(USS SAN DIEGO) Attachment J-3 Execution Milestones Rev_1.xlsx
XLSX spreadsheet 878 KB Posted
- Solicitation number
- N00024-21-R-4442
About this file
The Naval Sea Systems Command issued a solicitation for the execution of the USS MUSTIN (DDG 89) FY21 Docking Selected Restricted Availability and the USS SAN DIEGO (LPD 22) FY21 Docking Selected Restricted Availability. The solicitation requires maintenance, modernization, and repair services for the two named vessels and will be awarded to a single contactor capable of completing multiple areas of ship maintenance, repair and modernization. Interested offerors must be registered in the System for Award Management and monitor the beta.SAM.gov site for solicitation release and amendments. The solicitation includes execution milestones, pricing workbooks, and compartment closeout attachments. Work specifications and references are available via CD from identified points of contact. The Government anticipates a single award by May 2021. The USS MUSTIN availability period begins September 2021 and is expected to be complete by July 2023. The USS SAN DIEGO availability begins September 2021 and is expected to end in December 2022.
View the file
Other files
Show all 43
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Exec Milestones (Contractual)
| USS SAN DIEGO (LPD 22) FY21 DSRA | Offerors are not to propose milestones highlighted in Orange. These milestones are calculated or fixed | |
| Offerors are to propose values highlighted in Blue in accordance with "Notes". Entering values into the blue highlighted cells will allow the milestone spreadsheet to calculated the remaining interim milestones. | ||
| System | Milestones/Key Events (Calculated or Proposed) | Notes |
| Avail Start at KTR Facility | Monday, September 13, 2021 | |
| DOCK | ||
| Dry Dock Reports Due (No Later Than) | Sunday, December 31, 1899 | Reports due on the date in Column B or, if the date in Column B is on a weekend or Government holiday, due on the next Government business day following the date in Column B |
| UNDOCK | ||
| Crew Move Ashore | Monday, September 27, 2021 | |
| Avail 20% Open and Inspect | Monday, December 06, 2021 | |
| 25% CONFERENCE | Wednesday, December 29, 2021 | Conference to be held on the next Wednesday following the date in Column B |
| 50% CONFERENCE | Wednesday, April 13, 2022 | Conference to be held on the next Wednesday following the date in Column B |
| Start SSDS Fiber | Tuesday, May 10, 2022 | |
| CS Space Turn Over | Wednesday, July 06, 2022 | |
| CSSELO | Wednesday, July 13, 2022 | |
| 75% Conference | Wednesday, July 27, 2022 | Conference to be held on the next Wednesday following the date in Column B |
| C5ILO | Tuesday, August 02, 2022 | Minimum equipment/system required ISO C5ILO: Electrical Power (400Hz) , Seawater, Chilled Water, Electronic Cooling Water, Gray Water Tanks, VCHTs System, Electronic Dry air, AC Units, IC Switchboards, FWD/AFT Gyro and IVCS |
| HAB / Crew Move Aboard | Tuesday, August 30, 2022 | |
| PCD | Tuesday, September 06, 2022 | |
| AVCERT | Saturday, October 08, 2022 | |
| LOA | Monday, October 17, 2022 | |
| Dock Trials | Tuesday, October 25, 2022 | |
| Fast Cruise | Wednesday, October 26, 2022 | |
| Sea Trials | Sunday, October 30, 2022 | |
| Sea Trials Complete | Tuesday, November 08, 2022 | |
| Contract Complete | Tuesday, November 08, 2022 |
ERL
USS SAN DIEGO (LPD 22) FY21 DSRA
Event Readiness List (Work Item Title) Legend: "I" = Open & Inspect (CFR), "P" = Production Complete,
| "T" = Testing Complete, "C" = Certification Complete. | START OF AVAIL | DOCK | DRY DOCK REPORTS DUE | AVAIL 20% (O&I) | UNDOCK | C5ILO | HAB COMPLETE | PCD | AVCERT | LOA | DOCK TRAILS/FAST CRUISE | HM&E and TYCOM SEA TRAILS | CONTRACT COMPLETE | Annotate Critical Path WI, Controlling WI, PCP, RTR, Front Load… | ||
| WORK ITEM NO. | WORK ITEM TITLE | Comments | ||||||||||||||
| 042-11-001 | Work Package Execution Review (WPER); accomplish | C | 3.1.2.1 | |||||||||||||
| 042-11-002 | Accountability of Manhour and Material Reservation; accomplish | C | 3.2.2.1, 3.2.5, 3.2.6 | |||||||||||||
| 042-11-004 | Arrival Conference; accomplish | C | C | |||||||||||||
| 042-11-005 | Conditions Found Report (CFR); provide and manage | P/C | C | 3.1.1 | ||||||||||||
| 077-11-001 | Fire Drill Service; provide | I | P/C | 3.1.6 | ||||||||||||
| 100-10-001 | Temporary Access Cut; provide | P/C | Access Cut | |||||||||||||
| 110-11-001 | Underwater Hull; repair | I | P/C | 3.2.2, 3.5.1 | ||||||||||||
| 114-11-001 | Starboard Forward Lower Bossing; replace | P/C | ||||||||||||||
| 114-11-002 | Lifting Tube Assembly Covers; replace | P/C | 3.1.1 | |||||||||||||
| 115-90-001 | ShipAlt LPD17-84960K, LPD 17 Class V-Lines Increase; accomplish | P/C | Access Cut, PCP | |||||||||||||
| 123-10-001 | Tank and Void Cleaning and Pumping; accomplish | I | P/C | 3.1.3, 3.2.3, PCP | ||||||||||||
| 123-11-001 | Fuel Oil Storage Tank; preserve | P/C | Controlling Path | |||||||||||||
| 123-11-002 | Fuel Oil Storage Tank; repair | I | P/C | 3.1.1, Controlling Path | ||||||||||||
| 123-11-003 | Auxiliary Fuel Oil Service Tank; repair | I | P/C | 3.1.1, Controlling Path | ||||||||||||
