This solicitation seeks proposals for the execution of the USS MUSTIN (DDG 89) FY21 depot maintenance period and the USS SAN DIEGO (LPD 22) FY21 docking selected restricted availability. The Naval Sea Systems Command will perform maintenance, modernization, and repair of these vessels. Offerors must have substantial facilities including a capable pier, human resources, and the ability to complete, coordinate, and integrate multiple areas of ship maintenance, repair and modernization. The period of performance for the USS MUSTIN availability is from September 2021 to July 2023. The period of performance for the USS SAN DIEGO availability is from September 2021 to December 2022. Interested parties must register in the System for Award Management and monitor the beta.SAM.gov site for release of the solicitation and amendments. Key attachments will be made available on beta.SAM.gov with restricted access and additional references will be transmitted via DOD Safe. The Government anticipates a single award by May 2021. This is not set aside for small business due to the complexity and magnitude of the requirement.
View the file
Other files
Show all 43
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Exec Milestones (Contractual)
| USS MUSTIN (DDG 89) FY21 DMP | Offerors are not to propose milestones highlighted in Orange. These milestones are calculated or fixed | |
| Offerors are to propose values highlighted in Blue in accordance with "Notes". Entering values into the blue highlighted cells will allow the milestone spreadsheet to calculated the remaining interim milestones. | ||
| System | Milestones/Key Events (Calculated or Proposed) | Notes |
| Avail Start at MSR Facility | Monday, September 27, 2021 | |
| DOCK | Offeror to Propose Dock Dates IAW Specification 997-11-001. | |
| Dry Dock Reports Due (No Later Than) | Sunday, December 31, 1899 | Reports due on the date in Column B or, if the date in Column B is on a weekend or Government holiday, due on the next Government business day following the date in Column B |
| UNDOCK | - Offeror to Propose Undock Dates IAW Specification 997-11-001. | |
| 20% Open and Inspect CFR DUE | Thursday, January 13, 2022 | Reports due on the date in Column B or, if the date in Column B is on a weekend or Government holiday, due on the next Government business day following the date in Column B |
| 25% CONFERENCE | Wednesday, February 09, 2022 | Conference to be held on the next Wednesday following the date in Column B |
| 50% CONFERENCE | Friday, June 24, 2022 | Conference to be held on the next Wednesday following the date in Column B |
| 75% CONFERENCE | Friday, November 04, 2022 | Conference to be held on the next Wednesday following the date in Column B |
| HM&E TURNOVER 1 (MSR TO AIT) | Monday, April 25, 2022 | |
| HM&E AIT work complete Turnover 1- GEDMS MG and Mesh B (includes cabling) all AIT | Monday, May 02, 2022 | |
| HM&E Turnover 2 (MSR TO AIT) | Monday, May 09, 2022 | |
| HM&E AIT work complete Turnover 2 | Monday, May 16, 2022 | |
| HM&E Turnover 3 (MSR TO AIT) | Monday, May 23, 2022 | |
| HM&E AIT work complete Turnover 3 | Monday, May 30, 2022 | |
| HM&E Turnover 4 (MSR TO AIT) | Monday, June 06, 2022 | |
| HM&E AIT work complete Turnover 4 | Monday, June 13, 2022 | |
| HM&E Turnover 5 (MSR TO AIT) | Wednesday, July 06, 2022 | |
| HM&E AIT work complete Turnover 5 | Monday, July 18, 2022 | |
| HM&E Turnover 6 (MSR TO AIT) | Monday, July 25, 2022 | |
| HM&E AIT work complete Turnover 6 | Wednesday, August 03, 2022 | |
| HM&E Turnover 7 (MSR TO AIT) | Tuesday, September 06, 2022 | |
| HM&E AIT work complete Turnover 7 | Tuesday, September 13, 2022 | |
| Combat Systems Space Turnover 1 | Thursday, October 06, 2022 | |
| Combat Systems Space Turnover 2 | Thursday, October 13, 2022 | |
| Combat Systems Space Turnover 3 | Thursday, October 20, 2022 | |
| Combat Systems Space Turnover 4 | Thursday, October 27, 2022 | |
| Combat Systems Space Turnover 5 | Thursday, November 03, 2022 | |
| PCD | Tuesday, October 25, 2022 | |
| HAB COMPLETE | Wednesday, November 09, 2022 | |
| CREW MOVE ABOARD | Wednesday, November 09, 2022 | |
| AVCERT | Wednesday, November 09, 2022 | |
| C5ILO/ALO | Tuesday, November 15, 2022 | |
| LOA | Tuesday, February 21, 2023 | |
| DOCK TRAILS/FAST CRUISE | Thursday, March 02, 2023 | |
| HM&E and TYCOM SEA TRAILS | Monday, March 06, 2023 | |
| Contract Complete | Monday, March 20, 2023 |
ERL
USS MUSTIN (DDG 89) FY21 DMP
Event Readiness List (Work Item Title) Legend: "I" = Open & Inspect (CFR), "P" = Production Complete,
| "T" = Testing Complete, "C" = Certification Complete. | START OF AVAIL | DOCK | Dry Dock Reports Due | AVAIL 20% (O&I) | UNDOCK | PCD | HAB COMPLETE | C5ILO | AVCERT | LOA | DOCK TRAILS/FAST CRUISE | HM&E and TYCOM SEA TRAILS | CONTRACT COMPLETE | Annotate Critical Path WI, Controlling WI, PCP, RTR… | ||
| WORK ITEM NO. | WORK ITEM TITLE | Comments | ||||||||||||||
| 042-11-001 | Accountability of Manhour and Material Reservation; accomplish | C | ||||||||||||||
| 042-11-002 | Work Package Execution Review (WPER); accomplish | C | ||||||||||||||
| 042-11-005 | Condition Found Report (CFR); provide and manage | C | ||||||||||||||
| 077-11-001 | Fire Drill Service; provide | P/C | ||||||||||||||
| 110-11-001 | Underwater Hull; inspect and repair | I | P/C | 3.3.1,3.4.1 | ||||||||||||
| 110-11-002 | Fairwater Plug; remove and replace | P/C | ||||||||||||||
| 113-11-001 | Bilge Drain Well; repair and preserve | I | P/C | 3.2.1.1, 3.5.1.1 | ||||||||||||
| 113-11-002 | Auxiliary Machinery Room Number One Structural Repair; accomplish | P/C | ||||||||||||||
| 120-11-001 | Engine Room Number 2; repair | P/C | ||||||||||||||
| 120-11-002 | Vacuum Collection Holding Tank Room Number One; repair | P/C | ||||||||||||||
| 120-11-004 | Steering Gear Room Structural Weld; repair | P/C | ||||||||||||||
| 120-11-005 | Structural; repair | P/C | ||||||||||||||
| 120-11-006 | Windlass Machinery Room Structural Repair; accomplish | I | P/C | 3.1.1 | ||||||||||||
| 122-20-001 | Generator Room; repair | I | P/C | 3.1.2.1, 3.3.1 | ||||||||||||
| 122-21-001 | Auxiliary Machinery Room Number One Transverse Bulkhead; inspect and repair | I | P/C | 3.3.1 | ||||||||||||
| 123-10-001 | Tank and Void Cleaning and Pumping; accomplish | P/C | Critical Path, PCP | |||||||||||||
| 123-11-001 | Compensated Fuel Tank Group One; repair | I | P/C | 3.1.1.1 | ||||||||||||
| 123-11-002 | Compensated Fuel Tank Group 2; repair | I | P/C | 3.1.1.1 | ||||||||||||
| 123-11-003 | Compensated Fuel Tank Group 3; repair | I | P/C | 3.1.1.1 | ||||||||||||
| 123-11-004 | Compensated Fuel Tank Group 4; repair | I | P/C | 3.1.1.1 | ||||||||||||
| 123-11-005 | Compensated Fuel Tank Group 5; repair | I | P/C | 3.1.1.1 | ||||||||||||
| 123-11-006 | Compensated Fuel Tank Group 6; repair | I | P/C | 3.1.1.1 | ||||||||||||
| 123-11-007 | Fuel Oil Service and Gravity Head Tank; repair | I | P/C | 3.2.1 | ||||||||||||
| 123-11-008 | Compensated Fuel Tank Group One; preserve | P/C | Access-cut | |||||||||||||
| 123-11-009 | Compensated Fuel Tank Group 2; preserve | P/C | Access-cut | |||||||||||||
