N00024-21-R-4442_A0005 BQ 139-209 AMD_0005.xlsx

XLSX spreadsheet 27 KB Posted

Attached to
USS MUSTIN (DDG 89) FY21 DEPOT MAINTENANCE PERIOD & USS SAN DIEGO (LPD 22) FY21 DOCKING SELECTED RESTRICTED AVAILABILITY
Solicitation number
N00024-21-R-4442
Issued by

About this file

This solicitation seeks proposals for the USS MUSTIN (DDG 89) FY21 Depot Maintenance Period and USS SAN DIEGO (LPD 22) FY21 Docking Selected Restricted Availability. The Naval Sea Systems Command will execute maintenance, modernization, and repair of these vessels through a single award contract. Offerors must have substantial pier facilities and workforce capable of integrating multiple areas of ship maintenance and repair. Proposals are due on or around May 2021, with an USS MUSTIN availability period from September 2021 to July 2023 at contractor facilities on the West Coast. The USS SAN DIEGO availability will be from September 2021 to December 2022. Attachments include execution milestones, pricing workbooks, compartment closeouts, and eligibility criteria. Work specifications and references will be distributed separately through the points of contact identified in the solicitation.

View the file

Other files

File Type Posted
(USS SAN DIEGO) Attachment J-4 Pricing Workbook Rev_2.xlsx XLSX spreadsheet
N00024-21-R-4442_A0009.pdf PDF
USS San Diego TPPC-LPD22-SWRMC21-CNO1 - ERRATA 10.pdf PDF
N00024-21-R-4442_A0008.pdf PDF
N00024-21-R-4442-A0008 BQ 256-272.xlsx XLSX spreadsheet
MUSTIN ERRATA 12.pdf PDF
N00024-21-R-4442_A0007.pdf PDF
(USS MUSTIN) Attachment J-14 Rev_2.xlsx XLSX spreadsheet
(USS MUSTIN) Attachment J-13 Rev_2.xlsx XLSX spreadsheet
MUSTIN ERRATA 11.pdf PDF
N00024-21-R-4442-A0007 BQ 210-255.xlsx XLSX spreadsheet
N00024-21-R-4442_A0006.pdf PDF
N00024-21-R-4222_A0006.pdf PDF
(USS MUSTIN) Attachment J-14 Rev_1.xlsx XLSX spreadsheet
USS San Diego TPPC-LPD22-SWRMC21-CNO1 - ERRATA 9.pdf PDF
N00024-21-R-4442_A0005.pdf PDF
(USS SAN DIEGO) Attachment J-3 Execution Milestones Rev_1.xlsx XLSX spreadsheet
(USS MUSTIN) Attachment J-13 Rev_1.xlsx XLSX spreadsheet
(USS MUSTIN) Attachment J-18 GFM Rev_1.xlsx XLSX spreadsheet
USS MUSTIN ERRATA 9.pdf PDF
USS MUSTIN ERRATA 10.pdf PDF
(USS SAN DIEGO) Attachment J-4 Pricing Workbook Rev_1.xlsx XLSX spreadsheet
N00024-21-R-4442_A0004 BQ 11-138.xlsx XLSX spreadsheet
USS San Diego TPPC-LPD22-SWRMC21-CNO1 - ERRATA 8.pdf PDF
(USS SAN DIEGO) Attachment J-8 Rev_1 (Errata 8).xlsx XLSX spreadsheet
N00024-21-R-4442_A0004.pdf PDF
N00024-21-R-4442_A0003.pdf PDF
N00024-21-R-4442_A0003 BQ 11-137.xlsx XLSX spreadsheet
N00024-21-R-4442_A0002.pdf PDF
N00024-21-R-4442_A0002 BQ 1-10.xlsx XLSX spreadsheet
N00024-21-R-4442_A0001.pdf PDF
Attachment S-17 (Proposal Assessment).xlsx XLSX spreadsheet
Attachment S-7 (Proposal Assessment).xlsx XLSX spreadsheet
Attachment J-5 (QASP).pdf PDF
Attachment S-3 (PPI Form).xlsx XLSX spreadsheet
Attachment J-15 (QASP).pdf PDF
Attachment J-7 (Schedule Model Review).pdf PDF
Attachment J-8 (GFM List).xlsx XLSX spreadsheet
Attachment J-17 (Schedule Model Review).pdf PDF
N00024-21-R-4442.pdf PDF
CDRLs.zip ZIP file
Attachment S-13 (PPI Form).xlsx XLSX spreadsheet
Attachment J-18 (GFM List).xlsx XLSX spreadsheet
Show all 43

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BQ 139-208

Master #ShipQuestion AreaSection / Para #Contractor QuestionGovernment Response
139MUSTINJ-11N/AThe scope of work for WI 261-22-0012A Fuel Oil Service Pump; repair (OPTION ITEM; Out of Homeport ONLY) appears to contain work that has nothing to do with the geographic location of where the vessel will be worked.

Please clarify as to why the stated work item needs to be bid by out of port contractor's and does not need to be priced by potential offers located in San Diego.

Contractor believes that this requirement should be applicable to all offers.The work item has been changed to remove the Out of Homeport Only designation. It now reflects an Option item that all offerors must price. Reference errata 9.
140MUSTINJ-11N/AThe scope of work for WI 261-21-0011B Fuel Oil Service Pump; overhaul (OPTION ITEM; Out of Homeport ONLY) appears to contain work that has nothing to do with the geographic location of where the vessel will be worked.

Please clarify as to why the stated work item needs to be bid by out of port contractor's and does not need to be priced by potential offers located in San Diego.

Contractor believes that this requirement should be applicable to all offers.The work item has been changed to remove the Out of Homeport Only designation. It now reflects an Option item that all offerors must price. Reference errata 9.
141MUSTINJ-11N/AThe scope of work for WI 234-10-001Gas Turbine Module (GTM) 1A, 1B, 2A and 2B Flexible Hose Assembly; replace (OPTION ITEM: Out of Homeport ONLY) appears to contain work that has nothing to do with the geographic location of where the vessel will be worked.

Please clarify as to why the stated work item needs to be bid by out of port contractor's and does not need to be priced by potential offers located in San Diego.

Contractor believes that this requirement should be applicable to all offers.The work item has been changed to remove the Out of Homeport Only designation. It now reflects an Option item that all offerors must price. Reference errata 9.
142MUSTINJ-11N/AThe scope of work for WI 261-11-001 Fuel Service Pump Flexible Hose Assembly; replace (OPTION ITEM; Out of Homeport ONLY) appears to contain work that has nothing to do with the geographic location of where the vessel will be worked.

