J-2 Category A Item Revised.xlsx
XLSX spreadsheet 79 KB Posted
- Attached to
- USNS MERCY ROH/DD Federal contract opportunity
- Solicitation number
- N3220520R6500
About this file
This document contains a Category A items list for the USNS Mercy ROH/DD solicitation N3220520R6500. The list includes over 1,000 line items for hull structures, main propulsion, electrical, communications and navigation, auxiliary machinery, habitability, sponsor equipment, HVAC, drydocking, and underway replenishment equipment required for the overhaul and drydocking of the USNS Mercy. The line items describe the products and services required, such as main steam piping repairs, generator cleaning, lifeboat replacement, OR room deck refurbishment, and V-22 flight deck modifications. The total price for all Category A items is listed as $0.00, indicating this is a price breakdown template to be filled in by contractors responding to the solicitation. The solicitation is for the Department of the Navy Military Sealift Command for the USNS Mercy ROH/DD.
View the file
Other files for this federal contract opportunity
Show all 50
USNS MERCY ROH/DD has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Cat A Items
| CATEGORY “A” ITEMS | ||||||||||||
| GENERAL REQUIREMENT | PRIME Contractor | SUB Contractor | Govt Mandated Tech Rep / Sub | OTHER COSTS | TOTAL PRICE | |||||||
| ITEM NO. | TITLE CAT A ITEM | PRIME L/H | LABOR PRICE | MATERIAL PRICE | SUB L/H | LABOR PRICE | MATERIAL PRICE | Price | TOTAL LABOR HOURS | TOTAL MATERIAL | ||
| CATEGORY "A" | ||||||||||||
| 000 | GENERAL REQUIREMENTS | |||||||||||
| 001 | SCOPE GEN REQUIREMENTS DEFINITIONS REV JUL 18 | NSP | ||||||||||
| 002 | TECHNICAL AND MANUFACTURER REPRESENTATIVES REV MAY | NSP | ||||||||||
| 003 | APPROACH BERTH AND MOORING REQUIREMENTS REV JAN 19 | NSP | ||||||||||
| 004 | TESTING AND QUALITY ASSURANCE REV 08 NOV 17 | NSP | ||||||||||
| 005 | ELECTRICAL SAFETY PROCEDURE REQUIREMENTS REV FEB 1 | NSP | ||||||||||
| 006 | HEAVY WEATHER PLAN REV FEB 14 | NSP | ||||||||||
| 007 | COLD WEATHER PLAN REV FEB 14 | NSP | ||||||||||
| 024 | PHYSICAL SECURITY AT PRIVATE CONTRACTOR'S FACILITY | NSP | ||||||||||
| 010 | FURNISH OFFICE FOR OVERHAUL MANAGEMENT TEAM OMT RE | - 0 | $ - 0 | $0 | ||||||||
| 011 | FURNISH GENERAL SERVICES T AH REV FEB 14 | - 0 | $ - 0 | $0 | ||||||||