| 123-11-010 | Compensated Fuel Tank Group 3; preserve | P/C | Access-cut | |||||||||||||
| 123-11-011 | Compensated Fuel Tank Group 4; preserve | P/C | Access-cut | |||||||||||||
| 123-11-012 | Compensated Fuel Tank Group 5; preserve | P/C | Access-cut | |||||||||||||
| 123-11-013 | Compensated Fuel Tank Group 6; preserve | P/C | Access-cut | |||||||||||||
| 123-11-014 | Gas Turbine Generator (GTG) Fuel Gravity Feed Tank; preserve | P/C | ||||||||||||||
| 123-11-015 | Fuel Service Tank; preserve | P/C | Access-cut | |||||||||||||
| 123-11-016 | Fuel Oil Tank Equalizing Pipe; repair | P/C | ||||||||||||||
| 123-12-001 | JP-5 Tank; preserve | P/C | Access-cut | |||||||||||||
| 123-12-002 | JP-5 Tank; repair | I | P/C | 3.1.1.1 | ||||||||||||
| 123-14-001 | Potable Water Tank; repair | I | P/C | 3.1.1 | ||||||||||||
| 123-15-001 | Lube Oil Tank; repair | I | P/C | 3.2.1, PCP | ||||||||||||
| 123-17-001 | Contaminated Oil Tank; preserve (touch up) | I | P/C | 3.1.1 | ||||||||||||
| 123-17-002 | Contaminated Oil Tank; repair | I | P/C | 3.1.1 | ||||||||||||
| 123-17-003 | Contaminated Oil Tank; preserve | P/C | Access-cut | |||||||||||||
| 123-19-001 | Waste Water Tank; repair | I | P/C | 3.1.1.1 | ||||||||||||
| 123-19-002 | Waste Water Tank; preserve | P/C | Access-cut | |||||||||||||
| 123-21-001 | Forepeak Tank; repair | P/C | ||||||||||||||
| 123-21-002 | Accessible Void; preserve | P/C | Access-cut | |||||||||||||
| 123-21-003 | Accessible Void Base Metal Weld Builup; accomplish | I | P/C | 3.1.1.1 | ||||||||||||
| 123-22-001 | Chain Locker and Chain Locker Sump; repair | I | P/C | 3.1.1 | ||||||||||||
| 123-22-002 | Chain Locker and Chain Locker Sump; preserve | P/C | Access-cut | |||||||||||||
| 130-11-001 | Aircraft Securing Fitting; replace | P/C | ||||||||||||||
| 136-11-001 | 01 Level Transverse Bulkhead; repair | P/C | ||||||||||||||
| 137-11-001 | Davit Arm Stowage Bracket; replace | P/C | ||||||||||||||
| 150-11-001 | Deck Edge Coaming; repair | P/C | ||||||||||||||
| 150-11-002 | 02 Level Bulwark; repair and preserve | P/C | ||||||||||||||
| 150-11-004 | 04 Level Port Bridgewing; repair | P/C | ||||||||||||||
| 150-11-005 | 06 Level Platform Deck; repair | P/C | ||||||||||||||
| 150-11-006 | 05 Level Antenna Platform; repair | P/C | ||||||||||||||
| 150-11-007 | 03 Level Deck; repair | P/C | ||||||||||||||
| 150-11-008 | Close-In Weapons System (CIWS) Mount Number 22 Foundation and Support Structure; replace | P/C | ||||||||||||||
| 161-11-001 | Strut; inspect and repair | I | P/C | 3.1.1 | ||||||||||||
| 163-11-001 | Sea Chest; inspect and repair | I | P/C | 3.2.2.1 | ||||||||||||
| 163-11-002 | Waster Sleeve; replace | I | P/C | 3.4.7 | ||||||||||||
| 165-11-001 | Sonar Dome Rubber Window (SDRW); inspect and repair | I | P/C | 3.2.2,3.3.1,3.6.1,3.7.1,3.7, Access-cut | ||||||||||||
| 165-80-001 | ShipAlt DDG51-TY64,188, Sonar Dome Pressurization System, Digital Electronic Pressure Indicator Transducer and Sensing Line Relocation; accomplish | P/C | ||||||||||||||
| 167-11-001 | Watertight Closure; replace | P/C | ||||||||||||||
| 167-11-002 | Bolted Equipment Removal Plate (BERP) Repair; accomplish | I | P/C | 3.1.1.1, 3.5.2 | ||||||||||||
| 167-11-003 | Lower Sonar Dome Access Scuttle; repair | I | P/C | 3.1.1, 3.2.1.4, 3.2.2.1 | ||||||||||||
| 167-80-001 | ShipAlt DDG51-76258D, MAFO-Holtkamp Door Installation, (PARTIAL); accomplish | P/C | ||||||||||||||
| 168-12-001 | Watertight Scuttle; replace | P/C | ||||||||||||||
| 168-12-002 | Quick Acting Watertight (QAWTRTT) Door; repair | P/C | ||||||||||||||
| 171-11-001 | Wiring Trunk; inspect and preserve | P/C | Access-cut | |||||||||||||
| 181-11-001 | Auxiliary Machinery Room Number One Foundation; repair | P/C | ||||||||||||||
| 234-10-001 | Gas Turbine Module (GTM) 1A, 1B, 2A and 2B Flexible Hose Assembly; replace (OPTION ITEM) | I | P/C | 3.1.4.1 | ||||||||||||
| 241-10-001 | Lube Oil Pump Flexible Hose Assembly; replace | I | P/C | 3.1.4.1 | ||||||||||||
| 241-11-001 | Main Reduction Gear (MRG) Number One Flexible Hose Assembly; replace | I | P/C | PCP, 3.3.4.1 | ||||||||||||
| 241-12-001 | Main Reduction Gear (MRG) Number 2 Flexible Hose Assembly; replace | I | P/C | PCP, 3.3.4.1 | ||||||||||||
| 243-11-001 | Starboard Stern Tube Shaft Seal; overhaul | I | P/C | 3.2.2.3 | ||||||||||||
| 243-11-002 | Starboard Waterborne Propulsion Shafting; inspect and repair | I | P/C | 3.1.1, 3.2.5.1, 3.4.1.1, Access Cut, Critical | ||||||||||||
| 243-11-003 | Starboard Waterborne Propulsion Shafting; install | I | P/C | 3.1.1, 3.2.7, 3.4.1.1, Access Cut | ||||||||||||
| 243-12-001 | Port Stern Tube Shaft Seal; overhaul | I | P/C | 3.2.2.3, 3.3.2 | ||||||||||||
| 243-12-002 | Port Waterborne Propulsion Shafting; inspect and repair | I | P/C | 3.1.1, 3.2.5.1, 3.4.1.1, Access Cut, Critical | ||||||||||||
| 243-12-003 | Port Waterborne Propulsion Shafting; install | I | P/C | 3.1.1, 3.2.5.1, 3.4.1.1, Access Cut | ||||||||||||
| 244-10-001 | Strut Bearing Thru-Hole Plug; install | P/C | ||||||||||||||
| 244-11-001 | Stern Tube and Strut Bearing Strap; install | P/C | ||||||||||||||
| 244-11-003 | Starboard Outboard Propulsion Shafting Bearing Clearance Measurement; accomplish | I | P/C | 3.1.3.1 | ||||||||||||
| 244-12-003 | Port Outboard Propulsion Shafting, Bearing Clearance Measurement; accomplish | I | P/C | 3.1.3.1 | ||||||||||||
| 245-11-001 | Controllable Pitch Propeller (CPP) Prairie Air and Valve Rod Assembly Starboard; repair | I | P/C | 3.3.2.4, 3.3.4.1,3.4.2.4,3.4.4.1 | ||||||||||||
| 245-11-002 | Number One Controllable Pitch Propeller (CPP) Oil Distribution (OD) Box MER One; replace | I | P/C | 3.3.1 | ||||||||||||
| 245-11-003 | Propellers and Propulsors Shaft Flexible Hose Assembly; replace | I | P/C | 3.1.4.1 | ||||||||||||
| 245-11-004 | Number One Controllable Pitch Propeller (CPP) Blade Set Repair and Propeller Hub Replacement; accomplish | I | P/C | 3.2.2.1, PCP | ||||||||||||
| 245-12-001 | Controllable Pitch Propeller (CPP) Prairie Air and Valve Rod Assembly Port; repair | I | P/C | 3.3.2.4,3.3.4.1,3.4.2.4,3.4.4.1 | ||||||||||||
| 245-12-002 | Controllable Pitch Propeller (CPP) Oil Distribution (OD) Box MER 2; replace | I | P/C | 3.3.1 | ||||||||||||
| 245-12-004 | Number 2 Controllable Pitch Propeller (CPP) Blade Set Repair and Propeller Hub Replacement; accomplish | I | P/C | 3.2.2.1, PCP | ||||||||||||
| 245-80-001 | DDG51 Class AER 66047, HOPM Bleed Valve and Snubber Install; accomplish | P/C | PCP | |||||||||||||
| 251-30-001 | Number One Gas Turbine Module (GTM) Clean Air Intake; repair and preserve | I | P/C | 3.2.1, 3.5.1, 3.6.1 | ||||||||||||
| 251-30-002 | Number 2 Gas Turbine Module (GTM) Clean Air Intake; repair | I | P/C | 3.2.1, 3.5.1, 3.6.1 | ||||||||||||
| 251-30-003 | Number One Ship Service Gas Turbine Generator (SSGTG) Clean Air Intake; inspect and clean | I | P/C | 3.3.1 | ||||||||||||
| 251-30-004 | Number 3 Ship Service Gas Turbine Generator (SSGTG) Clean Air Intake; preserve | I | P/C | 3.2.1, 3.4.1 | ||||||||||||
| 251-31-001 | Air Intake and Exhaust Louver; clean and preserve | I | P/C | 3.3.1.1 | ||||||||||||