Please clarify as to why the stated work item needs to be bid by out of port contractor's and does not need to be priced by potential offers located in San Diego.

Contractor believes that this requirement should be applicable to all offers.The work item has been changed to remove the Out of Homeport Only designation. It now reflects an Option item that all offerors must price. Reference errata 9.
143MUSTINJ-11N/AThe scope of work for WI 311-30-001Ship Service Gas Turbine Generator Flexible Hose Assembly; replace (OPTION ITEM; Out of Homeport ONLY) appears to contain work that has nothing to do with the geographic location of where the vessel will be worked.

Please clarify as to why the stated work item needs to be bid by out of port contractor's and does not need to be priced by potential offers located in San Diego.

Contractor believes that this requirement should be applicable to all offers.The work item has been changed to remove the Out of Homeport Only designation. It now reflects an Option item that all offerors must price. Reference errata 9.
144MUSTINJ-11N/AThe scope of work for WI 423-10-001Antenna Group SPY-1 Series Flexible Hose Assembly; replace (OPTION ITEM; Out of Homeport ONLY) appears to contain work that has nothing to do with the geographic location of where the vessel will be worked.

Please clarify as to why the stated work item needs to be bid by out of port contractor's and does not need to be priced by potential offers located in San Diego.

Contractor believes that this requirement should be applicable to all offers.The work item has been changed to remove the Out of Homeport Only designation. It now reflects an Option item that all offerors must price. Reference errata 9.
145MUSTINJ-11N/AThe scope of work for WI 463-11-001AN/SQQ-89A (V)15 Transmitter Flexible Hose Assembly; replace (OPTION ITEM; Out of Homeport ONLY) appears to contain work that has nothing to do with the geographic location of where the vessel will be worked.

Please clarify as to why the stated work item needs to be bid by out of port contractor's and does not need to be priced by potential offers located in San Diego.

Contractor believes that this requirement should be applicable to all offers.The work item has been changed to remove the Out of Homeport Only designation. It now reflects an Option item that all offerors must price. Reference errata 9.
146MUSTINJ-11N/AThe scope of work for WI 522-11-003 Magazine Sprinkler System Flexible Hose Assembly; replace (OPTION ITEM; Out of Homeport ONLY) appears to contain work that has nothing to do with the geographic location of where the vessel will be worked.

Please clarify as to why the stated work item needs to be bid by out of port contractor's and does not need to be priced by potential offers located in San Diego.

Contractor believes that this requirement should be applicable to all offers.The work item has been changed to remove the Out of Homeport Only designation. It now reflects an Option item that all offerors must price. Reference errata 9.
147MUSTINJ-11N/AThe scope of work for WI 531-11-001Reverse Osmosis Flexible Hose Assembly; replace (OPTION ITEM; Out of Homeport ONLY) appears to contain work that has nothing to do with the geographic location of where the vessel will be worked.

Please clarify as to why the stated work item needs to be bid by out of port contractor's and does not need to be priced by potential offers located in San Diego.

Contractor believes that this requirement should be applicable to all offers.The work item has been changed to remove the Out of Homeport Only designation. It now reflects an Option item that all offerors must price. Reference errata 9.
148MUSTINJ-11N/AThe scope of work for WI 531-51-002 Reverse Osmosis High Pressure Pump; replace (OPTION ITEM; Out of Homeport ONLY) appears to contain work that has nothing to do with the geographic location of where the vessel will be worked.

Please clarify as to why the stated work item needs to be bid by out of port contractor's and does not need to be priced by potential offers located in San Diego.

Contractor believes that this requirement should be applicable to all offers.The work item has been changed to remove the Out of Homeport Only designation. It now reflects an Option item that all offerors must price. Reference errata 9.
149MUSTINJ-11N/AThe scope of work for WI 532-10-001Fire Control System Number One, 2 and 3 Flexible Hose Assembly; replace (OPTION ITEM; Out of Homeport ONLY) appears to contain work that has nothing to do with the geographic location of where the vessel will be worked.

Please clarify as to why the stated work item needs to be bid by out of port contractor's and does not need to be priced by potential offers located in San Diego.

Contractor believes that this requirement should be applicable to all offers.The work item has been changed to remove the Out of Homeport Only designation. It now reflects an Option item that all offerors must price. Reference errata 9.
150MUSTINJ-11N/AThe scope of work for WI 533-12-001Potable Water Service Pump Number 2; replace (OPTION ITEM; Out of Homeport ONLY) appears to contain work that has nothing to do with the geographic location of where the vessel will be worked.

Please clarify as to why the stated work item needs to be bid by out of port contractor's and does not need to be priced by potential offers located in San Diego.

Contractor believes that this requirement should be applicable to all offers.The work item has been changed to remove the Out of Homeport Only designation. It now reflects an Option item that all offerors must price. Reference errata 9.
151MUSTINJ-11N/AThe scope of work for WI 541-11-001 Fuel Oil Transfer Flexible Hose Assembly; replace (OPTION ITEM; Out of Homeport ONLY) appears to contain work that has nothing to do with the geographic location of where the vessel will be worked.

Please clarify as to why the stated work item needs to be bid by out of port contractor's and does not need to be priced by potential offers located in San Diego.

Contractor believes that this requirement should be applicable to all offers.The work item has been changed to remove the Out of Homeport Only designation. It now reflects an Option item that all offerors must price. Reference errata 9.
152MUSTINJ-11N/AThe scope of work for WI 541-21-001 Fuel Oil Transfer Pump and Motor; repair (OPTION ITEM; Out of Homeport ONLY) appears to contain work that has nothing to do with the geographic location of where the vessel will be worked.

Please clarify as to why the stated work item needs to be bid by out of port contractor's and does not need to be priced by potential offers located in San Diego.

Contractor believes that this requirement should be applicable to all offers.The work item has been changed to remove the Out of Homeport Only designation. It now reflects an Option item that all offerors must price. Reference errata 9.
153MUSTINJ-11N/AThe scope of work for WI 568-10-001 Steering System Flexible Hose Assembly; replace (OPTION ITEM; Out of Homeport ONLY) appears to contain work that has nothing to do with the geographic location of where the vessel will be worked.

Please clarify as to why the stated work item needs to be bid by out of port contractor's and does not need to be priced by potential offers located in San Diego.