| 123-11-004 | Auxiliary Fuel Oil Service Tank; preserve | P/C | Controlling Path | |||||||||||||
| 123-11-005 | Fuel Oil Storage Tank; repair | I | P/C | 3.1.1, Controlling Path | ||||||||||||
| 123-12-001 | JP-5 Tank; repair | I | P/C | 3.1.1, Controlling Path | ||||||||||||
| 123-12-002 | JP-5 Tank; preserve (touch up) | P/C | Controlling Path | |||||||||||||
| 123-13-001 | Fresh Water/Water Mist Storage Tank; repair | P/C | 3.1.1, Controlling Path | |||||||||||||
| 123-13-002 | Fresh Water/Water Mist Storage Tank; preserve (touch up) | P/C | Controlling Path | |||||||||||||
| 123-16-001 | Ballast Tank; preserve (touch up) | P/C | ||||||||||||||
| 123-16-002 | Ballast Tank; repair | I | P/C | 3.1.1, 3.2.2 | ||||||||||||
| 123-16-003 | Ballast Tank; preserve | I | P/C | 3.2.2, Access Cut | ||||||||||||
| 123-17-001 | Contaminated Oil Tank; preserve (touch up) | P/C | ||||||||||||||
| 123-17-002 | Contaminated Oil Tank; repair | I | P/C | 3.1.1 | ||||||||||||
| 123-17-003 | Contaminated Oil Tank; preserve | P/C | Access Cut | |||||||||||||
| 123-19-001 | Plumbing Waste Water Tank; preserve (touch up) | P/C | ||||||||||||||
| 123-19-002 | Plumbing Waste Water Tank; repair | I | P/C | 3.1.1 | ||||||||||||
| 123-22-001 | Chain Locker; repair | I | P/C | 3.1.1 | ||||||||||||
| 123-22-002 | Chain Locker; preserve | P/C | Access Cut | |||||||||||||
| 123-22-003 | Vacuum Collection, Holding and Transfer (VCHT) Room No. 2, Structural Repair; accomplish | P/C | ||||||||||||||
| 130-11-001 | Aircraft Securing Fitting; replace | P/C | 3.1.1 | |||||||||||||
| 134-11-001 | Well Deck Plate; repair | P/C | 3.2.1, 3.4.1, 3.5.2 | |||||||||||||
| 134-11-002 | Well Deck Wing Wall; repair | P/C | 3.3.1, 3.4.1 | |||||||||||||
| 150-11-001 | Longitudinal and Transverse Bulwark Framing and Deck Plating; repair | P/C | 3.4.1, 3.5.1, Access Cut | |||||||||||||
| 150-11-002 | Bulwark Access Cover; repair | P/C | ||||||||||||||
| 150-11-003 | Shaft Alley No.2, Structural Repair; accomplish | I | P/C | 3.1.1 | ||||||||||||
| 163-11-001 | Sea Chest; inspect and repair | I | P/C | 3.2.1.1, 3.3.1, Critical Path | ||||||||||||
| 163-11-002 | Waster Sleeve; replace | P/C | Critical Path | |||||||||||||
| 167-80-001 | ShipAlt LPD17-88217D, Watertight Door for Pilot Boarding Station; accomplish | P/C | PCP | |||||||||||||
| 233-11-001 | Number 1A Main Propulsion Diesel Engine (MPDE) Lay-up; accomplish | P/C | PCP | |||||||||||||
| 233-11-002 | Number 1A Main Propulsion Diesel Engine (MPDE) Crankcase Vacuum System; clean and inspect | I | P/C | 3.2.3.1, Critical Path, PCP | ||||||||||||
| 233-11-003 | Number 1A Main Propulsion Diesel Engine (MPDE) Sequential Turbocharger Valve; overhaul | I | P/C | 3.2.6.1, Critical Path, PCP | ||||||||||||
| 233-11-004 | Number 1A Main Propulsion Diesel Engine (MPDE) Intercooler; clean and inspect | I | P/C | 3.3.1.1, Critical Path, PCP | ||||||||||||
| 233-11-005 | Number 1A Main Propulsion Diesel Engine (MPDE) Air Intake Preheater; clean and inspect | I | P/C | 3.2.3.1, Critical Path, PCP | ||||||||||||
| 233-11-006 | Number 1A Main Propulsion Diesel Engine (MPDE) Connecting Rod, Main Bearing, and Thrust Bearing Shell; replace | I | P/C | 3.2.2.1, Critical Path, PCP | ||||||||||||
| 233-11-007 | Number 1A Main Propulsion Diesel Engine (MPDE) Cylinder Head; replace | I | P/C | 3.2.1.1, Critical Path, PCP | ||||||||||||
| 233-11-008 | Number 1A Main Propulsion Diesel Engine (MPDE) Exhaust Diffuser, Fastener, and Turbocharger Gas Inlet and Outlet Gasket; replace | I | P/C | 3.2.1.2, 3.2.2.1, Critical Path, PCP | ||||||||||||
| 233-11-009 | Number 1A Main Propulsion Diesel Engine (MPDE) Main Air Start Control Valve; replace | P/C | Critical Path | |||||||||||||
| 233-11-010 | Number 1A Main Propulsion Diesel Engine (MPDE) Fuel Oil Injection Pump; overhaul | I | P/C | 3.1.1.2, Critical Path, PCP | ||||||||||||
| 233-11-011 | Number 1A Main Propulsion Diesel Engine (MPDE) Turbocharger; overhaul | I | P/C | 3.3.5, Critical Path, PCP | ||||||||||||
| 233-11-012 | Number One Main Propulsion Diesel Engine (MPDE) Fuel Rack Crossover Shaft; overhaul | I | P/C | 3.3.1.9, 3.3.2.3, Controlling Path, PCP | ||||||||||||
| 233-11-016 | Number 1A Main Propulsion Diesel Engine (MPDE) Connecting Rod, Piston, and Liner; overhaul | I | P/C | 3.4.2, Controlling Path, PCP | ||||||||||||
| 233-11-017 | Number 1A Main Propulsion Diesel Engine (MPDE) Gear Train Backlash; measure | I | P/C | 3.2.3.3, Controlling Path, PCP | ||||||||||||
| 233-11-018 | Number 1A Main Propulsion Diesel Engine (MPDE) Jacket Water Temperature Regulating Valve; overhaul | P/C | Controlling Path | |||||||||||||
| 233-12-001 | Number 1B Main Propulsion Diesel Engine (MPDE) Main Air Start Control Valve; repair | I | P/C | 3.1.3.2, Controlling Path | ||||||||||||
| 233-12-002 | Number 1B Main Propulsion Diesel Engine (MPDE) Crankcase Vacuum System; clean and inspect | I | P/C | 3.2.3.1, Controlling Path, PCP | ||||||||||||
| 233-12-003 | Number 1B Main Propulsion Diesel Engine (MPDE) Sequential Turbocharger Valve; overhaul | I | P/C | 3.2.6.1, Critical Path, PCP | ||||||||||||
