This document outlines the scope of work for item number 953 under solicitation N3220521R4207 for the regular overhaul and dry docking of the USNS Arctic in January 2022. The scope includes inspecting, painting, and testing the vessel's anchoring system, which comprises the anchors, chains, chain lockers, hawse pipes, and related equipment. Surface preparation and coatings are specified for the anchors and chains, with the anchors to receive a topcoat of haze gray or black paint depending on the vessel's freeboard color and the chains to be marked with various colors to identify each shot. The government will provide specified coating materials for the project. The contractor must inspect and report on any deficiencies found, provide gauging and paint application reports, and assist with operational testing of the anchoring system upon completion of the work.

View the file

Other files

File Type Posted
Q and A 2.docx DOCX document
S6161-PQ-FSE-010_3_0.pdf PDF
USNS Arctic Master Calibration List.xlsx XLSX spreadsheet
Copy of J - 3 Category B Items ARCTIC REV 1.xlsx XLSX spreadsheet
Machinery Control SystemSSDGLM2500 Sensors.docx DOCX document
S9555-AR-MMO-010_10_0.pdf PDF
AOE-8 List of Waster Sleeves.xls XLS spreadsheet
0961_FREEBOARD PRESERVATION (5 YR)_TAOE_CCSI.docx DOCX document
J - 2 Category A Items ARCTIC REV 1.xlsx XLSX spreadsheet
0959_A_UNDERWATER HULL CLEANING AND PAINTING-NWB(10YR)_TAOE_CCSI_REV 1.docx DOCX document
0967_A_SHAFT ALIGNMENT AND BEARING REACTION CHECKS 3 AND 4_TAOE_CSI.docx DOCX document
WI 0405 REFERENCE TV-DTS SYSTEM PERFORMANCE SPECIFICATION TEST SHEET.docx DOCX document
0956_A_OVERHAULING SEA VALVES (5YR)_TAOE_CCSI.docx DOCX document
0966_A_SHAFT ALIGNMENT AND BEARING REACTION CHECKS_TAOE_CSI.docx DOCX document
0968_A_SHAFT ALIGNMENT AND BEARING REACTION CHECKS (POST SEA TRIAL)_TAOE_CCSI.docx DOCX document
0962_A_CATHODIC PROTECTION (5YR)_TAOE_CCSI_REV 1.docx DOCX document
0656_A_LIFE RAFT CERTIFICATION_REV-A-ARCTIC TAOE CCSI.docx DOCX document
0955_A_STERN TUBE SEAL ASSEMBLY (5YR)(SCSI)_TAOE_CCSI.docx DOCX document
0155_A_TANK VENT INSPECTION (5YR).docx DOCX document
0957_A_PROPELLER CLEAN AND POLISH_ON DOCK (2.5YR)_TAOE_CCSI.docx DOCX document
0963_A_SEA CHEST AND MARINE GROWTH PROTECTION (5YR)_TAOE_CCSI.docx DOCX document
Q and A 1.docx DOCX document
J - 3 Category B Items ARCTIC REV 1.xlsx XLSX spreadsheet
Arctic 2022 ROH Index REV 1.docx DOCX document
J - 12 Past Performance Data.doc DOC document
J - 10 Interport Differential - Arctic Nov MTA 2018.docx DOCX document
J - 8 Request for Spec Clarification.doc DOC document
J - 14 Technical Data Non-Disclosure.docx DOCX document
J - 11 Dry Dock Evaluation Form.docx DOCX document
J - 7 MSC Ship Repair Facility Survey.doc DOC document
J - 9 Disclosure of Lobbying Activities SF-LLL.doc DOC document
J - 4 GFM LIST USNS ARCTIC FY 22 ROHDD.xlsx XLSX spreadsheet
J - 13 PAST PERFORMANCE QUESTIONNAIRE.docx DOCX document
J - 3 Category B Items ARCTIC.xls XLS spreadsheet
J - 2 Category A Items ARCTIC.xls XLS spreadsheet
N3220521R4207 ARCTIC Solicitation.docx DOCX document
SYNOPSIS N3220521R4207 USNS ARCTIC ROH 2022.docx DOCX document
SOURCES SOUGHT FOR USNS ARCTIC ROHDD 2022.docx DOCX document
Show all 38

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

USNS ARCTIC

(T-AOE 8)

DRYDOCKING AND UNDOCKINGN32205-21-R-4207
4 May 2021
ITEM NO. 953Category "A"MSC/N756/CCSI

ANCHORS, CHAINS AND LOCKERS (5 YR)

ABSTRACT

The purpose of this item is to examine, paint and test the anchoring system to include chains, chain lockers, hawse pipes, and other related gear during the Special Survey.

