Amendment 5.docx

DOCX document 29 KB Posted

Attached to
USNS MERCY ROH/DD
Solicitation number
N3220520R6500
Issued by

About this file

This document is an amendment to a solicitation for repair and drydocking services for the USNS Mercy hospital ship. The amendment modifies the period of performance, establishing that all work must be completed within 150 calendar days from the actual start date designated by the Government upon contract award. It is anticipated the ship will arrive at the contractor's yard on or about April 20, 2020. The solicitation is seeking proposals from offerors to provide repair and drydocking services for the USNS Mercy, as described in the attached statements of work and drawings. The soliciting agency is the Department of the Navy Military Sealift Command.

View the file

Other files

File Type Posted
Amendment 9 USNS MERCY.docx DOCX document
Amendment 008.docx DOCX document
J-3 Category B Pier Side Availability.xlsx XLSX spreadsheet
J-3 Category B ROH.xlsx XLSX spreadsheet
J-2 Category A ROH.xlsx XLSX spreadsheet
J-2 Category A Item Pier Side Availability.xlsx XLSX spreadsheet
Amendment 7.docx DOCX document
Revised J-2 Category A Item.xlsx XLSX spreadsheet
Amendment 6.docx DOCX document
Revised J-3 Category B Items.xlsx XLSX spreadsheet
026 WI 709 Missing Ref.docx DOCX document
AMENDMENT 4.docx DOCX document
025 Nag Material Request.docx DOCX document
024 Axial Fan Material Requirements.docx DOCX document
022 1001 Ceiling panel size.docx DOCX document
023 Extension Request3.docx DOCX document
021 0101 Tk Vent Vlv Scope2.docx DOCX document
020 NAG Marine Software 1_9_20.rtf RTF text file
020 NAG Marine Software.docx DOCX document
N3220520R6500 Amendment 0003.docx DOCX document
Copy of J-3 Category B Items.xlsx XLSX spreadsheet
RFCs 013 through 019.docx DOCX document
003 0101 Tk Vent Ref Scope - Response.docx DOCX document
008 Missing DWGs & TMs.docx DOCX document
011 Missing TMs - Response.docx DOCX document
012 0907 blast prep - Response.docx DOCX document
006 0920 Stability Lightship-Response.docx DOCX document
AMENDMENT 2 MERCY.docx DOCX document
010 Ballast System Valve Actuator Repair - Response.docx DOCX document
005 0103 Ladders Rails scope - Response.docx DOCX document
004 0102 Anti Roll Tk Ref and Scope - Response.docx DOCX document
009 Extension Request.docx DOCX document
007 0105 WT Door size and detail - Response.docx DOCX document
J-2 Category A Item Revised.xlsx XLSX spreadsheet
AMENDMENT #1.docx DOCX document
Q&A #1.docx DOCX document
Q&A #2.docx DOCX document
J-15 Non-Mariner Maintenance Contractor Vetting Sheet (Rev 8 (v4) 20 Sep 2017).xlsx XLSX spreadsheet
DD Form 1423-1 SWI-016 Fire Protection.pdf PDF
J-12 Past Performance Data.docx DOCX document
J-8 Request for Spec Clarification.docx DOCX document
J-3 Category B Items.xlsx XLSX spreadsheet
DD Form 1423-1 SWI-001 General Requirements.pdf PDF
DD Form 1423-1 SWI-014.pdf PDF
SOLICITATION N3220520R6500.docx DOCX document
DD Form 1423-1 SWI-017 Ships Stores.pdf PDF
J-14 Technical Data Non-Disclosure.docx DOCX document
J-13 Past Performance Questionnaire.docx DOCX document
DD Form 1423-1 SWI-012 Telephone Service.pdf PDF
J-9 Disclosure of Lobbying Activities SF-LLL.docx DOCX document
Show 40 more

Latest 50 of 67 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N3220520R6500

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION F - DELIVERY AND PERFORMANCE

The following have been modified:

F-1 SHIP AVAILABILITY PERIOD

It is anticipated the ship will arrive at contractor’s yard on or about 20 April 2020. All work shall be completed in no more than 150 calendar days from actual start date designated by the Government at time of contract award.

(End of Summary of Changes) image1.wmf