| 012 | INFORMATION TECHNOLOGY SERVICES REV JUL 18 | - 0 | $ - 0 | $0 | ||||||||
| 013 | PROJECT PLANNING AND PRODUCTION STATUS MONITORING | - 0 | $ - 0 | $0 | ||||||||
| 014 | WEIGHT AND MOMENT REPORT | - 0 | $ - 0 | $0 | ||||||||
| 015 | INTEGRATED LOGISITIC AND GFM SUPPORT REQUIREMENTS | - 0 | $ - 0 | $0 | ||||||||
| 016 | FIRE PROTECTION AND SHIPS SAFETY PROGRAM REV 28 SE | - 0 | $ - 0 | $0 | ||||||||
| 017 | HANDLING SHIPS STORES REV FEB 14 | - 0 | $ - 0 | $0 | ||||||||
| 018 | DELIVERY AND REDELIVERY OF THE VESSEL REV MAY 16 | - 0 | $ - 0 | $0 | ||||||||
| 019 | SHIPBOARD ACCESS AND SECURITY REV AUG 15 | - 0 | $ - 0 | $0 | ||||||||
| 020 | GAS FREE CERTIFICATES REV FEB 14 | - 0 | $ - 0 | $0 | ||||||||
| 021 | CLEAN AND GAS FREE TANKS VOIDS AND COFFERDAMS AND | - 0 | $ - 0 | $0 | ||||||||
| 022 | MACHINERY SPACE TURN-OVER DOCK TRIALS AND SEA TRIA | - 0 | $ - 0 | $0 | ||||||||
| 023 | HAZARDOUS WASTE DISPOSAL AT A CONTRACTORS FACILITY | - 0 | $ - 0 | $0 | ||||||||
| 100 | HULL STRUCTURES | |||||||||||
| 101 | MISCELLANEOUS TANK VENT PIPING REPAIRS | - 0 | $ - 0 | $0 | ||||||||
| 102 | ANTI-ROLL TANK VENT REPAIRS | - 0 | $ - 0 | $0 | ||||||||
| 103 | 1F BALLAST AND ANTIROLL TANK LADDER RAIL REPAIRS | - 0 | $ - 0 | $0 | ||||||||
| 104 | 2DB TANK SAND HOLE REPAIRS | $ - 0 | $0 | |||||||||
| 105 | WATERTIGHT CLOSURE RENEWAL | - 0 | $ - 0 | $0 | ||||||||
| 106 | BOILER DECK REPAIRS | - 0 | $ - 0 | $0 | ||||||||
| 107 | WATERTIGHT DOUBLE DOOR REPLACEMENT | - 0 | $ - 0 | $0 | ||||||||
| 108 | RADIO ANNTENA CABLE PENETRATION REPAIR VR19-0162 | $ - 0 | $0 | |||||||||
| 109 | SERVICE AREA 2 STEEL REPAIRS | - 0 | $ - 0 | $0 | ||||||||
| 110 | SERVICE AREA 3 DECKING REPAIRS (VR18-0127) | - 0 | $ - 0 | $0 | ||||||||
| 111 | SERVICE AREA 5 STEEL REPAIRS REV A | - 0 | $ - 0 | $0 | ||||||||
| 112 | AFT OILY WASTE TANK PRESERVATION | $ - 0 | $0 | |||||||||
| 113 | RESERVE FEED TANK PRESERVATION | - 0 | $ - 0 | $0 | ||||||||
| 114 | SEWAGE AND EFFLUENT TANK PRESERVATION | - 0 | $ - 0 | $0 | ||||||||
| 115 | ENGINEROOM DOUBLE BOTTOM TANK 7-87-0 PRESERVATION | - 0 | $ - 0 | $0 | ||||||||
| 116 | MISSION RAMP DECK PRESERVATION STBD FR 33-42 | $ - 0 | $0 | |||||||||
| 117 | JP-5 FUEL TEST LAB AND MISSION RAMP (MTF) | - 0 | $ - 0 | $0 | ||||||||