Contractor believes that this requirement should be applicable to all offers.The work item has been changed to remove the Out of Homeport Only designation. It now reflects an Option item that all offerors must price. Reference errata 9.
154MUSTINJ-11N/AThe scope of work for WI 588-21-003 Recovery, Assist, Secure and Traverse (RAST) System Flexible Hose Assembly; replace (OPTION ITEM; Out of Homeport ONLY) appears to contain work that has nothing to do with the geographic location of where the vessel will be worked.

Please clarify as to why the stated work item needs to be bid by out of port contractor's and does not need to be priced by potential offers located in San Diego.

Contractor believes that this requirement should be applicable to all offers.The work item has been changed to remove the Out of Homeport Only designation. It now reflects an Option item that all offerors must price. Reference errata 9.
155MUSTINJ-11N/AThe scope of work for WI 593-11-004 Vacuum, Collection, Holding and Transfer (VCHT) System Flexible Hose Assembly; replace (OPTION ITEM; Out of Homeport ONLY) appears to contain work that has nothing to do with the geographic location of where the vessel will be worked.

Please clarify as to why the stated work item needs to be bid by out of port contractor's and does not need to be priced by potential offers located in San Diego.

Contractor believes that this requirement should be applicable to all offers.The work item has been changed to remove the Out of Homeport Only designation. It now reflects an Option item that all offerors must price. Reference errata 9.
156MUSTINJ-11N/AThe scope of work for WI 593-21-001 Oily Waste Transfer Pump Flexible Hose Assembly; replace (OPTION ITEM; Out of Homeport ONLY) appears to contain work that has nothing to do with the geographic location of where the vessel will be worked.

Please clarify as to why the stated work item needs to be bid by out of port contractor's and does not need to be priced by potential offers located in San Diego.

Contractor believes that this requirement should be applicable to all offers.The work item has been changed to remove the Out of Homeport Only designation. It now reflects an Option item that all offerors must price. Reference errata 9.
157MUSTINJ-11N/AThe scope of work for WI 593-21-002 Number One Gas Turbine Waste Drain Pump; overhaul (OPTION ITEM;Out of Homeport ONLY) appears to contain work that has nothing to do with the geographic location of where the vessel will be worked.

Please clarify as to why the stated work item needs to be bid by out of port contractor's and does not need to be priced by potential offers located in San Diego.

Contractor believes that this requirement should be applicable to all offers.The work item has been changed to remove the Out of Homeport Only designation. It now reflects an Option item that all offerors must price. Reference errata 9.
158MUSTINJ-11N/AThe scope of work for WI 595-00-001 Towed Array Handling and Stowage Flexible Hose Assembly; replace (OPTION ITEM; Out of Homeport ONLY) appears to contain work that has nothing to do with the geographic location of where the vessel will be worked.

Please clarify as to why the stated work item needs to be bid by out of port contractor's and does not need to be priced by potential offers located in San Diego.

Contractor believes that this requirement should be applicable to all offers.The work item has been changed to remove the Out of Homeport Only designation. It now reflects an Option item that all offerors must price. Reference errata 9.
159MUSTINJ-11N/AThe scope of work for WI 612-21-001Deck Edge Safety Net Load Test; accomplish (OPTION ITEM; Out of Homeport ONLY) appears to contain work that has nothing to do with the geographic location of where the vessel will be worked.

Please clarify as to why the stated work item needs to be bid by out of port contractor's and does not need to be priced by potential offers located in San Diego.

Contractor believes that this requirement should be applicable to all offers.The work item has been changed to remove the Out of Homeport Only designation. It now reflects an Option item that all offerors must price. Reference errata 9.
160MUSTINJ-11N/AThe scope of work for WI 763-11-001Ready Service Locker (RSL); repair (OPTION ITEM; Out of Homeport ONLY) appears to contain work that has nothing to do with the geographic location of where the vessel will be worked.

Please clarify as to why the stated work item needs to be bid by out of port contractor's and does not need to be priced by potential offers located in San Diego.

Contractor believes that this requirement should be applicable to all offers.The work item has been changed to remove the Out of Homeport Only designation. It now reflects an Option item that all offerors must price. Reference errata 9.
161MUSTINJ-11N/AThe scope of work for WI 980-11-002 Ship's Force Office Space and Temporary Classroom; provide (OPTION ITEM; Out of Homeport ONLY) appears to contain work that has nothing to do with the geographic location of where the vessel will be worked.

Please clarify as to why the stated work item needs to be bid by out of port contractor's and does not need to be priced by potential offers located in San Diego.

Contractor believes that this requirement should be applicable to all offers.No changes to this work item. If awarded locally in San Diego, the government provided berthing barge, comes with classrooms and office spaces.
162MUSTINJ-11N/AWI 992-11-010, Ship Towing Service; provide (OPTION ITEM; Out of Homeport ONLY) - Requires the contractor outside of San Diego to tow the vessel from its homeport to the location of the contractor and back to the vessels homeport once the availability has been accomplished.

Contractor has competed numerous availabilities of vessels homeported in San Diego and this is the first time a NAVSEA tow has been incorporated on a vessel that is self propelled into the specification.

Page 213 of the solicitation section a) The IPD applicable to the USS MUSTIN (DDG 89) FY21 DMP must be included in all offers and is calculated using foreReferenceable costs for fuel, towing and pilot charges, and travel to the contractor’s facility by applicable Government personnel. The following chart provides the values to be included in all Offerors’ price proposals to determine the Offeror’s Total Evaluated Price.

Location* Differential San Diego, CA $249,033 Seattle, WA $2,890,328 Portland, OR $3,128,771

Question #1 - As this item is designated as an option item, is it the intent for the Government to use one of MSC's towing/salvage tugs to accomplish the tow and if they cannot accommodate the schedule have the contractor provide commercial towing services?

Question #2 - If the vessel has a propulsion system, why is it necessary to accomplish towing the vessel rather then have the vessel come under its own power?

Question #3 - Why does the vessel need to be towed both ways?

Question #4 - If the USS MUSTIN does require a tow, shouldn't the cost already be covered within the Inter-port Differential (IPD) stated within the solicitation?

Contractor believes that by having the IPD stated within the solicitation as well as pricing the option item for the tow evaluated together essentially doubles the IPD for this vessel and gives San Diego contractors an unfair advantage prior to bidding any other work within the specification.

