Amendment 6.docx
DOCX document 67 KB Posted
- Attached to
- USNS MERCY ROH/DD Federal contract opportunity
- Solicitation number
- N3220520R6500
About this file
This document provides an amendment to a solicitation for the repair and overhaul of the USNS Mercy. Key details include that the solicitation seeks pricing for Category A work items to be completed at a firm fixed price, as well as rates for additional work that may be required under contract line item numbers for aggregate labor and other direct costs. Offerors are instructed to provide unit pricing for various materials and services, as well as fully burdened labor rates to be applied to any supplemental work. The amendment also specifies additional requirements for the proposal such as providing past performance information, certifications, and a small business subcontracting plan from large businesses. The solicitation identifies 20 optional Category B work items that may be exercised at the contracting officer's discretion. Response is due by the specified date.
View the file
Other files for this federal contract opportunity
Show all 50
USNS MERCY ROH/DD has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N3220520R6500
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION B - SUPPLIES OR SERVICES AND PRICES
The following have been modified:
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Category "A" Work Items (WIs)
FFP
Prepare for and accomplish the ROH/DD of the USNS MERCY (T-AH 19) Total Category "A" WIs $_____________
Proposed unit price per KWh $_____ in accordance with (IAW) WI 011, 7.1.1.4
Proposed unit price per gallon of potable water $______ IAW WI 011, 7.1.3.2
Proposed unit price per gallon of distilled water $______ IAW WI 011, 7.1.4.2
Proposed unit price per gallon of bilge water removal $______ IAW WI 011, 7.1.20.3
Proposed unit price per crane usage $______ IAW WI 11, 7.9.1
Proposed Hazardous Waste handling fee rate IAW WI 023, 7.4.3 ______%
FOB: Destination
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
AGR and ODC
AGR
(28,000) man-hours @ $________ per man-hour = $_____________
ODC
Base $1,000,000.00
Proposed G&A Rate _______________% Subtotal: $_____________
Proposed Profit Rate _______________% Subtotal: $_____________
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Category "B" WI 0025
WI 0025 - Physical Security at Private Contractor's Facility in FPCON Bravo - Delta
Category B WIs are optional WIs and not required to be accomplished as part of this contract as awarded. The KO may require the contractor to perform the requirements of the optional Category B WIs by exercising the option via written notice to the contractor.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Category "B" WI 0030
WI 0030 - Continuation of Services
Category B WIs are optional WIs and not required to be accomplished as part of this contract as awarded. The KO may require the contractor to perform the requirements of the optional Category B WIs by exercising the option via written notice to the contractor.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Category "B" WI 157
WI Potable Water Tank Preservation
Category B WIs are optional WIs and not required to be accomplished as part of this contract as awarded. The KO may require the contractor to perform the requirements of the optional Category B WIs by exercising the option via written notice to the contractor.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Category "B" WI 197
WI Lead Paint-Testing and Abatement
Category B WIs are optional WIs and not required to be accomplished as part of this contract as awarded. The KO may require the contractor to perform the requirements of the optional Category B WIs by exercising the option via written notice to the contractor.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Category "B" WI 198
WI Hull Gauging
Category B WIs are optional WIs and not required to be accomplished as part of this contract as awarded. The KO may require the contractor to perform the requirements of the optional Category B WIs by exercising the option via written notice to the contractor.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Category "B" WI 199
WI Miscellaneous Steel Renewal
Category B WIs are optional WIs and not required to be accomplished as part of this contract as awarded. The KO may require the contractor to perform the requirements of the optional Category B WIs by exercising the option via written notice to the contractor.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Category "B" WI 290
WI Lube Oil Flushing of Main Engine and Red Gear
Category B WIs are optional WIs and not required to be accomplished as part of this contract as awarded. The KO may require the contractor to perform the requirements of the optional Category B WIs by exercising the option via written notice to the contractor.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Category "B" WI 399
WI Miscellaneous Motor Overhauls
Category B WIs are optional WIs and not required to be accomplished as part of this contract as awarded. The KO may require the contractor to perform the requirements of the optional Category B WIs by exercising the option via written notice to the contractor.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Category "B" WI 458
WI Whip Antenna Maintenance
Category B WIs are optional WIs and not required to be accomplished as part of this contract as awarded. The KO may require the contractor to perform the requirements of the optional Category B WIs by exercising the option via written notice to the contractor.
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Category "B" WI 597
WI ESLP – Plumbing Drain Piping Replacement
Category B WIs are optional WIs and not required to be accomplished as part of this contract as awarded. The KO may require the contractor to perform the requirements of the optional Category B WIs by exercising the option via written notice to the contractor.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Category "B" WI 598
WI Sewage System 3-Way Valve Refurbishment
Category B WIs are optional WIs and not required to be accomplished as part of this contract as awarded. The KO may require the contractor to perform the requirements of the optional Category B WIs by exercising the option via written notice to the contractor.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Category "B" WI 599
WI Miscellaneous Piping Renewal
Category B WIs are optional WIs and not required to be accomplished as part of this contract as awarded. The KO may require the contractor to perform the requirements of the optional Category B WIs by exercising the option via written notice to the contractor.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Category "B" WI 899
WI Insulation and Lagging Repairs
Category B WIs are optional WIs and not required to be accomplished as part of this contract as awarded. The KO may require the contractor to perform the requirements of the optional Category B WIs by exercising the option via written notice to the contractor.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Category "B" WI 903
WI Tailshaft Inspection ABS 15 Year-Removal
Category B WIs are optional WIs and not required to be accomplished as part of this contract as awarded. The KO may require the contractor to perform the requirements of the optional Category B WIs by exercising the option via written notice to the contractor.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Category "B" WI 907
WI Freeboard Spot Preservation
Category B WIs are optional WIs and not required to be accomplished as part of this contract as awarded. The KO may require the contractor to perform the requirements of the optional Category B WIs by exercising the option via written notice to the contractor.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Category "B" WI 967
WI Shaft Alignment and Bearing Reaction Checks (Sets)
Category B WIs are optional WIs and not required to be accomplished as part of this contract as awarded. The KO may require the contractor to perform the requirements of the optional Category B WIs by exercising the option via written notice to the contractor.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Category "B" WI 968
WI Shaft Alignment and Bearing Reaction Checks (Post) Category B WIs are optional WIs and not required to be accomplished as part of this contract as awarded. The KO may require the contractor to perform the requirements of the optional Category B WIs by exercising the option via written notice to the contractor.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Category "B" WI 999
WI Extension on Dry Dock
Category B WIs are optional WIs and not required to be accomplished as part of this contract as awarded. The KO may require the contractor to perform the requirements of the optional Category B WIs by exercising the option via written notice to the contractor.
NET AMT
TOTAL PROPOSED PRICE
TOTAL PROPOSED PRICE FOR CLINS 0001 THROUGH 0020 $______________
The contractor shall enter the total proposed price of all CLINs.