| 251-32-001 | Propulsion Gas Turbine (GTRB) Intake Number 2 and Ships Service Gas Turbine Generator (SSGTG) Intake Number 2 and 3; repair and preserve | I | P/C | 3.2.1, 3.3.1, 3.4.2.1, 3.5.1.1 | ||||||||||||
| 251-32-002 | Propulsion Gas Turbine (GTRB) Intake Number One and Ships Service Gas Turbine Generator (SSGTG) Intake Number One; repair and preserve | I | P/C | 3.2.1, 3.3.1, 3.4.2.1, 3.5.1.1 | ||||||||||||
| 256-61-001 | Seawater Cooling System Butterfly Valve; replace | P/C | ||||||||||||||
| 256-70-001 | Centralized Seawater Cooling Pump; overhaul | I | P/C | 3.3.1, 3.5.5.1 | ||||||||||||
| 259-10-001 | Number 2 Gas Turbine Mixing Room, Uptake and Boundary Layer Infra-Red Suppression System (BLISS); repair and preserve | I | P/C | 3.3.3 | ||||||||||||
| 259-10-002 | Number One Gas Turbine Mixing Room, Uptake and Boundary Layer Infra-Red Suppression System (BLISS); repair and preserve | I | P/C | 3.2.1, 3.4.2 | ||||||||||||
| 259-10-003 | Number One Gas Turbine Mixing Room and Intake/Uptake Engine Room One; repair | P/C | ||||||||||||||
| 259-10-004 | Ship Service Gas Turbine (GTRB) Exhaust Trunk Deck; preserve | I | P/C | 3.2.1 | ||||||||||||
| 259-11-001 | Gas Turbine (GTRB) Exhaust Duct Collector; repair | I | P/C | 3.3.2 | ||||||||||||
| 261-11-001 | Fuel Service Pump Flexible Hose Assembly; replace (OPTION ITEM) | I | P/C | 3.1.4.1 | ||||||||||||
| 261-12-002 | 2A Fuel Service Filter Separator; replace | I | P/C | 3.2.3.1 | ||||||||||||
| 261-21-001 | 1B Fuel Oil Service Pump; overhaul (OPTION ITEM) | I | P/C | 3.5.2.1 | ||||||||||||
| 261-22-001 | 2A Fuel Oil Service Pump; repair (OPTION ITEM) | I | P/C | 3.5.2.1 | ||||||||||||
| 262-11-001 | Main Reduction Gear (MRG) Lube Oil Cooler; clean and inspect | I | P/C | 3.2.3.1, PCP | ||||||||||||
| 262-90-001 | ShipAlt DDG51-76253K, Main Reduction Gear Lube Oil Coalescing Filter Modification; accomplish | P/C | PCP | |||||||||||||
| 264-31-001 | Lube Oil Purifier Heater Number One; clean and inspect | I | P/C | 3.4.5 | ||||||||||||
| 264-31-002 | Lube Oil Purifier Heater Number 2; clean and inspect | I | P/C | 3.4.5 | ||||||||||||
| 304-11-001 | Multicable Transit (MCT) Plate; replace | P/C | ||||||||||||||
| 311-30-001 | Ship Service Gas Turbine Generator Flexible Hose Assembly; replace (OPTION ITEM) | I | P/C | 3.1.4.1 | ||||||||||||
| 311-31-001 | Ship Service Gas Turbine Generator (SSGTG) Number One Lube Oil Cooler; chemically clean and inspect | I | P/C | 3.2.2, 3.3.3,1, PCP | ||||||||||||
| 311-32-001 | Ship Service Gas Turbine Generator (SSGTG) Number 2 Lube Oil Cooler; chemically clean and inspect | I | P/C | 3.2.2, 3.3.3.2, PCP | ||||||||||||
| 311-33-001 | Ship Service Gas Turbine Generator (SSGTG) Number 3 Lube Oil Cooler; chemically clean and inspect | I | P/C | 3.2.2, 3.3.3.2, PCP | ||||||||||||
| 311-80-001 | DDG51 Class AER 66085, Repair Generator Cabling Chafing Modification; accomplish | P/C | ||||||||||||||
| 321-80-002 | DDG51 Class AER 64201D, Stuffing Tube Replacement (Partial); accomplish | P/C | ||||||||||||||
| 324-80-001 | DDG51 Class AER 76101D, Replace Dossert Lug Connector (Partial); accomplish | P/C | ||||||||||||||
| 331-80-001 | DDG51 Class AER 64125, Addition of Launcher Light; accomplish | P/C | ||||||||||||||
| 411-90-001 | ShipAlt DDG51-89925K, AWS: ACB16/TI16 CIC Display Upgrade; accomplish | I | P/C | 3.3.1, Critical Path, PCP, Access Cut | ||||||||||||
| 411-90-002 | ShipAlt DDG51-89804K, AWS: ACB16/TI16 OA Computing Plant; accomplish | I | P/C | 3.2.1, Critical Path, PCP, Access Cut | ||||||||||||
| 422-11-001 | Anti Submarine Warfare (ASW) Revolving Light; remove | P/C | ||||||||||||||
| 423-10-001 | Antenna Group SPY-1 Series Flexible Hose Assembly; replace (OPTION ITEM) | P/C | ||||||||||||||
| 437-90-001 | ShipAlt DDG51-77829K, Installation of Radar and TDR TLI's for DFM, JP-5 and Potable Water Tanks | P/C | For tanks that are filled ISO UD, ensure TLI cables are installed and tested prior | |||||||||||||
| 438-90-001 | ShipAlt DDG51-88260K, Enterprise Remote Monitor Hardware Installation; accomplish (OPTION ITEM) | I | P/C | 3.1.1, Critcal Path with GEDMS | ||||||||||||
| 438-90-002 | ShipAlt DDG51-71604K, DDG Mod MCS/DCS Upgrades, Single Central Control Station (CCS) Watchstander; accomplish | I | P/C | 3.3.2, Controlling Work Item, PCP, Access Cut | ||||||||||||
| 438-90-003 | ShipAlt DDG51-71726K, DDG Mod Full IBS Upgrade, Single Bridge Watchstander; accomplish | I | P/C | 3.3.1, Controlling Work Item, PCP, Access Cut | ||||||||||||
| 442-10-001 | TR-232B/WQC-2A and TR-233B/WQC-2A Transducer Cabling; install | I | P/C | 3.2.4.1, 3.3.1 | ||||||||||||
| 442-11-001 | TR-233B/WQC-2A Transducer; replace | I | P/C | 3.1.4 | ||||||||||||
| 456-90-001 | ShipAlt DDG51-89769K, AWS: ACB16/TI16 KAS WDRC Upgrade; accomplish | I | P/C | 3.2.1, Critical Path, PCP, Access Cut | ||||||||||||
| 456-90-002 | ShipAlt DDG51-91754K, AWS: ACB16/TI16 MMSP-R Upgrade; accomplish | I | P/C | 3.1.1, Critical Path, PCP, Access Cut | ||||||||||||
| 462-08-001 | DT-513/BQA-8 Hydrophone and Cable Assembly; replace | I | P/C | 3.1.2.3, 3.1.3.3, 3.3.1, 3.4.2 | ||||||||||||
| 463-11-001 | AN/SQQ-89A (V)15 Transmitter Flexible Hose Assembly; replace (OPTION ITEM) | P/C | ||||||||||||||
| 463-89-001 | AN/SQQ-89 Sonar Transducer and Stave Cable Connectorized; replace | I | P/C | 3.1.3, 3.2.1 | ||||||||||||
| 468-90-001 | ShipAlt DDG51-91580K, AN/SQQ-89A(V)15 Tech Refresh; accomplish (OPTION ITEM) | I | P/C | 3.1.1, Critical Path, PCP, Access Cut | ||||||||||||
| 472-00-001 | OrdAlt 80831, Guided Missile Director AS-3444/SPG-62, Passive Countermeasure System (PCMS) Installation; accomplish | P/C | ||||||||||||||
| 472-90-001 | ShipAlt DDG51-80156K, AN/SLQ-32 (V)6 Surface Electronic Warfare Improvement Program (SEWIP) Block 2 Upgrade; accomplish (OPTION ITEM) | P/C | PCP, Access Cut | |||||||||||||
| 482-99-001 | MK 82 Mod 0, Director; replace | P/C | ||||||||||||||
| 505-11-001 | Piping Support; repair | P/C | ||||||||||||||
| 506-80-001 | ShipAlt DDG51-64121D, Relocate Sounding Tube; accomplish | P/C | ||||||||||||||
| 508-12-001 | Machinery, Pipe, Bulkhead and Ventilation Lagging and Insulation, Inside Machinery Space; replace | P/C | ||||||||||||||
| 508-12-002 | Machinery, Pipe Lagging, Bulkhead and Ventilation Insulation, Outside Machinery Space; replace | P/C | ||||||||||||||
| 512-11-001 | Ventilation Cleaning; accomplish | P/C | ||||||||||||||
| 512-11-003 | Supply Ventilation; replace | P/C | ||||||||||||||
| 512-11-004 | Ventilation Master Switch Plexiglass Cover; replace | P/C | ||||||||||||||
| 512-11-005 | MORPAC Valve Overhaul; accomplish | I | P/C | 3.1.2 | ||||||||||||
| 512-11-006 | Fan Motor Resilient Mount; replace | P/C | ||||||||||||||
| 512-80-001 | DDG-51 Class AER 66113 Hangar Supply System (1S) and Exhaust System (1E) Vent Removal; accomplish | P/C | ||||||||||||||
| 512-90-001 | ShipAlt DDG51-74012K, VLS Magazine Ventilation Upgrade; accomplish | P/C | PCP, Access Cut | |||||||||||||
| 512-90-002 | ShipAlt DDG51-71655K, Zone 4 Intake Modification; accomplish | P/C | ||||||||||||||
