DD Form 1423-1 SWI-019 Shipboard Access.pdf
PDF 269 KB Posted
- Attached to
- USNS MERCY ROH/DD Federal contract opportunity
- Solicitation number
- N3220520R6500
About this file
This document contains a Contract Data Requirements List (CDRL) and information on a related solicitation opportunity. The CDRL outlines security and access requirements for contractor personnel working aboard ships, including submitting personnel lists in advance and using time clock cards signed daily by security. It requires a security plan be submitted within ten days of award.
The solicitation is for repair and overhaul work aboard the USNS Mercy and requests the return of one signed non-disclosure agreement for work items and associated drawings. The Department of the Navy Military Sealift Command is the contracting agency. The response date is not provided. Pricing terms, set asides, or other offer details are not included in this summary-level information.
View the file
Other files for this federal contract opportunity
Show all 50
USNS MERCY ROH/DD has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page of Pages
Adobe Professional 8.0
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved
OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP TM OTHER X
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO.
A019
2. TITLE OF DATA ITEM
Shipboard Access
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE
MSC SWI-019
6. REQUIRING OFFICE
PM_CM_/N10
7. DD 250 REQ
LT
9. DIST STATEMENT
REQUIRED
See Blk 16
10. FREQUENCY
ASREQ
12. DATE OF FIRST SUBMISSION
ASREQ
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
N/A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
ASREQ
Draft
Final Reg Repro
16. REMARKS
Abstract:
7.1 Within ten (10) days of the contract award, submit, hard copy and PDF, the Security
Plan to the MSCREP for review and approval.
7.2 Shipboard Access:
No less than five (5) days before scheduled ship arrival, the Contractor shall deliver to the
MSCREP a list (Excel format) of all contractor and subcontractor (including contractor furnished Tech Reps) personnel who will be involved in the onboard performance of the contract.
Prior to the commencement of each weekend or unscheduled overtime shift, not identified in the contractor’s production plan schedule as originally submitted with the contractor’s proposal (or subsequently revised during contract performance), the contractor shall provide to the MSCREP a list (Excel) of all contractor and subcontractor (including contractor furnished Tech Reps) personnel scheduled to work each shift.
7.3 Shipboard Security:
7.3.8.6.1 Time clock cards shall be kept from 1200 of the preceding day to 1200 of the succeeding day. Each day's clock card shall be delivered to the gangway watchman at 1200 for the start of the next twenty four hour period. No extra copies shall be allowed in the possession of the watchman.
7.3.8.6.2 As verification that the ship was inspected, the clock cards shall contain entry blocks on the back for the following:
a. Ship’s name
b. Contractor’s firm
c. Contract number
d. Start and end date of the period clocked
e. Signature of the first and last shift’s security watch
7.3.8.6.3 At the end of the twenty four (24) hour period the clock card shall be signed by the head of shipyard security and the shipyard Project Manager and delivered to the MSCREP, as a contract deliverable document.
ACO 1
PPE 1
15. TOTAL 0 2 0
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
Reset
DD FORM 1423-1, FEB 2001 Page of Pages
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
A. CONTRACT LINE ITEM NO. B. EXHIBIT
C. CATEGORY:
X TDP TM OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
16. REMARKS (Continued)
DD FORM 1423-1 (BACK), FEB 2001
INSTRUCTIONS FOR COMPLETING DD FORM 1423
(See DoD 5010.12-M for detailed instructions.)
FOR GOVERNMENT PERSONNEL
Item A. Self-explanatory.
Item B. Self-explanatory.
Item C. Mark (X) appropriate category: TDP - Technical Data Package;
TM - Technical Manual; Other - other category of data, such as "Provisioning,""Configuration Management," etc.
Item D. Enter name of system/item being acquired that data will support.
Item E. Self-explanatory (to be filled in after contract award).
Item F. Self-explanatory (to be filled in after contract award).
Item G. Signature of preparer of CDRL.
Item H. Date CDRL was prepared.
Item I. Signature of CDRL approval authority.
Item J. Date CDRL was approved.
Item 1. See DoD FAR Supplement Subpart 4.71 for proper numbering.
Item 2. Enter title as it appears on data acquisition document cited in Item 4.
Item 3. Enter subtitle of data item for further definition of data item (optional entry).
Item 4. Enter Data Item Description (DID) number, military specification number, or military standard number listed in DoD 5010.12-L (AMSDL), or one-time DID number, that defines data content and format requirements.
Item 5. Enter reference to tasking in contract that generates requirement for the data item (e.g., Statement of Work paragraph number).
Item 6. Enter technical office responsible for ensuring adequacy of the data item.
Item 7. Specify requirement for inspection/acceptance of the data item by the Government.
Item 8. Specify requirement for approval of a draft before preparation of the final data item.
Item 9. For technical data, specify requirement for contractor to mark the appropriate distribution statement on the data (ref. DoDD 5230.24).
Item 10. Specify number of times data items are to be delivered.
Item 11. Specify as-of date of data item, when applicable.
Item 12. Specify when first submittal is required.
Item 13. Specify when subsequent submittals are required, when applicable.
Item 14. Enter addressees and number of draft/final copies to be delivered to each addressee. Explain reproducible copies in Item 16.
Item 15. Enter total number of draft/final copies to be delivered.
Item 16. Use for additional/clarifying information for Items 1 through 15.
Examples are: Tailoring of documents cited in Item 4; Clarification of submittal dates in Items 12 and 13; Explanation of reproducible copies in Item 14.; Desired medium for delivery of the data item.
FOR THE CONTRACTOR
Item 17. Specify appropriate price group from one of the following groups of effort in developing estimated prices for each data item listed on the DD Form 1423.
a. Group I. Definition - Data which is not otherwise essential to the contractor's performance of the primary contracted effort
(production, development, testing, and administration) but which is required by DD Form 1423.
Estimated Price - Costs to be included under Group I are those applicable to preparing and assembling the data item in conformance with Government requirements, and the administration and other expenses related to reproducing and delivering such data items to the Government.
b. Group II. Definition - Data which is essential to the performance of the primary contracted effort but the contractor is required to perform additional work to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, or quality of the data item.
Estimated Price - Costs to be included under Group II are those incurred over and above the cost of the essential data item without conforming to Government requirements, and the administrative and other expenses related to reproducing and delivering such data item to the Government.
c. Group III. Definition - Data which the contractor must develop for his internal use in performance of the primary contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, and quality of the data item.
Estimated Price - Costs to be included under Group III are the administrative and other expenses related to reproducing and delivering such data item to the Government.
d. Group IV. Definition - Data which is developed by the contractor as part of his normal operating procedures and his effort in supplying these data to the Government is minimal.
Estimated Price - Group IV items should normally be shown on the DD Form 1423 at no cost.
Item 18. For each data item, enter an amount equal to that portion of the total price which is estimated to be attributable to the production or development for the Government of that item of data.
These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any amount for rights in data. The Government's right to use the data shall be governed by the pertinent provisions of the contract.
File details come from the government source that posted it. Updated .