CLAUSES INCORPORATED BY FULL TEXT
PART I - THE SCHEDULE
Section B, Price Schedule, detailed information
CLIN 0001 –Attachment J-2 – Category “A” WIs provides a WI breakdown of CLIN 0001 pricing.
CLIN 0002: This CLIN contains the FBLR (e.g., G&A, overhead, profit, supervision, consumables, and/or support functions, etc.) and the ODC profit and G&A rate. These rates are used for pricing changes negotiated under the H-3 Clause - AGR and H-4 Clause ODC, for the duration of the contract. Changes are inherent to vessel repair contracts and should be expected by the Contractors. Additionally, this CLIN includes G&A and profit rates for ODC to be used for negotiating changes. These rates shall prevail even when the contract is extended/modified. The number of AGR man-hours and the ODC base amount are estimates that were generated for evaluation purposes. The actual amounts of man-hours and ODC may be used interchangeably under the contract which could result in a distribution and amount of man-hours and ODC that is either higher or lower than that stated in CLIN 0002. Any additional AGR or ODC required beyond the CLIN 0002 estimated amount shall be added through contract modification using the same AGR and ODC rates agreed upon at contract award. Any unused AGR or ODC will be de-obligated from the contract at the same AGR and ODC rates agreed upon at contract award. The contractor agrees that the number of man-hours included in its proposed price for such AGR shall include only direct production man-hours. For these purposes, direct production man-hours are for skilled labor at the Journeyman level expended in direct production as exemplified by the following functions:
| Abrasive cleaning/blasting | Tank cleaning | ||
| Welding | Machinists (inside and outside) | ||
| Burning | Brazing | ||
| Carpentry | Electrical work | ||
| Electronic work | Shipfitting | ||
| Lagging | Painting | ||
| Boilermaking | Pipefitting | ||
| Sheetmetal work | Engineering | ||
| Rigging | Staging/scaffolding | ||
| General labor | Fire Watch |
Direct production man-hours will not include those functions (whether charged directly or indirectly by the contractor’s accounting system) which are defined herein as support for production functions. Necessary support functions shall be considered to be included in the offeror's FBLR for direct production man-hours. Examples of support functions include:
| Testing | Quality Assurance | ||
| Planning | Cleaning (except tank cleaning) | ||
| Material handling & warehousing | Security | ||
| Surveying | Administration | ||
| Transportation | Purchasing staff | ||
| Lofting | Other indirect support | ||
| Supervision |
Consumable materials are goods used in the ordinary course of work performance such as office supplies, paper, rags, vehicle or equipment fuel costs, cleaning chemicals, disposable tools, welding rods, paint buckets, paint brushes, protective clothing, etc. that do not become an integral part of the repaired vessel. Consumable material shall be included in the contractor's FBLR and not separately priced.
The rates for profit and G&A on CLIN 0002 above shall be the same rates used by the contractor in its responses to the Request for CCO Proposals issued under this contract. The KO will apply these rates to the ODCs for each CCO when it is negotiated and settled.
The base cost, stated in this CLIN does not include the profit or G&A rates.
NOTE: This does not include any material cost for Category “A” WIs. The material cost for Category “A” WIs has been included under CLIN 0001.
CLINs 0003 through 0020 –Attachment J-3 – Category “B” WIs provides a WI breakdown of CLIN 0003 through 0020 pricing.
SECTION C - DESCRIPTIONS AND SPECIFICATIONS
C – 2 List of Standard WIs included for this solicitation:
USNS MERCY
(T-AH 19)
N3220520R6500
WORK ITEM INDEX REPORT
| Item Number |
| Title |
| Category |
| SECTION 0000 |
| GENERAL SERVICES AND REQUIREMENTS |
| 0001 |
| SCOPE GEN REQUIREMENTS DEFINITIONS REV JUL 18 |
| N |
| 0002 |
| TECHNICAL AND MANUFACTURER REPRESENTATIVES REV MAY |
| N |
| 0003 |
| APPROACH BERTH AND MOORING REQUIREMENTS REV JAN 19 |
| N |
| 0004 |
| TESTING AND QUALITY ASSURANCE REV 08 NOV 17 |
| N |
| 0005 |
| ELECTRICAL SAFETY PROCEDURE REQUIREMENTS REV FEB 1 |
| N |
| 0006 |
| HEAVY WEATHER PLAN REV FEB 14 |
| N |
| 0007 |
| COLD WEATHER PLAN REV FEB 14 |
| N |
| 0010 |
| FURNISH OFFICE FOR OVERHAUL MANAGEMENT TEAM OMT RE |
| A |
| 0011 |
| FURNISH GENERAL SERVICES T AH REV FEB 14 |
| A |
| 0012 |
| INFORMATION TECHNOLOGY SERVICES REV JUL 18 |
| A |
| 0013 |
| PROJECT PLANNING AND PRODUCTION STATUS MONITORING |
| A |
| 0014 |
| WEIGHT AND MOMENT REPORT |
| A |
| 0015 |
| INTEGRATED LOGISITIC AND GFM SUPPORT REQUIREMENTS |
| A |
| 0016 |
| FIRE PROTECTION AND SHIPS SAFETY PROGRAM REV 28 SE |
| A |
| 0017 |
| HANDLING SHIPS STORES REV FEB 14 |
