J.10 Pre-Construction Agenda and Checklist - DOT Form F4220.3.doc

DOC document 121 KB Posted

Attached to
Power Systems Design & Install 2 Solicitation - 6973GH-26-R-00018
Solicitation number
6973GH-26-R-00018
Issued by

About this file

This is a DOT Form F 4220.3 Pre-Construction Conference Agenda and Checklist, a standardized template used to document discussions between government representatives and contractors prior to construction work commencement. The form serves as a checklist to ensure all critical contractual and operational requirements are addressed before work begins.

The checklist covers 24 major topic areas including government representation and authority, project commencement and completion schedules, progress reporting and liquidated damages, change order procedures, correspondence protocols, contractor superintendence, coordination with other contractors and utilities, subcontractor requirements, payment terms and retainage, shop drawings and equipment submissions, inspection and acceptance procedures, material storage and disposal, work layout and surveying responsibilities, trade coordination, government-furnished property and salvage materials, protection of existing structures and personnel security clearances, labor compliance (Equal Opportunity, Davis-Bacon Act, Contract Work Hours Standards Act, apprenticeships, payroll records, Copeland Act, and wage withholding), delay notifications, small business subcontracting programs, local regulatory compliance, safety and accident prevention, cleanup requirements, notice to proceed date, and contract completion date. Each agenda item is documented with checkboxes to confirm discussion with the contractor, and the form concludes with certification signatures from both contractor and government representatives, along with space for remarks. This template is not specific to any particular contract requirement but is a standard procedural document used across FAA construction projects.

View the file

Other files

File Type Posted
Official SIR RFI_Final 03.25.2026.pdf PDF
Amendment Form 00001.pdf PDF
6973GH-26-R-00018 Revised 03.25.26.pdf PDF
J.36 Schedule B Price Proposal PSDI II Cost Worksheet_03.20.2026.xlsx XLSX spreadsheet
J.00 Index.docx DOCX document
J.06 Travel Authorization Form.xlsx XLSX spreadsheet
J.15 FAA-STD-019G.pdf PDF
J.25 FAA Order 1370.121B - FAA Information Security and Privacy Policy.pdf PDF
J.22 FAA Order JO_6950_2F .pdf PDF
J.02 Contract Data Requirements List (CDRL).pdf PDF
J.27 FAA-STD-061A.pdf PDF
J.21 FAA Order JO 1050 17B.pdf PDF
J.24 FST Program Specifications.pdf PDF
J.11 FAA-C-1217H Chg 2.pdf PDF
J.01 Statement of Work 02.17.26.docx DOCX document
J.16 FAA-STD-032.pdf PDF
J.07 Performance Bond - FAA Form Number FAA 4400-63.pdf PDF
J.03 Data Item Description (DID).pdf PDF
J.34 Phase 2 Technical Approach - Factor 1, Design Proposal Form .docx DOCX document
J.08 Payment Bond - FAA Form Number 4400-61.pdf PDF
J.04 Government Furnished Equipment (GFE).pdf PDF
J.35 Phase 2 Technical Approach - Factor 2, Installation Proposal Form .docx DOCX document
J.23 FST Guidelines.pdf PDF
J.13 FAA-D-2494B.pdf PDF
6973GH-26-R-00018 PSDI - 03.03.26.pdf PDF
J.12 FAA-C-1391f.pdf PDF
J.09 Pre-Construction Installation EOSH Checklist - FAA Form 3900-18.pdf PDF
J.20 FAA Order 6950_27B.pdf PDF
J.33 PSDI II Technical Approach Evaluation Worksheets_02.27.2026.xlsx XLSX spreadsheet
J.17 FAA Order 1050.10D.pdf PDF
J.36 Schedule B, Price Proposal PSDI II Cost Worksheet_10.28.2025.xlsx XLSX spreadsheet
J.29 6980_37 Maintenance of Solar Photovoltaic System.pdf PDF
J.19 FAA Order JO 3900.64A - Air Traffic Organization Electrical SafetyProgram.pdf PDF
J.28 FAA Order 6980_36 Maintenance of Hydrogen Fuel Cells.pdf PDF
J.18 FAA Order JO_3900_57A_W-CHG_1_Inc.pdf PDF
PSDI 2 - RFIs from DRAFT SIR.pdf PDF
J.14 faa-std-002H.pdf PDF
J.32 Phase I Relevant Corporate Experience Form.pdf PDF
J.31 Contractor Release DOT 4220.4 (1).pdf PDF
J.30 LPGBS Checklist.xls XLS spreadsheet
J.05 6010-5 CAI Form.pdf PDF
J.26 FAA-E-99001 - Photovoltaic Specification.pdf PDF
Show all 42

