| GENERAL REQUIREMENT | QTY | UI | Unit Price | Total | PRIME Contractor | | | SUBCONTRACTOR | | | OTHER COSTS | | | |
| ITEM NO. | TITLE CAT B ITEM | | | | | PRIME L/H | LABOR PRICE | MATERIAL PRICE | SUB L/H | LABOR PRICE | MATERIAL PRICE | | Total Labor Hours | Total Material | TOTAL PRICE |
| 25 | COST TO ESTABLISH AND MAINTAIN PHYSICAL SECURITY AT PRIVATE CONTRACTOR'S FACILITY IN FORCE PROTECTION CONDITION CHARLIE AND DELTA | | | | | | | | | | | | | | |
| 7.1 | COST TO ESTABLISH PHYSICAL SECURITY AT PRIVATE CONTRACTOR'S FACILITY FROM BRAVO to FORCE PROTECTION CONDITION CHARLIE | 1 | Days | | $ - 0 | | | | | | | | | | $ - 0 |
| 7.1 | COST TO ESTABLISH PHYSICAL SECURITY AT PRIVATE CONTRACTOR'S FACILITY FROM CHARLIE to FORCE PROTECTION CONDITION DELTA | 1 | Days | | $ - 0 | | | | | | | | | | $ - 0 |
| 7.1 | COST TO MAINTAIN PHYSICAL SECURITY AT PRIVATE CONTRACTOR'S FACILITY IN FORCE PROTECTION CONDITION CHARLIE | 10 | Days | | $ - 0 | | | | | | | | | | $ - 0 |
| 7.1 | COST TO MAINTAIN PHYSICAL SECURITY AT PRIVATE CONTRACTOR'S FACILITY IN FORCE PROTECTION CONDITION DELTA | 10 | Days | | $ - 0 | | | | | | | | | | $ - 0 |
| WI 025 SUBTOTAL | | | | | | | | | | | | | | $ - 0 |
| 030 | CONTINUATION OF SERVICES | | | | |
| 7.1 | Overhaul Management Team | 30 | Days | $ - 0 | $ - 0 |
| 7.2 | General Services For The Ship | 30 | Days | $ - 0 | $ - 0 |
| 7.3 | Telephone Services | 30 | Days | $ - 0 | $ - 0 |
| 7.4 | Project Planning and Monitoring | 30 | Days | $ - 0 | $ - 0 |
| 7.5 | Fire Protection and Ship's Safety | 30 | Days | $ - 0 | $ - 0 |
| 7.6 | Shipboard Access and Security | 30 | Days | $ - 0 | $ - 0 |
| 7.7 | Gas Free Certificates | 30 | Days | $ - 0 | $ - 0 |
| WI 030 SUBTOTAL | | | | $ - 0 |
| 197 | Lead Paint Testing and Abatement | | | | | | |
| Paint Sample | 10 | LOT OF 10 EACH | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Overhead surfaces | 125 | SQ FT | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Horizontal surfaces | 125 | SQ FT | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Vertical surfaces | 125 | SQ FT | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Piping of various sizes | 125 | SQ FT | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| WI 0102 SUBTOTAL | | | | | | $ - 0 |
| 198 | Hull Gauging | | | | |
| Ultrasonic Thickness Gauging | 50 | LOT OF 100 EACH | $ - 0 | $ - 0 |
| WI 198 SUBTOTAL | | | | $ - 0 |
| 199 | MISC Steel Renewal | | | | | | |
| Misc Plate, Bulkheads and decks | 1,000 | Pounds | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Shell or Rudder Plating | 1,000 | Pounds | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Shell or Rudder Plating, Shaped | 1,000 | Pounds | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Tank Bulkhead | 500 | Pounds | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Tank Internals | 500 | Pounds | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Shell Plate Framing | 800 | Pounds | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Tank Top in Machinery Spaces | 800 | Pounds | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Machinery Foundations in Machinery Spaces | 500 | Pounds | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Floors and intercostals in double bottom tanks | 500 | Pounds | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Double bottom stiffeners and bulkheads | 500 | Pounds | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Machinery Foundations on Deck | 600 | Pounds | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| WI 199 SUBTOTAL | | | | | | $ - 0 |
| 399 | MISC Motor Overhauls | | | | |
| 2.2.1 | Motor OverhaUls Paragraph 7.3-7.9.2 | | | | |
| 2—7 horsepower | 2 | EA | $ - 0 | $ - 0 |
| 8—15 horsepower | 4 | EA | $ - 0 | $ - 0 |
| 16—25 horsepower | 4 | EA | $ - 0 | $ - 0 |
| 26—40 horsepower | 4 | EA | $ - 0 | $ - 0 |
| 41—60 horsepower | 4 | EA | $ - 0 | $ - 0 |
| 75—100 horsepower | 4 | EA | $ - 0 | $ - 0 |
| 2.2.1 | Motor Rewind Paragraph 7.4.4.1-7.4.4.14 | | | | |
| 2—7 horsepower | 2 | EA | $ - 0 | $ - 0 |
| 8—15 horsepower | 4 | EA | $ - 0 | $ - 0 |
| 16—25 horsepower | 4 | EA | $ - 0 | $ - 0 |
| 26—40 horsepower | 4 | EA | $ - 0 | $ - 0 |
| 41—60 horsepower | 4 | EA | $ - 0 | $ - 0 |
| 75—100 horsepower | 4 | EA | $ - 0 | $ - 0 |
| WI 399 SUBTOTAL | | | | $ - 0 |
| 597 | Plumbing Drain Piping Replacement | | | | |
| 2.2.1 | Pipe, Steel Schedule 40, seamless, ASTM A-53 Grade B Galvanized | | | | |
| 1.5 IPS | 200 | Linear FT | $ - 0 | $ - 0 |
| 2 IPS | 200 | Linear FT | $ - 0 | $ - 0 |
| 2.5 IPS | 200 | Linear FT | $ - 0 | $ - 0 |
| 3 IPS | 200 | Linear FT | $ - 0 | $ - 0 |
| 4 IPS | 200 | Linear FT | $ - 0 | $ - 0 |
| 6 IPS | 200 | Linear FT | $ - 0 | $ - 0 |
| 2.2.1 | Fitting: Elbow, Flange, Tee, etc. Steel, Schedule 40, seamless ASTM A-53 Grade B Galvanized | | | | |
| 1.5 IPS | 20 | Units | $ - 0 | $ - 0 |
| 2 IPS | 20 | Units | $ - 0 | $ - 0 |
| 2.5 IPS | 20 | Units | $ - 0 | $ - 0 |
| 3 IPS | 20 | Units | $ - 0 | $ - 0 |
| 4 IPS | 20 | Units | $ - 0 | $ - 0 |
| 6 IPS | 20 | Units | $ - 0 | $ - 0 |
| WI 597 SUBTOTAL | | | | $ - 0 |
| 598 | Sewage System 3-Way Valve Refurbishment | | | | |
| 2.2.1 | 3-Way Valve Overhaul/ para 7.1 – 7.7 | | | | |
| 3 inch 3-way plug valve | 6 | EA | $ - 0 | $ - 0 |
| 4 inch 3-way plug valve | 6 | EA | $ - 0 | $ - 0 |
| 6 inch 3-way plug valve | 6 | EA | $ - 0 | $ - 0 |
| WI 598 SUBTOTAL | | | | $ - 0 |
| 599 | MISC Piping Renewal | | | | |
| 2.2.1 | Pipe, Steel Schedule 40 | | | | |
| 2 IPS | 150 | Linear FT | $ - 0 | $ - 0 |
| 3 IPS | 150 | Linear FT | $ - 0 | $ - 0 |
| 4 IPS | 150 | Linear FT | $ - 0 | $ - 0 |
| 6 IPS | 150 | Linear FT | $ - 0 | $ - 0 |
| Fitting: Elbow, Flange, Tee, etc. Steel | | | | |
| 2 IPS | 40 | EA | $ - 0 | $ - 0 |
| 3 IPS | 40 | EA | $ - 0 | $ - 0 |
| 4 IPS | 20 | EA | $ - 0 | $ - 0 |
| 6 IPS | 20 | EA | $ - 0 | $ - 0 |
| Pipe, 90-10 Cu-Ni Class 200 | | | | |
| 2 IPS | 150 | Linear FT | $ - 0 | $ - 0 |
