(USS SAN DIEGO) Attachment J-3 Execution Milestones Rev_1.xlsx

XLSX spreadsheet 878 KB Posted

Attached to
USS MUSTIN (DDG 89) FY21 DEPOT MAINTENANCE PERIOD & USS SAN DIEGO (LPD 22) FY21 DOCKING SELECTED RESTRICTED AVAILABILITY
Solicitation number
N00024-21-R-4442
Issued by

About this file

The Naval Sea Systems Command issued a solicitation for the execution of the USS MUSTIN (DDG 89) FY21 Docking Selected Restricted Availability and the USS SAN DIEGO (LPD 22) FY21 Docking Selected Restricted Availability. The solicitation requires maintenance, modernization, and repair services for the two named vessels and will be awarded to a single contactor capable of completing multiple areas of ship maintenance, repair and modernization. Interested offerors must be registered in the System for Award Management and monitor the beta.SAM.gov site for solicitation release and amendments. The solicitation includes execution milestones, pricing workbooks, and compartment closeout attachments. Work specifications and references are available via CD from identified points of contact. The Government anticipates a single award by May 2021. The USS MUSTIN availability period begins September 2021 and is expected to be complete by July 2023. The USS SAN DIEGO availability begins September 2021 and is expected to end in December 2022.

View the file

Other files

File Type Posted
(USS SAN DIEGO) Attachment J-4 Pricing Workbook Rev_2.xlsx XLSX spreadsheet
N00024-21-R-4442_A0009.pdf PDF
USS San Diego TPPC-LPD22-SWRMC21-CNO1 - ERRATA 10.pdf PDF
N00024-21-R-4442_A0008.pdf PDF
N00024-21-R-4442-A0008 BQ 256-272.xlsx XLSX spreadsheet
MUSTIN ERRATA 12.pdf PDF
N00024-21-R-4442_A0007.pdf PDF
(USS MUSTIN) Attachment J-14 Rev_2.xlsx XLSX spreadsheet
(USS MUSTIN) Attachment J-13 Rev_2.xlsx XLSX spreadsheet
MUSTIN ERRATA 11.pdf PDF
N00024-21-R-4442-A0007 BQ 210-255.xlsx XLSX spreadsheet
N00024-21-R-4442_A0006.pdf PDF
N00024-21-R-4222_A0006.pdf PDF
N00024-21-R-4442_A0005 BQ 139-209 AMD_0005.xlsx XLSX spreadsheet
(USS MUSTIN) Attachment J-14 Rev_1.xlsx XLSX spreadsheet
USS San Diego TPPC-LPD22-SWRMC21-CNO1 - ERRATA 9.pdf PDF
N00024-21-R-4442_A0005.pdf PDF
(USS MUSTIN) Attachment J-13 Rev_1.xlsx XLSX spreadsheet
(USS MUSTIN) Attachment J-18 GFM Rev_1.xlsx XLSX spreadsheet
USS MUSTIN ERRATA 9.pdf PDF
USS MUSTIN ERRATA 10.pdf PDF
(USS SAN DIEGO) Attachment J-4 Pricing Workbook Rev_1.xlsx XLSX spreadsheet
N00024-21-R-4442_A0004 BQ 11-138.xlsx XLSX spreadsheet
USS San Diego TPPC-LPD22-SWRMC21-CNO1 - ERRATA 8.pdf PDF
(USS SAN DIEGO) Attachment J-8 Rev_1 (Errata 8).xlsx XLSX spreadsheet
N00024-21-R-4442_A0004.pdf PDF
N00024-21-R-4442_A0003.pdf PDF
N00024-21-R-4442_A0003 BQ 11-137.xlsx XLSX spreadsheet
N00024-21-R-4442_A0002.pdf PDF
N00024-21-R-4442_A0002 BQ 1-10.xlsx XLSX spreadsheet
N00024-21-R-4442_A0001.pdf PDF
Attachment S-17 (Proposal Assessment).xlsx XLSX spreadsheet
Attachment S-7 (Proposal Assessment).xlsx XLSX spreadsheet
Attachment J-5 (QASP).pdf PDF
Attachment S-3 (PPI Form).xlsx XLSX spreadsheet
Attachment J-15 (QASP).pdf PDF
Attachment J-7 (Schedule Model Review).pdf PDF
Attachment J-8 (GFM List).xlsx XLSX spreadsheet
Attachment J-17 (Schedule Model Review).pdf PDF
N00024-21-R-4442.pdf PDF
CDRLs.zip ZIP file
Attachment S-13 (PPI Form).xlsx XLSX spreadsheet
Attachment J-18 (GFM List).xlsx XLSX spreadsheet
Show all 43

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Exec Milestones (Contractual)

USS SAN DIEGO (LPD 22) FY21 DSRAOfferors are not to propose milestones highlighted in Orange. These milestones are calculated or fixed
Offerors are to propose values highlighted in Blue in accordance with "Notes". Entering values into the blue highlighted cells will allow the milestone spreadsheet to calculated the remaining interim milestones.