This work item has been deleted. Reference errata 9.
163MUSTINJ-11N/AThe scope of work for WI 992-11-016 Temporary Mobile Trailer for LAN Services; provide (OPTION ITEM; Out of Homeport ONLY) appears to contain work that has nothing to do with the geographic location of where the vessel will be worked.

Please clarify as to why the stated work item needs to be bid by out of port contractor's and does not need to be priced by potential offers located in San Diego.

Contractor believes that this requirement should be applicable to all offers.This work item has been deleted. Reference errata 9.
164MUSTINJ-11N/AWI 992-11-010, Ship Towing Service; provide (OPTION ITEM; Out of Homeport ONLY) - Requires the contractor outside of San Diego to tow the vessel from its homeport to the location of the contractor and back to the vessels homeport once the availability has been accomplished.

Contractor has competed numerous availabilities of vessels homeported in San Diego and this is the first time a NAVSEA tow has been incorporated on a vessel that is self propelled into the specification.

Page 213 of the solicitation section a) The IPD applicable to the USS MUSTIN (DDG 89) FY21 DMP must be included in all offers and is calculated using foreReferenceable costs for fuel, towing and pilot charges, and travel to the contractor’s facility by applicable Government personnel. The following chart provides the values to be included in all Offerors’ price proposals to determine the Offeror’s Total Evaluated Price.

Location* Differential San Diego, CA $249,033 Seattle, WA $2,890,328 Portland, OR $3,128,771

Question #1 - As this item is designated as an option item, is it the intent for the Government to use one of MSC's towing/salvage tugs to accomplish the tow and if they cannot accommodate the schedule have the contractor provide commercial towing services?

Question #2 - If the vessel has a propulsion system, why is it necessary to accomplish towing the vessel rather then have the vessel come under its own power?

Question #3 - Why does the vessel need to be towed both ways?

Question #4 - If the USS MUSTIN does require a tow, shouldn't the cost already be covered within the Inter-port Differential (IPD) stated within the solicitation?

Contractor believes that by having the IPD stated within the solicitation as well as pricing the option item for the tow evaluated together essentially doubles the IPD for this vessel and gives San Diego contractors an unfair advantage prior to bidding any other work within the specification.

This work item has been deleted. Reference errata 9.
165MUSTINJ-11N/AWI 857-11-001 Personnel Berthing Barge Support; provide (OPTION ITEM; Out of Homeport ONLY) - Requires the contractor to tow a berthing barge to and from contractors facility for ship's force to be housed during the availability.

WI 857-11-003 Temporary Duty Section Berthing Off-Ship; provide (OPTION ITEM; Out of Homeport ONLY) - Requires the contractor to provide and maintain temporary berthing for ship's force to be housed during the availability.

Please clarify the intent of each work item. Contractors believes that the two work items may have some of the same requirements and should not be evaluated independently of each other.

Additionally, contractor does not Reference these requirements within the specification package earmarked for the potential San Diego Offers to price.

Contractor believes that this requirement should be applicable to all offers.857-11-001 : Should have been a base work item. ERRATA 9 to follow for the deletion of "OPTION ITEM: In Homeport Only". 857-11-003 remains unchanged.
166MUSTINJ-11Ref 2.3(MUSTIN) The following drawing 540-8826460 Rev A on work item 437-90-001 (E7) has material indicated on the BOM source of GFM. This material is not listed in the GFM ship alt kit in paragraph 5 of the work item. Please confirm if this material is being provided as GFM?

ref. 2.3 8826460 PC # 100, 101, 102, B0001, F0001, F0002, F0003, F0017, F0027, F0029, F0030, G0001, G0002, J0001, J0002, LBL01, N0001, P0002, P0003, P0004, P0005, P0006, X0001

If the drawing states GFM this material will be provided by the Planning Yard. All material listed in the question is Installing Activity Furnished (IAF) which is the installing activity's responsibility to provide.
167MUSTINJ-11.1 & 3.23.2 Provide one lockable, weatherproof stowage space, containing 70,000 square feet of floor space, 150 square feet of shelving space, meets each local fire prevention code and the following minimum requirements:

Bidder's Question:

Can the customer verify that 70,000 square feet of floor space is correct or issue an errata with the correct square footage?This is in regards to work item 992-90-001. Concur, 70,000 square feet of floor space is correct.
168MUSTINJ-113.12MUSTIN. WI 980-90-009 Para 3.12. states " Install and maintain a steel tube and clamp type staging in each of the following locations with each having sufficent level and projection to safety …" Is it the government's intent to have scaffolding installed in all three locations listed in para 1.2.? Please adviseThe only location that will require staging is para. 1.2.2 Weatherdeck, 05 Level, Frame 160, Port.
169MUSTINJ-113.4MUSTIN. WI 982-31-003 Para 3.4. implies the sea trial duration will be for 7 days. Attachment J-13 (Execution Milestones) list a 14 day duration for sea trials. Is it the government's intent to deploy out on sea trials for 7 days and return to Navsta 32nd for the remaining 7 days to finish out the contract? If so will temp services still be required for these remaining 7 days?Temp services will be required for the 7 day duration specified in para. 3.4.
170MUSTINJ-11992-11-013Para 3.1. states "Provide transportation, including drivers, for 150 ea crew members between the berthing facility and ship site for the entire contract"
Will the State of California Department of Industrial Relations Covid-19 requirements contained within the "General Industry Safety Orders" Section 3205.4 Covid-19 Prevention in Employer-Provided Transportation to and from Work apply should the vessel receive repairs in San Diego, CA? Please advise.The State of California Department of Industrial Relations Covid-19 requirements contained within the "General Industry Safety Orders" Section 3205.4 “Covid-19 Prevention in Employer-Provided Transportation to and from Work” will apply if the Availability(ies) are awarded in San Diego, CA.
171MUSTINJ-11631-11-001; section 3.2Paragraph 3.2 states: "Remove all existing insulation, lagging and sound dampening tiles located in 1.2.3. Remove all sound dampening tile studs and grind flush with bilge surface."
Is the intent to remove all insulation & lagging in the space identified by 1.2.3, or only the sound dampening tile?Para 3.2 applies to location 1.2.3 only. ERRATA 10 issued for bilges definition.
172MUSTINJ-11631-13-001; sections 3.3, 3.5.1, 3.10Paragraph 3.3 requires a clean blast of 1.2.

Paragraph 3.4 requires a structural integrity visual inspection.

In order to accomplish 3.4 all insulation in 1.2 would have to be removed and potentially for the underside of space specified in 1.2.

Paragraph 3.5.1 specifies the removal of 400 SF of insulation.