| 3 IPS | 150 | Linear FT | $ - 0 | $ - 0 |
| 4 IPS | 150 | Linear FT | $ - 0 | $ - 0 |
| 6 IPS | 150 | Linear FT | $ - 0 | $ - 0 |
| Fitting: Elbow, Flange, Tee etc. 90-10 Cu-Ni Class 200 | | | | |
| 2 IPS | 40 | EA | $ - 0 | $ - 0 |
| 3 IPS | 40 | EA | $ - 0 | $ - 0 |
| 4 IPS | 20 | EA | $ - 0 | $ - 0 |
| 6 IPS | 20 | EA | $ - 0 | $ - 0 |
| WI 599 SUBTOTAL | | | | $ - 0 |
| 899 | Insulation and Lagging Repair | | | | |
| 2.2.1 | Pipe Lagging Steam or Chilled | | | | |
| 1-½IPS | 50 | Linear FT | $ - 0 | $ - 0 |
| 2 IPS | 50 | Linear FT | $ - 0 | $ - 0 |
| 2-½IPS | 50 | Linear FT | $ - 0 | $ - 0 |
| 3 IPS | 20 | Linear FT | $ - 0 | $ - 0 |
| 4 Inch IPS | 20 | Linear FT | $ - 0 | $ - 0 |
| 6 Inch IPS | 20 | Linear FT | $ - 0 | $ - 0 |
| 8 Inch IPS | 20 | Linear FT | $ - 0 | $ - 0 |
| 10 Inch IPS | 20 | Linear FT | $ - 0 | $ - 0 |
| Valve Blankets Steam or Chilled | | | | |
| 2 Inch Valve | 5 | 1 Blanket | $ - 0 | $ - 0 |
| 3 Inch Valve | 5 | 1 Blanket | $ - 0 | $ - 0 |
| 4 Inch Valve | 5 | 1 Blanket | $ - 0 | $ - 0 |
| 6 Inch Valve | 5 | 1 Blanket | $ - 0 | $ - 0 |
| 8 Inch Valve | 5 | 1 Blanket | $ - 0 | $ - 0 |
| 10 Inch Valve | 2 | 1 Blanket | $ - 0 | $ - 0 |
| Insulation Bulkhead | | | | |
| 1 Inch thick fiberglass, cloth backed | 50 | Sq ft | $ - 0 | $ - 0 |
| 2 Inch thick fiberglass, cloth backed | 50 | Sq ft | $ - 0 | $ - 0 |
| 3 Inch thick fiberglass, cloth backed | 300 | Sq ft | $ - 0 | $ - 0 |
| 4 Inch thick fiberglass, cloth backed | 20 | Sq ft | $ - 0 | $ - 0 |
| Vent Duct* Insulation | | | | |
| Round and Oval | 1,000 | Sq ft | $ - 0 | $ - 0 |
| Square and Rectangular | 1,000 | Sq ft | $ - 0 | $ - 0 |
| Generator Exhaust Insulation | | | | |
| Calcium Silicate up to 4.5” thickness | 150 | Sq ft | $ - 0 | $ - 0 |
| WI 899 SUBTOTAL | | | | $ - 0 |
| 903 | Tailshaft Inspection ABS 15 YR | | | | | | |
| Tailshaft Inspection ABS 15 YR | 1 | EA | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| WI 903 SUBTOTAL | | | | | | $ - 0 |
| 967 | Shaft Alignment and Bearing Reaction Checks Sets | | | | | | |
| Shaft Alignment and Bearing Reaction Checks | 1 | EA | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| WI 967 SUBTOTAL | | | | | | $ - 0 |
| 968 | SHAFT ALIGNMENT AND BEARING REACTION CHECKS (POST ) | | | | | | |
| Shaft Alignment and Bearing Reaction Checks Post | 1 | EA | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| WI 968 SUBTOTAL | | | | | | $ - 0 |
| 999 | Extension on Dry Dock | | | | |
| Extension on Dry Dock | 10 | Days | $ - 0 | $ - 0 |
| WI 968 SUBTOTAL | | | | $ - 0 |
TOTAL J-3 CATEGORY B WORK ITEMS $ - 0
| &14USNS MERCY (T-AH 19) | &14CONTRACTOR PRICE BREAKDOWN |
| &"Arial,Bold"CATEGORY "B" ITEMS | &14N3220520R6500 |
| &14USNS MERCY (T-AH 19) | &14CONTRACTOR PRICE BREAKDOWN |
| &"Arial,Bold"CATEGORY "B" ITEMS | &14N3220520R6500 |
| &14USNS MERCY (T-AH 19) | &14CONTRACTOR PRICE BREAKDOWN |
| &"Arial,Bold"CATEGORY "B" ITEMS | &14N3220520R6500 |
ATTACHMENT J-3