| 233-12-004 | Number 1B Main Propulsion Diesel Engine (MPDE) Intercooler; clean and inspect | I | P/C | 3.3.1.1, Controlling Path, PCP | ||||||||||||
| 233-12-005 | Number 1B Main Propulsion Diesel Engine (MPDE) Air Intake Preheater; clean and inspect | I | P/C | 3.2.3.1, Controlling Path, PCP | ||||||||||||
| 233-12-007 | Number 1B Main Propulsion Diesel Engine (MPDE) Lay-up; accomplish | P/C | 3 PCP | |||||||||||||
| 233-12-008 | Number 1B Main Propulsion Diesel Engine (MPDE) Exhaust Diffuser, Fastener, and Turbocharger Gas Inlet and Outlet Gasket; replace | I | P/C | 3.2.1.2, Critical Path, PCP | ||||||||||||
| 233-12-010 | Number 1B Main Propulsion Diesel Engine (MPDE) Fuel Oil Injection Pump and Drive; overhaul | I | P/C | 3.1.3.1, Controlling Path, PCP | ||||||||||||
| 233-12-011 | Number 1B Main Propulsion Diesel Engine (MPDE) Turbocharger; overhaul | I | P/C | 3.3.5, Critical Path, PCP | ||||||||||||
| 233-12-012 | Number 1B Main Propulsion Diesel Engine (MPDE) Connecting Rod, Main Bearing, and Thrust Bearing Shell; replace | I | P/C | 3.2.2.1, Critical Path, PCP | ||||||||||||
| 233-12-014 | Number 1B Main Propulsion Diesel Engine (MPDE) Cylinder Head; replace | I | P/C | 3.2.1.1, Critical Path, PCP | ||||||||||||
| 233-12-016 | Number 1B Main Propulsion Diesel Engine (MPDE) Connecting Rod, Piston, and Liner; overhaul | P/C | Critical Path, PCP | |||||||||||||
| 233-12-017 | Number 1B Main Propulsion Diesel Engine (MPDE) Gear Train Backlash; measure | I | P/C | 3.2.3.3, Critical Path, PCP | ||||||||||||
| 233-13-001 | Number 2A Main Propulsion Diesel Engine (MPDE) Lay-Up; accomplish | P/C | PCP | |||||||||||||
| 233-13-002 | Number 2A Main Propulsion Diesel Engine (MPDE) Crankcase Vacuum System; clean and inspect | I | P/C | 3.2.3.1, Controlling Path, PCP | ||||||||||||
| 233-13-003 | Number 2A Main Propulsion Diesel Engine (MPDE) Connecting Rod, Main Bearing and Thrust Bearing Shell; replace | I | P/C | 3.2.2.1, Critical Path, PCP | ||||||||||||
| 233-13-004 | Number 2A Main Propulsion Diesel Engine (MPDE) Intercooler; clean and inspect | I | P/C | 3.3.1.1, Controlling Path, PCP | ||||||||||||
| 233-13-005 | Number 2A Main Propulsion Diesel Engine (MPDE) Air Intake Preheater; clean and inspect | I | P/C | 3.2.3.1, Controlling Path, PCP | ||||||||||||
| 233-13-006 | Number 2A Main Propulsion Diesel Engine (MPDE) Fuel Rack Crossover Shaft; overhaul | I | P/C | 3.3.1.9, Controlling Path, PCP | ||||||||||||
| 233-13-007 | Number 2A Main Propulsion Diesel Engine (MPDE) Main Air Start Control Valve; replace | P/C | Controlling Path | |||||||||||||
| 233-13-008 | Number 2A Main Propulsion Diesel Engine (MPDE) Exhaust Diffuser, Fastener, and Turbocharger Gas Inlet and Outlet Gasket; replace | I | P/C | 3.2.1.2, 3.2.2.1 Critical Path, PCP | ||||||||||||
| 233-13-010 | Number 2A Main Propulsion Diesel Engine (MPDE) Fuel Oil Injection Pump; overhaul | I | P/C | 3.1.1.2, 3.3.3 Controlling Path, PCP | ||||||||||||
| 233-13-011 | Number 2A Main Propulsion Diesel Engine (MPDE) Turbocharger; overhaul | P/C | 3.3.5, Critical Path, PCP | |||||||||||||
| 233-13-012 | Number 2A Main Propulsion Diesel Engine (MPDE) Sequential Turbocharger Valve; overhaul | I | P/C | 3.2.6.1, Critical Path, PCP | ||||||||||||
| 233-13-015 | Number 2A Main Propulsion Diesel Engine (MPDE) Cylinder Head; replace | I | P/C | 3.2.1.1, Critical Path, PCP | ||||||||||||
| 233-13-016 | Number 2A Main Propulsion Diesel Engine (MPDE) Connecting Rod, Piston, and Liner; overhaul | P/C | Critical Path, PCP | |||||||||||||
| 233-13-017 | Number 2A Main Propulsion Diesel Engine (MPDE) Gear Train Backlash; measure | I | P/C | 3.2.3.3, Controlling, PCP | ||||||||||||
| 233-13-018 | Number 2A Main Propulsion Diesel Engine (MPDE) Jacket Water Temperature Regulating Valve; overhaul | P/C | Controlling | |||||||||||||
| 233-14-001 | Number 2B Main Propulsion Diesel Engine (MPDE) Lay-Up; accomplish | P/C | PCP | |||||||||||||
| 233-14-002 | Number 2B Main Propulsion Diesel Engine (MPDE) Crankcase Vacuum System; clean and inspect | I | P/C | 3.2.3.1, Critical Path, PCP | ||||||||||||
| 233-14-003 | Number 2B Main Propulsion Diesel Engine (MPDE) Sequential Turbocharger Valve; overhaul | I | P/C | 3.2.6.1 Critical Path, PCP | ||||||||||||
| 233-14-004 | Number 2B Main Propulsion Diesel Engine (MPDE) Intercooler; clean and inspect | I | P/C | 3.3.1.1, Controlling, PCP | ||||||||||||
| 233-14-005 | Number 2B Main Propulsion Diesel Engine (MPDE) Air Intake Preheater; clean and inspect | I | P/C | 3.2.3.1, Controlling, PCP | ||||||||||||
| 233-14-007 | Number 2B Main Propulsion Diesel Engine (MPDE) Main Air Start Control Valve; replace (OPTION ITEM) | I | P/C | 3.1.2.1 | ||||||||||||
| 233-14-008 | Number 2B Main Propulsion Diesel Engine (MPDE) Exhaust Diffuser, Fastener, and Turbocharger Gas Inlet and Outlet Gasket; replace | I | P/C | 3.2.1.2, 3.2.2.1, Critical Path, PCP | ||||||||||||
| 233-14-010 | Number 2B Main Propulsion Diesel Engine (MPDE) Fuel Oil Injection Pump and Drive; overhaul | I | P/C | 3.1.3.1, Controlling, PCP | ||||||||||||
| 233-14-011 | Number 2B Main Propulsion Diesel Engine (MPDE) Turbocharger; overhaul | I | P/C | 3.3.5, PCP | ||||||||||||