Paragraph 3.10 specifies installation of insulation removed in 3.5.1. (400 sqft).

The insulation arrangement specifies upwards of 1000 SF of structural insulation alone in space located in 1.2.

Is the intent to remove and replace all structural and machinery insulation inside 1.2 as well as associated insulation do to the inspection required in 3.4 or is the intent to remove and replace only 400 SF of insulation specified in 3.5.1?WI has been updated to require 1150 sqft of insulation in para 3.5.1 via ERRATA 10.
173MUSTINJ-11631-13-003; sections 3.3, 3.4, 3.5, 3.12Paragraph 3.3 requires a clean blast of 1.2.

Paragraph 3.4 requires a structural integrity visual inspection.

Paragraph 3.5 specifies the removal of 400 SF of insulation.

Paragraph 3.12 specifies installation of insulation removed in 3.5 (400 sqft).

Is the intent to remove and replace all structural and machinery insulation inside 1.2 as well as associated insulation do to the inspection required in 3.4 or is the intent to remove and replace only 400 SF of insulation specified in 3.5?WI has been updated to require 1150 sqft of insulation in para 3.5 via ERRATA 10.
174MUSTINJ-11631-13-002; sections 3.3, 3.4, 3.5.1Paragraph 3.3 requires a clean blast of 1.2.

Paragraph 3.4 requires a structural integrity visual inspection.

Paragraph 3.5.1 specifies the removal of 400 SF of insulation.

Is the intent to remove and replace all structural and machinery insulation inside 1.2 as well as associated insulation do to the inspection required in 3.4 or is the intent to remove and replace only 400 SF of insulation specified in 3.5.1?WI has been updated to require 1150 sqft of insulation in para 3.5.1 via ERRATA 10.
175MUSTINJ-12.4Ref. 2.4, dwg# 8826333 Rev.A was provided on CD

Contractor notes Work Item calls out Rev-B for para's 2.4.

Bidder's Question:

Will the customer proved Rev-B? Missing reference(s) will be available upon request and sent via DoD SAFE. Requests for missing reference(s) shall be directed to Stephanie Hoffman, Contracting Officer, Stephanie Allshouse, Contract Specialist, at Stephanie.L.Hoffman@navy.mil, and stephanie.j.allshouse@navy.mil, respectively.

176 MUSTIN J-11 1.2; 3.2.1 WI 123-14-001

Specification Item states to accomplish various steel repairs in the Portable Water Tanks listed in paragraphs 1.2.

Paragraph 3.2.1 states to "Vee-out and weld a total of 6 linear feet of deteriorated and damaged weld for each tank listed in 1.2.1 and 1.2.2 for a total of 4 linear feet."

Steel repairs of 6 linear feet in each of these two (2) Potable Water Tanks would total 12 linear feet as opposed to the 4 linear feet specified in paragraph 3.2.1.

Please clarify total linear footage.ERRATA 10 issued to correct the total footage from 4 linear feet to 12 linear feet.
177MUSTINJ-113.2WI 411-90-002 E7
(MUSTIN) Paragraph 3.2 states to accomplish 2.2 through 2.22 and 2.32. Reference 2.10 through 2.22 appear to be reference drawings and not drawings that needs to be accomplished in its entirety. Please clarify if 2.10 through 2.22 are only to be used for guidance.ERRATA 10 issued to para 3.2. to reflect refs 2.10 - 2.20 as guidance.
178MUSTINJ-11Ref 2.2WI 432-80-001 The following drawing 432-7517839 Rev A on work item 432-80-001 has material indicated on the BOM source of GFM. This material is not listed in the GFM ship alt kit in paragraph 5 of the work item. Please confirm if this material is being provided as GFM?

ref. 2.2 7517839 PC # 101

This SHIPALT was removed from TYCOM LOA CH-3. ERRATA 10 issued to cancel this work item.
179MUSTINJ-11N/AWI 437-90-001

Ref. 2.2, dwg# 8826458 Rev. A was provided on CD.

Ref. 2.3, dwg# 8826460 Rev. A was provied on CD Ref's 2.9 and 2.10 RLAR's.

Contractor notes Work Item calls out Rev-B for para's 2.2 and 2.3.

Bidder's Question:

1) Will the customer proved Rev-B?

2) Will the customer provide the RLARS's required for para's 2.9 and 2.10? Missing reference(s) will be available upon request and sent via DoD SAFE. Requests for missing reference(s) shall be directed to Stephanie Hoffman, Contracting Officer, Stephanie Allshouse, Contract Specialist, at Stephanie.L.Hoffman@navy.mil, and stephanie.j.allshouse@navy.mil, respectively.

180 MUSTIN J-11 N/A WI 438-90-001

Ref. 2.2, dwg# 8826304 Rev.A was provided on CD Ref. 2.3, dwg# 8826305 Rev.A was provided on CD Ref. 2.4, dwg# 8826306 Rev.A was provided on CD Contractor notes Work Item calls out Rev-B for para's 2.2 , 2.3 and 2.4.

Bidder's Question:

Will the customer proved Rev-B? Missing reference(s) will be available upon request and sent via DoD SAFE. Requests for missing reference(s) shall be directed to Stephanie Hoffman, Contracting Officer, Stephanie Allshouse, Contract Specialist, at Stephanie.L.Hoffman@navy.mil, and stephanie.j.allshouse@navy.mil, respectively.

181 MUSTIN J-11 WI 438-90-002 Para 3.3.1 states, "Ktr must inventory, bag, tag and turnover material received in 5.3. required by the AIT when directed by the supervisor."

This statement implies that the AIT will be accomplish work on this item.

