley to Executive Laundry (TALT 6-18-333) | - 0 | $ - 0 | $0 | ||||||||
| 653 | Annual Rescue Boat and Davit Inspection (ABS) (CCSI) | - 0 | $ - 0 | $0 | ||||||||
| 656 | Life Rafts and Embarkation Ladder Certification REV-A | - 0 | $ - 0 | $0 | ||||||||
| 657 | Accomadation Ladder Inspection (1YR) (CCSI) | - 0 | $ - 0 | $0 | ||||||||
| 661 | Carpet Replacement (CCSI) | - 0 | $ - 0 | $0 | ||||||||
| 800 | HEATING, VENTILATION, AND AIR CONDITIONING | |||||||||||
| 851 | Annual Galley Ventilation and Gaylord Hood Cleaning (CCSI) | - 0 | $ - 0 | $0 | ||||||||
| 852 | Annual Laundry Vent Cleaning (CCSI) | - 0 | $ - 0 | $0 | ||||||||
| 900 | DRYDOCKING AND UNDOCKING | |||||||||||
| 901 | Dry Docking and Undocking Vessel | - 0 | $ - 0 | $0 | ||||||||
| 902 | Sea suction and Discharge Waster Piping (2.5 YR) (CSI) | - 0 | $ - 0 | $0 | ||||||||
| 903 | Propulsion Shafting Inspection and Removal (5 YR) (CSI) | - 0 | $ - 0 | $0 | ||||||||
| 904 | Zinc Renewal (5 YR) (CSI) | - 0 | $ - 0 | $0 | ||||||||
| 905 | Speed Log Maintenance (5 YR) (CSI) | - 0 | $ - 0 | $0 | ||||||||
| 906 | Intrasonic Tsting | - 0 | $ - 0 | $0 | ||||||||
| 907 | Replace Port and Starboard Rudder Stock Bearings | - 0 | $ - 0 | $0 | ||||||||
| 908 | Bilge Keel Examination | - 0 | $ - 0 | $0 | ||||||||
| 909 | Rudder and Stern Frame Examination | - 0 | $ - 0 | $0 | ||||||||
| 953 | Anchors, Chains and Lockers (5 YR) (CCSI) | - 0 | $ - 0 | $0 | ||||||||
| 955 | Stern Tube Seal Assembly (5 Yr) (SCSI) (CCSI) | - 0 | $ - 0 | $0 | ||||||||
| 956 | Overhauling Sea Valves (5 YR) (CCSI) | - 0 | $ - 0 | $0 | ||||||||
| 957 | Propeller Clean and Polish - On Dock (2.5 YR) (CCSI) | - 0 | $ - 0 | $0 | ||||||||
| 959 | Underwater Hull Cleaning and Painting - Near White Blast (10YR) (CCSI) | - 0 | $ - 0 | $0 | ||||||||
| 961 | Freeboar Preservation (5YR) (CCSI) | - 0 | $ - 0 | $0 | ||||||||
| 962 | Cathodic Protection (5 YR) (CCSI) | - 0 | $ - 0 | $0 | ||||||||
| 963 | Sea Chest and Marine Growth Protection (2.5 YR) ( CCSI) | - 0 | $ - 0 | $0 | ||||||||
| 966 | Shaft Alignment and Bearing Reaction Checks (Set 1 and 2) (CCSI) | - 0 | $ - 0 | $0 | ||||||||
| 967 | Shaft Alignment and Bearing Reaction (Sets 3 and 4) (5 YR) (CCSI) | - 0 | $ - 0 | $0 | ||||||||
| 968 | Shaft Alignment and Bearing Reaction (Post Sea Trail) ( CCSI) | - 0 | $ - 0 | $0 | ||||||||
| 1000 | UNREP GEAR | |||||||||||
| 1001 | Inspect and Test UNREP Relief Valves | - 0 | $ - 0 | $0 | ||||||||
| 1002 | Saddle Winch and Winch Foundation Refurbishment | - 0 | $ - 0 | $0 | ||||||||
| 1003 | Gypsy winch and Winch foundation Refurbishment | - 0 | $ - 0 | $0 | ||||||||
| 1004 | Station Six Winch and Sliding Block Electric Brake Replacement and Weight Test | - 0 | $ - 0 | $0 | ||||||||
| 1005 | Sliding Block Chain Replacement and Transfer Head Refurbishment (Standard UNREP Station) | - 0 | $ - 0 | $0 | ||||||||
| 1006 | Heavy Sliding Block Chain Replacement and Transfer Head Refurbishment | - 0 | $ - 0 | $0 |
&LUSNS ARCTIC (T-AOE 8)&CCONTRACTOR PRICE BREAKDOWN
&"Arial,Bold"CATEGORY "A" ITEMS&RN32205-19-R-6012
&CATTACHMENT J-2
File details come from the government source that posted it. Updated .