| 233-14-013 | Number 2B Main Propulsion Diesel Engine (MPDE) Connecting Rod, Main Bearing, and Thrust Bearing Shell; replace | I | P/C | 3.2.2.1 PCP | ||||||||||||
| 233-14-014 | Number 2B Main Propulsion Diesel Engine (MPDE) Cylinder Head; replace (OPTION ITEM) | I | P/C | 3.2.1.1, PCP | ||||||||||||
| 233-14-016 | Number 2B Main Propulsion Diesel Engine (MPDE) Connecting Rod, Piston, and Liner; overhaul (OPTION ITEM) | P/C | Controlling, PCP | |||||||||||||
| 233-14-017 | Number 2B Main Propulsion Diesel Engine (MPDE) Gear Train Backlash; measure (OPTION ITEM) | I | P/C | 3.2.3.3, Controlling, PCP | ||||||||||||
| 240-80-001 | ShipAlt LPD17-84077D, Modify Port and Starboard Shaft Bossing Section; accomplish | P/C | Controlling | |||||||||||||
| 241-11-001 | Number One Main Reduction Gear (MRG) Thrust Bearing Cap; repair | P/C | Critical Path, PCP | |||||||||||||
| 242-11-001 | Number 1A Main Propulsion Diesel Engine (MPDE) Dual Clutch Propulsion Assembly; repair | I | P/C | 3.3.2, Critical Path, PCP | ||||||||||||
| 242-12-001 | Number 1B Main Propulsion Diesel Engine (MPDE) Dual Clutch Propulsion Assembly; repair | I | P/C | 3.3.2, Critical Path, PCP | ||||||||||||
| 242-13-001 | Number 2A Main Propulsion Diesel Engine (MPDE) Dual Clutch Propulsion Assembly; repair | I | P/C | 3.3.2, Critical Path, PCP | ||||||||||||
| 242-14-001 | Number 2B Main Propulsion Diesel Engine (MPDE) Dual Clutch Propulsion Assembly; repair | I | P/C | 3.3.2, Critical Path, PCP | ||||||||||||
| 243-11-001 | Starboard Stern Tube Shaft Seal; overhaul | I | P/C | 3.2.3.1, 3.3.1, Critical Path | ||||||||||||
| 243-11-002 | Starboard Propulsion Shaft Alignment; accomplish | I | P/C | 3.3.1, Critical Path | ||||||||||||
| 243-11-003 | Starboard Waterborne Propulsion Shafting; inspect and repair | I | P/C | 3.2.1, 3.3.5.1 | ||||||||||||
| 243-12-001 | Port Stern Tube Shaft Seal; overhaul | I | P/C | 3.2.3.1, 3.3.1, Critical Path | ||||||||||||
| 243-12-002 | Port Propulsion Shaft Alignment; accomplish | I | P/C | 3.3.1, Critical Path | ||||||||||||
| 243-12-003 | Port Waterborne Propulsion Shafting; inspect and repair | I | P/C | 3.2.1, 3.2.5.1 | ||||||||||||
| 244-11-001 | Starboard Outboard Propulsion Shafting, Bearing Clearance Measurement; accomplish | I | P/C | 3.2.4, Critical Path | ||||||||||||
| 244-12-001 | Port Outboard Propulsion Shafting, Bearing Clearance Measurement; accomplish | I | P/C | 3.2.4, Controlling | ||||||||||||
| 245-11-001 | Starboard Controllable Pitch Propeller (CPP) Oil Distribution (OD) Box; replace | P/C | ||||||||||||||
| 245-11-002 | Starboard Controllable Pitch Propeller (CPP) Valve Rod Assembly; repair | I | P/C | 3.2.2.1, 3.2.2.8, 3.2.5, Critical path | ||||||||||||
| 245-11-003 | Starboard Controllable Pitch Propeller (CPP) Blade Set Repair and Propeller Hub Replacement; accomplish | I | P/C | 3.11.2.1, 3.13.1.1, Critical path, PCP | ||||||||||||
| 245-12-001 | Port Controllable Pitch Propeller (CPP) Oil Distribution (OD) Box; replace | P/C | ||||||||||||||
| 245-12-002 | Port Controllable Pitch Propeller (CPP) Valve Rod Assembly; repair | I | P/C | 3.2.2.1, 3.2.2.8, 3.2.5, Critical path | ||||||||||||
| 245-12-003 | Port Controllable Pitch Propeller (CPP) Blade Set Repair and Propeller Hub Replacement; accomplish | I | P/C | 3.11.2.1, 3.13.1.1, Critical path, PCP | ||||||||||||
| 259-10-001 | Diesel Engine Exhaust System Piping Fastener; replace | I | P/C | 3.2.1, Critical Path | ||||||||||||
| 264-31-001 | Number One Main Reduction Gear (MRG) and Controllable Pitch Propeller (CPP) Lube Oil Purifier Heater (LOPH); clean | I | P/C | 3.2.1, 3.3.5.1, Controlling Path | ||||||||||||
| 264-32-001 | Number 2 Main Reduction Gear (MRG) and Controllable Pitch Propeller (CPP) Lube Oil Purifier Heater (LOPH); clean | I | P/C | 3.1.2, 3.3.5.1, Controlling Path | ||||||||||||
| 311-20-002 | Number 4 and 5 Ship's Service Diesel Generator (SSDG) Lay-up; accomplish | I | P/C | 3.3.1.1 | ||||||||||||
| 311-21-001 | Number One Ship's Service Diesel Generator (SSDG) Aftercooler Core; clean and inspect | I | P/C | 3.1.1 | ||||||||||||
| 311-21-002 | Number One and 2 Ship's Service Diesel Generator (SSDG) Lay-up; accomplish | I | P/C | 3.3.1.1 | ||||||||||||
| 311-21-003 | Number One Ships Service Diesel Generator (SSDG) Turbocharger; replace | I | P/C | 3.2.2.1 | ||||||||||||
| 311-21-004 | Number One Ships Service Diesel Generator (SSDG) Resistance Temperature Detector (RTD); replace | P/C | ||||||||||||||
| 311-22-001 | Number 2 Ship's Service Diesel Generator (SSDG) Aftercooler Core; clean and inspect | I | P/C | 3.1.1 | ||||||||||||
| 311-22-002 | Ship Service Diesel Generator (SSDG) Cylinder Head; overhaul | P/C | ||||||||||||||
| 311-23-001 | Number 3 Ship's Service Diesel Generator (SSDG) Aftercooler Core; clean and inspect | I | P/C | 3.1.1 | ||||||||||||
| 311-23-002 | Number 3 Ship's Service Diesel Generator (SSDG) Lay-up; accomplish | P/C | ||||||||||||||
| 311-23-003 | Number 3 Ships Service Diesel Generator (SSDG) Turbocharger; replace | I | P/C | 3.2.2.1 | ||||||||||||