Please identify which references will be accomplished by the AITFor the material associated with paragraphs 3.3.1 and 5.3, it belongs to the AIT but is received at the MSR warehouse. This material will be inventoried, bagged, tagged and turned over to the AIT when directed by the supervisor.
182MUSTINJ-11Ref 2.2WI 533-80-001 The following drawing 533-7379412 on work item 533-80-001 has material indicated on the BOM source of GFM. This AER does not contain a GFM alt kit in paragraph 5 of the work item. Please confirm if this material is being provided as GFM?

ref. 2.2 7379412 PC # V-1, F-1, F-2, F-3, F-4

This SHIPALT was removed from TYCOM LOA CH-2. ERRATA 10 issued to cancel this work item.
183MUSTINJ-11Ref 2.2WI 552-80-001 The following drawing 672-8757381 Rev A on work item 552-80-001 has material indicated on the BOM source of GFM. This material is not listed in the GFM ship alt kit in paragraph 5 of the work item. Please confirm if this material is being provided as GFM?

ref. 2.2 8757381 PC # A001, 101, 102, 103, 104, 107, 108, 113, 114, 115, 117, 119, 123, 125, 126, 128, 129, 130, 131, 132, A002, 104, 107, 108, 113, 114, 116, 118, 119, 122, 123, 125, 126, 130, 200, 201, 202

This SHIPALT was removed from TYCOM LOA CH-3. ERRATA 10 issued to cancel this work item.
184MUSTINJ-11Ref 2.5WI 583-90-001 (E7) The following drawing 583-8826334 Rev A (Rev B not provided) on work item 583-90-001 has material indicated on the BOM source of GFM. This material is not listed in the GFM ship alt kit in paragraph 5 of the work item. Please confirm if this material is being provided as GFM?

ref. 2.5 8826334 PC # A004, 151, 152, A006, 153, 155-158, 160, A007, 153-159, A009, 126, 128, 131, 132, 184, 185, 101-109, 111-114, 116-118, 120, 124, 125, 133, 134, 136, 137, 138, 140, 141, 146, 148-150, 161, 163-167, 174-178, 183, 190, LBL01

If the drawing states GFM, this material will be provided by the Planning Yard. The following material listed in the question is Installing Activity Furnished (IAF) and is the responsibility of the the installing activity to provide: PC # A004, 151, 152, A006, A007, A009, 126, 128, 131, 132, 101-109, 111-114, 116-118, 120, 124, 125, 140, 141, 146, 164, 165, 178, 183, and LB01. The folloiwng material listed in questions is GFM: 153, 155-158, 160, 184, 185, 133, 134, 136, 137, 138, 138, 140, 141, 146, 148-150, 161, 163, 166, 167, 174, 175, 176, 177 and 190.
185MUSTINJ-11Ref 2.2WI 583-90-001 (E7) The following drawing 180-8826331 Rev A (Rev B not provided) on work item 583-90-001 has material indicated on the BOM source of GFM. This material is not listed in the GFM ship alt kit in paragraph 5 of the work item. Please confirm if this material is being provided as GFM?

ref. 2.2 8826331 PC # A027, 210A-210H, 211, A028, A124, 124A, 124B, 167, 167, 189, 203, 204, A127, 127, 191, 192, 201, 108-123, 125, 126, 128-135, 137-139, 141-143, 145-147, 149-151, 153-162, 165, 169, 173-188, 190, 193-200, 202, 205-209, 213, LBL01 Reference Rev B will be uploaded in the next amendment. Missing reference(s) will be available upon request and sent via DoD SAFE. Requests for missing reference(s) shall be directed to Stephanie Hoffman, Contracting Officer, Stephanie Allshouse, Contract Specialist, at Stephanie.L.Hoffman@navy.mil, and stephanie.j.allshouse@navy.mil, respectively. If the drawing/lien states GFM this material will be provided by the Planning Yard. All material listed in the question is Installing Activity Furnished (IAF) which is the installing activity's responsibility to provide.

186 MUSTIN J-11 2.2 - 2.4 WI 583-90-001 (E7) Refence drawings from paragraphs 2.2 through 2.4 were not provided in the original workpackage (Rev A was provided instead), please provide Rev B. Missing reference(s) will be available upon request and sent via DoD SAFE. Requests for missing reference(s) shall be directed to Stephanie Hoffman, Contracting Officer, Stephanie Allshouse, Contract Specialist, at Stephanie.L.Hoffman@navy.mil, and stephanie.j.allshouse@navy.mil, respectively.

187MUSTINJ-112.2, 2.3WI 625-11-001 References S9625-AF-MMA-010 and S9625-AU-MMA-010 have not been received to date. Please provide.Per the Solicitation posting, "...[R]eferences that contain limiting distribution statements...will not be disseminated from the Contract Specialist. In these instances, please contact the Southwestern Regional Maintenance Center (SWRMC) technical librarian POC to arrange access. This POC is Sonia Moran, at sonia.moran@navy.mil, (619-556-3458). On all communications regarding requests for missing references Offerors shall cc Acquisition Managers, Brad Smith and Jordan Nannah, at bradley.e.smith1@navy.mil, jordan.nannah@navy.mil, as well as Stephanie Hoffman, Contracting Officer, Stephanie Allshouse, Contract Specialist, at Stephanie.L.Hoffman@navy.mil, and stephanie.j.allshouse@navy.mil, respectively.
188MUSTINJ-112.2WI 633-21-001 Reference S9633-AE-MMA-010 Rev 5 has not been received to date. Please provide.Missing reference(s) will be available upon request and sent via DoD SAFE. Requests for missing reference(s) shall be directed to Stephanie Hoffman, Contracting Officer, Stephanie Allshouse, Contract Specialist, at

Stephanie.L.Hoffman@navy.mil, and stephanie.j.allshouse@navy.mil, respectively.

189MUSTINJ-13.5.2WI 634-11-001 Are we to assume in paragraph 3.5.2 space designation 1.2.2 is a typo? If so, what space designation should it be? Is the quantity of insulation specified in this paragraph (100 SF) the total amount being asked to be removed & replaced in this space; or should we assume the amount necessary for the removal and replacement of the entire space based on paragraphs 3.2 & 3.3?ERRATA 10 issued to add in paragraph 1.2.2, Auxiliary Room # 2.
190MUSTINJ-13.5.1WI 634-11-001 Are we to assume all insulation in the space identified in 1.2.1 is to be removed & replaced, due to the requirements of 3.2 & 3.3, or are we to assume the quantity of insulation specified in 3.5.1, (240 SF) to be removed and replaced for that space?ERRATA 10 issued to correct para 3.5.1 to increase the lagging requirement to 500 sqft.
191MUSTINJ-11Ref 2.3WI 641-80-001 The following drawing 641-8570473 REV A on work item 641-80-001 has material indicated on the BOM source of GFM. This material is not listed in the GFM ship alt kit in paragraph 5 of the work item. Please confirm if this material is being provided as GFM?

ref. 2.3 8570473 PC # 106, 108, 109, 111, 115, 116, 425

This SHIPALT was removed from TYCOM LOA CH-2. ERRATA 10 issued to cancel this work item.
192MUSTINJ-112.11WI 641-80-001 Work Item calls for reference 4720-DDG89-FY20, Ship Alteration Material Summary (4720/3). Contractor has received 4720-DDG89-FY21, Ship Alteration Material Summary (4720/3). Please clarify if FY20 or FY21 reference is correct, and provide FY20 if needed.FY21 reference is correct.
193MUSTINJ-11Para 3.1.14.1WI 980-90-020 Para 3.1.14.1. states "Parking spaces shall be located adjacent to the Navsea SEA21 office facility" For safety reasons, please change this to read, "near the entrance of the shipyard" in order to avoid high vehicular traffic inside the shipyard industrial area.The Government does not concur. Solicitation requirements remain unchanged.
194MUSTINJ-11Para. 3.4WI 992-11-006 Para 3.4. states "“Provide a compensate water barge with a capability of holding 250,000 gallons of fluid in support of refueling the ship for a total of 4 workdays (96 Hours).”