| 151 | ULTRASONIC THICKNESS GAUGING (5YR) | - 0 | $ - 0 | $0 | ||||||||
| 154 | SPECIAL SURVEY-TANK INSPECTIONS (5YR) | - 0 | $ - 0 | $0 | ||||||||
| 157 | POTABLE WATER TANK PRESERVATION | - 0 | $ - 0 | $0 | ||||||||
| 162 | WATERTIGHT CLOSURE INSPECTION | - 0 | $ - 0 | $0 | ||||||||
| 183 | TANK VENTS-OPEN AND INSPECT TAH 5 YR ABS | - 0 | $ - 0 | $0 | ||||||||
| 200 | MAIN PROPULSION | |||||||||||
| 201 | ESLP-MAIN STEAM PIPING REPAIR | - 0 | $ - 0 | $0 | ||||||||
| 202 | ESLP-AUXILIARY STEAM PIPING REPAIR | - 0 | $ - 0 | $0 | ||||||||
| 203 | ENGINE ORDER TELEGRAPH AND SHAFT TACHOMETER REFURB | - 0 | $ - 0 | $0 | ||||||||
| 204 | MAIN CONDENSER FLEX JOINTS REPLACEMENT | - 0 | $ - 0 | $0 | ||||||||
| 205 | MAIN CIRCULATING PUMP REPLACEMENT AND MOTOR REFURB | - 0 | $ - 0 | $0 | ||||||||
| 206 | STEAM VALVE OVERHAUL VR18-148 | - 0 | $ - 0 | $0 | ||||||||
| 207 | ESLP-BOILER INSPECTIONS | - 0 | $ - 0 | $0 | ||||||||
| 252 | MAIN REDUCTION GEAR INSPECTION (5YR) | - 0 | $ - 0 | $0 | ||||||||
| 254 | THRUST AND LINE SHAFT BEARING INSPECTION (5YR) | - 0 | $ - 0 | $0 | ||||||||
| 281 | BOILER INSPECTION AND HYDRO (2.5YR) | - 0 | $ - 0 | $0 | ||||||||
| 282 | BOILER MOUNTS OPEN INSPECT AND TEST (2.5YR) | - 0 | $ - 0 | $0 | ||||||||
| 283 | BOILER SAFETY VALVES OPEN INSPECT AND TEST (2.5YR) | - 0 | $ - 0 | $0 | ||||||||
| 284 | STEAM PIPE INSPECTION AND HYDROSTATIC TESTING (5YR | - 0 | $ - 0 | $0 | ||||||||
| 286 | HP AND LP STEAM TURBINE OPEN AND INSPECT (5YR) | - 0 | $ - 0 | $0 | ||||||||
| 287 | AUTOMATION AND PROPULSION CONTROL INSPECT AND TEST | - 0 | $ - 0 | $0 | ||||||||
| 288 | MAIN CONDENSER INSPECTION (5YR) | - 0 | $ - 0 | $0 | ||||||||
| 290 | LUBE OIL FLUSHING OF MAIN ENGINE AND RED GEAR-TAH | - 0 | $ - 0 | $0 | ||||||||
| 292 | MAIN FEED PUMP OVERHAUL | - 0 | $ - 0 | $0 | ||||||||
| 300 | ELECTRICAL | |||||||||||
| 301 | ENCON-HEAT BALANCE INSTRUMENTATION INSTALL | - 0 | $ - 0 | $0 | ||||||||
| 302 | SSDG LOW VOLTAGE ALARM INSTALLATION | - 0 | $ - 0 | $0 | ||||||||
| 303 | MOTOR CONTROLLER CLEAN AND SERVICE | - 0 | $ - 0 | $0 | ||||||||
| 351 | SWITCHBOARD CLEANING (2.5 YR) | - 0 | $ - 0 | $0 | ||||||||
| 352 | MOTOR CONTROL CENTER CLEANING (2.5YR) | - 0 | $ - 0 | $0 | ||||||||
| 354 | GENERATOR CLEANING AND INSPECTION | - 0 | $ - 0 | $0 | ||||||||
| 400 | COMMUNICATION AND NAVIGATION | |||||||||||