SystemMilestones/Key Events (Calculated or Proposed)Notes
Avail Start at KTR FacilityMonday, September 13, 2021
DOCK
Dry Dock Reports Due (No Later Than)Sunday, December 31, 1899Reports due on the date in Column B or, if the date in Column B is on a weekend or Government holiday, due on the next Government business day following the date in Column B
UNDOCK
Crew Move AshoreMonday, September 27, 2021
Avail 20% Open and InspectMonday, December 06, 2021
25% CONFERENCEWednesday, December 29, 2021Conference to be held on the next Wednesday following the date in Column B
50% CONFERENCEWednesday, April 13, 2022Conference to be held on the next Wednesday following the date in Column B
Start SSDS FiberTuesday, May 10, 2022
CS Space Turn OverWednesday, July 06, 2022
CSSELOWednesday, July 13, 2022
75% ConferenceWednesday, July 27, 2022Conference to be held on the next Wednesday following the date in Column B
C5ILOTuesday, August 02, 2022Minimum equipment/system required ISO C5ILO: Electrical Power (400Hz) , Seawater, Chilled Water, Electronic Cooling Water, Gray Water Tanks, VCHTs System, Electronic Dry air, AC Units, IC Switchboards, FWD/AFT Gyro and IVCS
HAB / Crew Move AboardTuesday, August 30, 2022
PCDTuesday, September 06, 2022
AVCERTSaturday, October 08, 2022
LOAMonday, October 17, 2022
Dock TrialsTuesday, October 25, 2022
Fast CruiseWednesday, October 26, 2022
Sea TrialsSunday, October 30, 2022
Sea Trials CompleteTuesday, November 08, 2022
Contract CompleteTuesday, November 08, 2022

ERL

USS SAN DIEGO (LPD 22) FY21 DSRA

Event Readiness List (Work Item Title) Legend: "I" = Open & Inspect (CFR), "P" = Production Complete,

"T" = Testing Complete, "C" = Certification Complete.START OF AVAILDOCKDRY DOCK REPORTS DUEAVAIL 20% (O&I)UNDOCKC5ILOHAB COMPLETEPCDAVCERTLOADOCK TRAILS/FAST CRUISEHM&E and TYCOM SEA TRAILSCONTRACT COMPLETEAnnotate Critical Path WI, Controlling WI, PCP, RTR, Front Load…
WORK ITEM NO.WORK ITEM TITLEComments
042-11-001Work Package Execution Review (WPER); accomplishC3.1.2.1
042-11-002Accountability of Manhour and Material Reservation; accomplishC3.2.2.1, 3.2.5, 3.2.6
042-11-004Arrival Conference; accomplishCC
042-11-005Conditions Found Report (CFR); provide and manageP/CC3.1.1
077-11-001Fire Drill Service; provideIP/C3.1.6
100-10-001Temporary Access Cut; provideP/CAccess Cut
110-11-001Underwater Hull; repairIP/C3.2.2, 3.5.1
114-11-001Starboard Forward Lower Bossing; replaceP/C
114-11-002Lifting Tube Assembly Covers; replaceP/C3.1.1
115-90-001ShipAlt LPD17-84960K, LPD 17 Class V-Lines Increase; accomplishP/CAccess Cut, PCP
123-10-001Tank and Void Cleaning and Pumping; accomplishIP/C3.1.3, 3.2.3, PCP
123-11-001Fuel Oil Storage Tank; preserveP/CControlling Path
123-11-002Fuel Oil Storage Tank; repairIP/C3.1.1, Controlling Path
123-11-003Auxiliary Fuel Oil Service Tank; repairIP/C3.1.1, Controlling Path
123-11-004Auxiliary Fuel Oil Service Tank; preserveP/CControlling Path
123-11-005Fuel Oil Storage Tank; repairIP/C3.1.1, Controlling Path
123-12-001JP-5 Tank; repairIP/C3.1.1, Controlling Path
123-12-002JP-5 Tank; preserve (touch up)P/CControlling Path
123-13-001Fresh Water/Water Mist Storage Tank; repairP/C3.1.1, Controlling Path
123-13-002Fresh Water/Water Mist Storage Tank; preserve (touch up)P/CControlling Path
123-16-001Ballast Tank; preserve (touch up)P/C
123-16-002Ballast Tank; repairIP/C3.1.1, 3.2.2
123-16-003Ballast Tank; preserveIP/C3.2.2, Access Cut
123-17-001Contaminated Oil Tank; preserve (touch up)P/C
123-17-002Contaminated Oil Tank; repairIP/C3.1.1
123-17-003Contaminated Oil Tank; preserveP/CAccess Cut
123-19-001Plumbing Waste Water Tank; preserve (touch up)P/C
123-19-002Plumbing Waste Water Tank; repairIP/C3.1.1
123-22-001Chain Locker; repairIP/C3.1.1
123-22-002Chain Locker; preserveP/CAccess Cut
123-22-003Vacuum Collection, Holding and Transfer (VCHT) Room No. 2, Structural Repair; accomplishP/C
130-11-001Aircraft Securing Fitting; replaceP/C3.1.1
134-11-001Well Deck Plate; repairP/C3.2.1, 3.4.1, 3.5.2
134-11-002Well Deck Wing Wall; repairP/C3.3.1, 3.4.1
150-11-001Longitudinal and Transverse Bulwark Framing and Deck Plating; repairP/C3.4.1, 3.5.1, Access Cut
150-11-002Bulwark Access Cover; repairP/C
150-11-003Shaft Alley No.2, Structural Repair; accomplishIP/C3.1.1
163-11-001Sea Chest; inspect and repairIP/C3.2.1.1, 3.3.1, Critical Path
163-11-002Waster Sleeve; replaceP/CCritical Path