REFERENCES

1.1 NAVSEA Drawing No. 581-6360992, Anchor Handling Arrangement NAVSEA Drawing No. 098-6360991, Anchor Handling Model Surface Preparation Standard, SSPC-SP-6/NACE No. 3, Commercial Blast Cleaning (Available Commercially) PPG PMC-MSC Paint Handbook PPG Product Data Sheets, Amercoat 240 and Amershield

ITEM LOCATION/DESCRIPTION

Location Locations

a. Forecastle Windlass Machinery Room (1-35-0-Q)

b. Chain Locker (5-35-0-Q) Item Description/Manufacturer’s Data

Anchor Windlass Mfg.
Appleton Marine
Anchor Windlass Model
AMD-689
# of Anchors
Two (2) each
Anchor weight
30,000 lbs
# of Links per Shot
77 Links
# of Shots per Anchor
Eleven (11) Port

Thirteen (13) Stbd

Anchor Equipment Two (2) 30,000 pound, fluked, stockless type anchors Three Hundred and Sixty (360) Fathoms of 3.5 inch chain (195 Fathoms Stbd anchor/165 Fathoms Port anchor) Two (2) Chain stoppers with 3-1/2 inch Pelican Hooks, One (1) per chain

c. One (1) chain locker each with approximately 9,200 square feet of surface area Towing Gear Equipment

d. Three (3) Chain Stoppers with Pelican Hooks (Same size as the anchor chain stoppers)

e. Three (3) Towing Pelican Hook Assembly, including Long Link

GOVERNMENT FURNISHED EQUIPMENT/MATERIAL/SERVICE

Government Furnished Equipment (GFE): None Government Furnished Material (GFM)

Product
Type/Notes
Color
Qty
Amercoat 240
Epoxy (1st primer coat)
Red Oxide
xx gal
Amercoat 240
Epoxy (2nd primer coat)
Black
xx gal
Amershield
Anchor topcoat (Polyurethane)
Haze Gray or Black
xx gal
Amershield
Chain Stopper topcoat
Black
10 gal
Amercoat 5450
Detachable Link markings
Red
xx gal
Amercoat 5450
Links and Detachable Link markings
White
xx gal
Amercoat 5450
Detachable Link markings
Blue
xx gal
Amercoat 65
Solvent
N/A
xx gal
Amercoat 15
Solvent
N/A
xx gal

Government Furnished Services

1.1.2 The Government will provide the services of a OMT Paint Representative. The OMT Paint Representative will report to the OMT REP on a daily basis during the performance of this item. Cost of the OMT Paint Representative will be borne by the Government and is not to be included in this item.

2.0 NOTES

2.1 The contractor and all subcontractors, regardless of tier must consult the General Technical Requirements (GTR) to determine applicability to this work item. In performance of this work item, the contractor and all subcontractors regardless of tier must comply with the requirements of all applicable GTR’s including but not limited to GTR’s 1 through 7, 22, 23, 24, 28, and 29.

2.2 The contractor and all subcontractors, regardless of tier are advised to review other work items under this contract, including but not limited to Work items 020, 021, 023, 901 and XXX to determine their effect on the work required under this work item. Many of the definitions relating to performance of this work item are found in Work Item 001.

2.3 Solvents supplied as GFM are for viscosity control only. Solvents required for equipment clean-up are the responsibility of the contractor.

3.0 QUALITY ASSURANCE REQUIREMENTS: None additional

4.0 STATEMENT OF WORK REQUIRED

4.1 Inspect, paint and test the anchoring system to include chains, chain lockers, hawse pipes, and other related gear using References 2.1 through 2.5, ABS, IMO and manufacturer’s requirements as guidance.

4.2 Coordinate with ship’s force to have associated equipment locked and/or tagged out per ship’s lock out/tag out policy. When the maintenance is complete, coordinate with ship’s force to have associated equipment unlocked and/or tagged in per ship’s lock out/tag out policy.

4.3 Temporarily remove the access covers from the chain lockers, ventilate and certify they are gas free and safe for entry. Cleaning and gas free certification requirements for the subject spaces are covered under work items 020 and 021.

4.4 Inspect the ship’s anchoring system, chains and lockers listed in section 3.0 using References 2.1 through 2.2, ABS, IMO and Manufacturer requirements as guidance.

4.4.1 Examine the bitter end connections of each chain in its chain locker and disconnect from their breakaway fittings.

4.4.2 Temporarily remove the anchors and chains from the vessel and range them by flaking them out.

4.4.3 Examine and verify the required compliment and proper condition of each chain to include an inspection of all detachable links, swivels, markings, as well as for loose studs, abnormal wear, damage, deteriorated connecting links and missing plugs.