Question #1 - Will compensate water barge be supplied by fuel depot San Diego?

Please note fuel depot San Diego does not allow contractor supplied barges to enter or tow their barges.

Question #2 - Is it the government’s intent to have Ship’s force arrange compensating water barge and towing services?

Please adviseThis WI applies to Naval Base Ports Only. The compensated barge will be provided by the Navy. Ship's force will arrange for the barge and towing service.
195MUSTINJ-113.13WI 992-11-009 Para 3.13 states, "Provide, install and maintain a Temporary Fire and smoke detection alarm system, in accordance with paragraph 6.5 of 2.3 when the ships permanently installed Fire Detection System is disabled and throughout the entire availability.
For bidding Purposes please provide material descriptions (type of sensors, what type of alarms etc.) and locations.ERRATA 10 issued for Temporary fire detection system hardware and temporary alarms installation locations.
196MUSTINJ-113.3-3.3.1 & 3.10-3.10.4WI: 259-10-002 Contractor Finds para 3.3-3.3.1 requires removal of existing exaust, bulkhead, overhead and ventilation insulation in 1.2.1 through 1.2.6. However Contractor finds Para 3.10-3.10.4 requires installation of new and disturbed insulation in significantly less quantities then removed in 3.3. Is it the intent of the Govt to remove all insulation and only install small quantities? Please clarify.ERRATA 10 issued to delete paragraph 3.10.1-3.10.3. Intent is to remove and replace the entire spaces lagging.
197SAN DIEGOJ-13.2, Ref 2.21,Work Item 412-90-001, ShipAlt LPD17-92882K Rearrangement Modification for SSDS; accomplish (Option Item)

Paragraph 3.2 states, "Accomplish each requirement of 2.2 through 2.27 and using material provided in 5.3, include procurement of all material not provided as GFM.

Contractor notes reference 2.21 lists Cable assemblies Items 24-26 however does not have Assembly Specification references provided for Vendors to quote and that Note: 4.1 states, "4720 has not been issued as of 05 Oct 2020".

Bidder's Question: Can the Customer provide the Cable assemblies Items 24-26 Assembly Specification references or provide a 4720 document that lists these article as being provided as GFM?WI 412-90-001 - Material items listed in 5.3 are Kitted Material and are provided by the Program / Sponsor Activity. Materials listed as items 24-26 in reference 2.21 are mfg part number and needs to be procured by KTR.
198MUSTINJ-11Ref 2.2Work item 437-90-001

Paragraph 3.1 states to accomplish the requirements of reference 2.2 437-8826458 Rev B . However only Rev A of the drawing has been provided by the government.

Please confirm which revision will be needed to accomplish work item task.

Missing reference(s) will be available upon request and sent via DoD SAFE. Requests for missing reference(s) shall be directed to Stephanie Hoffman, Contracting Officer, Stephanie Allshouse, Contract Specialist, at Stephanie.L.Hoffman@navy.mil, and stephanie.j.allshouse@navy.mil, respectively.

199 MUSTIN J-11 Ref 2.3 Work item 437-90-001 Paragraph 3.1 states to accomplish the requirements of reference 2.3 540-8826460 Rev B. However only Rev A of the drawing has been provided by the government.

Please confirm which revision will be needed to accomplish work item task.

Missing reference(s) will be available upon request and sent via DoD SAFE. Requests for missing reference(s) shall be directed to Stephanie Hoffman, Contracting Officer, Stephanie Allshouse, Contract Specialist, at Stephanie.L.Hoffman@navy.mil, and stephanie.j.allshouse@navy.mil, respectively.

200 SAN DIEGO J-1 472-90-001 (E5); 3.1 Work Item 472-90-001 (E5), ShipAlt LPD17-80156K, AN/SLQ-32(V)6 Hardware; accomplish (Option Item) Paragraph 3.1 states, "Accomplish the requirements of 2.2 through 2.27, using material provide in 5.3, include procurement of all material not provided as GFM."

Contractor notes thatupon review of reference CD provided by the Customer that references 2.2 through 2.24 and 2.26 through 2.27 were not provided and reference 2.25, 4720-LPD22-FY21 does not have this ShipAlt listed.

Bidder's Question: Does the Customer intend to provide missing references 2.2 through 2.24 and 2.26 through 2.27 along with a revised or new reference 2.25, 4720-LPD22-FY21 that provided the GFM for this ShipAlt to all bidders? WI 472-90-001 (SA 80156K) - material items listed under 5.3 are kitted materials, and will be provided to the awarded contractor for the avail by Spronsor/Program. For references 2.2 and 2.5, missing reference(s) will be available upon request and sent via DoD SAFE. Requests for missing reference(s) shall be directed to Stephanie Hoffman, Contracting Officer, Stephanie Allshouse, Contract Specialist, at Stephanie.L.Hoffman@navy.mil, and stephanie.j.allshouse@navy.mil, respectively.

For references 2.3 through 2.24, 2.26 and 2.27 Please contact the Southwestern Regional Maintenance Center (SWRMC) technical librarian POC to arrange access. This POC is Sonia Moran, at sonia.moran@navy.mil, (619-556-3458). On all communications regarding requests for missing references Offerors shall cc Acquisition Managers, Brad Smith and Jordan Nannah, at bradley.e.smith1@navy.mil, jordan.nannah@navy.mil, as well as Stephanie Hoffman, Contracting Officer, and and Stephanie allshouse, Contract Specialist, at Stephanie.L.Hoffman@navy.mil, and stephanie.j.allshouse@navy.mil, respectivelyrespectively.