167-80-001ShipAlt LPD17-88217D, Watertight Door for Pilot Boarding Station; accomplishP/CPCP
233-11-001Number 1A Main Propulsion Diesel Engine (MPDE) Lay-up; accomplishP/CPCP
233-11-002Number 1A Main Propulsion Diesel Engine (MPDE) Crankcase Vacuum System; clean and inspectIP/C3.2.3.1, Critical Path, PCP
233-11-003Number 1A Main Propulsion Diesel Engine (MPDE) Sequential Turbocharger Valve; overhaulIP/C3.2.6.1, Critical Path, PCP
233-11-004Number 1A Main Propulsion Diesel Engine (MPDE) Intercooler; clean and inspectIP/C3.3.1.1, Critical Path, PCP
233-11-005Number 1A Main Propulsion Diesel Engine (MPDE) Air Intake Preheater; clean and inspectIP/C3.2.3.1, Critical Path, PCP
233-11-006Number 1A Main Propulsion Diesel Engine (MPDE) Connecting Rod, Main Bearing, and Thrust Bearing Shell; replaceIP/C3.2.2.1, Critical Path, PCP
233-11-007Number 1A Main Propulsion Diesel Engine (MPDE) Cylinder Head; replaceIP/C3.2.1.1, Critical Path, PCP
233-11-008Number 1A Main Propulsion Diesel Engine (MPDE) Exhaust Diffuser, Fastener, and Turbocharger Gas Inlet and Outlet Gasket; replaceIP/C3.2.1.2, 3.2.2.1, Critical Path, PCP
233-11-009Number 1A Main Propulsion Diesel Engine (MPDE) Main Air Start Control Valve; replaceP/CCritical Path
233-11-010Number 1A Main Propulsion Diesel Engine (MPDE) Fuel Oil Injection Pump; overhaulIP/C3.1.1.2, Critical Path, PCP
233-11-011Number 1A Main Propulsion Diesel Engine (MPDE) Turbocharger; overhaulIP/C3.3.5, Critical Path, PCP
233-11-012Number One Main Propulsion Diesel Engine (MPDE) Fuel Rack Crossover Shaft; overhaulIP/C3.3.1.9, 3.3.2.3, Controlling Path, PCP
233-11-016Number 1A Main Propulsion Diesel Engine (MPDE) Connecting Rod, Piston, and Liner; overhaulIP/C3.4.2, Controlling Path, PCP
233-11-017Number 1A Main Propulsion Diesel Engine (MPDE) Gear Train Backlash; measureIP/C3.2.3.3, Controlling Path, PCP
233-11-018Number 1A Main Propulsion Diesel Engine (MPDE) Jacket Water Temperature Regulating Valve; overhaulP/CControlling Path
233-12-001Number 1B Main Propulsion Diesel Engine (MPDE) Main Air Start Control Valve; repairIP/C3.1.3.2, Controlling Path
233-12-002Number 1B Main Propulsion Diesel Engine (MPDE) Crankcase Vacuum System; clean and inspectIP/C3.2.3.1, Controlling Path, PCP
233-12-003Number 1B Main Propulsion Diesel Engine (MPDE) Sequential Turbocharger Valve; overhaulIP/C3.2.6.1, Critical Path, PCP
233-12-004Number 1B Main Propulsion Diesel Engine (MPDE) Intercooler; clean and inspectIP/C3.3.1.1, Controlling Path, PCP
233-12-005Number 1B Main Propulsion Diesel Engine (MPDE) Air Intake Preheater; clean and inspectIP/C3.2.3.1, Controlling Path, PCP
233-12-007Number 1B Main Propulsion Diesel Engine (MPDE) Lay-up; accomplishP/C3 PCP
233-12-008Number 1B Main Propulsion Diesel Engine (MPDE) Exhaust Diffuser, Fastener, and Turbocharger Gas Inlet and Outlet Gasket; replaceIP/C3.2.1.2, Critical Path, PCP
233-12-010Number 1B Main Propulsion Diesel Engine (MPDE) Fuel Oil Injection Pump and Drive; overhaulIP/C3.1.3.1, Controlling Path, PCP
233-12-011Number 1B Main Propulsion Diesel Engine (MPDE) Turbocharger; overhaulIP/C3.3.5, Critical Path, PCP
233-12-012Number 1B Main Propulsion Diesel Engine (MPDE) Connecting Rod, Main Bearing, and Thrust Bearing Shell; replaceIP/C3.2.2.1, Critical Path, PCP
233-12-014Number 1B Main Propulsion Diesel Engine (MPDE) Cylinder Head; replaceIP/C3.2.1.1, Critical Path, PCP
233-12-016Number 1B Main Propulsion Diesel Engine (MPDE) Connecting Rod, Piston, and Liner; overhaulP/CCritical Path, PCP
233-12-017Number 1B Main Propulsion Diesel Engine (MPDE) Gear Train Backlash; measureIP/C3.2.3.3, Critical Path, PCP
233-13-001Number 2A Main Propulsion Diesel Engine (MPDE) Lay-Up; accomplishP/CPCP
233-13-002Number 2A Main Propulsion Diesel Engine (MPDE) Crankcase Vacuum System; clean and inspectIP/C3.2.3.1, Controlling Path, PCP
233-13-003Number 2A Main Propulsion Diesel Engine (MPDE) Connecting Rod, Main Bearing and Thrust Bearing Shell; replaceIP/C3.2.2.1, Critical Path, PCP
233-13-004Number 2A Main Propulsion Diesel Engine (MPDE) Intercooler; clean and inspectIP/C3.3.1.1, Controlling Path, PCP
233-13-005Number 2A Main Propulsion Diesel Engine (MPDE) Air Intake Preheater; clean and inspectIP/C3.2.3.1, Controlling Path, PCP
233-13-006Number 2A Main Propulsion Diesel Engine (MPDE) Fuel Rack Crossover Shaft; overhaulIP/C3.3.1.9, Controlling Path, PCP
233-13-007Number 2A Main Propulsion Diesel Engine (MPDE) Main Air Start Control Valve; replaceP/CControlling Path