| A |
| 0018 |
| DELIVERY AND REDELIVERY OF THE VESSEL REV MAY 16 |
| A |
| 0019 |
| SHIPBOARD ACCESS AND SECURITY REV AUG 15 |
| A |
| 0020 |
| GAS FREE CERTIFICATES REV FEB 14 |
| A |
| 0021 |
| CLEAN AND GAS FREE TANKS VOIDS AND COFFERDAMS AND |
| A |
| 0022 |
| MACHINERY SPACE TURN-OVER DOCK TRIALS AND SEA TRIA |
| A |
| 0023 |
| HAZARDOUS WASTE DISPOSAL AT A CONTRACTORS FACILITY |
| A |
| 0024 |
| PHYSICAL SECURITY AT PRIVATE CONTRACTOR'S FACILITY |
| N |
| 0025 |
| ENHANCED PHYSICAL SECURITY AT A PRIVATE CONTRACTOR |
| B |
| 0030 |
| CONTINUATION OF SERVICE REV OCT 18 |
| B |
| SECTION 0100 |
| HULL AND STRUCTURAL |
| 0101 |
| MISCELLANEOUS TANK VENT PIPING REPAIRS |
| A |
| 0102 |
| ANTI-ROLL TANK VENT REPAIRS |
| A |
| 0103 |
| 1F BALLAST AND ANTIROLL TANK LADDER RAIL REPAIRS |
| A |
| 0104 |
| 2DB TANK SAND HOLE REPAIRS |
| A |
| 0105 |
| WATERTIGHT CLOSURE RENEWAL |
| A |
| 0106 |
| BOILER DECK REPAIRS |
| A |
| 0107 |
| WATERTIGHT DOUBLE DOOR REPLACEMENT |
| A |
| 0108 |
| RADIO ANNTENA CABLE PENETRATION REPAIR VR19-0162 |
| A |
| 0109 |
| SERVICE AREA 2 STEEL REPAIRS |
| A |
| 0110 |
| SERVICE AREA 3 DECKING REPAIRS (VR18-0127) |
| A |
| 0111 |
| SERVICE AREA 5 STEEL REPAIRS REV A |
| A |
| 0112 |
| AFT OILY WASTE TANK PRESERVATION |
| A |
| 0113 |
| RESERVE FEED TANK PRESERVATION |
| A |
| 0114 |
| SEWAGE AND EFFLUENT TANK PRESERVATION |
| A |
| 0115 |
| ENGINEROOM DOUBLE BOTTOM TANK 7-87-0 PRESERVATION |
| A |
| 0116 |
| MISSION RAMP DECK PRESERVATION STBD FR 33-42 |
| A |
| 0117 |
| JP-5 FUEL TEST LAB AND MISSION RAMP (MTF) |
| A |
| 0151 |
| ULTRASONIC THICKNESS GAUGING (5YR) |
| A |
| 0154 |
| SPECIAL SURVEY-TANK INSPECTIONS (5YR) |
| A |
| 0157 |
| POTABLE WATER TANK PRESERVATION |
| B |
| 0162 |
| WATERTIGHT CLOSURE INSPECTION |
| A |
| 0183 |
| TANK VENTS-OPEN AND INSPECT TAH 5 YR ABS |
| A |
| 0197 |
| LEAD PAINT-TESTING AND ABATEMENT |
| B |
| 0198 |
| HULL GAUGING |
| B |
| 0199 |
| MISC STEEL RENEWAL |
| B |
| SECTION 0200 |
| PROPULSION MACHINERY |
| 0201 |
| ESLP-MAIN STEAM PIPING REPAIR |
| A |
| 0202 |
| ESLP-AUXILIARY STEAM PIPING REPAIR |
| A |
| 0203 |
| ENGINE ORDER TELEGRAPH AND SHAFT TACHOMETER REFURB |
| A |
| 0204 |
| MAIN CONDENSER FLEX JOINTS REPLACEMENT |
| A |
| 0205 |
| MAIN CIRCULATING PUMP REPLACEMENT AND MOTOR REFURB |
| A |
| 0206 |
| STEAM VALVE OVERHAUL VR18-148 |
| A |
| 0207 |
| ESLP-BOILER INSPECTIONS |
| A |
| 0252 |
| MAIN REDUCTION GEAR INSPECTION (5YR) |
| A |
| 0254 |
| THRUST AND LINE SHAFT BEARING INSPECTION (5YR) |
| A |
| 0281 |
| BOILER INSPECTION AND HYDRO (2.5YR) |
| A |
| 0282 |
| BOILER MOUNTS OPEN INSPECT AND TEST (2.5YR) |
| A |
| 0283 |
| BOILER SAFETY VALVES OPEN INSPECT AND TEST (2.5YR) |
| A |
| 0284 |
| STEAM PIPE INSPECTION AND HYDROSTATIC TESTING (5YR |
| A |
| 0286 |
| HP AND LP STEAM TURBINE OPEN AND INSPECT (5YR) |
| A |
| 0287 |
| AUTOMATION AND PROPULSION CONTROL INSPECT AND TEST |
| A |
| 0288 |
| MAIN CONDENSER INSPECTION (5YR) |
| A |
| 0290 |
| LUBE OIL FLUSHING OF MAIN ENGINE AND RED GEAR-TAH |
| B |
| 0292 |
| MAIN FEED PUMP OVERHAUL |
| A |
| SECTION 0300 |
| ELECTRICAL |
| 0301 |
| ENCON-HEAT BALANCE INSTRUMENTATION INSTALL |
| A |
| 0302 |
| SSDG LOW VOLTAGE ALARM INSTALLATION |
| A |
| 0303 |
| MOTOR CONTROLLER CLEAN AND SERVICE |
| A |
| 0351 |
| SWITCHBOARD CLEANING (2.5 YR) |
| A |
| 0352 |
| MOTOR CONTROL CENTER CLEANING (2.5YR) |
| A |
| 0354 |
| GENERATOR CLEANING AND INSPECTION |
| A |
| 0399 |
| MISCELLANEOUS MOTOR OVERHAULS |
| B |
| SECTION 0400 |
| COMMUNICATION AND NAVIGATION |
| 0401 |
| HF ANTENNA COAX CABLE REPAIRS |
| A |
| 0451 |
| ANNUAL RADAR SERVICE (1YR) |
| A |
| 0452 |
| ANNUAL ECDIS SERVICE (1YR) |
| A |
| 0453 |
| ANNUAL GYRO SERVICE (1YR) |
| A |
| 0455 |
| ANNUAL RADIO COMMUNICATIONS EQUIPMENT RECERT |
| A |
| 0456 |
| MAGNETIC COMPASS SERVICE (2YR) |
| A |
| 0458 |
| WHIP ANTENNA MAINTENANCE |
| B |
| 0459 |
| ECHO SOUNDER SERVICE |
| A |
| 0460 |
| ANNUAL INSPECTION OF ALARMS (1YR) |
| A |
| 0490 |
| SPEED LOG SERVICING (5YR) |
| A |
| 0491 |
| ANNUAL SVDR RECERTIFICATION (1YR) |
| A |
| SECTION 0500 |
| AUXILIARY MACHINERY |
| 0501 |
| ESLP-TLI SENSOR INSTALLATION PHASE 2 |
| A |
| 0502 |
| ESLP-TLI SENSOR INSTALLATION PHASE 3 |
| A |
| 0503 |
| ESLP-PLUMBING SYSTEM PHASE 2 |
| A |
| 0504 |
| ESLP-PLUMBING SYSTEM PHASE 3 |
| A |
| 0505 |
| ESLP-PLUMBING SYSTEM PHASE 4 |
| A |
| 0506 |
| ESLP-SW FLUSHING STATION 1 AND 2 ADDL WORK |
| A |
| 0507 |
| ESLP-SW FLUSHING STATION 3 AND 4 OVERHAUL |
| A |
| 0508 |
| ESLP-SW FLUSHING STATION OVERHAUL 5 6 AND 7 |
| A |
| 0509 |
| ESLP-ADG OVERHAUL |
| A |
| 0510 |
| MISCELLANEOUS PIPING REPAIRS |
| A |
| 0511 |
| EDG COOLING FAN AND MOTOR REPAIRS |
| A |
| 0512 |
| EDG RADIATOR REPAIRS |
| A |
| 0513 |
| BALLAST AND SEAWATER SYSTEM VALVE REPAIRS |
| A |
| 0514 |