| 512-90-003 | ShipAlt DDG51-77419K, DDGM Textile Ducting Installation; accomplish | P/C | ||||||||||||||
| 514-11-001 | Ventilation Cooling Coil Unit Drain Pan; replace | P/C | ||||||||||||||
| 514-20-001 | Air Conditioning Plant Condenser Water Control Valve (CWCV); replace | I | P/C | 3.1.1 | ||||||||||||
| 514-20-002 | Air Conditioning Plant Groom and Variable Geometry Diffuser (VGD) Replacement; accomplish | I | P/C | 3.2.1, 3.4.1.1 | ||||||||||||
| 514-21-001 | Air Conditioning (AC) Plant Condenser; mechanically clean | I | P/C | 3.3.5.1, Critical | ||||||||||||
| 514-21-002 | Air Conditioner Chill Water Pump; overhaul | I | P/C | 3.7.1.2 | ||||||||||||
| 516-11-001 | Refrigeration System Flexible Hose Assembly; replace | P/C | PCP | |||||||||||||
| 520-11-001 | Sea Valve; repair and replace | I | P/C | 3.2.1.1 | ||||||||||||
| 521-11-001 | Firemain Valve; replace | I | P/C | 3.2.1 | ||||||||||||
| 521-11-002 | Hydraulic Power Unit (HPU) Cascade Orificial Restrictive Device (CORD); install | P/C | ||||||||||||||
| 521-11-003 | Firemain Valve and Cascade Orificial Restrictive Device (CORD); replace | P/C | ||||||||||||||
| 521-11-004 | Firemain Valve; replace | P/C | ||||||||||||||
| 521-21-001 | Fire Pump Number 5; overhaul | I | P/C | 3.4.3.1, 3.5.3.2 | ||||||||||||
| 521-21-002 | Fire Pump Number 2; overhaul | I | P/C | 3.4.3.1, 3.5.3.2 | ||||||||||||
| 522-11-001 | Deluge Firemain Control Valve; replace | P/C | ||||||||||||||
| 522-11-003 | Magazine Sprinkler System Flexible Hose Assembly; replace (OPTION ITEM) | P/C | ||||||||||||||
| 522-11-004 | Torpedo Magazine Flexible Hose Assembly; replace | P/C | ||||||||||||||
| 523-11-001 | Countermeasure Washdown Bulkhead Penetration Sleeve; replace | P/C | ||||||||||||||
| 523-80-001 | ShipAlt DDG51-64245D Countermeasure Washdown Bulkhead Penetration Sleeve Installation; accomplish | P/C | ||||||||||||||
| 524-10-001 | Starboard Shaft Stern Tube Seal Cooling Valve and Piping; replace | P/C | ||||||||||||||
| 524-10-002 | Port Shaft Stern Tube Seal Cooling Valve and Piping; replace | P/C | ||||||||||||||
| 529-11-001 | Submersible Pump Overboard Discharge Fitting; install | P/C | ||||||||||||||
| 531-11-001 | Reverse Osmosis Flexible Hose Assembly; replace (OPTION ITEM) | P/C | ||||||||||||||
| 531-51-002 | Reverse Osmosis High Pressure Pump; replace (OPTION ITEM) | P/C | ||||||||||||||
| 532-10-001 | Fire Control System Number One, 2 and 3 Flexible Hose Assembly; replace (OPTION ITEM) | P/C | ||||||||||||||
| 532-11-001 | Cooling Skid, Demineralized Water System Trisodium Phosphate and Citric Acid Flush; accomplish | P/C | PCP | |||||||||||||
| 532-11-002 | Aegis Cooling Module, HD-1140/SPY-1D Flexible Hose Assembly; replace | P/C | ||||||||||||||
| 532-11-003 | AN/SPY-1D S16 Purity Loop Low Flow Switch; replace | P/C | ||||||||||||||
| 532-11-004 | Cooling Water Flex Hose Assembly; replace | P/C | ||||||||||||||
| 533-12-001 | Potable Water Service Pump Number 2; replace (OPTION ITEM) | P/C | ||||||||||||||
| 541-11-001 | Fuel Oil Transfer Flexible Hose Assembly; replace (OPTION ITEM) | P/C | ||||||||||||||
| 541-12-001 | Fueling-at-Sea Station Sampling Valve; replace | P/C | ||||||||||||||
| 541-21-001 | Fuel Oil Transfer Pump and Motor; repair (OPTION ITEM) | I | P/C | 3.4.2.2 | ||||||||||||
| 541-22-001 | Fuel Oil Purifier Class B Overhaul; accomplish | P/C | 3.5.1.1 | |||||||||||||
| 541-80-001 | DDG51 ShipAlt 64191D, FAS Transducer Gage Cutout Root Valve; accomplish | P/C | ||||||||||||||
| 541-90-001 | ShipAlt DDG51-70403K, Digital Fuel Control System Installation; accomplish | P/C | ||||||||||||||
| 551-53-001 | Number One Low Pressure Air Compressor (LPAC) Class B Overhaul; accomplish | I | P/C | 3.3.2, 3.4.1.1 | ||||||||||||
| 551-53-002 | Number 2 Low Pressure Air Compressor (LPAC) Class B Overhaul; accomplish | I | P/C | 3.3.2, 3.4.1 | ||||||||||||
| 551-53-003 | Number 3 Low Pressure Air Compressor (LPAC) Class B Overhaul; accomplish | I | P/C | 3.3.2, 3.4.1.1 | ||||||||||||
| 551-61-001 | Masker Air Cooler; chemical clean | I | P/C | 3.5, PCP | ||||||||||||
| 551-62-001 | Prairie Air Cooler; chemical clean | P/C | PCP | |||||||||||||
| 562-10-001 | Rudder Bearing Seal and Rudderstock Seal; repair | I | P/C | 3.3.3.1, ACCECC CUT | ||||||||||||
| 562-11-001 | Starboard Rudder; inspect and repair | I | P/C | 3.2.2.1 | ||||||||||||
| 562-11-002 | Rudder Stock Bearing; install | I | P/C | 3.4.1.1 | ||||||||||||
| 562-11-003 | Port Rudder; inspect and repair | I | P/C | 3.2.2.1 | ||||||||||||
| 568-10-001 | Steering System Flexible Hose Assembly; replace (OPTION ITEM) | I | P/C | 3.1.5.1 | ||||||||||||
| 571-11-001 | Sliding Padeye, Tilting; overhaul and preserve | I | P/C | 3.4.3.1 | ||||||||||||
| 581-11-001 | Port and Centerline Anchor Hawse and Chain Pipe; repair | I | P/C | 3.2.1, 3.3.1 | ||||||||||||
| 581-11-002 | Anchor and Anchor Chain; inspect and preserve | I | P/C | 3.1.3.2, 3.3.11 | ||||||||||||
| 582-11-001 | Aft Warping Capstan; repair | P/C | ||||||||||||||
| 583-90-001 | ShipAlt DDG51-83894K, Navy Standard Slewing Arm Davit (SLAD) Installation; accomplish | P/C | PCP | |||||||||||||
| 588-20-001 | Landing Signal Officer (LSO) Control Station Repair and Heated Window Assembly Replacement; accomplish | P/C | ||||||||||||||
| 588-21-001 | Flight Deck and Recovery Assist, Securing and Traversing (RAST) System Track and Plate; repair and preserve | P/C | ||||||||||||||
| 588-21-002 | Helicopter Hangar Door; repair | I | P/C | 3.2.1.1, 3.3.3.1 | ||||||||||||
| 588-21-003 | Recovery, Assist, Secure and Traverse (RAST) System Flexible Hose Assembly; replace (OPTION ITEM) | P/C | ||||||||||||||
| 588-90-001 | ShipAlt DDG51-73212K, Helicopter Hanger Door (HHD) Control System Upgrade; accomplish | P/C | ||||||||||||||
| 593-11-001 | Vacuum, Collection, Holding and Transfer (VCHT) Piping System; chemically clean | P/C | PCP | |||||||||||||
| 593-11-002 | Vacuum, Collection, Holding and Transfer (VCHT) Ejector Pump and Motor; replace | P/C | PCP | |||||||||||||
| 593-11-004 | Vacuum, Collection, Holding and Transfer (VCHT) System Flexible Hose Assembly; replace (OPTION ITEM) | I | P/C | 3.2.5.1, PCP | ||||||||||||
| 593-21-001 | Oily Waste Transfer Pump Flexible Hose Assembly; replace (OPTION ITEM) | I | P/C | 3.1.4.1 | ||||||||||||
| 593-21-002 | Number One Gas Turbine Waste Drain Pump; overhaul (OPTION ITEM) | P/C | ||||||||||||||
| 593-80-001 | DDG51 Class AER 90419, VCHT System Replacement Controller; accomplish | P/C | ||||||||||||||
| 593-90-001 | ShipAlt DDG51-73622K, VCHT H2S Detector Installation; accomplish | P/C | ||||||||||||||
| 595-00-001 | Towed Array Handling and Stowage Flexible Hose Assembly; replace (OPTION ITEM) | P/C | ||||||||||||||
| 611-80-002 | ShipAlt DDG51-64185D, Anchor Chain Chafing Plate Installation; accomplish | P/C | ||||||||||||||
| 612-21-001 | Deck Edge Safety Net Load Test; accomplish (OPTION ITEM) | P/C | ||||||||||||||
| 624-11-001 | Balanced Joiner Door; remove, store and install | I | P/C | 3.1.2 | ||||||||||||
| 625-11-001 | Pilot House Window; repair | P/C | ||||||||||||||