233-13-008Number 2A Main Propulsion Diesel Engine (MPDE) Exhaust Diffuser, Fastener, and Turbocharger Gas Inlet and Outlet Gasket; replaceIP/C3.2.1.2, 3.2.2.1 Critical Path, PCP
233-13-010Number 2A Main Propulsion Diesel Engine (MPDE) Fuel Oil Injection Pump; overhaulIP/C3.1.1.2, 3.3.3 Controlling Path, PCP
233-13-011Number 2A Main Propulsion Diesel Engine (MPDE) Turbocharger; overhaulP/C3.3.5, Critical Path, PCP
233-13-012Number 2A Main Propulsion Diesel Engine (MPDE) Sequential Turbocharger Valve; overhaulIP/C3.2.6.1, Critical Path, PCP
233-13-015Number 2A Main Propulsion Diesel Engine (MPDE) Cylinder Head; replaceIP/C3.2.1.1, Critical Path, PCP
233-13-016Number 2A Main Propulsion Diesel Engine (MPDE) Connecting Rod, Piston, and Liner; overhaulP/CCritical Path, PCP
233-13-017Number 2A Main Propulsion Diesel Engine (MPDE) Gear Train Backlash; measureIP/C3.2.3.3, Controlling, PCP
233-13-018Number 2A Main Propulsion Diesel Engine (MPDE) Jacket Water Temperature Regulating Valve; overhaulP/CControlling
233-14-001Number 2B Main Propulsion Diesel Engine (MPDE) Lay-Up; accomplishP/CPCP
233-14-002Number 2B Main Propulsion Diesel Engine (MPDE) Crankcase Vacuum System; clean and inspectIP/C3.2.3.1, Critical Path, PCP
233-14-003Number 2B Main Propulsion Diesel Engine (MPDE) Sequential Turbocharger Valve; overhaulIP/C3.2.6.1 Critical Path, PCP
233-14-004Number 2B Main Propulsion Diesel Engine (MPDE) Intercooler; clean and inspectIP/C3.3.1.1, Controlling, PCP
233-14-005Number 2B Main Propulsion Diesel Engine (MPDE) Air Intake Preheater; clean and inspectIP/C3.2.3.1, Controlling, PCP
233-14-007Number 2B Main Propulsion Diesel Engine (MPDE) Main Air Start Control Valve; replace (OPTION ITEM)IP/C3.1.2.1
233-14-008Number 2B Main Propulsion Diesel Engine (MPDE) Exhaust Diffuser, Fastener, and Turbocharger Gas Inlet and Outlet Gasket; replaceIP/C3.2.1.2, 3.2.2.1, Critical Path, PCP
233-14-010Number 2B Main Propulsion Diesel Engine (MPDE) Fuel Oil Injection Pump and Drive; overhaulIP/C3.1.3.1, Controlling, PCP
233-14-011Number 2B Main Propulsion Diesel Engine (MPDE) Turbocharger; overhaulIP/C3.3.5, PCP
233-14-013Number 2B Main Propulsion Diesel Engine (MPDE) Connecting Rod, Main Bearing, and Thrust Bearing Shell; replaceIP/C3.2.2.1 PCP
233-14-014Number 2B Main Propulsion Diesel Engine (MPDE) Cylinder Head; replace (OPTION ITEM)IP/C3.2.1.1, PCP
233-14-016Number 2B Main Propulsion Diesel Engine (MPDE) Connecting Rod, Piston, and Liner; overhaul (OPTION ITEM)P/CControlling, PCP
233-14-017Number 2B Main Propulsion Diesel Engine (MPDE) Gear Train Backlash; measure (OPTION ITEM)IP/C3.2.3.3, Controlling, PCP
240-80-001ShipAlt LPD17-84077D, Modify Port and Starboard Shaft Bossing Section; accomplishP/CControlling
241-11-001Number One Main Reduction Gear (MRG) Thrust Bearing Cap; repairP/CCritical Path, PCP
242-11-001Number 1A Main Propulsion Diesel Engine (MPDE) Dual Clutch Propulsion Assembly; repairIP/C3.3.2, Critical Path, PCP
242-12-001Number 1B Main Propulsion Diesel Engine (MPDE) Dual Clutch Propulsion Assembly; repairIP/C3.3.2, Critical Path, PCP
242-13-001Number 2A Main Propulsion Diesel Engine (MPDE) Dual Clutch Propulsion Assembly; repairIP/C3.3.2, Critical Path, PCP
242-14-001Number 2B Main Propulsion Diesel Engine (MPDE) Dual Clutch Propulsion Assembly; repairIP/C3.3.2, Critical Path, PCP
243-11-001Starboard Stern Tube Shaft Seal; overhaulIP/C3.2.3.1, 3.3.1, Critical Path
243-11-002Starboard Propulsion Shaft Alignment; accomplishIP/C3.3.1, Critical Path
243-11-003Starboard Waterborne Propulsion Shafting; inspect and repairIP/C3.2.1, 3.3.5.1
243-12-001Port Stern Tube Shaft Seal; overhaulIP/C3.2.3.1, 3.3.1, Critical Path
243-12-002Port Propulsion Shaft Alignment; accomplishIP/C3.3.1, Critical Path
243-12-003Port Waterborne Propulsion Shafting; inspect and repairIP/C3.2.1, 3.2.5.1
244-11-001Starboard Outboard Propulsion Shafting, Bearing Clearance Measurement; accomplishIP/C3.2.4, Critical Path
244-12-001Port Outboard Propulsion Shafting, Bearing Clearance Measurement; accomplishIP/C3.2.4, Controlling
245-11-001Starboard Controllable Pitch Propeller (CPP) Oil Distribution (OD) Box; replaceP/C
245-11-002Starboard Controllable Pitch Propeller (CPP) Valve Rod Assembly; repairIP/C3.2.2.1, 3.2.2.8, 3.2.5, Critical path
245-11-003Starboard Controllable Pitch Propeller (CPP) Blade Set Repair and Propeller Hub Replacement; accomplishIP/C3.11.2.1, 3.13.1.1, Critical path, PCP