| BALLAST SYSTEM VALVE MOTOR OPERATOR REPAIRS |
| A |
| 0515 |
| FIRE MAIN SYSTEM VALVE REPAIRS |
| A |
| 0516 |
| SEWAGE PUMP AND MOTOR OVERHAUL |
| A |
| 0517 |
| ESLP-SHIPS SERVICE DIESEL GENERATOR ENGINE OVERHAU |
| A |
| 0518 |
| ESLP-SSTG OVERHAUL |
| A |
| 0519 |
| CENTRAL FRESH WATER COOLING HEAT EXCHANGER REFURBI |
| A |
| 0520 |
| WATER MIST FIREFIGHTING SYSTEMS- 1YR TAH |
| A |
| 0552 |
| HOSE REPLACEMENT (5YR) |
| A |
| 0553 |
| PRESSURE VESSEL INSPECTION (5YR) |
| A |
| 0555 |
| INSPECT AND CERTIFY MACHINERY SPACE CRANES AND HOI |
| A |
| 0562 |
| SCBA ANNUAL INSPECTION |
| A |
| 0563 |
| SCBA AIR COMPRESSOR AND FILL STATION INSPECTION |
| A |
| 0565 |
| FIXED GAS FIREFIGHTING SYSTEM INSPECTION AND TEST |
| A |
| 0567 |
| FIXED FOAM FIREFIGHTING SYSTEMS INSPECTION (1YR) |
| A |
| 0569 |
| FIRE AND SMOKE DETECTION SYSTEM (1YR) |
| A |
| 0570 |
| PORTABLE FIRE EXTINGUISHER SERVICE (1YR) |
| A |
| 0571 |
| ANNUAL FIRE AND SMOKE DAMPER SERVICE (1YR) |
| A |
| 0572 |
| DEEP FAT FRYER AND RANGE FIRE EXT SYSTEM (1YR) |
| A |
| 0573 |
| FIRE HOSE (1YR) |
| A |
| 0574 |
| FIRE DOORS AND SHUTTERS (1YR) |
| A |
| 0597 |
| ESLP-PLUMBING DRAIN PIPING REPLACEMENT |
| B |
| 0598 |
| SEWAGE SYSTEM 3-WAY VALVE REFURBISHMENT |
| B |
| 0599 |
| MISCELLANEOUS PIPING RENEWAL |
| B |
| SECTION 0600 |
| HABITABILITY OUTFITTING AND FURNISHINGS |
| 0601 |
| TENDER BOAT DAVIT SERVICE-ANNUAL TAH |
| A |
| 0602 |
| TENDER BOAT SERVICE-ANNUAL TAH |
| A |
| 0603 |
| RESCUE BOAT DAVIT REPAIRS |
| A |
| 0604 |
| DECK CRANE INSPECTION-5YR (NON-ABS) |
| A |
| 0605 |
| LIFE RAFT DAVIT SERVICE-ANNUAL TAH |
| A |
| 0606 |
| ELEVATOR AND DUMBWAITER GROOMING AND INSPECTION |
| A |
| 0650 |
| ESLP-LIFEBOAT REPLACEMENT |
| A |
| 0653 |
| ANNUAL RESCUE BOAT AND DAVIT INSPECTION |
| A |
| 0658 |
| ACCOMMODATION LADDER MAINTENANCE AND TESTING (5YR) |
| A |
| 0659 |
| PILOT BOARDING AND EMBARKATION LADDERS (5YR) |
| A |
| 0662 |
| DEEP FAT FRYER INSPECTION (1YR) |
| A |
| SECTION 0700 |
| SPONSOR RELATED |
| 0701 |
| O2N2 SYSTEM INSPECTION AND GROOM-2 YR |
| A |
| 0702 |
| O2N2 LPAC COMPRESSOR INSPECT AND GROOM-ANNUAL |
| A |
| 0703 |
| MTF BERTHING SHOWER PRESERVATION |
| A |
| 0704 |
| MASTER CLOCK SYSTEM INSTALLATION |
| A |
| 0705 |
| PATIENT LITTER HOIST INSPECTION-2.5 YR TAH |
| A |
| 0706 |
| OR ROOM DECK REFURBISHMENT (VR19-0213) REV A |
| A |
| 0707 |
| OR SURROUNDING AREA DECK REFURBISHMENT (VR19-0214) REV A |
| A |
| 0708 |
| OR COMMON CORE DECK DRAIN REPAIR(VR19-0215) |
| A |
| 0709 |
| DRY PROVISIONS ROOM MODS |
| A |
| SECTION 0800 |
| HVAC |
| 0802 |
| NO1 AC CONDENSER RETUBE |
| A |
| 0803 |
| AC CONDENSER END BELL REFURBISHMENT |
| A |
| 0804 |
| HALON ROOM INSULATION INSTALLATION |
| A |
| 0851 |
| ANNUAL GALLEY VENTILATION AND GAYLORD HOOD CLEANIN |
| A |
| 0852 |
| ANNUAL LAUNDRY VENT CLEANING (1YR) |
| A |
| 0899 |
| INSULATION AND LAGGING REPAIR |
| B |
| SECTION 0900 |
| DRYDOCKING |
| 0901 |
| DOCKING AND UNDOCKING |
| A |
| 0902 |
| TAIL SHAFT INSPECTION (ABS-IN PLACE) |
| A |
| 0903 |
| TAILSHAFT INSPECTION ABS 15 YR-REMOVAL |
| B |
| 0904 |
| PROPELLER INSPECTION AND POLISHING-TAH |
| A |
| 0905 |
| ANCHORS AND CHAINS INSPECT AND PRESERVE |
| A |
| 0906 |
| CHAIN LOCKERS INSPECT AND PRESERVE-TAH |
| A |
| 0907 |
| FREEBOARD SPOT PRESERVATION-TAH |
| B |
| 0908 |
| SSDG SEA SUCTION PIPE REPLACEMENT |
| A |
| 0909 |
| CATHODIC PROTECTION SYSTEM INSPECTION TAH |
| A |
| 0910 |
| SEA VALVES TAH 5 YR ABS-USCG |
| A |
| 0911 |
| RUDDER AND STERN FRAME EXAM TAH ABS |
| A |
| 0912 |
| SHAFT SEAL INSPECTION AND REPLACEMENT |
| A |
| 0913 |
| AUXILIARY SEAWATER PIPING CLEANING |
| A |
| 0914 |
| BILGE KEEL INSPECTION AND TESTING |
| A |
| 0915 |
| CHAIN LOCKER AND FOREPEAK EDUCTOR VALVE SERVICE |
| A |
| 0920 |
| STABILITY TEST REV A |
| A |
| 0960 |
| CCSI_UNDERWATER HULL CLEANING PAINTING - SPOT BLA |
| A |
| 0966 |
| SHAFT ALIGNEMENT AND BEARING REACTION CHECKS (2.5Y |
| A |
| 0967 |
| SHAFT ALIGNMENT AND BEARING REACTION CHECKS (SETS |
| B |
| 0968 |
| SHAFT ALIGNMENT AND BEARING REACTION CHECKS (POST |
| B |
| 0984 |
| UW HULL ZINC ANODE REPLACEMENT |
| A |
| 0999 |
| EXTENSION ON DRY DOCK |
| B |
| SECTION 1000 |
| UNDERWAY REPLENISHMENT EQUIPMENT |
| 1001 |
| ESLP- V-22 FLIGHT DECK MODIFICATIONS |
| A |
SECTION H - SPECIAL CONTRACT REQUIREMENTS
SECTION H CLAUSES
H-1 OPTION FOR INCREASED QUANTITIES
The Government may require delivery of the numbered line items identified in Section B as option items in any amount up to the unit quantities and at the unit prices stated in the contractor’s J-3, “Contractor Price Breakdown – Category B Items.” The KO may exercise the options by giving the contractor written notification or via issuance of standard modification (SF 30). Delivery of option items shall be within the performance period identified in Section F unless the parties otherwise agree.