| 631-11-001 | Bilge; preserve | I | P/C | 3.5.2.1 | ||||||||||||
| 631-11-002 | Escape Trunk; preserve | P/C | ||||||||||||||
| 631-11-003 | Compartment; preserve | P/C | ||||||||||||||
| 631-11-004 | Crew Washroom, Water Closet and Shower Bulkhead; preserve | P/C | ||||||||||||||
| 631-11-005 | Supply Department Storeroom; preserve | P/C | ||||||||||||||
| 631-11-006 | AFFF Station Number One Deck; preserve | P/C | ||||||||||||||
| 631-11-008 | Fan Room Deck; preserve | I | P/C | 3.1.1, 3.2.1.1 | ||||||||||||
| 631-11-009 | Interior Compartment Deck; preserve | P/C | ||||||||||||||
| 631-11-010 | Infrared Suppression (IRS) Eductor Secondary Air Inlet Trunk; preserve | P/C | ||||||||||||||
| 631-12-001 | Engine Room Number One Deck; preserve | I | P/C | 3.1.1, 3.3.1 | ||||||||||||
| 631-12-003 | Ships Service Gas Turbine Generator (SSGTG) Exhaust Trunk; preserve | I | P/C | 3.2.1, 3.3.1 | ||||||||||||
| 631-13-001 | Collective Protection System (CPS) Zone One Fan Room; repair and preserve | I | P/C | 3.4.1 | ||||||||||||
| 631-13-002 | Collective Protection System (CPS) Zone 2 Fan Room; repair and preserve | I | P/C | 3.4.1 | ||||||||||||
| 631-13-003 | Collective Protection System (CPS) Zone 3 Fan Room; repair and preserve | I | P/C | 3.4.1 | ||||||||||||
| 631-13-004 | Interior Compartment Deck; preserve | P/C | ||||||||||||||
| 631-21-001 | Superstructure; preserve | P/C | ||||||||||||||
| 631-21-002 | Mast Preservation; accomplish | P/C | Critical | |||||||||||||
| 631-21-004 | Weatherdeck Nonskid; replace | P/C | ||||||||||||||
| 631-31-002 | Underwater Hull Preservation with Paint Company Original Equipment Manufacturers' (OEM) Technical Representative; accomplish | I | P/C | 3.1.1, Controlling | ||||||||||||
| 631-41-001 | Freeboard; preserve | P/C | ||||||||||||||
| 633-11-001 | Transducer Compartment Zinc Anode; install | I | P/C | 3.3.3, 3.4.4 | ||||||||||||
| 633-21-001 | Impressed Current Cathodic Protection (ICCP) System; inspect and repair | I | P/C | 3.2.1, 3.4.3, 3.5.3 | ||||||||||||
| 633-80-001 | ShipAlt DDG51-64153D, Zinc Anode Modification; accomplish | P/C | ||||||||||||||
| 634-11-001 | Trash Disposal Room; repair and preserve | P/C | ||||||||||||||
| 634-11-002 | Electrical Grade Matting Deck Covering System; replace | P/C | ||||||||||||||
| 634-11-003 | Vacuum Collection Holding Tank Room Number One and 2 Chemical Resistant Floor Covering System; install | P/C | ||||||||||||||
| 634-11-004 | 5"/54 Caliber Projectile Magazine Room Latex Concrete Covering; replace | P/C | ||||||||||||||
| 634-11-005 | Electrical Grade Matting Deck Covering System; install | P/C | ||||||||||||||
| 634-11-006 | Solid Vinyl or Vinyl Composition Tile; replace | P/C | ||||||||||||||
| 634-11-008 | Weather Deck Nonskid; replace | P/C | ||||||||||||||
| 634-11-009 | Bridgewing Deck; repair and preserve | P/C | ||||||||||||||
| 634-11-010 | Aviation Repair Shop Nonskid; replace | P/C | ||||||||||||||
| 634-11-011 | Laundry Room (2-414-0-Q) Chemical Resistant Floor Covering System; install | P/C | ||||||||||||||
| 634-21-001 | Flight Deck Nonskid; replace | P/C | ||||||||||||||
| 634-21-003 | Non-Critical Nonskid; replace | P/C | ||||||||||||||
| 634-21-004 | Fueling at Sea (FAS) Station Number 3 and 4 Nonskid; replace | P/C | ||||||||||||||
| 634-21-005 | Forecastle Nonskid; replace | P/C | ||||||||||||||
| 635-11-001 | Ship Service Gas Turbine Generator (SSGTG) Exhaust Trunk Insulation; replace | P/C | ||||||||||||||
| 635-11-002 | Compartment Insulation; install | P/C | ||||||||||||||
| 636-11-001 | Sonar Dome Hull Damping System; repair | I | P/C | 3.1.1, 3.3.1.1 | ||||||||||||
| 641-11-001 | Executive Officer Stateroom Desk; replace | P/C | ||||||||||||||
| 643-11-001 | Berthing Habitability Project Installation; accomplish | P/C | ||||||||||||||
| 644-11-001 | Executive Officer Stateroom Head Habitability Overhaul; accomplish | P/C | PCP | |||||||||||||
| 644-11-002 | Sanitary Habitability Project Installation; accomplish | P/C | PCP | |||||||||||||
| 644-11-003 | 01 Level Officer Washroom, Water Closet and Shower Overhaul; accomplish | P/C | PCP | |||||||||||||
| 644-11-004 | Female Chief Petty Officer (CPO) Sanitary Space Overhaul; accomplish | P/C | PCP | |||||||||||||
| 644-11-005 | 02 Level Officer Washroom, Water Closet and Shower Overhaul; accomplish | P/C | PCP | |||||||||||||
| 644-11-006 | Crew Scullery Passing Window; replace | P/C | ||||||||||||||
| 644-80-001 | ShipAlt DDG51-64170D, Crew 3 Shower Stall Modification; accomplish | P/C | ||||||||||||||
| 644-90-001 | ShipAlt DDG51-86821K Women at Sea Berthing Number 2 Crew Living Space Modification; accomplish | P/C | PCP | |||||||||||||
| 651-80-001 | DDG51 Class AER 66082, Crew Galley Serving Line Modification; accomplish | P/C | ||||||||||||||
| 651-90-001 | ShipAlt DDG51-71605, DDG Modifications to Galley; accomplish | I | P/C | 3.2.1, Controlling Work Item, Access Cut, PCP | ||||||||||||
| 661-10-001 | Chart Table; replace | P/C | ||||||||||||||
| 711-80-001 | ShipAlt DDG51-94448D, Install M240 Mount Foundations on DDG51 with SLQ-59; accomplish | P/C | ||||||||||||||
| 721-31-001 | Vertical Launch System (VLS), MK 41 Launcher Top and Uptake Hatch; preserve | P/C | 3.2.1 | |||||||||||||
| 721-31-002 | Vertical Launch System (VLS), MK 41 Launcher Uptake and Cell Hatch; remove and replace | P/C | 3.3.4.2 | |||||||||||||
| 721-90-001 | ShipAlt DDG51-85964K, MK 41 Vertical Launching System (VLS) BLV DDG ShipAlt; accomplish | P/C | ||||||||||||||
| 752-10-001 | Torpedo Bridge Crane Hoist Flexible Hose Assembly; replace | P/C | ||||||||||||||
| 763-11-001 | Ready Service Locker (RSL); repair (OPTION ITEM) | P/C | ||||||||||||||
| 837-90-001 | Antenna Photograph; provide | P/C | ||||||||||||||
| 857-11-001 | Personnel Berthing Barge Support; provide (OPTION ITEM; Homeport ONLY) | P/C | PCP | |||||||||||||
| 857-11-003 | Temporary Duty Section Berthing Off-Ship; provide (OPTION ITEM; Out of Homeport ONLY) | P/C | PCP | |||||||||||||
| 897-11-001 | Availability Program Management Multi-Cable Transit (MCT) Cableway Integrator; provide | P/C | ** Affects all 3 KEs | |||||||||||||
| 980-00-001 | OrdAlts 85473K, 79024K, and 78778K, AWS: MMSP Transmitter Modifications for DDG and LBTS, Alteration Installation Team (AIT) Support Service; provide (OPTION ITEM) | P/C | ||||||||||||||
| 980-00-002 | OrdAlts 85224K and 79353K, MK41 VLS BL BMD 5.1 and Ablative upgrade, Alteration Installation Team (AIT) Support Service; provide (OPTION ITEM) | P/C | ||||||||||||||
| 980-00-003 | OrdAlt 80817, Air Cooled Solid State Frequency (ACSSFC) Insulated Gate Bipolar Transistor (IGBT) Inverter Module and 28 Volts DC Power Supply, Alteration Installation Team (AIT) Support Service; provide (OPTION ITEM) | P/C | ||||||||||||||
| 980-00-004 | OrdAlt 74588, FCS KAS Installation, Alteration Installation Team (AIT) Support Service; provide (OPTION ITEM) | P/C | ||||||||||||||
| 980-11-002 | Ship's Force Office Space and Temporary Classroom; provide (OPTION ITEM; Out of Homeport ONLY) | P/C | ||||||||||||||
| 980-11-004 | Light-Off Discrepancy Correction Assistance; provide | P/C | RTR | |||||||||||||