201 SAN DIEGO J-1 493-90-001 (E6); 3.1 & Ref 2.10 Work Item 493-90-001 (E6), ShipAlt LPD17-87656K, Damage Control Management Software (DCAMS) and Advanced Damage Control System (ADCS) Hardware Tech Refresh, Alteration Installation Team (AIT) Support; accomplish Paragraph 3.1 states, "Receive, inventory, and store all material listed on 2.10, provided in 5.3 for AIT installation." and then states, "All material not provided as GFM to be purchased by the contractor."

Contractor notes that refrence 2.10, 4720-LPD22-FY21, Ship Alteration Material Summary (4720/3) was not provided on the CD.

Contractor note since only GFM is listed on a 4720 the statement "All material not provided as GFM to be purchased by the contractor" is not applacable to reference 2.10.

Bidder's Question:

1) Does the Customer intend to provide missing reference 2.10, 4720-LPD22-FY21, Ship Alteration Material Summary (4720/3) to all bidders?

2) Can the Customer provide clarification regarding paragraph 3.1 statement "All material not provided as GFM to be purchased by the contractor" and/or remove from it in a future Errata?

Missing reference(s) will be available upon request and sent via DoD SAFE. Requests for missing reference(s) shall be directed to Stephanie Hoffman, Contracting Officer, Stephanie Allshouse, Contract Specialist, at Stephanie.L.Hoffman@navy.mil, and stephanie.j.allshouse@navy.mil, respectively.

202 SAN DIEGO J-1 Paragraph 3.1 Work Item 524-90-001, ShipAlt LPD17-81157.04K, Auxiliary Sea Water System Valve Replacement; accomplish

Paragraph 3.1 states, "Accomplish the requirements of 2.2 through 2.4 and using material provided in 5.3 to include procurement of materials to complete install."

Contractor notes that these same requirements were accomplished during the FY18 SRA under Work Item 524-90-001, ShipAlt LPD17-81157.01, 02, 03, 04K Auxiliary Seawater System Valve; replace.

Bidders question: Can the Customer validate that this ShipAlt was completed and if so will an Errata be issued removing this specification from the J-1 Specification Package and provided a revised Attachment J-4 (Pricing Workbook)?WI 524-90-001 remains in the work package
203SAN DIEGOJ-1Paragraph 3.1Work Item 524-90-005 (E6), ShipAlt LPD17-81157.03K, Auxiliary Sea Water System Valve Replacement; accomplish

Paragraph 3.1 states, "Accomplish each requirement of 2.2 and using material provided in 5.3 to include procurement of materials to support install."

Contractor notes that these same requirements were accomplished during the FY18 SRA under Work Item 524-90-001, ShipAlt LPD17-81157.01, 02, 03, 04K Auxiliary Seawater System Valve; replace.

Bidders question: Can the Customer validate that this ShipAlt was alredeady and if so will an Errata be issued removing this specification from the J-1 Specification Package and provided a revised Attachment J-4 (Pricing Workbook)?WI 524-90-005 - SA 81157.03K was scheduled to be accomplished during FY 18, but was deleted from the SRA package. WI 524-90-005 is valid and remains in the work package.
204SAN DIEGOJ-1N/AWork Item 992-21-001, Defuel Ship; accomplish Contractor has reviewed the RFP, specification, and all identified references noting that, the intent of this items work scope appears to be for home port (San Diego) bidders ONLY. Bidders question: Is this work item to be priced only by homeport (San Diego) bidders and is it to be accomplished only if the contract is awarded in San Diego?This work item has been changed to "Option Item, Non-Naval Base Ports Only". Applicable to all offerors in ports that do not have a US Navy Naval Base/Station within its geographic region. Reference errata 9.
205MUSTINRFPSection CPage 117 of 225, 5 OTHER REQUIREMENTS, Paragraph 5.4 PAINT ABATEMENT states, "Abatement work will be conducted in accordance with NSI 009-32. Paint abatement will be included as part of offerors proposed pricing and is not subject to additional growth." Bidders question: Since the ship was last painted in a US Shipyard, has there been any paint applied that does not meet NAVSEA Standard Item FY21 Change 2, 009-32, tables 1 thru 8 requirements?No. No other paint material has been applied to the ship that was not IAW 009-32.
206MUSTINJ-11N/AThe scope of work for WI 993-11-002 Transportation Service; provide (OPTION ITEM; Out of Homeport ONLY) has the requirement for the contractor to transport Ship's Force material, stores, and equipment from

Contractor's Facility to Naval Base San Diego.

Transportation services must be 15 round trips, not to exceed 80,000 pounds per trip in accordance with local, state and federal regulations.

The requirement to transport GFM is typically handled by the RMC for any given availability.

Please consider the following:

Remove the specification from the package and have the RMC transport the GFM as it becomes available to transport.Governement does not concur. These taskings are set aside to also include transport of RMC overhaul item; ie. antennas, pumps, etc. in addition to the items in the WI.
207SAN DIEGORFPSection CPage 117 of 225, 5 OTHER REQUIREMENTS, Paragraph 5.4 PAINT ABATEMENT states, "Abatement work will be conducted in accordance with NSI 009-32. Paint abatement will be included as part of offerors proposed pricing and is not subject to additional growth." Bidders question: Since the ship was last painted in a US Shipyard, has there been any paint applied that does not meet NAVSEA Standard Item FY21 Change 2, 009-32, tables 1 thru 8 requirements?No. No other paint material has been applied to the ship that was not IAW 009-32.
208MUSTINJ-113.7MUSTIN. Work item 997-11-001 paragraph 3.7 states to drydock the ship during the first 10 percent of the availability and paragraph 3.20 states to undock the ship at a mutually agreeable time. Attachment J-3 states that the dock and undock dates are to be determined by the offeror IAW 997-11-001, but also states to have a minimum dock duration of 220 days. In order to maximize competition on this solicitation it is recommended the more flexibility be provided by allowing docking within the first 20 percent of the availability and removing the minimum dock duration constraint from Attachment J-3.All docking and undocking restrictions have been removed. Reference errata 9 and updated J-3 and J-4.
209MUSTINJ-11N/AWI 997-11-001: In accordance with the RFP provisions and the Dry-Docking work item specification(s), please clarify the latest date that the vessel can be docked. In addition, please clarify that the Government does not intend to adjust the RFP schedule after contract award to accommodate alternate docking schedules; i.e., allowing a bidder to dock the vessel(s) later than the latest docking dates allowed in the RFP and Dry-Docking work item specifications.All docking and undocking restrictions have been removed. Reference errata 9 and updated J-3 and J-4.