245-12-001Port Controllable Pitch Propeller (CPP) Oil Distribution (OD) Box; replaceP/C
245-12-002Port Controllable Pitch Propeller (CPP) Valve Rod Assembly; repairIP/C3.2.2.1, 3.2.2.8, 3.2.5, Critical path
245-12-003Port Controllable Pitch Propeller (CPP) Blade Set Repair and Propeller Hub Replacement; accomplishIP/C3.11.2.1, 3.13.1.1, Critical path, PCP
259-10-001Diesel Engine Exhaust System Piping Fastener; replaceIP/C3.2.1, Critical Path
264-31-001Number One Main Reduction Gear (MRG) and Controllable Pitch Propeller (CPP) Lube Oil Purifier Heater (LOPH); cleanIP/C3.2.1, 3.3.5.1, Controlling Path
264-32-001Number 2 Main Reduction Gear (MRG) and Controllable Pitch Propeller (CPP) Lube Oil Purifier Heater (LOPH); cleanIP/C3.1.2, 3.3.5.1, Controlling Path
311-20-002Number 4 and 5 Ship's Service Diesel Generator (SSDG) Lay-up; accomplishIP/C3.3.1.1
311-21-001Number One Ship's Service Diesel Generator (SSDG) Aftercooler Core; clean and inspectIP/C3.1.1
311-21-002Number One and 2 Ship's Service Diesel Generator (SSDG) Lay-up; accomplishIP/C3.3.1.1
311-21-003Number One Ships Service Diesel Generator (SSDG) Turbocharger; replaceIP/C3.2.2.1
311-21-004Number One Ships Service Diesel Generator (SSDG) Resistance Temperature Detector (RTD); replaceP/C
311-22-001Number 2 Ship's Service Diesel Generator (SSDG) Aftercooler Core; clean and inspectIP/C3.1.1
311-22-002Ship Service Diesel Generator (SSDG) Cylinder Head; overhaulP/C
311-23-001Number 3 Ship's Service Diesel Generator (SSDG) Aftercooler Core; clean and inspectIP/C3.1.1
311-23-002Number 3 Ship's Service Diesel Generator (SSDG) Lay-up; accomplishP/C
311-23-003Number 3 Ships Service Diesel Generator (SSDG) Turbocharger; replaceIP/C3.2.2.1
311-23-004Ship Service Diesel Generator (SSDG) Bulkhead Mounted Spare Cylinder Head; procureP/C
311-24-001Number 4 Ship's Service Diesel Generator (SSDG) Aftercooler Core; clean and inspectIP/C3.1.1
311-24-002Number 4 Ship's Service Diesel Generator (SSDG) Camshaft Segment and Follower; replaceIP/C3.1.2.1
311-25-001Number 5 Ship's Service Diesel Generator (SSDG) Aftercooler Core; clean and inspectIP/C3.1.1
311-25-002Ship's Service Diesel Generator (SSDG) Camshaft Segment and Follower; replaceIP/C3.1.2.1
321-11-001Shore Power Receptacle; replaceP/C
412-90-001ShipAlt LPD17-92882K Rearrangement Modification for SSDS; accomplish (Option Item)P/CAccess Cut
412-90-002ShipAlt LPD17-90783K, Ship Self Defense System (SSDS) MK 2 Install to Mod C Baseline; accomplish (OPTION ITEM)P/CAccess Cut
437-21-001Oily Waste Holding Tank Level Indicating Sensor; replaceP/C
441-71-001Antenna Radome; refurbishP/C
441-90-001ShipAlt LPD17-94717K, USMC Tier 2 Embarkable Servers Stowage; accomplishP/C
453-48-001AN/SPS-48 Radar Antenna; replaceIP/C3.2.1, 3.3.1.1, 3.4.1
472-90-001ShipAlt LPD17-80156K, AN/SLQ-32(V)6 Hardware; accomplish (Option Item)P/C
493-90-001ShipAlt LPD17-87656K, Damage Control Management Software (DCAMS) and Advanced Damage Control System (ADCS) Hardware Tech Refresh, Alteration Installation Team (AIT) Support; accomplishIP/C3.1.1
508-11-001Lagging and Insulation, Outside Machinery Space; installP/C3.1.4
508-11-002Lagging and Insulation, Inside Machinery Space; replaceP/C3.1.3
508-11-003Lagging and Insulation; repairP/C
508-12-001Lagging and Insulation; replaceP/C
512-10-001Ventilation Cleaning; accomplishP/CPCP
512-11-001Laundry and Galley Exhaust Ventilation Cleaning; accomplishP/CPCP
512-11-002Fan Coil Assembly Ducting; repairP/C
512-80-001ShipAlt LPD17-95124D, Relocate Communication Center Ventilation; accomplishP/C
514-20-001Number One, 2 and 3 Air Conditioning (AC) Plant Condenser; mechanically cleanIP/C3.2.5.1
514-20-002Number 4 and 5 Air Conditioning (AC) Plant Condenser; mechanically cleanIP/C3.2.5.1
514-20-003Number 6 and 7 Air Conditioning (AC) Plant Condenser; mechanically cleanP/C
514-20-004Air Conditioning Plant Condenser Water Control Valve (CWCV); replaceIP/C3.1.1, 3.4.1
514-20-005Air Conditioning Plant Condenser Water Control Valve (CWCV); replaceIP/C3.1.1, 3.4.1
514-20-006Air Conditioning Plant Condenser Water Control Valve (CWCV); replaceIP/C3.1.1, 3.4.1
514-80-001ShipAlt LPD17-90486D, Chilled Water Triple Offset, Torque Seated (TOTS) Valve Installation; accomplishP/C
514-90-001ShipAlt LPD17-92017K, Prevention of Frozen Drain Lines On Chiller Plants; accomplishP/C
516-10-001Number 2 Refrigeration Unit Valve and Piping; replaceP/C