| 980-31-001 | Regional Maintenance Center (RMC) Office Space; provide | P/C | ||||||||||||||
| 980-90-001 | ShipAlt 79362K and OrdAlt 79362K, AWS Seawater Flowmeter, Alteration Installation Team (AIT) Support Service; provide (OPTION ITEM) | P/C | ||||||||||||||
| 980-90-002 | ShipAlt 83591K and MachAlt 74904K, Digital Voltage Regulator and FADC Modernization, Alteration Installation Team (AIT) Support Service; provide | P/C | ||||||||||||||
| 980-90-003 | ShipAlt DDG51-80274K, 76829K, 76869K, 76974K, 82635K, 85964K, 87103K, 90643K, 89769K, 89804K, 89925K, and 91754 NAWCAD Combat Systems Alteration, Alteration Installation Team (AIT) Support Service; provide | P/C | Critical Path, Controlling Work Item, Access Cut | |||||||||||||
| 980-90-004 | Engineering Change 90119, Navy Cash Equipment Refresh, Alteration Installation Team (AIT) Support Service; provide (OPTION ITEM) | P/C | Needs NIPR. After CANES? | |||||||||||||
| 980-90-005 | ShipAlt DDG-51-96436K, Temporary 30MM Gun Weapon System (GWS), Alteration Installation Team (AIT) Support Service; provide (OPTION ITEM) | P/C | Affects Intakes/Uptakes | |||||||||||||
| 980-90-006 | Engineering Change 70619, Gas Turbine Module (GTM) Main Engine Digital Fuel Control, Alteration Installation Team (AIT) Support Service; provide | P/C | ||||||||||||||
| 980-90-007 | ShipAlt DDG51-70403K, 71604K, 71615K, 71726K, 73091K, 77427K, 77829K, 84226K, and 84400 Hull, Mechanical and Electrical (HM and E), Alteration Installation Team (AIT) Support Service; provide | P/C | Controlling Work Item, Access Cut | |||||||||||||
| 980-90-008 | MachAlt DDG-51, 82560K, 82582K, 83082K, and 84127K, DDG Helo Hangar Door Upgrade, Alteration Installation Team (AIT) Support Service; provide | P/C | SA 732121K Work Item 588-90-001 must complete before this can start | |||||||||||||
| 980-90-009 | ShipAlt DDG51-75360K, CBSP Tier 3, Alteration Installation Team (AIT) Support Service; provide (OPTION ITEM) | P/C | ||||||||||||||
| 980-90-010 | ShipAlt DDG51-84694K, PEOC4I DMR IW and MUOS Upgrade, Alteration Installation Team (AIT) Support Service; provide (OPTION ITEM) | P/C | ||||||||||||||
| 980-90-011 | ShipAlt DDG51-86033K, MOS Modification, Alteration Installation Team (AIT) Support Service; provide (OPTION ITEM) | P/C | ||||||||||||||
| 980-90-012 | ShipAlt DDG51-91580K and 86222K, SQQ-89/NGF Install, Alteration Installation Team (AIT) Support Service; provide (OPTION ITEM) | P/C | Critical Path, PCP, Access Cut | |||||||||||||
| 980-90-014 | ShipAlt DDG51-87785K, AS-4775 Link 16 Antenna, Alteration Installation Team (AIT) Support Service; provide (OPTION ITEM) | P/C | ||||||||||||||
| 980-90-015 | ShipAlt DDG51-91027K, GPNTS(V)4, Alteration Installation Team (AIT) Support Service; provide (OPTION ITEM) | P/C | ||||||||||||||
| 980-90-016 | ShipAlt DDG51-93987K, SSEE INC AIU Modification, Alteration Installation Team (AIT) Support Service; provide (OPTION ITEM) | P/C | ||||||||||||||
| 980-90-017 | ShipAlt DDG51-88635K, CIWS Block 1B Overhaul, Alteration Installation Team (AIT) Support Service; provide (OPTION ITEM) | P/C | ||||||||||||||
| 980-90-018 | ShipAlt DDG51-83335K, Phase III OPA System Improvement, Alteration Installation Team (AIT) Support Service; provide (OPTION ITEM) | P/C | ||||||||||||||
| 980-90-019 | ShipAlt DDG51-94294K, Canes HW2 Tech Refresh, Alteration Installation Team (AIT) Support Service; provide (OPTION ITEM) | P/C | ||||||||||||||
| 980-90-020 | Government Sponsored Representative (NAVSEA SEA21 PMR) Office Space; provide | P/C | ||||||||||||||
| 980-90-021 | Naval Surface Warfare Center (NSWC) Port Hueneme Detachment (PHD) Project Team Office Space; provide | P/C | ||||||||||||||
| 980-90-022 | ShipAlt DDG51-85030K, PEOC41 GBS RBM, Alteration Installation Team (AIT) Support Service; provide (OPTION ITEM) | P/C | ||||||||||||||
| 980-90-023 | ShipAlt DDG51-84646K, SSEE Mod SA 555, Alteration Installation Team (AIT) Support Service; provide (OPTION ITEM) | P/C | ||||||||||||||
| 980-90-024 | ShipAlt DDG51-95861K, AN/USQ T-52A(V)1 Training Interface Unit, Alteration Installation Team (AIT) Support Service; provide (OPTION ITEM) | P/C | ||||||||||||||
| 980-90-025 | ShipAlt DDG-51-94692K, N/SPS-73(V)18 Surface Scan Radar, Alteration Installation Team (AIT) Support Service; provide (OPTION ITEM) | P/C | ||||||||||||||
| 980-90-026 | ShipAlt DDG51-94979K, DDG HM&E Condition System Rack, Alteration Installation Team (AIT) Support Service; provide (OPTION ITEM) | P/C | ||||||||||||||
| 980-90-028 | ShipAlt DDG51-85077K, AN/SPQ-9B Production Tech Refresh With PDD On Surface Ship, Alteration Installation Team (AIT) Support Service; provide (OPTION ITEM) | P/C | Critical Path, Controlling Work Item, PCP | |||||||||||||
| 980-90-029 | ShipAlt DDG51-95946K, C2P Tech Refresh, Alteration Installation Team (AIT) Support Service; provide (OPTION ITEM) | P/C | ||||||||||||||
| 980-90-030 | Standardized Pierside Maintenance and Repair (SPMR), Alteration Installation Team (AIT) Support Service; provide (OPTION ITEM) | P/C | ||||||||||||||
| 980-90-031 | ShipAlt DDG51-90149K, ADNS AN/USQ-144K(V)2 With SP4, Alteration Installation Team (AIT) Support Service; provide (OPTION ITEM) | P/C | ||||||||||||||
| 982-31-002 | Machinery Space Production Completion and Requirement for Light-Off Assessment (LOA) (Non-Complex); accomplish | P/C | RTR | |||||||||||||
| 982-31-003 | Dock Trial, Fast Cruise, and Sea Trial; accomplish | P/C | ||||||||||||||
| 982-32-001 | Preliminary Light Off Assessment (LOA) Inspection Discrepancy Correction Assistance; provide | P/C | RTR | |||||||||||||
| 992-11-001 | Temporary Flammable Liquid Hazardous Waste and Hazardous Material Storage for Ship's Force Use at Contractor's Facility; provide | P/C | ||||||||||||||
| 992-11-003 | Temporary Air Conditioning; provide | P/C | ||||||||||||||
| 992-11-004 | Transport Control Protocol/Internet Protocol Based T-1 Type Computer Network (T-1 Line) Support Service; provide | P/C | ||||||||||||||
| 992-11-006 | Fuel Assistance for Fuel Barge; provide (OPTION ITEM; Naval Base Ports Only) | P/C | ||||||||||||||
| 992-11-007 | Oil Spillage and Floating Sandblasting Debris Boom; install | P/C | ||||||||||||||
| 992-11-008 | Support Service for Ship's Force Security; provide | P/C | ||||||||||||||
| 992-11-009 | Temporary Service; provide | P/C | ||||||||||||||
| 992-11-011 | Ship's Force Parking; provide | P/C | ||||||||||||||
| 992-11-012 | Pressurized Waveguide and Transmission Line Dry Air Lay-Up; provide | P/C | ||||||||||||||
| 992-11-013 | Crew Transportation; provide | P/C | ||||||||||||||
| 992-11-015 | Demineralized Water; provide | P/C | ||||||||||||||
| 992-11-017 | Barge For Multi-Function Towed Array (MFTA); provide | P/C | ||||||||||||||
| 992-21-001 | Defuel Ship; accomplish (OPTION ITEM; Non-Naval Base Ports ONLY) | P/C | ||||||||||||||
| 992-31-001 | Bilge Cleaning and Pumping; accomplish | P/C | ||||||||||||||
| 992-90-001 | Government Furnished Material Warehouse Storage Space for SEA21 AIT 70,000 Square Feet; provide | P/C | ||||||||||||||
| 993-11-001 | Ship's Force Warehouse Storage Space; provide | P/C | ||||||||||||||