| 311-23-004 | Ship Service Diesel Generator (SSDG) Bulkhead Mounted Spare Cylinder Head; procure | P/C | ||||||||||||||
| 311-24-001 | Number 4 Ship's Service Diesel Generator (SSDG) Aftercooler Core; clean and inspect | I | P/C | 3.1.1 | ||||||||||||
| 311-24-002 | Number 4 Ship's Service Diesel Generator (SSDG) Camshaft Segment and Follower; replace | I | P/C | 3.1.2.1 | ||||||||||||
| 311-25-001 | Number 5 Ship's Service Diesel Generator (SSDG) Aftercooler Core; clean and inspect | I | P/C | 3.1.1 | ||||||||||||
| 311-25-002 | Ship's Service Diesel Generator (SSDG) Camshaft Segment and Follower; replace | I | P/C | 3.1.2.1 | ||||||||||||
| 321-11-001 | Shore Power Receptacle; replace | P/C | ||||||||||||||
| 412-90-001 | ShipAlt LPD17-92882K Rearrangement Modification for SSDS; accomplish (Option Item) | P/C | Access Cut | |||||||||||||
| 412-90-002 | ShipAlt LPD17-90783K, Ship Self Defense System (SSDS) MK 2 Install to Mod C Baseline; accomplish (OPTION ITEM) | P/C | Access Cut | |||||||||||||
| 437-21-001 | Oily Waste Holding Tank Level Indicating Sensor; replace | P/C | ||||||||||||||
| 441-71-001 | Antenna Radome; refurbish | P/C | ||||||||||||||
| 441-90-001 | ShipAlt LPD17-94717K, USMC Tier 2 Embarkable Servers Stowage; accomplish | P/C | ||||||||||||||
| 453-48-001 | AN/SPS-48 Radar Antenna; replace | I | P/C | 3.2.1, 3.3.1.1, 3.4.1 | ||||||||||||
| 472-90-001 | ShipAlt LPD17-80156K, AN/SLQ-32(V)6 Hardware; accomplish (Option Item) | P/C | ||||||||||||||
| 493-90-001 | ShipAlt LPD17-87656K, Damage Control Management Software (DCAMS) and Advanced Damage Control System (ADCS) Hardware Tech Refresh, Alteration Installation Team (AIT) Support; accomplish | I | P/C | 3.1.1 | ||||||||||||
| 508-11-001 | Lagging and Insulation, Outside Machinery Space; install | P/C | 3.1.4 | |||||||||||||
| 508-11-002 | Lagging and Insulation, Inside Machinery Space; replace | P/C | 3.1.3 | |||||||||||||
| 508-11-003 | Lagging and Insulation; repair | P/C | ||||||||||||||
| 508-12-001 | Lagging and Insulation; replace | P/C | ||||||||||||||
| 512-10-001 | Ventilation Cleaning; accomplish | P/C | PCP | |||||||||||||
| 512-11-001 | Laundry and Galley Exhaust Ventilation Cleaning; accomplish | P/C | PCP | |||||||||||||
| 512-11-002 | Fan Coil Assembly Ducting; repair | P/C | ||||||||||||||
| 512-80-001 | ShipAlt LPD17-95124D, Relocate Communication Center Ventilation; accomplish | P/C | ||||||||||||||
| 514-20-001 | Number One, 2 and 3 Air Conditioning (AC) Plant Condenser; mechanically clean | I | P/C | 3.2.5.1 | ||||||||||||
| 514-20-002 | Number 4 and 5 Air Conditioning (AC) Plant Condenser; mechanically clean | I | P/C | 3.2.5.1 | ||||||||||||
| 514-20-003 | Number 6 and 7 Air Conditioning (AC) Plant Condenser; mechanically clean | P/C | ||||||||||||||
| 514-20-004 | Air Conditioning Plant Condenser Water Control Valve (CWCV); replace | I | P/C | 3.1.1, 3.4.1 | ||||||||||||
| 514-20-005 | Air Conditioning Plant Condenser Water Control Valve (CWCV); replace | I | P/C | 3.1.1, 3.4.1 | ||||||||||||
| 514-20-006 | Air Conditioning Plant Condenser Water Control Valve (CWCV); replace | I | P/C | 3.1.1, 3.4.1 | ||||||||||||
| 514-80-001 | ShipAlt LPD17-90486D, Chilled Water Triple Offset, Torque Seated (TOTS) Valve Installation; accomplish | P/C | ||||||||||||||
| 514-90-001 | ShipAlt LPD17-92017K, Prevention of Frozen Drain Lines On Chiller Plants; accomplish | P/C | ||||||||||||||
| 516-10-001 | Number 2 Refrigeration Unit Valve and Piping; replace | P/C | ||||||||||||||
| 516-11-001 | Number One Evaporator Coil Unit Cooler; replace | P/C | ||||||||||||||
| 520-11-001 | Sea Valve; repair and replace | I | P/C | 3.2.1.1 | ||||||||||||
| 521-10-001 | Breathing Air and Seawater Piping System; modify | P/C | ||||||||||||||
| 521-11-001 | Firemain Valve; repair | P/C | ||||||||||||||
| 521-11-002 | Firemain Valves; overhaul | P/C | ||||||||||||||
| 521-90-001 | ShipAlt LPD17-81157.01K, Auxiliary Sea Water System Valve Replacement; accomplish | P/C | ||||||||||||||
| 521-90-002 | ShipAlt LPD17-81157.02K, Auxiliary Sea Water System Valve Replacemnet; accomplish | I | P/C | 3.1.1.1 | ||||||||||||
| 521-90-003 | ShipAlt LPD17-85606.01K, Firemain and Auxiliary Seawater Branch Piping Modification; accomplish | P/C | ||||||||||||||
| 521-90-004 | ShipAlt LPD17-85606.02K, Firemain and Auxiliary Seawater Branch Piping Modification; accomplish | P/C | ||||||||||||||
| 521-90-005 | ShipAlt LPD17-85606.03K, Firemain and Auxiliary Seawater Branch Piping Modification; accomplish | P/C | ||||||||||||||
| 521-90-006 | ShipAlt LPD17-85606.04K, Firemain and Auxiliary Seawater Branch Piping Modification; accomplish | P/C | ||||||||||||||
| 521-90-007 | ShipAlt LPD17-85606.07K, Firemain and Auxiliary Seawater Branch Piping Modification; accomplish | P/C | ||||||||||||||
| 521-90-008 | ShipAlt LPD17-85606.08K, Firemain and Auxiliary Seawater Branch Piping Modification; accomplish | P/C | ||||||||||||||
| 521-90-009 | ShipAlt LPD17-85606.10K, Firemain and Auxiliary Seawater Branch Piping Modification; accomplish | P/C | ||||||||||||||
| 521-90-010 | ShipAlt LPD17-85606.12K, Firemain and Auxiliary Seawater Branch Piping Modification; accomplish | P/C | ||||||||||||||