516-11-001Number One Evaporator Coil Unit Cooler; replaceP/C
520-11-001Sea Valve; repair and replaceIP/C3.2.1.1
521-10-001Breathing Air and Seawater Piping System; modifyP/C
521-11-001Firemain Valve; repairP/C
521-11-002Firemain Valves; overhaulP/C
521-90-001ShipAlt LPD17-81157.01K, Auxiliary Sea Water System Valve Replacement; accomplishP/C
521-90-002ShipAlt LPD17-81157.02K, Auxiliary Sea Water System Valve Replacemnet; accomplishIP/C3.1.1.1
521-90-003ShipAlt LPD17-85606.01K, Firemain and Auxiliary Seawater Branch Piping Modification; accomplishP/C
521-90-004ShipAlt LPD17-85606.02K, Firemain and Auxiliary Seawater Branch Piping Modification; accomplishP/C
521-90-005ShipAlt LPD17-85606.03K, Firemain and Auxiliary Seawater Branch Piping Modification; accomplishP/C
521-90-006ShipAlt LPD17-85606.04K, Firemain and Auxiliary Seawater Branch Piping Modification; accomplishP/C
521-90-007ShipAlt LPD17-85606.07K, Firemain and Auxiliary Seawater Branch Piping Modification; accomplishP/C
521-90-008ShipAlt LPD17-85606.08K, Firemain and Auxiliary Seawater Branch Piping Modification; accomplishP/C
521-90-009ShipAlt LPD17-85606.10K, Firemain and Auxiliary Seawater Branch Piping Modification; accomplishP/C
521-90-010ShipAlt LPD17-85606.12K, Firemain and Auxiliary Seawater Branch Piping Modification; accomplishP/C
522-11-001Fire Extinguishing Sea Water Sprinkler System Piping; replaceP/C
524-90-001ShipAlt LPD17-81157.04K, Auxiliary Sea Water System Valve Replacement; accomplishP/C
524-90-002ShipAlt LPD17-81157.05K, Auxiliary Sea Water System Valve Replacement; accomplishIP/C3.1.2.1
524-90-003ShipAlt LPD17-81157.07K, Auxiliary Sea Water System Valve Replacement; accomplishP/C
524-90-004ShipAlt LPD17-81157.06K, Auxiliary Sea Water System Valve Replacement; accomplishP/C
524-90-005ShipAlt LPD17-81157.03K, Auxiliary Sea Water System Valve Replacement; accomplishP/C
526-11-001Deck Drain Piping; replaceP/C
529-11-001Well Deck Eductor Suction Valve Remote Operator; repairP/C
529-11-002Ballast Valve; repairIP/C3.1.1, 3.4.5.1
529-60-001Deballast Air Main Back Pressure Regulating Valve; replaceP/C
532-90-001ShipAlt LPD17-84372K, Central Fresh Water System Realignment; accomplishP/C
536-11-001Number 1B Central Fresh Water (CFW) Pump Motor; repairP/C
536-11-002Central Fresh Water Temperature Regulating Valve (1-CFW-V-009) Actuator; repairIP/C3.1.1
536-11-003Central Fresh Water Temperature Regulating Valve (2-CFW-V-009) Actuator; repairIP/C3.1.1
541-80-001ShipAlt LPD17-90511D, Replace LPD 17 Class FP 3-Way Valve; accomplishP/C
542-80-001ShipAlt LPD17-88024D, Provide Drain Funnel for Fuel Sample Line, accomplishP/C
551-90-001ShipAlt LPD17-89320K, Indoor Simulated Marksmanship Trainer (ISMT) Air Compressor Equipage; accomplishP/CPCP
555-30-001Halon/Heptafluoropropane (HFP) System Piping; testP/C
555-30-002Halon/Heptafluoropropane (HFP) System Piping; testP/C
555-30-003Halon/Heptafluoropropane (HFP) System Piping; testP/C
555-30-004Halon/Heptafluoropropane (HFP) System Piping; testP/C
555-51-001Fresh Water Fire Fighting (FWFF) Piping; replaceP/C
555-82-001Water Mist Firefighting (WMFF) Pump; repairIP/C3.2.3.1, 3.4.1
562-11-001Port Rudder Bearing Seal and Rudderstock Seal; repairIP/C3.3.4.1, PCP
562-11-002Starboard Rudder Bearing Seal and Rudderstock Seal; repairIP/C3.3.4.1, PCP
581-11-001Port Anchor and Anchor Chain; inspect and preserveIP/C3.1.4.2, 3.4.9, 3.6.3.1
581-11-002Starboard Anchor and Anchor Chain; inspect and preserveIP/C3.1.4.2, 3.4.9, 3.6.3.1
581-11-003Anchor Windlass Crossover Valve Assembly; repairIP/C3.2.2.1
583-11-001Slewing Arm Boat Davit Lift Wire; replaceP/C
583-11-002Boat Cradle Wood Block; replaceP/C
583-11-003Rescue Boat Davit Towing Arm Assembly; repairIP/C3.2.2, 3.5.5.1
583-90-002ShipAlt LPD17-86165K, Caley Boat Davit Phase I Improvement; accomplishP/C
583-90-003ShipAlt LPD17-87782K, Tow Boom Phase 2 Baseline Improvement; accomplishP/CAccess Cut
583-90-004ShipAlt LPD17-87784K Caley Boat Davit Lat Mode and Corrosion Correction; accomplishP/C
584-20-001Stern Gate Upper and Lower Hydraulic Cylinder Assembly; repairIP/C3.3.1, 3.4.4
584-21-001Stern Gate Preservation and Gasket Replacement; accomplishIP/C3.1.1
584-21-002Upper Stern Gate Locking Latch Port and Stbd; replaceP/C
584-51-001LCAC and Amphibian Recovery Winch Reduction Gear; repairP/C
584-90-001ShipAlt LPD17-78332K, Stern Gate Control Panel Replacement; accomplishP/C
