J.04 Government Furnished Equipment (GFE).pdf

PDF 65 KB Posted

Attached to
Power Systems Design & Install 2 Solicitation - 6973GH-26-R-00018
Solicitation number
6973GH-26-R-00018
Issued by

About this file

This is an attachment listing Government Furnished Equipment (GFE) that may be provided in support of a Power Services Group contract and its Statement of Work. The document identifies five categories of electrical power equipment with specified vendors, equipment specifications, and lead times.

The Electrical Power Distribution Equipment category includes Schneider Electric/Square D switchboards, switchgear, panel boards, circuit breakers, transformers, and monitoring software with lead times of 1-12 months depending on the specific component. Engine Generator equipment from Rehlko includes propane generators ranging from 20 kW to 100 kW and diesel generators from 15 kW to 1.5 MW, along with automatic transfer switches, load banks, and related components, with a 12-month lead time. The Static Automatic Transfer Switch category specifies equipment at 480 volts (200-600 amp) and 208 volts (150-600 amp) with a 12-month lead time, though the vendor is listed as TBD. The Uninterruptible Power Supply (UPS) equipment from Eaton Electric ranges from 30 KVA to 825 KVA at 480 volts and 10 KVA to 160 kVA at 208 volts, with 12-week lead times for small to medium units. The Direct Current Back-Up System from Oceus provides 24-volt DC systems with batteries and related components on a 60-90 day lead time. The document notes that some equipment may require longer lead times than those listed.

View the file

Other files

File Type Posted
Official SIR RFI_Final 03.25.2026.pdf PDF
Amendment Form 00001.pdf PDF
6973GH-26-R-00018 Revised 03.25.26.pdf PDF
J.36 Schedule B Price Proposal PSDI II Cost Worksheet_03.20.2026.xlsx XLSX spreadsheet
J.00 Index.docx DOCX document
J.06 Travel Authorization Form.xlsx XLSX spreadsheet
J.15 FAA-STD-019G.pdf PDF
J.25 FAA Order 1370.121B - FAA Information Security and Privacy Policy.pdf PDF
J.22 FAA Order JO_6950_2F .pdf PDF
J.02 Contract Data Requirements List (CDRL).pdf PDF
J.27 FAA-STD-061A.pdf PDF
J.21 FAA Order JO 1050 17B.pdf PDF
J.10 Pre-Construction Agenda and Checklist - DOT Form F4220.3.doc DOC document
J.24 FST Program Specifications.pdf PDF
J.11 FAA-C-1217H Chg 2.pdf PDF
J.01 Statement of Work 02.17.26.docx DOCX document
J.16 FAA-STD-032.pdf PDF
J.07 Performance Bond - FAA Form Number FAA 4400-63.pdf PDF
J.03 Data Item Description (DID).pdf PDF
J.34 Phase 2 Technical Approach - Factor 1, Design Proposal Form .docx DOCX document
J.08 Payment Bond - FAA Form Number 4400-61.pdf PDF
J.35 Phase 2 Technical Approach - Factor 2, Installation Proposal Form .docx DOCX document
J.23 FST Guidelines.pdf PDF
J.13 FAA-D-2494B.pdf PDF
6973GH-26-R-00018 PSDI - 03.03.26.pdf PDF
J.12 FAA-C-1391f.pdf PDF
J.09 Pre-Construction Installation EOSH Checklist - FAA Form 3900-18.pdf PDF
J.20 FAA Order 6950_27B.pdf PDF
J.33 PSDI II Technical Approach Evaluation Worksheets_02.27.2026.xlsx XLSX spreadsheet
J.17 FAA Order 1050.10D.pdf PDF
J.36 Schedule B, Price Proposal PSDI II Cost Worksheet_10.28.2025.xlsx XLSX spreadsheet
J.29 6980_37 Maintenance of Solar Photovoltaic System.pdf PDF
J.19 FAA Order JO 3900.64A - Air Traffic Organization Electrical SafetyProgram.pdf PDF
J.28 FAA Order 6980_36 Maintenance of Hydrogen Fuel Cells.pdf PDF
J.18 FAA Order JO_3900_57A_W-CHG_1_Inc.pdf PDF
PSDI 2 - RFIs from DRAFT SIR.pdf PDF
J.14 faa-std-002H.pdf PDF
J.32 Phase I Relevant Corporate Experience Form.pdf PDF
J.31 Contractor Release DOT 4220.4 (1).pdf PDF
J.30 LPGBS Checklist.xls XLS spreadsheet
J.05 6010-5 CAI Form.pdf PDF
J.26 FAA-E-99001 - Photovoltaic Specification.pdf PDF
Show all 42

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment J.04

POWER SERVICES GROUP GOVERNMENT FURNISHED EQUIPMENT (GFE)

In support of the requirements of the Statement of Work and contract, below is a sample list of equipment that may be provided as GFE:

ELECTRICAL POWER DISTRIBUTION EQUIPMENT (EDE)

Vendor:

Equipment:

Lead-time:

Schneider Electric/Square D

Switchboards, Switchgear, Panel boards, Circuit Breakers, Transformers, and Monitoring

Software and Hardware

Switchboards 9-12 months, Panel boards 6 months, Transformers 1-3 months Switchgear

9-12 months

ENGINE GENERATOR (EG)

Vendor:

Equipment:

Rehlko Propane engine generators 20 kW to 100 kW

Diesel engine generators 15 kW to 1.5 MW

Automatic Transfer Switches, Load Banks, Day Tanks/Sub-Base Tanks and Mufflers

Voltages 480, 208, 240 three phase, 240 single phase

Lead-Time: 12 months

STATIC AUTOMATIC TRANSFER SWITCH (STS)

Vendor:

Equipment:

Lead-Time:

UNINTERRUPTIBLE POWER SUPPLY (UPS)

Vendor: Eaton Electric

Equipment: 480 volt 30 KVA to 825 KVA

208 volt 10 KVA to 160 kVA

Battery strings, battery monitors, and bypass panels.

Lead-Time: small to medium UPSs and associated equipment 12-weeks

DIRECT CURRENT BACK-UP SYSTEM (DC BUS)

Vendor: Oceus

Equipment: 24 volt DC BUS, UXTM, ERMS, batteries, battery rack and strings

Lead-Time: 60-90 days

Note: Some equipment may have longer lead times than listed above.

TBD

480 volt, 200 amp to 600 amp

208 volt, 3 or 4-pole, 150 amp to 600 amp

12 months

File details come from the government source that posted it. Updated .