H-2 PREVENTION OF THE DISCHARGE OF OIL AND HAZARDOUS SUBSTANCES
(a) Policy. In compliance with Executive Order Number 11752 (38 F.R. 34793), the policy of the DON is to conform to the provisions of the Federal Water Pollution Control Act, as amended (Title 33 U.S.C. 1251 et seq), and the Oil Pollution Act of 1990, as amended (Title 33 U.S.C. 2701 et seq.), insofar as these Acts prohibit the discharge of oil, oily mixtures, and hazardous substances, and regardless of whether or not these Acts pertain specifically to the Naval vessel and shore activities. The prescribed clause is intended to implement that policy with respect to the ship(s) being constructed or undergoing repair and overhaul under this contract.
(b) Definitions. For the purpose of this clause, the terms "oil," "oily mixtures," "hazardous substance," and "discharge" shall have the meanings as defined in the Acts referred to in paragraph (a) of this clause and other environmental statutes.
(c) Trials. Prior to commencement of any dock or sea trials hereunder, the contractor shall assure the Ship’s Master and CHENG as well as the PPE by demonstrations, completed test memoranda, or other means reasonably acceptable to the Ship’s Master and CHENG, as well as the PPE, that all equipment, the function of which is to prevent the accidental discharge of oil, oily mixtures, or hazardous substances from the ship, that the contractor shall be required by the specifications to install, is fully operable.
(d) Reports. The contractor shall, as soon as it has knowledge of any discharge of oil, oily substance, or hazardous substance from the ship, immediately notify the Ship’s Master and CHENG, as well as the Principle Port Engineer, thereof and shall immediately take all reasonable steps to prevent further discharge. Within 24-hours thereafter, the contractor shall file with the Ship’s Master and CHENG, as well as the PPE, the "Oil or Hazardous Substance Discharge Report.”
(e) Liability. The contractor shall be liable to the Government for all such costs of removal of such oil, oily mixture, or hazardous substance where such discharge was the result of willful negligence or willful misconduct within the privity and knowledge of the contractor. All documentation related to such waste shall bear the contractor’s generator number in accordance with WI 0023 HAZARDOUS WASTE DISPOSAL AT A CONTRACTOR'S FACILITY. The contractor shall not be liable for the costs incurred by the Government for the removal of such oil, oily mixture, or hazardous substance when initiated by the Government.
H-3 AGR CONTRACT LINE ITEM NUMBER (CLIN 0002)
(a) The Government may utilize CLIN 0002 for and not limited to, man-hours generated from a discrepancy found between WIs and the current conditions or a needed repair found during the open and inspect phase of the WI. This work may consist of supplemental, emergent, or new work. AGR does not include work performed pursuant to DFARS Clause 252.217-7005 - Inspection and Manner of Doing Work, 252.217-7013 - Guarantees, or other contract clauses relating to the correction of defects. The contractor agrees that CLIN 0002 AGR man-hours, if ordered, shall be performed concurrently with CLIN 0001 and any or all Category “B” WIs exercised, during the contract’s performance period, without impacting, accelerating, or causing delay or disruption to the work required by the aforementioned WIs, to any other Government contract, or to any other work in progress for the Government. Work under this CLIN may coincide with ODC, and therefore will be performed concurrently with H-4 (ODC).
(b) As a result of a discrepancy found between the WI and the current conditions or a needed repair found during the open and inspect phase of the WI, the contractor may submit a CFR to the ACO and the PPE. As a result of this report submission, the ACO may request a proposal from the contractor. Whenever the Government orders AGR pursuant to this clause, the contractor shall submit a price proposal for such work. This proposal shall be submitted within three (3) days of the receipt of the Government's request for a proposal, or within such additional time provided in writing by the KO. The contractor's failure to submit its proposal within the three (3) day period, or such extended period of time, may be considered a failure of the parties to negotiate a fair and reasonable price for the AGR and will permit the KO to take any of the three (3) options set forth in subparagraph (d) below. AGR proposals shall be priced using the FBLR set forth in Section B, CLIN 0002. The rate established in CLIN 0002 will be used in evaluating the contractor's proposal and will also be used for negotiating changes as required by this clause. As part of the contractor’s proposal submission for AGR, the following shall be included:
| - FBLR |
| - Proposed Labor Mix/Categories |
| - Proposed Man Hours |
| - Total Proposed AGR |
(c) Considering FBLRs have been pre-approved in CLIN 0002, proposal evaluation may be limited to: (1) evaluating the mix of labor categories and associated man-hours to ensure that they are reasonable to meet the Government’s minimum requirements in addressing these discrepancies or repairs found; and (2) as a result of the mix of labor categories and man-hours, the subsequent AGR price is fair and reasonable IAW FAR 15.404-1(b) – Price analysis for commercial and non-commercial items. In the event that a fair and reasonable price cannot be negotiated, the KO reserves the right to procure these ODCs utilizing alternative means described in subparagraph (d), below.
(d) Upon receipt of the contractor's price proposal for the AGR the contractor and the KO shall negotiate the scope of the effort. If a fair and reasonable price cannot be negotiated between the contractor and the KO, the KO reserves the right to:
(1) Have the work performed by the Government;
(2) Issue a unilateral modification;
(3) Cancel the requirement.
(e) The contractor knowingly and voluntarily waives all claims against the Government and/or other third-party contractors for delay, disruption, loss of efficiency, or other impact arising out of or based upon the presence of Government or other contractor employees performing the AGR at the contractor's facility. Furthermore, in cases described in sub-paragraphs (d)(1) and (2) above, the contractor waives any right to claims of interference under the DFARS Clause 252.217-7011 - Access to Vessels.