584-90-002ShipAlt LPD17-86554K, LPD17 Stern Gate Emergency Rigging Removal; accomplishP/C
588-90-001ShipAlt LPD17-87303K, LPD17 Class HHD Control System; accomplishP/C
589-11-001Knuckleboom Crane; repairIP/C3.2.1
589-11-002Knuckleboom Crane Hydraulic Assembly; repairIP/C3.3.5.3
589-11-003Knuckleboom Crane; preserveP/C
589-11-004Knuckleboom Crane Radar Cross Section Reduction (RCSR) Panel; repairP/C
589-11-005Cargo Crane; repairP/C
589-11-006Aviation Folding Boom Crane Hose Assembly; replaceP/C
589-21-001K80-65 Boat and Cargo Crane, Load Test; accomplishP/C
589-21-002Well Deck Bridge Crane Hoist Brake; repairP/C
593-11-001Vacuum, Collection, Holding and Transfer (VCHT) Piping System Chemical Cleaning; accomplishP/CPCP
612-80-001ShipAlt LPD17-95214D, Flight Deck Safety Net Modification; accomplishP/C
624-11-001Balanced Joiner Door; repairIP/C3.1.2
624-12-001Metal Joiner Door; installP/C
624-12-002Metal Joiner Door and Frame; replaceP/C
631-10-001Well Deck Overhead and Bulkhead; preserveP/C
631-10-002Landing Craft Unit (LCU) Shoring Stowage; preserveP/C
631-11-001Main Machinery Room Number One Bilge; preserve (touch up)IP/C3.1.1
631-11-002Auxiliary Machinery Room Number One Bilge; preserve (touch up)IP/C3.1.1
631-11-003Main Machinery Room Number 2 Bilge; preserve (touch up)IP/C3.1.1
631-11-004Auxiliary Machinery Room Number 2 Bilge; preserve (touch up)IP/C3.1.1
631-11-005Auxiliary Machinery Room Number 3 Bilge; preserve (touch up)IP/C3.1.1
631-21-001Forward Advanced Enclosed Mast/Sensor (AEM/S) Mast; preserveIP/C3.1.1
631-21-002Aft Advanced Enclosed Mast/Sensor (AEM/S) Mast; preserveIP/C3.1.1
631-21-003Catwalk Platform; preserveP/C
631-21-004Advanced Enclosed Mast/Sensor (AEM/S) Mast; repair and preserveIP/C3.1.1
631-21-00503 and 04 Level, Port and Starboard Life Raft Deck; preserveP/C
631-30-001Underwater Hull Preservation with Paint Company Original Equipment Manufacturers (OEM) Technical Representative; accomplishIP/C3.1.1
631-41-001Freeboard; preserveIP/C3.1.1
633-21-001Impressed Current Cathodic Protection System Reference Electrode Assembly; inspect and repairIP/C3.1.1.1
634-11-001Chemical - Resistant Floor Covering System; installP/C
634-21-001Flight Deck Nonskid; replaceP/C3.1.1, 3.2.1, 3.3.1, 3.4.1
634-21-002Weatherdeck Nonskid; replaceP/C
651-80-001ShipAlt LPD17-95000D, Combi-Oven Gaylord Hood Replacement; accomplishP/C
651-90-001ShipAlt LPD17-87889K, Scullery Re-Design; accomplishIP/C3.1.1.1, PCP
660-11-001Bench Seat Upholstery; replaceP/C
661-11-001Chart Table; replaceP/C
763-90-001ShipAlt LPD17-92223K, Troop Rifles Stowage; accomplishP/CPCP
844-31-001Combat Systems Discrepancy Correction; accomplishP/C
854-11-001Transportation Services, Ship's Force; provideP/C
897-10-001Availability Program Management AIT Integrator; provideP/C
897-11-001Availability Program Management Multi-Cable Transit (MCT) Cableway Integrator; provideP/C
980-10-001Naval Air Warfare Center, Aviation Facilities Assist Visit Discrepancy; correctP/C
980-11-001Light-Off Discrepancy Correction Assistance; provideP/C
980-11-003Temporary Off-Ship Berthing to include Galley and Mess Hall, Equivalent to BOQ/BEQ and Ship's Force Office and Training Space; provide (OPTION ITEM, Out of Homeport ONLY)P/C
980-80-001ShipAlt LPD17-95788D, 400Hz SSFC Distribution Upgrade, Alteration Installation Team (AIT) Support Service; provideP/C
980-90-001ShipAlt LPD17-86386K, LPD-17 Class Cargo/Weapon Elevator Human Machine Interface 3 (HMI) Touch Screen Installation, Alteration Installation Team (AIT) Support Service; provideP/C
980-90-002ShipAlt LPD17-92223K, Troop Rifle Stowage, Alteration Installation Team (AIT) Support Service; provideP/C
980-90-003ShipAlt LPD17-85076K, Hull, Mechanical and Electrical (HM and E) Network Mesh Implementation, Alteration Installation Team (AIT) Support Service; provideP/C
980-90-004ShipAlt LPD17-81798K, NAVMACS Tech Refresh, Alteration Installation Team (AIT) Support Service; provide (Option Item)P/C
980-90-005ShipAlt LPD17-82249K, LPD 17 Class UPS Reduction, Alteration Installation Team (AIT) Support Service; provideP/C
980-90-006ShipAlt LPD17-86679K, Swan Removal, Alteration Installation Team (AIT) Support Service; provideP/CAccess Cut
980-90-007ShipAlt LPD17-92014K, ICOP Full Infrastructure USMC Transmitter, Alteration Installation Team (AIT) Support Service; provide (Option Item)P/C