| 993-11-002 | Transportation Service; provide (OPTION ITEM) | P/C | ||||||||||||||
| 993-21-001 | Rigging, Crane and Transportation Service; provide | P/C | ||||||||||||||
| 993-31-001 | Temporary Main Reduction Gear (MRG) Dehumidifier System; provide | P/C | ||||||||||||||
| 993-31-002 | Temporary Deck Covering; install | P/C | ||||||||||||||
| 993-31-003 | AN/SPY-1D Antenna Protective Cover; install | P/C | ||||||||||||||
| 997-11-001 | Drydocking and Undocking; accomplish | P/C | ||||||||||||||
| 998-41-001 | Hazardous Waste Produced on Naval Vessels; control | P/C |
DISTRIBUTION STATEMENT D : Distribution authorized to the Department of Defense and U.S. Department of Defense contractors only (administrative use) (27 Sep 16). Other request shall be referred to CNRMC. FOUO
HM&E Turnovers
| Critical Path Equipment Cable Turnover, Power-up and Test Requirement Schedule DDG89 FY21 DMP (HM&E Turnovers) | |||
| Equipment | A+ SY turnover to AIT | Date | Equipment |
| MSR Responsible | 27-Sep-21 | AIT Responsible | |
| SA 71726- SPS-73 ISEA Disconnect Stand Alone Operating Panel (SAOP) for relocation and engineering/field changes. ISEA to disconnect prior to Contractor rigging. | |||
| SA 73091- Remove al FODMS IOUs (29 total) and ship as directed by drawing Ripout 12,13,52,73,81 and 91 foundations. | |||
| SA 71604- Start CTM install and Swbd Connections in Swbds, SF Swbds, Load Centers (SA71604) (30 days) | |||
| MSR Fuel Bank Turnover | AIT Fuel Bank Turnover | ||
| 2 Fuel banks closed & ready to test (any two from groups 1 through 6). Includes requirements of SA70403K and SA77829K for those tanks (MOVs, XDCRs, Press SWs, Flow Meters, TDRs | 6 weeks prior to undock | Includes requirements of SA70403K and SA77829K for those tanks (MOVs, XDCRs, Press SWs, Flow Meters, TDRs, cabling, connections) | |
| 2 Fuel banks closed & ready to test (any two from groups 1 through 6). Includes requirements of SA70403K and SA77829K for those tanks (MOVs, XDCRs, Press SWs, Flow Meters, TDRs | 4 weeks prior to undock | Includes requirements of SA70403K and SA77829K for those tanks (MOVs, XDCRs, Press SWs, Flow Meters, TDRs, cabling, connections) | |
| 2 Fuel banks closed & ready to test (any two from groups 1 through 6). Includes requirements of SA70403K and SA77829K for those tanks (MOVs, XDCRs, Press SWs, Flow Meters, TDRs | 2 weeks prior to undock | Includes requirements of SA70403K and SA77829K for those tanks (MOVs, XDCRs, Press SWs, Flow Meters, TDRs, cabling, connections) | |
| MSR Turnover 1 | 210 | 25-Apr-22 | AIT Turnover 1 GEDMS Mesh B and MG |
| SA 70403- Ripout Fuel Storage & Receiver Tanks Monitor Panel from Oil Lab | 210 | 25-Apr-22 | SA 73091K- All Power Sources and Terminal Boxes for Equipment in TO 1, TO 2 and TO 3 to also include new and upgraded sources.* |
| 25-Apr-22 | SA 73091K-GEDMS Mesh B (BSE B1-B10) and power cables at least one power source has to be available* | ||
| 25-Apr-22 | SA 73091K- Install GEDMS Maintenance Group. Removed MG will be shipped as directed by drawing. Install while access cut to Aft IC is open | ||
| MSR Turnover 2- Aft Steering, Repair 3 and #3 GTG | 224 | 09-May-22 | AIT Turnover 2- Aft Steering, Repair 3 and #3 GTG |
| SA 71726- Aft Steering Unit (ASU) | 175 | 09-May-22 | (Power/Network/Shipside Cabling) |
| Repair 3 Equipment , Misc Stowages and painted iaw spec 438-90-002 | 175 | 09-May-22 | SA 71604- RSC Repair 3, C/O SW, Speaker. Hold Keyboard for later installation per SMR direction. |
| SA 71726- Local Control Steering Units (LCUs 1 - 4) | 175 | 09-May-22 | (Power/Network/Shipside Cabling) |
| SA 71604- Electric Plant DIU 3 | 175 | 09-May-22 | (Power/Network/Shipside Cabling) |
| All Power Sources & Terminal Boxes for Equipment in TO 4, TO 5 and TO 6 as per SIDs. | |||
| FADC #3 (Power/Network/Shipside Cabling) | |||
| SA 73091- Install IOUs: 21, 22, 23 and 62. IIUs 122, 162. C-DR 122, 141 and 162. USE-162B. All associated work related to these IOUs/IIUs/USEs/C-DR boxes | |||
| MSR Turnover 3- CCS and Repair 5 | 238 | 23-May-22 | AIT Turnover 3- CCS and Repair 5 |
| SA 71604-UCCs 1 & 2 | 238 | 23-May-22 | Complete SA 71604 wiring in CCS, including vent control panels, RSC DCC, C/O SW & Speaker. Hold Keyboard, 40" Monitor & Printer for later installation per SMR direction. |
| SA 77419 Textile Ducting WI 512-90-002 complete | 238 | 23-May-22 | S/A 94979 OIP in CCS |
| CCS and Repair 5 Equipment and Misc Stowages. Painted and deck complete iaw spec 438-90-002 | 238 | 23-May-22 | SA 71604-RSC Repair 5, UPS, C/O SW and Speaker. Hold Keyboard for later installation per SMR direction. |
| SA 70403K complete in Oil Lab, includes all cabling, connections for Oil Lab PC | |||
| SA 71604- TIWS (CCS) LAN Drop & Power Outlet | |||
| SA 73091- Install IOUs 32, 33, 72. IIUs 132, 172 and 173. C-DRs 26,132,172 and 173. USE 132B. All associated work related to these IOUs/IIUs/USEs/C-DR boxes | |||
| MSR Turnover 4- MER 1, AUX 1 and Repair 2 | 252 | 06-Jun-22 | AIT Turnover 4- MER 1, AUX 1 and Repair 2 |
| SA 71604-Electric Plant DIU 1 AUX 1 | 252 | 06-Jun-22 | (Power/Network/Shipside Cabling) |
| SA 71604- Propulsion DIU 4 MER 1 | 252 | 06-Jun-22 | (Power/Network/Shipside Cabling) |
| SA 71604- UCC 3 MER 1 | 252 | 06-Jun-22 | (Power/Network/Shipside Cabling) |
| SA 71604- ECU 1A and 1B MER 1 | 252 | 06-Jun-22 | (Power/Network/Shipside Cabling) |
| Repair 2 Equipment, Misc Stowages and painted iaw spec 438-90-002 | 252 | 06-Jun-22 | S/A 94979 OIC #1/#2/#4/#A1/#A2 |
| F/O, L/O & CRP valves associated with SA71604K in MER1. 1A/1B F/O Filt/Sep Outlet, #1MRG Pur Suct/Fill, #1CRP Pur Suct/Fill | 252 | 06-Jun-22 | Electrical hook-up of valves associated with SA 71604K in MER 1 |
| FADC #1 (Power/Network/Shipside Cabling) | |||
| SA 71605 Galley foundations, piping and electrical complete that impact MER 1 overhead | 252 | 06-Jun-22 | SA 71604- RSC Repair 2, C/O SW, Speaker. Hold Keyboard for later installation per SMR direction. |
| SA 73091- Install IOUs 74, 82, 83 and 84. IIUs 174, 182 and 183. USEs 174B and 183B. C-DRs 8A, 14, 174, 182 and 183. All associated work related to these IOUs/IIUs/USEs/C-DR boxes | |||
| MSR Turnover 5- MER 2 | 282 | 06-Jul-22 | AIT Turnover 5- MER 2 |
| SA 71604- Electric Plant DIU 2 MER 2 | 282 | 06-Jul-22 | AIT (Power/Network/Shipside Cabling) S/A 94979 - OIC #3/#5/#B |
| SA 71604- Propulsion DIU 5 MER 2 | 282 | 06-Jul-22 | AIT (Power/Network/Shipside Cabling) |
| SA 71604-UCC 4 MER2 | 282 | 06-Jul-22 | AIT (Power/Network/Shipside Cabling) |
| SA 71604- ECU 2A, 2B MER2 | 282 | 06-Jul-22 | AIT (Power/Network/Shipside Cabling) |
| F/O, L/O & CRP valves associated with SCD 71604K in MER2. 2A/2B F/O Filt/Sep Outlet, #2MRG Pur Suct/Fill, #2CRP Pur Suct/Fill | 282 | 06-Jul-22 | AIT (Power/Network/Shipside Cabling) |
| Install IOU 31, IIU 131 and 134, C-DR 131 and 134, USE 131B.All associated work related to these IOUs/IIUs/USEs/C-DR boxes | |||
| FADC # 2 (Power/Network/Shipside Cabling) | |||
| SA 71604- ADACS Foundation MER 2 | 282 | 06-Jul-22 | ADACS unit in MER2, including power and all hook-ups |