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEPARTMENT OF TRANSPORTATION

PRECONSTRUCTION CONFERENCE AGENDA AND CHECKLIST

I. CONTRACT NO.

II. CONTRACTOR

III. CONFERENCE HELD AT

IV. DATE

V. CONTRACT DESCRIPTION AND LOCATION

VI. (1) CONTRACTING OFFICER, (2) CONTRACT ADMINISTRATOR, (3) CONTRACTING OFFICER’S REPRESENTATIVE

NAME

TELEPHONE NO.

(1) (2) (3)

VII. Place “X” in appropriate box if item is discussed with contractor.
“X”

1.

GOVERNMENT

REPRESENTATIVES

A. CONTRACTING OFFICER (Name and title)

FORMCHECKBOX

B.

AUTHORIZED REPRESENTATIVE (Name and title)

FORMCHECKBOX

2.

STATUS

A.

COMMENCEMENT, PROGRESS, AND COMPLETION OF WORK

FORMCHECKBOX

3.

PROGRESS

A. SUBMISSION FOR APPROVAL
FORMCHECKBOX

SCHEDULE

B. ITEMS TO BE INCLUDED
FORMCHECKBOX

C.

COMPLIANCE WITH PROGRESS SCHEDULE AND ACTION BY CONTRACTING OFFICER IF CONTRACTOR FAILS TO

MAINTAIN PROGRESS

FORMCHECKBOX

D.

LIQUIDATED DAMAGES

FORMCHECKBOX

4.

CHANGES

A.

AUTHORITY

FORMCHECKBOX

5.

CORRESPONDENCE

A.

NORMALLY, ALL CORRESPONDENCE WILL BE ADDRESSED TO THE CONTRACTING OFFICER WITH A COPY TO HIS

REPRESENTATIVE

FORMCHECKBOX

6.

SUPERINTENDENCE

BY CONTRACTOR

A.

NAME AND TELEPHONE NUMBER OF REPRESENTATIVE

NAME:

TELEPHONE NO:

FORMCHECKBOX

7.

OTHER CONTRACTS

A.

COOPERATION WITH CONTRACTORS AND OTHER GOVERNMENT EMPLOYEES

FORMCHECKBOX

B. USE OF ROADS AND UTILITIES
FORMCHECKBOX
C. COORDINATION BETWEEN CONTRACTORS
FORMCHECKBOX

8.

SUBCONTRACTORS

A.

PERCENTAGE ITEMS OF WORK PERFORMED BY PRIME CONTRACTORS OWN FORCES

FORMCHECKBOX

B. STATEMENT AND ACKNOWLEDGMENT, FAA Template 21, FOR EACH SUBCONTRACT. 3.6.2-22 “SUBCONTRACTS”
FORMCHECKBOX

C.

CONTRACTUAL RELATIONS BETWEEN SUBONCTRACTORS AND GOVERNMENT

FORMCHECKBOX

9.

PAYMENT TO

A.

RETAINED PERCENTAGE

FORMCHECKBOX

CONTRACTOR

B.

PAYMENT FOR MATERIAL AND EQUIPMENT ON SITE

FORMCHECKBOX

C.

STORAGE AND PROTECTION

FORMCHECKBOX

10. SHOP DRAWINGS
A.

SUBMITTAL OF SHOP DRAWINGS

FORMCHECKBOX

B. SUBMITTAL OF EQUIPMENT LAYOUT
FORMCHECKBOX
C. RESPONSIBILITY OF CONTRACTOR TO ALERT GOVERNMENT IF ITEMS ARE NOT FULFILLING CONTRACT
FORMCHECKBOX

REQUIREMENTS

FORMCHECKBOX

11. INSPECTION
A.

RIGHT TO REJECT DEFECTIVE MATERIAL OR WORKMANSHIP

FORMCHECKBOX

B.

NO REPRESENTATIVE IS AUTHORIZED TO CHANGE ANY PROVISION OF THE CONTRACT

FORMCHECKBOX

C.

PRESENCE OR ABSENCE OF INSPECTOR SHALL NOT RELIEVE CONTRACTOR FROM REQUIREMENT OF CONTRACT

FORMCHECKBOX

D.

ACCEPTANCE OF WORK

FORMCHECKBOX

E.