| 401 | HF ANTENNA COAX CABLE REPAIRS | - 0 | $ - 0 | $0 | ||||||||
| 451 | ANNUAL RADAR SERVICE (1YR) | - 0 | $ - 0 | $0 | ||||||||
| 452 | ANNUAL ECDIS SERVICE (1YR) | - 0 | $ - 0 | $0 | ||||||||
| 453 | ANNUAL GYRO SERVICE (1YR) | - 0 | $ - 0 | $0 | ||||||||
| 455 | ANNUAL RADIO COMMUNICATIONS EQUIPMENT RECERT | - 0 | $ - 0 | $0 | ||||||||
| 456 | MAGNETIC COMPASS SERVICE (2YR) | - 0 | $ - 0 | $0 | ||||||||
| 458 | WHIP ANTENNA MAINTENANCE | - 0 | $ - 0 | $0 | ||||||||
| 459 | ECHO SOUNDER SERVICE | - 0 | $ - 0 | $0 | ||||||||
| 460 | ANNUAL INSPECTION OF ALARMS (1YR) | - 0 | $ - 0 | $0 | ||||||||
| 490 | SPEED LOG SERVICING (5YR) | - 0 | $ - 0 | $0 | ||||||||
| 491 | ANNUAL SVDR RECERTIFICATION (1YR) | - 0 | $ - 0 | $0 | ||||||||
| 500 | AUXILIARY MACHINERY | |||||||||||
| 501 | ESLP-TLI SENSOR INSTALLATION PHASE 2 | - 0 | $ - 0 | $0 | ||||||||
| 502 | ESLP-TLI SENSOR INSTALLATION PHASE 3 | - 0 | $ - 0 | $0 | ||||||||
| 503 | ESLP-PLUMBING SYSTEM PHASE 2 | - 0 | $ - 0 | $0 | ||||||||
| 504 | ESLP-PLUMBING SYSTEM PHASE 3 | - 0 | $ - 0 | $0 | ||||||||
| 505 | ESLP-PLUMBING SYSTEM PHASE 4 | - 0 | $ - 0 | $0 | ||||||||
| 506 | ESLP-SW FLUSHING STATION 1 AND 2 ADDL WORK | - 0 | $ - 0 | $0 | ||||||||
| 507 | ESLP-SW FLUSHING STATION 3 AND 4 OVERHAUL | - 0 | $ - 0 | $0 | ||||||||
| 508 | ESLP-SW FLUSHING STATION OVERHAUL 5 6 AND 7 | - 0 | $ - 0 | $0 | ||||||||
| 509 | ESLP-ADG OVERHAUL | - 0 | $ - 0 | $0 | ||||||||
| 510 | MISCELLANEOUS PIPING REPAIRS | - 0 | $ - 0 | $0 | ||||||||
| 511 | EDG COOLING FAN AND MOTOR REPAIRS | - 0 | $ - 0 | $0 | ||||||||
| 512 | EDG RADIATOR REPAIRS | - 0 | $ - 0 | $0 | ||||||||
| 513 | BALLAST AND SEAWATER SYSTEM VALVE REPAIRS | - 0 | $ - 0 | $0 | ||||||||
| 514 | BALLAST SYSTEM VALVE MOTOR OPERATOR REPAIRS | - 0 | $ - 0 | $0 | ||||||||
| 515 | FIRE MAIN SYSTEM VALVE REPAIRS | - 0 | $ - 0 | $0 | ||||||||
| 516 | SEWAGE PUMP AND MOTOR OVERHAUL | - 0 | $ - 0 | $0 | ||||||||
| 517 | ESLP-SHIPS SERVICE DIESEL GENERATOR ENGINE OVERHAU | - 0 | $ - 0 | $0 | ||||||||
| 518 | ESLP-SSTG OVERHAUL | - 0 | $ - 0 | $0 | ||||||||
| 519 | CENTRAL FRESH WATER COOLING HEAT EXCHANGER REFURBI | - 0 | $ - 0 | $0 | ||||||||
| 520 | WATER MIST FIREFIGHTING SYSTEMS- 1YR TAH | - 0 | $ - 0 | $0 | ||||||||
| 552 | HOSE REPLACEMENT (5YR) | - 0 | $ - 0 | $0 | ||||||||