(f) The contractor warrants and hereby certifies that its price for the firm fixed portion of this contract (CLIN 0001) does not include any amount for AGR (CLIN 0002). Settlement of AGR (CLIN 0002) will be for the purpose of providing funding. In the event the Government requires additional work, authorization to proceed shall be made only by the KO. The Contractor is to perform and invoice against CLIN 0002 ONLY for work that has been AUTHORIZED through a settled CCO and incorporated into the contract through a contract modification. All funding remaining on CLINs 0001 through 0020 at contract completion shall be de-obligated.
H – 4 OTHER DIRECT COSTS (CLIN 0002)
(a) The Government may utilize CLIN 0002 for and not limited to, material and equipment generated from a discrepancy found between WIs and the current conditions or a needed repair found during the open and inspect phase of the WI. This work may consist of supplemental, emergent, or new work. ODC does not include work performed pursuant to DFARS Clause 252.217-7005 - Inspection and Manner of Doing Work, 252.217-7013 - Guarantees, or other contract clauses relating to the correction of defects. The contractor agrees that CLIN 0002 ODC, if ordered, shall be performed concurrently with CLIN 0001 and any or all Category “B” WIs exercised, during the contract’s performance period, without impacting, accelerating, or causing delay or disruption to the work required by the aforementioned WIs, to any other Government contract, or to any other work in progress for the Government. Work under this CLIN may coincide with AGR, and therefore will be performed concurrently with H-3 (AGR).
(b) As a result of a discrepancy found between the WI and the current conditions or a needed repair found during the open and inspect phase of the WI, the contractor may submit a CFR to the ACO and the PPE. As a result of this report submission, the ACO may request a proposal from the contractor. Whenever the Government orders ODC pursuant to this clause, the contractor shall submit a price proposal for such work. This proposal shall be submitted within three (3) days of the receipt of the Government's request for a proposal, or within such additional time provided in writing by the KO. The contractor's failure to submit its proposal within the three (3) day period, or such extended period of time, may be considered a failure of the parties to negotiate a fair and reasonable price for the ODC and will permit the KO to take any of the three options set forth in subparagraph (d) below. As part of the contractor’s proposal submission for ODCs, the following shall be included:
Material -Part number -Order quantity -Unit price -Total price
Equipment
- Part number
- Order quantity
- Unit price
- Total price
Other Direct Costs not captured above
- Travel
- Per diem (lodging, M&IE daily rates)
- Subcontractor Proposal Breakdown shall include but not be limited to, Material (Part number, Order Quantity, Unit Price, and Total Price), equipment (Part Number, Order Quantity, Unit Price, and Total Price), labor (FBLR, Proposed Labor Mix/Categories, and Proposed Manhours), and ODC (Travel and Per Diem)
- Etc.
The G&A and profit rates proposed shall be the same as the rates provided under CLIN 0002 in the contract.
(c) Considering, G&A and profit rates have been pre-approved in CLIN 0002, proposal evaluation may be limited to: (1) evaluating the mix of ODCs proposed to ensure that they are reasonable to meet the Government’s minimum requirements in addressing these discrepancies or repairs found; and (2) the costs of the ODCs are fair and reasonable IAW FAR 15.404-1(b) – Price analysis for commercial and non-commercial items. In the event that a fair and reasonable price cannot be negotiated, the KO reserves the right to procure these ODCs utilizing alternative means described in subparagraph (d), below.
(d) Upon receipt of the contractor's price proposal for the AGR the contractor and the KO shall negotiate the scope of the effort. If a fair and reasonable price cannot be negotiated between the contractor and the KO, the KO reserves the right to:
(1) Have the work performed by the Government;
(2) Issue a unilateral modification;
(3) Cancel the requirement.
(e) The contractor knowingly and voluntarily waives all claims against the Government and/or other third-party contractors for delay, disruption, loss of efficiency, or other impact arising out of or based upon the presence of Government or other contractor employees performing the ODC at the contractor's facility. Furthermore, in cases described in sub-paragraphs (d)(1) and (2) above, the contractor waives any right to claims of interference under the DFARS Clause 252.217-7011 - Access to Vessels.
(f) The contractor warrants and hereby certifies that its price for the firm fixed portion of this contract (CLIN 0001) does not include any amount for the ODC (CLIN 0002). Settlement of ODC (CLIN 0002) will be for the purpose of providing funding. In the event the Government requires additional work, authorization to proceed shall be made only by the KO. The contractor is to perform and invoice against CLIN 0002 ONLY for work that has been AUTHORIZED through a settled CCO and incorporated into the contract through a contract modification. All funding remaining on CLINs 0001 through 0020 at contract completion shall be de-obligated.
H-5 EMPLOYMENT OF NAVY PERSONNEL RESTRICTED
In performing this contract, the contractor will not use as a consultant or employ (on either a full or part-time basis) any active duty Navy personnel (civilian or military) without the prior approval of the KO. Such approval may be given only in circumstances where it is clear that no laws and no DOD or Navy instructions, regulations, or policies are contravened and no appearance of a conflict of interest will result.
H-6 ASBESTOS REMOVAL REQUIREMENTS
(a) During the performance of this contract the contractor and subcontractors may be required to perform work which involves the removal or disturbance of asbestos or asbestos-containing products. This clause applies to each instance of asbestos removal or disturbance.
(b) The contractor shall comply with the precautions required in 29 CFR 1910.1001, 29 CFR 1926.58 and 40 CFR Part 61 and all other applicable Federal, state, and local restrictions. The contractor shall forward a copy of all required notices, licenses and permits to the KO immediately upon issuance or receipt.
(c) The latest change to the Federal, state, and local regulations in effect at the time of issuance of the contract shall govern. Compliance with these regulations is mandatory and is necessary to protect the employees of the contractor and Naval personnel from exposure to asbestos fibers in excess of the OSHA Action level airborne concentration (currently 0.1 f/cc of air).
(d) During removal or disturbance, the contractor shall control airborne asbestos concentrations outside the removal boundary to less than 0.1 f/cc at all times.
(e) After removal or disturbance is complete, the areas within the removal boundary shall not be released for re-occupancy until clearance air sampling demonstrates these spaces have concentrations of asbestos less than 0.1 f/cc.
(f) In all respects, the performance of air sampling and analysis shall be performed in accordance with the OSHA Reference Method (Appendix A of 29 CFR 1910.1001), with the following additional specifications:
(1) Aggressive clearance sampling shall be performed on 25 mm cassettes at 2.0 liters per minute for a minimum of four (4) hours.
(2) In performing the clearance sampling, the pump shall be placed within the compartment where the removal or disturbance occurred. When this operation is conducted in a multilevel space, at least one pump shall be placed on each level.
(3) Air sampling shall be performed by a person competent in sampling procedures and overseen by a CIH by the ABIH.