4.4.4 Gauge the chain links. Verify their mean diameter has not lost 12% or more of its original required nominal size.

4.4.5 Examine the anchors including their crown pin, anchor shackle, shackle pin and swivels for damage, cracks, bends, wear or defect.

4.4.6 Pressure wash the chain locker interiors. In conjunction with the water washing, pump out liquids and remove all mud, dirt and debris using contractor furnished pumps and hoses, as may be necessary to clean the lockers and bilge wells.

4.4.7 With the OMT REP and ABS Surveyor in attendance, examine the chain lockers, holdfasts, chain pipes, hawse pipes, chain stoppers, and pelican hooks for signs of damage, corrosion, erosion or defect. Provide and maintain adequate lighting and ventilation in the lockers to aid in the inspections and tests.

4.4.8 Examine the anchor windlass including foundation, prime mover, shafting, wildcats, brakes and controls.

4.5 Accomplish the following surface preparation on the anchors and chains:

4.5.1 Perform a HP water wash of the anchors and chains using fresh water at 2,500 to 3,000 psi to remove slime, dirt, mud, soluble salts and other foreign matter. Particular attention is to be given to the undersides of chain links, anchors, crevices and areas of rust, rust scale, blistered, cracked, peeling or flaking coatings. Accomplish the requirements of Surface Preparation Standard SSPC-SP1, Solvent Cleaning, to remove all dirt, oil, grease, soluble salts or other organic matter. Biodegradable cleaners or other eco-friendly methods/agents are to be used to the greatest extent possible.

4.5.2 Disconnect the first shot of both the port and starboard chains from the anchor swivels and the second shot of chain. Connect the second shot of chain, port and starboard, to their respective anchors. Shift the removed first shots of chain and connect to the original bitter end of their respective chains.

4.5.3 Prior to the start of abrasive blasting the blast media is to be tested to ensure that it is not contaminated with chlorides, as determined by field or laboratory analysis using reliable, reproducible test equipment.

4.5.4 Abrasive blast the port and starboard anchors and chains using Reference 2.3 as guidance. Turn the chains and anchors as necessary to ensure that all surfaces are abrasive blasted. The blast profile achieved is to be angular in nature and within the range set by the manufacturer’s product data sheet for the coating system being applied. Profile is to be determined using a Keane-Tator (or equal) Surface Profile Comparator.

4.5.5 With the OMT REP’s approval, surfaces may be prepared using ultra high-pressure water jetting in lieu of abrasive blasting at no additional cost to the Government. If allowed, water jetting is to be performed using Surface Preparation Standard SSPC-SP WJ-1/NACE WJ-1 as guidance. All blasted areas are to be prepared to a WJ-3, NV-2 Condition. No more than a light (L) grade flash rust is to be allowed on the steel at the time of coating application. If heavier flash rust is present, the surface is to be restored to a coatable condition, at the contractor’s expense, by pressure washing at 2,500 to 3,000 psi and allowing them to dry, or by other suitable means.

4.6 Coatings application

4.6.1 Surface preparation of the anchors and chains is to be inspected and approved by the OMT REP and the Paint Manufacturer’s Representative prior to the application of any coatings. This includes not only the initial coat of paint, but all subsequent coats as well. Inspection is to include observation, measuring and recording:

a. Surface profile is to be determined using a Keane Tator Surface Comparator (or equal) examination and/or replica tape

b. Environmental conditions (surface temperature, ambient air temperature, dew point temperature and relative humidity)

c. Over coating interval (curing time) since previous application

d. Dry film thickness readings at a rate of five (5) spot readings per shot of chain and five (5) spot readings per anchor for each coat of paint

4.6.2 Ensure the following conditions are met prior to painting:

a. Surfaces are to be clean, dry and free of oil, grease or residue from abrasive blasting.

b. Surface appearance meets the definition of SSPC-SP6, Commercial Blast Cleaning.

c. Air and substrate temperatures are to be within the range published by the paint manufacturer using References 2.4 and 2.5 as guidance.

d. During application and curing, the substrate temperature is to be at least 5°F (3°C) above Dew Point.

e. The Relative Humidity is within the range set by the manufacturer but is not to exceed 85%.

4.6.3 No coating is to be applied at temperatures below 35°F without prior written approval of the OMT REP.

4.6.4 No coating is to be applied between the hours of sunset and 0800 without prior written approval of the OMT REP.

4.6.5 All coatings are to be prepared and applied using the manufacturer’s requirements outlined in the Product Data Sheets, References 2.4 and 2.5 as guidance. The Product Data Sheets for each product being applied are to be on the jobsite and have been reviewed by the personnel involved.

