0656_A_LIFE RAFT CERTIFICATION_REV-A-ARCTIC TAOE CCSI.docx
DOCX document 30 KB Posted
- Attached to
- USNS ARCTIC REGULAR OVERHAUL DRY DOCKING 2022 Federal contract opportunity
- Solicitation number
- N3220521R4207
About this file
This document outlines the requirements for annual certification of life rafts and embarkation ladders aboard the vessel USNS ARCTIC. The contractor will be required to remove 20 life rafts and 6 embarkation ladders from their storage locations, transport them to a SOLAS/USCG approved repair facility, and inspect the hydrostatic releases. Any releases expiring within one year must be replaced. The contractor will also inspect the floor seams and perform NAP testing on 14 of the 20 rafts exceeding 10 years of age. Upon completion of repairs, the contractor will reinstall the equipment, provide certification documents to the vessel master and Military Sealift Command, and properly mark all life rafts and releases.
View the file
Other files for this federal contract opportunity
Show all 38
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1.0 ABSTRACT:
1.1 This item describes the requirement to perform annual certification of the vessel’s life rafts and embarkation ladders.
2.0 REFERENCES:
2.1 NAVSEA Tech Manual S9086-TX-STM-010010 / CH-583V1R5; Section 12 – Liferafts and Abandon Ship Boat.
2.2 MSFSC Standard Work Item No. 002, “Inspection and Repair of Inflatable Liferafts”.
3.0 ITEM LOCATION/DESCRIPTION:
3.1 Location/Quantity
3.1.1 PORT/STBD forward (02 deck house area) and PORT/STBD aft boat deck area (02 level).
Each rack has 5 rafts, for a total of 20 rafts.
3.1.2 Disembarkation Ladder; One (1) each installed at each life-raft location above.
3.2 Description/Manufacturer Data:
3.2.1 Life-raft Manufacturer:
Elliott Man Mk IV TO, SOLAS A Packed/USCG approved; 25 man inflatable raft in fiberglass casing shell; outfitted with Hydrostatic Release and Lanyard.
3.2.2 Disembarkation Ladders: SOLAS/USCG approved; 75 foot long. Six (6) Total.
4.0 GOVERNMENT FURNISHED EQUIPMENT/MATERIAL/SERVICES: None
5.0 NOTES:
5.1 The contractor and all subcontractors regardless of tier shall consult the General Technical Requirements (GTR) to determine applicability to this work item. In performance of this work item, the contractor and all subcontractors regardless of tier must comply with the requirements of all applicable GTR’s.
5.2 The contractor and all subcontractors regardless of tier are advised to review all other work items under this contract, to determine their effect on the work required under this work item. Many of the definitions relating to performance of this work item are found in Work Item 001.
5.3 Items will be considered out of date if they do not have at least six (6) months of remaining shelf life at the time of inspection.
6.0 QUALITY ASSURANCE REQUIREMENTS: None additional
7.0 STATEMENT OF WORK REQUIRED:
7.1 Provide all labor, materials, equipment, rigging, staging, crane service, transportation, and shop facilities to accomplish the requirements of this work item.
7.2 Remove the inflatable life rafts from their respective stowages identified in paragraph 3, including any hydrostatic release devices and convey to SOLAS/U.S.C.G. approved repair facility.
7.3 Inspect Hydrostatic releases for expiration date. If release will expire within one year of the date inspected, submit a condition report recommending replacing hydrostatic release.
7.3.1 If a hydrostatic release is replaced, the contractor shall provide a certificate with all new releases.
7.3.2 Contractor shall notify the local USCG inspector and/or local ABS Surveyor to inspect life-rafts repairs, and witness life-raft testing requirements.
7.3.3 Contractor shall submit a condition report providing an inventory of dated items in each raft that require renewal, within 5 days of receiving rafts.
7.3.4 Replaced Items shall be offered to the MSCREP prior to disposal via condition report that includes exact list of all items that require replacement. MSC shall respond to condition report if any items are to be returned.
7.3.5 For bidding purposes 14 of 20 life rafts are beyond 10 years from date of manufacture.
7.3.5.1 14 of 20 life rafts will require NAP testing.
7.3.5.2 14 of 20 life rafts will require floor seam inspections.
7.4 Temporarily remove the disembarkation ladders and inspect in accordance with current USCG and SOLAS-ABS rules and regulations.
7.5 Upon completion of all shop work, reinstall each life-raft in their original location, stow, rig and secure life-rafts as per original arrangements. Replace connecting and mounting hardware and fasteners.
7.6 Install name plates, notices, markings and test label plates for all new, modified and repaired equipment per USCG and ABS Regulations.
7.7 Submit “as-released” condition report listing repairs and/or equipage replacements accomplished to each life-raft. Submit “as released” condition report along with the certificate requirements specified in reference 2.1.2. Originals for ship force file, and copy of originals to MSCREP.
7.8 Submit “as-released” condition report and certificates for all disembarkation ladders.
7.9 Preparation of Drawings:
7.9.1 Provide copies of certificates of inspection with original to Ships Master and Electronic copies to MSCREP.
7.10 Manufacturer’s Representative:
7.10.1 Contractor shall employ the services of a USCG approved facility to accomplish life-raft repairs and certifications.
7.11 Marking:
7.11.1 Label the life rafts containers and release devices showing date of test, contractor's name, location and the USCG inspector’s initials.
USNS ARCTIC
T-AOE 8
| OUTFIT, FURNISHING & HABITABILITY | N3220521R4207 | |
| 28 SEPTEMBER 2016 | ||
| ITEM NO. 656 | CATEGORY “A” | N756/CSI/MZ |
LIFE RAFTS AND EMBARKATION LADDER CERTIFICATION REV-A
656-4
8.0 GENERAL REQUIREMENTS: None additional.