| 553 | PRESSURE VESSEL INSPECTION (5YR) | - 0 | $ - 0 | $0 | ||||||||
| 555 | INSPECT AND CERTIFY MACHINERY SPACE CRANES AND HOI | - 0 | $ - 0 | $0 | ||||||||
| 562 | SCBA ANNUAL INSPECTION | - 0 | $ - 0 | $0 | ||||||||
| 563 | SCBA AIR COMPRESSOR AND FILL STATION INSPECTION | - 0 | $ - 0 | $0 | ||||||||
| 565 | FIXED GAS FIREFIGHTING SYSTEM INSPECTION AND TEST | - 0 | $ - 0 | $0 | ||||||||
| 567 | FIXED FOAM FIREFIGHTING SYSTEMS INSPECTION (1YR) | - 0 | $ - 0 | $0 | ||||||||
| 569 | FIRE AND SMOKE DETECTION SYSTEM (1YR) | - 0 | $ - 0 | $0 | ||||||||
| 570 | PORTABLE FIRE EXTINGUISHER SERVICE (1YR) | - 0 | $ - 0 | $0 | ||||||||
| 571 | ANNUAL FIRE AND SMOKE DAMPER SERVICE (1YR) | - 0 | $ - 0 | $0 | ||||||||
| 572 | DEEP FAT FRYER AND RANGE FIRE EXT SYSTEM (1YR) | - 0 | $ - 0 | $0 | ||||||||
| 573 | FIRE HOSE (1YR) | - 0 | $ - 0 | $0 | ||||||||
| 574 | FIRE DOORS AND SHUTTERS (1YR) | - 0 | $ - 0 | $0 | ||||||||
| 600 | HABITABILITY | |||||||||||
| 601 | TENDER BOAT DAVIT SERVICE-ANNUAL TAH | - 0 | $ - 0 | $0 | ||||||||
| 602 | TENDER BOAT SERVICE-ANNUAL TAH | - 0 | $ - 0 | $0 | ||||||||
| 603 | RESCUE BOAT DAVIT REPAIRS | - 0 | $ - 0 | $0 | ||||||||
| 604 | DECK CRANE INSPECTION-5YR (NON-ABS) | - 0 | $ - 0 | $0 | ||||||||
| 605 | LIFE RAFT DAVIT SERVICE-ANNUAL TAH | - 0 | $ - 0 | $0 | ||||||||
| 606 | ELEVATOR AND DUMBWAITER GROOMING AND INSPECTION | - 0 | $ - 0 | $0 | ||||||||
| 650 | ESLP-LIFEBOAT REPLACEMENT | - 0 | $ - 0 | $0 | ||||||||
| 653 | ANNUAL RESCUE BOAT AND DAVIT INSPECTION | - 0 | $ - 0 | $0 | ||||||||
| 658 | ACCOMMODATION LADDER MAINTENANCE AND TESTING (5YR) | - 0 | $ - 0 | $0 | ||||||||
| 659 | PILOT BOARDING AND EMBARKATION LADDERS (5YR) | - 0 | $ - 0 | $0 | ||||||||
| 662 | DEEP FAT FRYER INSPECTION (1YR) | - 0 | $ - 0 | $0 | ||||||||
| 700 | SPONSOR EQUIPMENT | |||||||||||
| 701 | O2N2 SYSTEM INSPECTION AND GROOM-2 YR | - 0 | $ - 0 | $0 | ||||||||
| 702 | O2N2 LPAC COMPRESSOR INSPECT AND GROOM-ANNUAL | - 0 | $ - 0 | $0 | ||||||||
| 703 | MTF BERTHING SHOWER PRESERVATION | - 0 | $ - 0 | $0 | ||||||||
| 704 | MASTER CLOCK SYSTEM INSTALLATION | - 0 | $ - 0 | $0 | ||||||||
| 705 | PATIENT LITTER HOIST INSPECTION-2.5 YR TAH | - 0 | $ - 0 | $0 | ||||||||
| 706 | OR ROOM DECK REFURBISHMENT (VR19-0213) | - 0 | $ - 0 | $0 | ||||||||
| 707 | OR SURROUNDING AREA DECK REFURBISHMENT (VR19-0214) | - 0 | $ - 0 | $0 | ||||||||