| MSR Turnover 6 SA 71604 Potable Water System mods | 301 | 25-Jul-22 | AIT Turnover 6 |
| Complete following under SA 71604; Potable Water System, incl Tanks, TBs, MOVs, TLIs & Modified Pump Controllers | 301 | 25-Jul-22 | AIT (Power/Network/Shipside Cabling) |
| GEDMS Mesh A BSEs (A1-A10) and power cables at least one power source has to be available* | |||
| Install IOUs 53, 93 and 94. IIU 194. C-DR 5A, 194. All associated work related to these IOUs/IIUs/USEs/C-DR boxes | |||
| SA 77829K, Includes all cabling, C-DR boxes, TBs, etc. from sensor/component to DIU (INCL OW, CRP & MRG due to DIU tie-ins) and associated TBs, JP-5, all electrical work complete | |||
| MSR Turnover 7 SA70403 DFC, SA77253K Filter Seprator, SA71604 AHSS Vent Mod Complete | 344 | 06-Sep-22 | AIT Turnover 7 AHSS, DVSS and Dig Indicators |
| LO Filter Separator Purifier (SA 76253K) complete | 344 | 06-Sep-22 | |
| AHSS Vent Mod SA 71604 dwg 500-8659958 complete | 344 | 06-Sep-22 | AHSS Install Complete |
| Digital Fuel Control SA 70403 complete | 344 | 06-Sep-22 | SA71615 DVSS Complete - ALL VIROEs, CJBs, Cables (*) |
| SA 77829K 70403K, Includes all cabling, C-DR boxes, TBs, etc. from sensor/component to DIU (INCL OW, CRP & MRG due to DIU tie-ins) and associated TBs, JP-5, all electrical work complete | |||
| Digital Indicators SA 77427 complete except CS spaces | |||
| SA 71615- Install all DVSS Cameras as directed by SMR (week prior to PCD) | |||
| SA 73091-Install IOUs 14, IIUs 114, C-DRs 6, 114. Complete all associated work related to these IOUs/IIUs/USEs/C-DR boxes | |||
| HM&E SHIPALT Equipment in Combat Systems MOD Spaces, dates are CS Turnover dates | |||
| MSR Complete | A+ | Date | AIT Complete |
| RADAR 1- SA71726 work complete | 388 | 20-Oct-22 | RADAR 1- SA 71726 working complete. IBNS Rack 2 wiring including HS Firewall, UPS & C/O Switches |
| CIC- SA 71604 work complete | 381 | 13-Oct-22 | RADAR 2- SA71726 Trigger/Video Amp installed and wired |
| CIC- SA71726 work complete | 381 | 13-Oct-22 | CIC- SA77427 and SA71726 work complete |
| Array Room #1- SA71726 mods complete | 388 | 20-Oct-22 | Array Room 1- SA71726 work complete |
| CSMC- SA 71604 work complete | 374 | 06-Oct-22 | CSMC- SA73091K (BSE A5), SA 84226K and SA 71604K work complete. Hold Keyboard for later installation per SMR direction. |
| Pilot House- all SA 71604 mods complete | 388 | 20-Oct-22 | Pilot House- all SA71604, SA77427 work complete |
| Pilot House- SA 71726 SPS-73 SAOP install. (ISEA deliver to SY) | 388 | 20-Oct-22 | Pilot House- SA71726, SPS-73 ISEA Connectorize SAOP Ethernet SW, C/O SW & UPS |
| Pilot House- SA 71726 work complete | 388 | 20-Oct-22 | Pilot House- SA71726 work complete. Hold Keyboard, Training Monitors, Joystick & Cables for later installation per SMR direction. |
| Pilot House- SA 77419 Textile ducting work complete | 388 | 20-Oct-22 | Pilot House- complete all SA 77427 mods |
| Pilot House- Painted and deck complete iaw SA 71604 work item | 388 | 20-Oct-22 | |
| Aft IC Gyro 3-300-0-C, SA 73091(IOU41, IIU141, CDR 17/141) and SA77427 complete. SA 94979 OIC #D | |||
| Power Supply / Conversion Rm 3-126-2-Q, SA 73091 complete | |||
| Fwd IC Gyro 4-94-0-C, SA 73091( IOU51, IIU151, CDR 151) and SA 77427 complete. SA 94979 OIC #C | |||
| CSER 1 2-53-1-C, SA 73091(IOU93, CDR4) and SA 77427 complete. SA 94979 - Condition Sys Rack, XFMR, Vent Mod | |||
| CSER 3 1-300-0-C, SA 73091 complete (IOU42, IIU142, CDR 24/142) | |||
| CSER 2 2-126-2-C, SA 73091 complete (CDR10) | |||
| CIC- SA 71604 work complete including RSC, UPS & C/O Switch. Hold Keyboard for later installation per SMR direction. | |||
| SONAR Control 2-50-2-C, SA 77427 complete | |||
| SONAR 3 3-18-0-Q, SA 73091 complete (IOU92, CDR2) | |||
| SONAR 1 1-18-0-Q, SA 73091 complete (BSE A7) | |||
| Communications Center 2-126-1-C, SA 73091(IOU71, CDR9) and SA 77427 complete. SA 94979 OIP | |||
| CSER 4 03-142-1-C, SA 73091 complete (IOU 11, IIU 111, CDR 29,30, 111) | |||
| Chart Room- SA 77427 and SA 71726 complete, IBNS NAV 2 computer | |||
| Electric Load Center 03-142-2-Q, SA73091 complete (CDR28) | |||
| XO Cabin- SA 77427 complete | |||
| CO Cabin- SA 77427, 71726 complete; IBNS NAV 4 computer (CO's Laptop), install prior to HAB Turnover |
CS Turnovers
| USS MUSTIN (DDG 89) | SUPPORT SERVICES | ||||||||||
| SPACE NO. | SPACE NAME | 60 Hz | 400 Hz | A/C | ECW | Chill Water | FM SWS | Dry Air | HP Air | LP Air | Release Date |
| TURNOVER 1 | |||||||||||
| 4-94-0-C | IC & Gyro Rm #1 | Y | Y | Y | Y | ALO -40 | |||||
| 3-300-0-C | IC & Gyro Rm #2 | Y | Y | Y | Y | ALO -40 | |||||
| 3-126-2-Q | Power Supply/Conversion Room | Y | Y | Y | Y | ALO -40 | |||||
| 3-319-0-Q | Power Conversion Rm | Y | Y | Y | Y | ALO -40 | |||||
| 4-126-0-E | Auxiliary Machinery Rm #1 | Y | Y | Y | Y | SWS | Y | ALO -40 | |||
| 4-42-0-Q | Sonar Cooling Equip Rm | Y | Y | Y | Y | Y | ALO -40 | ||||
| 03-142-2-Q | Electric Load Center #1 | Y | Y | ALO -40 | |||||||
| 01-110-3-Q | Fan Room PZ #1 | Y | Y | ALO -40 | |||||||
| 01-126-3-Q | Fan Room PZ #2 | Y | Y | ALO -40 | |||||||
| 01-158-0-Q | Fan Room | Y | Y | ALO -40 | |||||||
| 01-240-01-Q | Fan Room PZ #3 | Y | Y | ALO -40 | |||||||
| 01-300-2-Q | Fan Room | Y | Y | ALO -40 | |||||||
| 01-338-3-Q | Fan Room | Y | Y | ALO -40 | |||||||
| 01-338-4-Q | Fan Room | Y | Y | ALO -40 | |||||||
| 03-142-3-Q | Fan Room | Y | Y | ALO -40 | |||||||
| 03-142-4-Q | Fan Room | Y | Y | ALO -40 | |||||||
| 1-78-1-Q | Fan Room | Y | Y | ALO -40 | |||||||
| 1-78-2-Q | Fan Room | Y | Y | ALO -40 | |||||||
| 2-42-2-Q | Fan Room (SNR CONT-CSER1) | Y | Y | ALO -40 | |||||||
| 3-164-2-Q | Fan Room | Y | Y | ALO -40 | |||||||
| 3-362-0-Q | Fan Room | Y | Y | ALO -40 | |||||||
| 01-130-0-Q | CSMC | Y | Y | Y | ALO -40 | ||||||
| TURNOVER 2 | |||||||||||
| 05-131-0-Q | Director Equip Rm #1 | Y | Y | Y | Y | Y | ALO -33 | ||||
| 04-272-0-Q | Director Equip Rm #2 | Y | Y | Y | Y | ALO -33 | |||||
| 03-282-0-Q | Director Equip Rm #3 | Y | Y | Y | Y | Y | ALO -33 | ||||
| 06-157-0-T | Mast Access/Wiring Trunk | Y | ALO -33 | ||||||||
| 1-126-0-C | CIC | Y | Y | Y | ALO -33 | ||||||
| 1-268-0-C | CCS (VLS Alarms) | Y | Y | ALO -33 | |||||||
| 2-53-1-C | CSER #1 | Y | Y | Y | Y | ALO -33 | |||||
| 2-126-2-C | CSER #2 | Y | Y | Y | Y | ALO -33 | |||||
| 1-300-0-C | CSER #3 | Y | Y | Y | ALO -33 | ||||||
| 1-314-0-C | CSER 3 Annex | Y | Y | ALO -33 | |||||||
| 03-142-1-C | CSER Rm #4 | Y | Y | Y | Y | ALO -33 | |||||
| TURNOVER 3 | |||||||||||
| 03-128-0-C | Radar Rm #1 | Y | Y | Y | Y | Y | Y | ALO -26 | |||
| 03-142-0-C | Radar Rm #2 | Y | Y | Y | Y | Y | ALO -26 | ||||
| 01-274-1-C | Radar Rm #3 | Y | Y | Y | Y | Y | ALO -26 | ||||
| 03-128-1-Q | Array Rm #1 (Fwd Stbd) | Y | Y | Y | Y | ALO -26 | |||||
| 03-128-2-Q | Array Rm #2 (Fwd Port) | Y | Y | Y | Y | ALO -26 | |||||
| 03-158-3-Q | Array Rm #3/Elect WS #1A | Y | Y | Y | Y | ALO -26 | |||||
| 03-158-2-Q | Array Rm #4/ Elect WS #1B | Y | Y | Y | Y | ALO -26 | |||||
| 2-126-1-C | Communications Center | Y | Y | Y | ALO -26 | ||||||
| 2-157-1-C | Radio Transmitter Room | Y | Y | Y | ALO -26 | ||||||
| 2-220-1-Q | Snap III Computer Room | Y | Y | ALO -26 |