| 522-11-001 | Fire Extinguishing Sea Water Sprinkler System Piping; replace | P/C | ||||||||||||||
| 524-90-001 | ShipAlt LPD17-81157.04K, Auxiliary Sea Water System Valve Replacement; accomplish | P/C | ||||||||||||||
| 524-90-002 | ShipAlt LPD17-81157.05K, Auxiliary Sea Water System Valve Replacement; accomplish | I | P/C | 3.1.2.1 | ||||||||||||
| 524-90-003 | ShipAlt LPD17-81157.07K, Auxiliary Sea Water System Valve Replacement; accomplish | P/C | ||||||||||||||
| 524-90-004 | ShipAlt LPD17-81157.06K, Auxiliary Sea Water System Valve Replacement; accomplish | P/C | ||||||||||||||
| 524-90-005 | ShipAlt LPD17-81157.03K, Auxiliary Sea Water System Valve Replacement; accomplish | P/C | ||||||||||||||
| 526-11-001 | Deck Drain Piping; replace | P/C | ||||||||||||||
| 529-11-001 | Well Deck Eductor Suction Valve Remote Operator; repair | P/C | ||||||||||||||
| 529-11-002 | Ballast Valve; repair | I | P/C | 3.1.1, 3.4.5.1 | ||||||||||||
| 529-60-001 | Deballast Air Main Back Pressure Regulating Valve; replace | P/C | ||||||||||||||
| 532-90-001 | ShipAlt LPD17-84372K, Central Fresh Water System Realignment; accomplish | P/C | ||||||||||||||
| 536-11-001 | Number 1B Central Fresh Water (CFW) Pump Motor; repair | P/C | ||||||||||||||
| 536-11-002 | Central Fresh Water Temperature Regulating Valve (1-CFW-V-009) Actuator; repair | I | P/C | 3.1.1 | ||||||||||||
| 536-11-003 | Central Fresh Water Temperature Regulating Valve (2-CFW-V-009) Actuator; repair | I | P/C | 3.1.1 | ||||||||||||
| 541-80-001 | ShipAlt LPD17-90511D, Replace LPD 17 Class FP 3-Way Valve; accomplish | P/C | ||||||||||||||
| 542-80-001 | ShipAlt LPD17-88024D, Provide Drain Funnel for Fuel Sample Line, accomplish | P/C | ||||||||||||||
| 551-90-001 | ShipAlt LPD17-89320K, Indoor Simulated Marksmanship Trainer (ISMT) Air Compressor Equipage; accomplish | P/C | PCP | |||||||||||||
| 555-30-001 | Halon/Heptafluoropropane (HFP) System Piping; test | P/C | ||||||||||||||
| 555-30-002 | Halon/Heptafluoropropane (HFP) System Piping; test | P/C | ||||||||||||||
| 555-30-003 | Halon/Heptafluoropropane (HFP) System Piping; test | P/C | ||||||||||||||
| 555-30-004 | Halon/Heptafluoropropane (HFP) System Piping; test | P/C | ||||||||||||||
| 555-51-001 | Fresh Water Fire Fighting (FWFF) Piping; replace | P/C | ||||||||||||||
| 555-82-001 | Water Mist Firefighting (WMFF) Pump; repair | I | P/C | 3.2.3.1, 3.4.1 | ||||||||||||
| 562-11-001 | Port Rudder Bearing Seal and Rudderstock Seal; repair | I | P/C | 3.3.4.1, PCP | ||||||||||||
| 562-11-002 | Starboard Rudder Bearing Seal and Rudderstock Seal; repair | I | P/C | 3.3.4.1, PCP | ||||||||||||
| 581-11-001 | Port Anchor and Anchor Chain; inspect and preserve | I | P/C | 3.1.4.2, 3.4.9, 3.6.3.1 | ||||||||||||
| 581-11-002 | Starboard Anchor and Anchor Chain; inspect and preserve | I | P/C | 3.1.4.2, 3.4.9, 3.6.3.1 | ||||||||||||
| 581-11-003 | Anchor Windlass Crossover Valve Assembly; repair | I | P/C | 3.2.2.1 | ||||||||||||
| 583-11-001 | Slewing Arm Boat Davit Lift Wire; replace | P/C | ||||||||||||||
| 583-11-002 | Boat Cradle Wood Block; replace | P/C | ||||||||||||||
| 583-11-003 | Rescue Boat Davit Towing Arm Assembly; repair | I | P/C | 3.2.2, 3.5.5.1 | ||||||||||||
| 583-90-002 | ShipAlt LPD17-86165K, Caley Boat Davit Phase I Improvement; accomplish | P/C | ||||||||||||||
| 583-90-003 | ShipAlt LPD17-87782K, Tow Boom Phase 2 Baseline Improvement; accomplish | P/C | Access Cut | |||||||||||||
| 583-90-004 | ShipAlt LPD17-87784K Caley Boat Davit Lat Mode and Corrosion Correction; accomplish | P/C | ||||||||||||||
| 584-20-001 | Stern Gate Upper and Lower Hydraulic Cylinder Assembly; repair | I | P/C | 3.3.1, 3.4.4 | ||||||||||||
| 584-21-001 | Stern Gate Preservation and Gasket Replacement; accomplish | I | P/C | 3.1.1 | ||||||||||||
| 584-21-002 | Upper Stern Gate Locking Latch Port and Stbd; replace | P/C | ||||||||||||||
| 584-51-001 | LCAC and Amphibian Recovery Winch Reduction Gear; repair | P/C | ||||||||||||||
| 584-90-001 | ShipAlt LPD17-78332K, Stern Gate Control Panel Replacement; accomplish | P/C | ||||||||||||||
| 584-90-002 | ShipAlt LPD17-86554K, LPD17 Stern Gate Emergency Rigging Removal; accomplish | P/C | ||||||||||||||
| 588-90-001 | ShipAlt LPD17-87303K, LPD17 Class HHD Control System; accomplish | P/C | ||||||||||||||
| 589-11-001 | Knuckleboom Crane; repair | I | P/C | 3.2.1 | ||||||||||||
| 589-11-002 | Knuckleboom Crane Hydraulic Assembly; repair | I | P/C | 3.3.5.3 | ||||||||||||
| 589-11-003 | Knuckleboom Crane; preserve | P/C | ||||||||||||||
| 589-11-004 | Knuckleboom Crane Radar Cross Section Reduction (RCSR) Panel; repair | P/C | ||||||||||||||
| 589-11-005 | Cargo Crane; repair | P/C | ||||||||||||||
| 589-11-006 | Aviation Folding Boom Crane Hose Assembly; replace | P/C | ||||||||||||||
| 589-21-001 | K80-65 Boat and Cargo Crane, Load Test; accomplish | P/C | ||||||||||||||
| 589-21-002 | Well Deck Bridge Crane Hoist Brake; repair | P/C | ||||||||||||||
| 593-11-001 | Vacuum, Collection, Holding and Transfer (VCHT) Piping System Chemical Cleaning; accomplish | P/C | PCP | |||||||||||||