(4) Laboratory analysis of samples shall be performed by a participant in the AIHA PAT Program rated proficient for asbestos and air.
(g) Personal sampling shall be conducted using breathing zone air samples which are representative of the 8-hour TWA exposure of each individual. Samples shall be collected and analyzed using the OSHA Reference Method contained in either 29 CFR 1910.1001 (as amended) or 29 CFR 1926.58 (as amended).
(h) The contractor agrees to indemnify MSC for any fines assessed by Federal, state, or local agencies, for the contractor's failure to properly follow applicable regulations.
(i) The contractor shall insert this clause in all subcontracts entered into under this contract.
H-7 SUBCONTRACTOR SUBSTITUTION
Post-award substitution of any major subcontractor should not be effected unless the proposed substitution is submitted to the KO and official approval is obtained. The post-award substitution or insertion of a second-tier subcontractor will be treated in the same manner as the substitution of a major subcontractor and will require specific approval by the KO.
H-8 SUBSTITUTION OF KEY PERSONNEL
(a) General Clause. The contractor agrees to assign to this contract those persons identified as key personnel whose resumes were submitted with the proposal and who are necessary to fulfill the requirements of this contract. No substitution of key personnel shall be made except IAW this clause.
(b) Guidance on Substitutions. All proposed substitutions must be submitted, in writing, at least seven (7) days in advance of the proposed substitutions to the KO and must provide the information required by paragraph (c) below.
(c) Request for Substitution. All requests for substitution must provide a detailed explanation of the circumstances necessitating the proposed substitution, a resume for the proposed substitute, and any other information as requested by the KO. All proposed substitutes must have qualifications equal to or higher than the qualifications of the person to be replaced. The KO or his authorized representative will evaluate such requests and promptly notify the contractor of the approval or disapproval thereof.
H – 9 WAIVER OF CLAIMS
All requests for equitable adjustment to the contract price and any other claims whatsoever for monies due under this contract must be submitted to the KO pursuant to FAR Clause 52.233-1 Alt I - Disputes within six (6) months of the redelivery of the ship. All requests for equitable adjustment that are not submitted within the six (6) month limit shall be deemed to have been waived by the contractor.
H – 10 UTILIZATION OF TRAVEL AND PERDIEM IN CONDUCTING CHANGE ORDERS
The contractor shall demonstrate due diligence in the assessment, evaluation, and determination resulting in the proposed utilization of other than local specialized labor resources.
Only with KO approval to proceed will a contractor, technical representative, or subcontractor be reimbursed for reasonable per diem costs (transportation, travel expenses, lodging, meals, and incidental expenses) required in connection with the associated change order. Per diem costs are considered reasonable, allowable, and reimbursable only to the extent that they do not exceed the allowed per diem rate in effect at the time of travel as set forth in the FTR, JTR, or Standardized Regulations as set forth in FAR 31.205-46.
SECTION L - INSTRUCTIONS, CONDITIONS AND NOTICE TO BIDDERS
L – 1 GOVERNMENT FURNISHED INFORMATION – TECHNICAL DATA (GFI-TD)
GFI-TD referenced but not enclosed with this RFP are available via CD upon request. Offerors shall submit their request to the KO and provide their company name, point of contact, address, and phone number, and shall indicate if data will be forwarded to subcontractors.
L –2 REQUIREMENTS FOR SUBMISSION OF PROPOSALS
A. Proposal Submittal and Inquiries.
1. Proposals shall be received prior to the closing date and time identified on the SF 33, at the following address:
Military Sealift Command
| Attn: Colin Edick |
| 471 C Street |
| Naval Station Norfolk, VA 23511-2419 |
2. Electronic submissions via email or facsimile will not be accepted. Offers shall be mailed through a commercial/Government carrier or hand-carried.
3. All questions concerning the solicitation shall be addressed to the contracting specialist identified below via email:
colin.edick1@navy.mil
4. See L-5, “Inspection of Vessel/Pre-Proposal Conference,” for instructions to participate in a pre-proposal inspection of the vessel.
B. General Instructions
1. The selection of a source for award purposes will be conducted utilizing source selection (negotiated) procedures as delineated in FAR Subpart 15.3. Offers will be evaluated using the criteria under Section M, “Evaluation Factors for Award.” Noncompliance with the RFP requirements may hamper the Government’s ability to properly evaluate the proposal and may result in elimination of the proposal from further consideration for contract award.
2. The offer. The submission of the documentation specified below will constitute the offeror’s acceptance of the terms and conditions of the solicitation.
3. It is the Government’s intention to award without discussions. Offerors are encouraged to submit their best technical proposal and prices in initial proposals. IAW FAR 15.306, should discussions become necessary, the Government reserves the right to hold them. If this occurs, a competitive range will be determined and offerors notified. The competitive range may be limited for purposes of efficiency IAW FAR 15.306(c)(2). Proposals containing unacceptable ratings may be included in the competitive range provided they can be made acceptable as a result of discussions.
4. Instructions outlined in paragraph C below prescribe the format for the proposal and describe the approach for the development and presentation of proposal data. These instructions are designed to ensure the submission of information needed to allow for evaluation of proposals.
5. The WI Package is only available upon a written request to the contract specialist. All other referenced documents for this solicitation are available on the FBO website at https://www.fbo.gov.
6. Debriefings. The KO will promptly notify offerors of the decision to eliminate their proposals from the competitive range, whereupon an offeror can request and receive a debriefing in accordance with FAR 15.505. The KO will notify unsuccessful offerors in the competitive range of the source selection decision IAW FAR 15.506. Upon such notification, unsuccessful offerors may request and receive a debriefing. Any offeror requesting a debriefing must make the request in accordance with the requirements of FAR 15.506.
C. Proposal Preparation Instructions
1. Offeror’s proposal shall consist of two (2) separate volumes: (Volume I) General; and (Volume II) Technical Proposal.
2. Proposal Format
a. Offerors shall submit an original of their proposals and the number of copies listed in paragraph “c” below.
b. The proposals shall be organized into two (2) separate, sealed volumes. Each hard copy volume of the proposal shall be separately bound in a three-ring loose leaf binder. The original copy of each volume shall be marked, “Original,” and any copy shall be marked, “Copy.”
c. In addition to submitting hard copies of the proposals, offerors shall provide digital copies shall be provided on CD-ROM disk in Adobe PDF, Microsoft Word, PowerPoint, and/or Excel. Offerors shall ensure that proposal disks are virus-free and free of password protection. The Government reserves the right to eliminate a proposal from consideration if access to proposal data is prohibited due to viruses, passwords, and/or wrong format.
d. The table below shows detailed page limits and number of copies required to be submitted:
| Volume |
| Title |
| Number of Hard Copies |
| Number of Digital Copies (CD ROM) |
| Page Limits |
| I |
| General |
| 2 |
| 1 |
| N/A |
| II |
| Technical Proposal |
| 4 |
| 1 |
| 50 pages, excluding appendices |
The proposal shall not exceed the limits stated above. If the page limits are exceeded, the pages in excess of the limit shall be removed and remain unread.