| 708 | OR COMMON CORE DECK DRAIN REPAIR(VR19-0215) | - 0 | $ - 0 | $0 | ||||||||
| 709 | DRY PROVISIONS ROOM MODS | - 0 | $ - 0 | $0 | ||||||||
| 800 | HEATING, VENTILATION, AND AIR CONDITIONING | |||||||||||
| 802 | NO1 AC CONDENSER RETUBE | - 0 | $ - 0 | $0 | ||||||||
| 803 | AC CONDENSER END BELL REFURBISHMENT | - 0 | $ - 0 | $0 | ||||||||
| 804 | HALON ROOM INSULATION INSTALLATION | - 0 | $ - 0 | $0 | ||||||||
| 851 | ANNUAL GALLEY VENTILATION AND GAYLORD HOOD CLEANIN | - 0 | $ - 0 | $0 | ||||||||
| 852 | ANNUAL LAUNDRY VENT CLEANING (1YR) | - 0 | $ - 0 | $0 | ||||||||
| 900 | DRYDOCKING | |||||||||||
| 901 | DOCKING AND UNDOCKING | - 0 | $ - 0 | $0 | ||||||||
| 902 | TAIL SHAFT INSPECTION (ABS-IN PLACE) | - 0 | $ - 0 | $0 | ||||||||
| 904 | PROPELLER INSPECTION AND POLISHING-TAH | - 0 | $ - 0 | $0 | ||||||||
| 905 | ANCHORS AND CHAINS INSPECT AND PRESERVE | - 0 | $ - 0 | $0 | ||||||||
| 906 | CHAIN LOCKERS INSPECT AND PRESERVE-TAH | - 0 | $ - 0 | $0 | ||||||||
| 907 | FREEBOARD SPOT PRESERVATION-TAH | - 0 | $ - 0 | $0 | ||||||||
| 908 | SSDG SEA SUCTION PIPE REPLACEMENT | - 0 | $ - 0 | $0 | ||||||||
| 909 | CATHODIC PROTECTION SYSTEM INSPECTION TAH | - 0 | $ - 0 | $0 | ||||||||
| 910 | SEA VALVES TAH 5 YR ABS-USCG | - 0 | $ - 0 | $0 | ||||||||
| 911 | RUDDER AND STERN FRAME EXAM TAH ABS | - 0 | $ - 0 | $0 | ||||||||
| 912 | SHAFT SEAL INSPECTION AND REPLACEMENT | - 0 | $ - 0 | $0 | ||||||||
| 913 | AUXILIARY SEAWATER PIPING CLEANING | - 0 | $ - 0 | $0 | ||||||||
| 914 | BILGE KEEL INSPECTION AND TESTING | - 0 | $ - 0 | $0 | ||||||||
| 915 | CHAIN LOCKER AND FOREPEAK EDUCTOR VALVE SERVICE | - 0 | $ - 0 | $0 | ||||||||
| 920 | STABILITY TEST | - 0 | $ - 0 | $0 | ||||||||
| 960 | CCSI_UNDERWATER HULL CLEANING PAINTING - SPOT BLA | - 0 | $ - 0 | $0 | ||||||||
| 966 | SHAFT ALIGNEMENT AND BEARING REACTION CHECKS (2.5Y | - 0 | $ - 0 | $0 | ||||||||
| 984 | UW HULL ZINC ANODE REPLACEMENT | - 0 | $ - 0 | $0 | ||||||||
| 1000 | UNDERWAY REPLENISHMENT EQUIPMENT | |||||||||||
| 1001 | ESLP- V-22 FLIGHT DECK MODIFICATIONS | - 0 | $ - 0 | $0 | ||||||||
| TOTAL CAT "A" | $0.00 |
| USNS MERCY | CONTRACTOR PRICE BREAKDOWN |
| &"Arial,Bold"CATEGORY "A" ITEMS | N3220520R6500 |
ATTACHMENT J-2
File details come from the government source that posted it. Updated .