| 612-80-001 | ShipAlt LPD17-95214D, Flight Deck Safety Net Modification; accomplish | P/C | ||||||||||||||
| 624-11-001 | Balanced Joiner Door; repair | I | P/C | 3.1.2 | ||||||||||||
| 624-12-001 | Metal Joiner Door; install | P/C | ||||||||||||||
| 624-12-002 | Metal Joiner Door and Frame; replace | P/C | ||||||||||||||
| 631-10-001 | Well Deck Overhead and Bulkhead; preserve | P/C | ||||||||||||||
| 631-10-002 | Landing Craft Unit (LCU) Shoring Stowage; preserve | P/C | ||||||||||||||
| 631-11-001 | Main Machinery Room Number One Bilge; preserve (touch up) | I | P/C | 3.1.1 | ||||||||||||
| 631-11-002 | Auxiliary Machinery Room Number One Bilge; preserve (touch up) | I | P/C | 3.1.1 | ||||||||||||
| 631-11-003 | Main Machinery Room Number 2 Bilge; preserve (touch up) | I | P/C | 3.1.1 | ||||||||||||
| 631-11-004 | Auxiliary Machinery Room Number 2 Bilge; preserve (touch up) | I | P/C | 3.1.1 | ||||||||||||
| 631-11-005 | Auxiliary Machinery Room Number 3 Bilge; preserve (touch up) | I | P/C | 3.1.1 | ||||||||||||
| 631-21-001 | Forward Advanced Enclosed Mast/Sensor (AEM/S) Mast; preserve | I | P/C | 3.1.1 | ||||||||||||
| 631-21-002 | Aft Advanced Enclosed Mast/Sensor (AEM/S) Mast; preserve | I | P/C | 3.1.1 | ||||||||||||
| 631-21-003 | Catwalk Platform; preserve | P/C | ||||||||||||||
| 631-21-004 | Advanced Enclosed Mast/Sensor (AEM/S) Mast; repair and preserve | I | P/C | 3.1.1 | ||||||||||||
| 631-21-005 | 03 and 04 Level, Port and Starboard Life Raft Deck; preserve | P/C | ||||||||||||||
| 631-30-001 | Underwater Hull Preservation with Paint Company Original Equipment Manufacturers (OEM) Technical Representative; accomplish | I | P/C | 3.1.1 | ||||||||||||
| 631-41-001 | Freeboard; preserve | I | P/C | 3.1.1 | ||||||||||||
| 633-21-001 | Impressed Current Cathodic Protection System Reference Electrode Assembly; inspect and repair | I | P/C | 3.1.1.1 | ||||||||||||
| 634-11-001 | Chemical - Resistant Floor Covering System; install | P/C | ||||||||||||||
| 634-21-001 | Flight Deck Nonskid; replace | P/C | 3.1.1, 3.2.1, 3.3.1, 3.4.1 | |||||||||||||
| 634-21-002 | Weatherdeck Nonskid; replace | P/C | ||||||||||||||
| 651-80-001 | ShipAlt LPD17-95000D, Combi-Oven Gaylord Hood Replacement; accomplish | P/C | ||||||||||||||
| 651-90-001 | ShipAlt LPD17-87889K, Scullery Re-Design; accomplish | I | P/C | 3.1.1.1, PCP | ||||||||||||
| 660-11-001 | Bench Seat Upholstery; replace | P/C | ||||||||||||||
| 661-11-001 | Chart Table; replace | P/C | ||||||||||||||
| 763-90-001 | ShipAlt LPD17-92223K, Troop Rifles Stowage; accomplish | P/C | PCP | |||||||||||||
| 844-31-001 | Combat Systems Discrepancy Correction; accomplish | P/C | ||||||||||||||
| 854-11-001 | Transportation Services, Ship's Force; provide | P/C | ||||||||||||||
| 897-10-001 | Availability Program Management AIT Integrator; provide | P/C | ||||||||||||||
| 897-11-001 | Availability Program Management Multi-Cable Transit (MCT) Cableway Integrator; provide | P/C | ||||||||||||||
| 980-10-001 | Naval Air Warfare Center, Aviation Facilities Assist Visit Discrepancy; correct | P/C | ||||||||||||||
| 980-11-001 | Light-Off Discrepancy Correction Assistance; provide | P/C | ||||||||||||||
| 980-11-003 | Temporary Off-Ship Berthing to include Galley and Mess Hall, Equivalent to BOQ/BEQ and Ship's Force Office and Training Space; provide (OPTION ITEM, Out of Homeport ONLY) | P/C | ||||||||||||||
| 980-80-001 | ShipAlt LPD17-95788D, 400Hz SSFC Distribution Upgrade, Alteration Installation Team (AIT) Support Service; provide | P/C | ||||||||||||||
| 980-90-001 | ShipAlt LPD17-86386K, LPD-17 Class Cargo/Weapon Elevator Human Machine Interface 3 (HMI) Touch Screen Installation, Alteration Installation Team (AIT) Support Service; provide | P/C | ||||||||||||||
| 980-90-002 | ShipAlt LPD17-92223K, Troop Rifle Stowage, Alteration Installation Team (AIT) Support Service; provide | P/C | ||||||||||||||
| 980-90-003 | ShipAlt LPD17-85076K, Hull, Mechanical and Electrical (HM and E) Network Mesh Implementation, Alteration Installation Team (AIT) Support Service; provide | P/C | ||||||||||||||
| 980-90-004 | ShipAlt LPD17-81798K, NAVMACS Tech Refresh, Alteration Installation Team (AIT) Support Service; provide (Option Item) | P/C | ||||||||||||||
| 980-90-005 | ShipAlt LPD17-82249K, LPD 17 Class UPS Reduction, Alteration Installation Team (AIT) Support Service; provide | P/C | ||||||||||||||
| 980-90-006 | ShipAlt LPD17-86679K, Swan Removal, Alteration Installation Team (AIT) Support Service; provide | P/C | Access Cut | |||||||||||||
| 980-90-007 | ShipAlt LPD17-92014K, ICOP Full Infrastructure USMC Transmitter, Alteration Installation Team (AIT) Support Service; provide (Option Item) | P/C | ||||||||||||||
| 980-90-008 | ShipAlt LPD17-78304K and 81400K, Remove Trainer, Stimulator-Simulator System (TSSS) SPS-48E Stimulator, Alteration Installation Team (AIT) Support Service; provide (Option Item) | P/C | ||||||||||||||
| 980-90-009 | ShipAlt LPD17-86908K, LPD17 Class CWE a, Alteration Installation Team (AIT) Support Service; provide | P/C | ||||||||||||||