The offeror shall submit a technical and a price proposal that shall include, at a minimum:
D. Proposal Content
1. Volume 1 – General. Offerors are required to submit: (TAB A) a completed SF 33 to include acknowledgement of amendments, if applicable; (TAB B) Section B – Supplies or Services and Prices/Costs and an itemized breakdown of price on the form(s) provided in Attachments J-2 and J-3; (TAB C) Subcontracting Plan (applicable if the offeror is a large business); (TAB D) Section K Representations, Certifications, and Other Statements of Offerors; and (TAB E) Past Performance.
TAB A, SF 33. The SF 33 shall be fully completed upon submission. The offeror shall acknowledge any amendments to the RFP in accordance with the instructions on the SF 33 and FAR Clause 52.215-1(b).
TAB B, Price:
For the price submission, the hard copy version will take precedence for any differences noted between the hard copy and electronic versions of an offeror’s proposal.
Offerors shall submit prices in the format specified on the Contractor Price Breakdown forms of this solicitation, Attachments J-2 and J-3. Each specification Item Number must be either priced or marked “NSP.”
Overall Price. Unit prices and extended prices must be submitted as indicated, except NSP items.
Offerors shall include any costs associated with third-party access to the contractor’s facility, including costs for badges, safety orientation instruction, and/or parking, in the price proposal under the Shipboard Access and Security Item. For estimating purposes, offerors shall assume that (1) the Government will require access, to include safety orientation instruction and parking at the shipyard facility, for thirty individuals for the entire duration of the performance period; and (2) 20% of the badges issued to the Government and third-party personnel will be lost/misplaced and will require replacement.
Offerors shall include the Hazardous Waste Handling Fee rate per WI 0023 Hazardous Waste Disposal at a Contractor’s Facility; and the unit price per KWh for electrical power, the unit price per gallon of potable water, and the unit price per gallon of distilled water per WI 0011 in Section B of the solicitation.
The contractor agrees that its man-hour rate for the 28,000 man-hours of the AGR includes the complete and full compensation to which it is entitled, including, but not limited to, compensation for all the direct labor costs, (e.g., straight time, overtime, premium time, shift differential, holiday time, standby time, etc.) for performing the AGR, as well as compensation for acceleration, delay and disruption, and other impact, if any, to the aforementioned WI, to work performed under any other Government contract, and to any work in progress for the Government. The contractor further agrees that it is not entitled to a time extension to the delivery date of any ship under a Government contract by reason of or as a result of the ordering of the 28,000 man-hours of AGR.
AGR does not include work performed pursuant to the clauses of this contract entitled “Inspection and Manner of Doing Work,” “Guarantees,” or other contract provision relating to the correction of defects.
TAB C, Subcontracting Plan. IAW FAR 52.219-9, 52.219-9 Alt II, and DFARS 252.219-7003 (DEVIATION 2018-O0007), large business offerors shall submit a Small Business Subcontracting Plan with their proposal. Offerors shall ensure they submit a Small Business Subcontracting Plan with all of the information required.
In preparing the Small Business Subcontracting Plan, offerors should note that historical compliance with FAR 52.219-8, 52.219-9 Alt II, and DFARS 252.219-7003 (DEVIATION 2018-O0007) shall be evaluated as part of Past Performance.
TAB D, Section K (Representations, Certifications, and Other Statements of Offerors). The offeror shall ensure that its Section K submission is thoroughly completed, with all blocks in each certification/representation executed in their entirety and truthfully.
TAB E, Past Performance:
The Past Performance evaluation will be accomplished by reviewing aspects of an offeror’s recent and relevant Past Performance. Offerors may provide information for up to three (3) previous Government contracts where the effort is/was recent and relevant to the effort required by this solicitation.
a. “Recent” is defined as a contract inprogress or completed within the last three (3) years. If the offeror has not had three (3) Government contracts within the last three (3) years, information on recent and relevant subcontracts and/or commercial contracts may be submitted.
b. “Relevant” is defined as a contract that is of similar scope, magnitude, and complexity to the requirements as set forth in this solicitation.
i. Scope: Experience in the areas defined in the WI package.
ii. Magnitude: The measure of the similarity of the volume, dollar value and/or duration of the work actually performed under the offeror’s submitted contracts to the WI package.
iii. Complexity: The measure of the similarity of technical difficulty, managerial intricacy and/or required coordination of efforts and disciplines performed by the offeror in its submitted contracts to the WI package. For complexity, not only will the tasks performed by the offeror be considered, but also the offeror’s ability to coordinate tasks (e.g., concurrent performance requirements).
A Past Performance Data Sheet (Attachment J-12) shall be submitted for each contract to be considered as past performance. Offerors shall provide a detailed explanation demonstrating the similarity of the contracts to the requirements of this solicitation; a detailed description of the work performed for the contract; and the role performed, including whether the offeror acted as a prime contractor or a subcontractor. Offerors are responsible for the accuracy of all data provided. Past performance information regarding predecessor companies, key personnel who have relevant experience, and subcontractors that will perform major or critical aspects of the requirement may be provided as past performance submissions.
For each of the contracts the offeror describes in a Performance Data Sheet (Attachment J-12), the offeror is requested to provide a Past Performance Questionnaire (Attachment J-13) to a reference at the organization that awarded the contract. The reference, not the offeror, shall email the completed past performance Questionnaire BEFORE THE DUE DATE FOR PROPOSALS directly to Colin Edick, Military Sealift Command Norfolk, Bldg SP-64 471 C Street, Naval Station Norfolk, VA 23511-2419, email to colin.edick1@navy.mil. Fax submittals will not be considered. If the contracts listed in Attachment J-12 are available in a Government past performance system (i.e. CPARS, FAPIIS, ESRS) for Government review, Attachment J-13 is not required. The offeror, NOT THE GOVERNMENT, is responsible for ensuring the Government receives a sufficient number of questionnaires or that sufficient information is documented in the Government’s past performance systems for review.
2. Volume II – Technical Proposal.
The technical proposal will be the basis for assessing the offeror’s ability to understand and perform the tasks in the solicitation. Section M of the solicitation outlines the evaluation factors and defines the source selection evaluation criteria for evaluating the technical proposal. A legible, neat, orderly, and comprehensive proposal is required. Data should be presented in Evaluation Factor sequence (1.0-3.0) and paragraph numbering in the proposal submitted should coincide with the numbering system set forth in Section M. Failure to respond to any one of the evaluation factors may result in disqualification of the proposal.
The technical proposal must demonstrate an understanding of and an ability to meet all of the requirements covered in the specification.