4.6.6 Apply the following coatings to all prepared surfaces:

Coat
Product
Color
Solvent
DFT
1st Coat
Amercoat 240
Red Oxide, Black, Dark Gray, Buff, Off-white, Pastel Green
Amercoat T-10
5-6
2nd Coat
Amercoat 240
Black
Amercoat T-10
5-6
Topcoat, Anchor1
Amershield, or

Amercoat 5450

Haze Gray, Black
Amercoat 65 or

Amercoat 15 2-3

Topcoat, Chain Stoppers, etc.1
Amershield or

Amercoat 5450

Black
Amercoat 65 or

Amercoat 15 2-3

Anchor Chain Markings
Amercoat 5450
Red, White Yellow and Blue
Amercoat 15
2-3

1 For vessels with gray freeboards the anchors are to be Haze Gray and for white or black freeboards the anchors are to be Black.

4.6.7 The anchors and chain stoppers are to be coated with one full topcoat.

4.6.8 Each shot of anchor chain is to be marked to help identify the length of chain payed out. Detachable links are to be painted in a Red, White or Blue repetitive sequence. In addition, a specific number of Links on either side of the detachable link are to be painted white in a repetitive sequence and the first stud on each side of the detachable link is to be wrapped with a specified number of turns of stainless steel wire to indicate their shot. The last shot of chain is to be painted bright Red and the next to last shot of chain is to be painted bright Yellow.

Shot
Fathoms
Feet
Chain

(color) Detachable Link (color) Adjacent Links (white) Adjacent Link (# of wire turns)

1
15
90
Black
Red
1
1
2
30
180
Black
White
2
2
3
45
270
Black
Blue
3
3
4
60
360
Black
Red
4
4
5
75
450
Black
White
5
5
6
90
540
Black
Blue
6
6
“
…
…
Black

2nd last

Yellow

Last

Red

4.6.9 Random Wet Film Thickness (WFT) readings are to be taken during the application of coatings and Dry Film Thickness (DFT) readings after curing to verify correct millages were applied. Consult the OMT Paint Rep for proper overcoat intervals.

4.6.10 Paint material is to be stored within the paint manufacturer's recommended temperature range. When paint material is being applied, ensure that the material's temperature is within the manufacturer's recommended range for application but in any case, not less than 70°F.

4.7 Upon completion of all coating and marking of the chains, reconnect the bitter ends of the chain in their respective chain lockers. Ensure that there are no twists in the chain, either between the bitter end and the wildcat or between the wildcat and the pawl. Remove all rigging gear and debris. Heave-in the anchor chains and bring the anchors home.

4.8 Clean and touch-up any coatings disturbed by this work.

4.9 With assistance of the ship’s crew, coordinate and conduct functional tests of the Anchoring system listed in section 3.0 in the presence of the OMT REP and ABS Surveyor:

a. Operationally test each chain locker pumping arrangement; prior to loading the chain.

b. Operationally test each anchor windlass, ensuring proper operation of;

i.Safety devices
ii.Brakes
iii.Clutch function
iv.Lowering and hoisting chain and anchor
v.Proper riding of the chain over the wildcat
vi.Proper transit of the chain through the hawse pipe and chain pipe, and
vii.Effecting proper stowage of the chain and anchor.

4.10 Upon completion of the survey, restore all access cover plates, grates, threaded plugs, suction strainers, and remove all blanks leaving the vessel in a ready for service condition.

4.11 Reports

4.11.1 When examination and servicing reveal any deficiency a condition report is to be submitted to the OMT REP with recommended repair and parts required. Submit one (1) electronic copy in Portable Document Format (PDF).

4.11.2 Submit one (1) electronic copy in Portable Electronic Format (PDF) of the gauging results to the OMT REP and one (1) electronic copy in Portable Document Format (PDF) to the ABS Surveyor. The report is to identify the original dimension, the as gauged dimension and % loss.

4.11.3 Prepare a Paint Report and submit one (1) electronic copy in Portable Document Format (PDF) within three (3) days of completing the coating application. The report is to include the following data:

a. The location, date and time of each coating application

b. Surface profile measurements of the metal substrate

c. Results of testing for non-visible surface contaminants (soluble salts)

d. The air and substrate temperatures, relative humidity and dewpoint temperature at the time of each coating application

e. Interval between coatings

f. Dry film thickness readings at a rate of five (5) spot readings per 1,000 sq. ft. of surface for each coat of paint

g. Paint Manufacturer, Product Identification Number, color and Batch Numbers for each coat of paint applied

4.12 Painting: None additional

4.13 Manufacturer’s Representative: None

4.14 Preparation of Drawings: None additional

8.0 GENERAL REQUIREMENTS: None additional

953-11 image1.png