| 980-90-010 | ShipAlt LPD17-92735K, Navigation Data Distribution System (NDDS) Sustainment and Obsolescence Upgrade, Alteration Installation Team (AIT) Support Service; provide | P/C | ||||||||||||||
| 980-90-011 | ShipAlt LPD17-92738K, NDDS Navigation Display Upgrade, Alteration Installation Team (AIT) Support Service; provide | P/C | ||||||||||||||
| 980-90-012 | ShipAlt LPD17-94138K, OE-570 To OE-570D Mobile Objective System (MUOS) Upgrade, Alteration Installation Team (AIT) Support Service; provide (Option Item) | P/C | ||||||||||||||
| 980-90-013 | MechAlt LPD17-87665K and 82565K, LPD17 Class HHD Pneumatic Console Replacement, Alteration Installation Team (AIT) Support Service; provide | P/C | ||||||||||||||
| 980-90-016 | ShipAlt LPD17-86669K, CIDS (23TV) Upgrade to V5.1, Alteration Installation Team (AIT) Support Service; provide | P/C | ||||||||||||||
| 980-90-017 | ShipAlt LPD17-86033K, Multifunctional Information Distribution System (MIDS) On Ships Modernization (MOS MOD), Alteration Installation Team (AIT) Support Service; provide (Option Item) | P/C | ||||||||||||||
| 980-90-018 | ShipAlt LPD17-91027K, GPS-Based Positioning, Navigation and Timing Service (GPNTS)(V)4, Alteration Installation Team (AIT) Support Service; provide (Option Item) | P/C | ||||||||||||||
| 980-90-021 | ShipAlt LPD17-90783K, Ship Self Defense System (SSDS) MK 2 Install to Mod C Baseline, Alteration Installation Team (AIT) Support Service; provide (Option Item) | P/C | ||||||||||||||
| 980-90-023 | ShipAlt LPD17-89491K, CANES HW 1.2, Alteration Installation Team (AIT) Support Service; provide (Option Item) | P/C | ||||||||||||||
| 980-90-024 | ShipAlt LPD17-80897K, NMT AN/WSC-9(V)XX Q/KA/X/GBS Terminal, Alteration Installation Team (AIT) Support Service; provide (Option Item) | P/C | ||||||||||||||
| 980-90-026 | ShipAlt LPD17-93987K, SSEE VUHF AIU Modification, ShipAlt Title, Alteration Installation Team (AIT) Support Service; provide (Option Item) | P/C | ||||||||||||||
| 980-90-027 | ShipAlt LPD17-94058K, EMUT MUOS Replacement Antenna, Alteration Installation Team (AIT) Support Service; provide (Option Item) | P/C | ||||||||||||||
| 980-90-030 | ShipAlt LPD17-87303K, LPD17 Class HHD Control System, Alteration Installation Team (AIT) Support Service; provide | P/C | ||||||||||||||
| 980-90-034 | ShipAlt LPD17-94905K, AN/SPS-73(V)18 Surface Scan Radar, Alteration Installation Team (AIT) Support Service; provide (Option Item) | P/C | ||||||||||||||
| 980-90-035 | ShipAlt LPD17-96483K, CAC2S Afloat Flight 0 Hardware, Alteration Installation Team (AIT) Support Service; provide (Option Item) | P/C | ||||||||||||||
| 980-90-036 | ShipAlt LPD17-91525K, Sound Powered Modification, Alteration Installation Team (AIT) Support Service; provide | P/C | ||||||||||||||
| 980-90-037 | ShipAlt LPD17-87447K, Installation of Moriah Wind System, Alteration Installation Team (AIT) Support Service; provide (Option Item) | P/C | ||||||||||||||
| 982-31-001 | Dock Trial, Fast Cruise, and Sea Trial; accomplish | P/C | ||||||||||||||
| 982-31-002 | Machinery Space Production Completion and Requirement for Light-Off Assessment (LOA)(Complex); accomplish | P/C | RTR | |||||||||||||
| 982-31-003 | Dock Trial, Sea Trial Discrepancy Correction; accomplish | P/C | ||||||||||||||
| 991-12-001 | Mast and Superstructure Temporary Staging; provide | P/C | ||||||||||||||
| 992-11-001 | Pressurized Waveguide and Transmission Lay-Up; accomplish | P/C | ||||||||||||||
| 992-11-002 | Regional Maintenance Center (RMC) Office Space; provide | P/C | ||||||||||||||
| 992-11-003 | Demineralized Water; provide | P/C | ||||||||||||||
| 992-11-005 | Ship's Force Parking; provide | P/C | ||||||||||||||
| 992-11-006 | Small Boat Storage; provide | P/C | ||||||||||||||
| 992-11-007 | Temporary Air Conditioning; provide | P/C | ||||||||||||||
| 992-11-008 | Fuel Assistance and Towboat Service for Fuel Barge; provide | P/C | ||||||||||||||
| 992-11-009 | Temporary Refrigerated Storage Facility; provide | P/C | ||||||||||||||
| 992-11-010 | Temporary Service; provide | P/C | ||||||||||||||
| 992-11-011 | Messing and Berthing Barge Tow Service; provide (Option Item) | P/C | ||||||||||||||
| 992-11-012 | Temporary Flammable Liquid Hazardous Waste and Hazardous Material Storage for Ship's Force Use at Contractor's Facility; provide | P/C | ||||||||||||||
| 992-11-013 | Oil Spillage and Floating Sandblasting Debris Boom; install | P/C | ||||||||||||||
| 992-21-001 | Defuel Ship; accomplish (OPTION ITEM; Non-Naval Base Ports Only) | P/C | ||||||||||||||
| 992-31-001 | Bilge Cleaning and Pumping; accomplish | I | P/C | 3.2.3.1 | ||||||||||||
| 993-10-001 | Rigging, Crane and Transportation Service; provide | P/C | ||||||||||||||
| 993-11-001 | Ship's Force Warehouse Storage Space; provide | P/C | ||||||||||||||
| 993-11-002 | Temporary Lift and Operator; provide | P/C | ||||||||||||||
| 993-31-001 | Temporary Deck Covering; install | P/C | ||||||||||||||
| 993-31-002 | Temporary Main Reduction Gear (MRG) Dehumidifier System; provide | I | P/C | 3.4.9.5, 3.5.1.1 | ||||||||||||
| 997-11-001 | Drydocking and Undocking; accomplish | P/C | PCP | |||||||||||||
| 998-41-001 | Hazardous Waste Produced on Naval Vessels; control | P/C |