SPECIFICATIONS GOVERN WHEN DIFFERENCES EXIST BETWEEN DRAWINGS AND SPECIFICATIONS

FORMCHECKBOX

12. OPERATIONS AND
A.

STORAGE AREAS TO BE AUTHORIZED OR APPROVED

FORMCHECKBOX

STORAGE
B.

DISPOSAL AREAS

FORMCHECKBOX

13. LAYOUT OF WORK
A.

GOVERNMENT ESTABLISHED BASE LINE AND BENCH MARK

FORMCHECKBOX

B.

CONTRACTOR RESPONSIBILITY FOR LINE AND GRADES

FORMCHECKBOX

VII. Place “X” in appropriate box if item is discussed with contractor
“X”

14.

COORDINATION

A.

CONTRACTOR TO COORDINATE VARIOUS TRADES

FORMCHECKBOX

OF TRADES

B.

CONTRACTOR TO COORDINATE SHOP DRAWING AND LAYOUT OF VARIOUS TRADES

FORMCHECKBOX

15.

GOVERNMENT-FURN.

A.

DELIVERY, INVENTORY, AND ACCEPTANCE

FORMCHECKBOX

PROPERTY AND

B.

STORAGE AND PROTECTION

FORMCHECKBOX

SALVAGED MATERIAL

C.

SALVAGE MATERIAL - SERVICEABLE OR UNSERVICEABLE

FORMCHECKBOX

16.

PROTECTION OF

A.

PROTECTION OF EXISTING STRUCTURES, UTILITIES, WORK AND VEGETATION

FORMCHECKBOX

MATERIAL AND WORK

B.

PERSONNEL SECURITY CLEARANCE AND IDENTIFICATION (IF APPLICABLE)

FORMCHECKBOX

17.

LABOR

A.

EQUAL OPPORTUNITY

FORMCHECKBOX

B.

DAVIS-BACON ACT (Including Labor Department wage determination)

FORMCHECKBOX

C.

CONTRACT WORK HOURS STANDARDS ACT - OVERTIME COMP.

FORMCHECKBOX

D.

APPRENTICES

FORMCHECKBOX

E.

PAYROLL RECORDS AND PAYROLLS

FORMCHECKBOX

F.

COPELAND (“And-Kickback”) ACT

FORMCHECKBOX

G.

WITHHOLDING OF FUNDS TO ASSURE WAGE PAYMENT

FORMCHECKBOX

H.

SUBCONTRACTING - TERMINATION

FORMCHECKBOX

18.

NOTICE OF DELAYS

A.

NOTICE TO CONTRACTING OFFER OF ACTUAL AND POTENTIAL LABOR DISPUTES

FORMCHECKBOX

B. OTHER ACTUAL AND POTENTIAL DELAYS
FORMCHECKBOX

19.

SMALL BUSINESS

A.

CONTRACTOR DESIGNATES LIAISON OFFICER

FORMCHECKBOX

SUBCONTRACTING

B.

MAINTAINS RECORDS AVAILABLE FOR REVIEW

FORMCHECKBOX

PROGRAM

C.

NOTIFIES CONTRACTING OFFICER IF SMALL BUSINESS IS NOT SOLICITED FOR SUBCONTRACTS

FORMCHECKBOX

20.

COMPLIANCE

A.

COMPLIANCE WITH LOCAL RULES AND REGULATIONS

FORMCHECKBOX

21.

SAFETY

A.

ACCIDENT PREVENTION

FORMCHECKBOX

B.

CLEANING-UP

FORMCHECKBOX

22. NOTICE TO PROCEED
A. DATE
FORMCHECKBOX
23. DATE OF CONTRACT COMPLETION
A. DATE
FORMCHECKBOX

24.

OTHER ITEMS

FORMCHECKBOX

(Add as necessary)

FORMCHECKBOX

(Key to previous items,

FORMCHECKBOX

if applicable)

FORMCHECKBOX
FORMCHECKBOX
FORMCHECKBOX
FORMCHECKBOX
FORMCHECKBOX
FORMCHECKBOX

CERTIFICATION: The preceding items marked by “X” have been discussed.

SIGNATURE FOR THE CONTRACTOR

SIGNATURE FOR THE GOVERNMENT

REMARKS (Continue on attached sheet(s), if necessary)

OMB Control No. 2120-0595 (DOT F4220.3) FAA Template No. 12 (8/97) OMB Control No. 2120-0595 (DOT F4220.3) FAA Template No. 12 (Reverse) (8/97)