980-90-008ShipAlt LPD17-78304K and 81400K, Remove Trainer, Stimulator-Simulator System (TSSS) SPS-48E Stimulator, Alteration Installation Team (AIT) Support Service; provide (Option Item)P/C
980-90-009ShipAlt LPD17-86908K, LPD17 Class CWE a, Alteration Installation Team (AIT) Support Service; provideP/C
980-90-010ShipAlt LPD17-92735K, Navigation Data Distribution System (NDDS) Sustainment and Obsolescence Upgrade, Alteration Installation Team (AIT) Support Service; provideP/C
980-90-011ShipAlt LPD17-92738K, NDDS Navigation Display Upgrade, Alteration Installation Team (AIT) Support Service; provideP/C
980-90-012ShipAlt LPD17-94138K, OE-570 To OE-570D Mobile Objective System (MUOS) Upgrade, Alteration Installation Team (AIT) Support Service; provide (Option Item)P/C
980-90-013MechAlt LPD17-87665K and 82565K, LPD17 Class HHD Pneumatic Console Replacement, Alteration Installation Team (AIT) Support Service; provideP/C
980-90-016ShipAlt LPD17-86669K, CIDS (23TV) Upgrade to V5.1, Alteration Installation Team (AIT) Support Service; provideP/C
980-90-017ShipAlt LPD17-86033K, Multifunctional Information Distribution System (MIDS) On Ships Modernization (MOS MOD), Alteration Installation Team (AIT) Support Service; provide (Option Item)P/C
980-90-018ShipAlt LPD17-91027K, GPS-Based Positioning, Navigation and Timing Service (GPNTS)(V)4, Alteration Installation Team (AIT) Support Service; provide (Option Item)P/C
980-90-021ShipAlt LPD17-90783K, Ship Self Defense System (SSDS) MK 2 Install to Mod C Baseline, Alteration Installation Team (AIT) Support Service; provide (Option Item)P/C
980-90-023ShipAlt LPD17-89491K, CANES HW 1.2, Alteration Installation Team (AIT) Support Service; provide (Option Item)P/C
980-90-024ShipAlt LPD17-80897K, NMT AN/WSC-9(V)XX Q/KA/X/GBS Terminal, Alteration Installation Team (AIT) Support Service; provide (Option Item)P/C
980-90-026ShipAlt LPD17-93987K, SSEE VUHF AIU Modification, ShipAlt Title, Alteration Installation Team (AIT) Support Service; provide (Option Item)P/C
980-90-027ShipAlt LPD17-94058K, EMUT MUOS Replacement Antenna, Alteration Installation Team (AIT) Support Service; provide (Option Item)P/C
980-90-030ShipAlt LPD17-87303K, LPD17 Class HHD Control System, Alteration Installation Team (AIT) Support Service; provideP/C
980-90-034ShipAlt LPD17-94905K, AN/SPS-73(V)18 Surface Scan Radar, Alteration Installation Team (AIT) Support Service; provide (Option Item)P/C
980-90-035ShipAlt LPD17-96483K, CAC2S Afloat Flight 0 Hardware, Alteration Installation Team (AIT) Support Service; provide (Option Item)P/C
980-90-036ShipAlt LPD17-91525K, Sound Powered Modification, Alteration Installation Team (AIT) Support Service; provideP/C
980-90-037ShipAlt LPD17-87447K, Installation of Moriah Wind System, Alteration Installation Team (AIT) Support Service; provide (Option Item)P/C
982-31-001Dock Trial, Fast Cruise, and Sea Trial; accomplishP/C
982-31-002Machinery Space Production Completion and Requirement for Light-Off Assessment (LOA)(Complex); accomplishP/CRTR
982-31-003Dock Trial, Sea Trial Discrepancy Correction; accomplishP/C
991-12-001Mast and Superstructure Temporary Staging; provideP/C
992-11-001Pressurized Waveguide and Transmission Lay-Up; accomplishP/C
992-11-002Regional Maintenance Center (RMC) Office Space; provideP/C
992-11-003Demineralized Water; provideP/C
992-11-005Ship's Force Parking; provideP/C
992-11-006Small Boat Storage; provideP/C
992-11-007Temporary Air Conditioning; provideP/C
992-11-008Fuel Assistance and Towboat Service for Fuel Barge; provideP/C
992-11-009Temporary Refrigerated Storage Facility; provideP/C
992-11-010Temporary Service; provideP/C
992-11-011Messing and Berthing Barge Tow Service; provide (Option Item)P/C
992-11-012Temporary Flammable Liquid Hazardous Waste and Hazardous Material Storage for Ship's Force Use at Contractor's Facility; provideP/C
992-11-013Oil Spillage and Floating Sandblasting Debris Boom; installP/C
992-21-001Defuel Ship; accomplish (OPTION ITEM; Non-Naval Base Ports Only)P/C
992-31-001Bilge Cleaning and Pumping; accomplishIP/C3.2.3.1
993-10-001Rigging, Crane and Transportation Service; provideP/C
993-11-001Ship's Force Warehouse Storage Space; provideP/C
993-11-002Temporary Lift and Operator; provideP/C
993-31-001Temporary Deck Covering; installP/C
993-31-002Temporary Main Reduction Gear (MRG) Dehumidifier System; provideIP/C3.4.9.5, 3.5.1.1
997-11-001Drydocking and Undocking; accomplishP/CPCP
998-41-001Hazardous Waste Produced on Naval Vessels; controlP/C