This is Attachment J.32, a Relevant Corporate Experience form required for federal contract proposals. Offerors must submit three completed contracts or projects from the past five years, with at least one being an installation project. The three projects must represent three different types of design and/or installation work selected from six classifications: Engine Generators (20 kW or larger), Uninterruptible Power Supplies (40 kVA or larger), Fuel Storage Tank Systems (250 gallons or larger with environmental monitoring), Underground Electrical Line Distribution cabling (minimum 1,000 feet with splicing and terminations) or low voltage conduit systems (500 feet with handholes), Alternative Energy Systems (1 kW or larger), and Lightning Protection, Grounding, Bonding and Shielding systems (requiring three of five main components).

The form requires offerors to document geographic support experience across at least three Continental United States regions and at least one Outside Continental United States location, with specific regional areas defined by FAA airport regions. Offerors must complete vendor information blocks including company name, email address, contract numbers, issuing offices, estimated contract values, periods of performance, and places of performance, then provide detailed information for each qualifying project including project title, contract selection, design/installation designation, start and completion dates, and facility type. The submission must be an independent PDF with no attachments, and the estimated value references example contracts only, not the current proposal cost. If work was performed on a task order, both the task order number and base/parent contract number must be referenced. Block 2 must contain a single email address for the authorized company representative.

View the file

Other files

File Type Posted
Official SIR RFI_Final 03.25.2026.pdf PDF
Amendment Form 00001.pdf PDF
6973GH-26-R-00018 Revised 03.25.26.pdf PDF
J.36 Schedule B Price Proposal PSDI II Cost Worksheet_03.20.2026.xlsx XLSX spreadsheet
J.00 Index.docx DOCX document
J.06 Travel Authorization Form.xlsx XLSX spreadsheet
J.15 FAA-STD-019G.pdf PDF
J.25 FAA Order 1370.121B - FAA Information Security and Privacy Policy.pdf PDF
J.22 FAA Order JO_6950_2F .pdf PDF
J.02 Contract Data Requirements List (CDRL).pdf PDF
J.27 FAA-STD-061A.pdf PDF
J.21 FAA Order JO 1050 17B.pdf PDF
J.10 Pre-Construction Agenda and Checklist - DOT Form F4220.3.doc DOC document
J.24 FST Program Specifications.pdf PDF
J.11 FAA-C-1217H Chg 2.pdf PDF
J.01 Statement of Work 02.17.26.docx DOCX document
J.16 FAA-STD-032.pdf PDF
J.07 Performance Bond - FAA Form Number FAA 4400-63.pdf PDF
J.03 Data Item Description (DID).pdf PDF
J.34 Phase 2 Technical Approach - Factor 1, Design Proposal Form .docx DOCX document
J.08 Payment Bond - FAA Form Number 4400-61.pdf PDF
J.04 Government Furnished Equipment (GFE).pdf PDF
J.35 Phase 2 Technical Approach - Factor 2, Installation Proposal Form .docx DOCX document
J.23 FST Guidelines.pdf PDF
J.13 FAA-D-2494B.pdf PDF
6973GH-26-R-00018 PSDI - 03.03.26.pdf PDF
J.12 FAA-C-1391f.pdf PDF
J.09 Pre-Construction Installation EOSH Checklist - FAA Form 3900-18.pdf PDF
J.20 FAA Order 6950_27B.pdf PDF
J.33 PSDI II Technical Approach Evaluation Worksheets_02.27.2026.xlsx XLSX spreadsheet
J.17 FAA Order 1050.10D.pdf PDF
J.36 Schedule B, Price Proposal PSDI II Cost Worksheet_10.28.2025.xlsx XLSX spreadsheet
J.29 6980_37 Maintenance of Solar Photovoltaic System.pdf PDF
J.19 FAA Order JO 3900.64A - Air Traffic Organization Electrical SafetyProgram.pdf PDF
J.28 FAA Order 6980_36 Maintenance of Hydrogen Fuel Cells.pdf PDF
J.18 FAA Order JO_3900_57A_W-CHG_1_Inc.pdf PDF
PSDI 2 - RFIs from DRAFT SIR.pdf PDF
J.14 faa-std-002H.pdf PDF
J.31 Contractor Release DOT 4220.4 (1).pdf PDF
J.30 LPGBS Checklist.xls XLS spreadsheet
J.05 6010-5 CAI Form.pdf PDF
J.26 FAA-E-99001 - Photovoltaic Specification.pdf PDF
Show all 42

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment J.32

Relevant Corporate Experience

Attachment J.32– Relevant Corporate Experience:

Offeror must submit this form, Relevant Corporate Experience, addressing the following and per the below instructions:

• Offerors may reference the same contract (A, B, C) for multiple citations in question 8.

• This J.32 Submission must be an independent PDF with no other attachments.

• Estimated Value on this form refers to the example contracts submitted for

Relevant Corporate Experience and should make no reference to cost associated with this SIR proposal.

• If work was performed on a specific Task Order, site both the Task Order number and the Base/Parent Contract number should be referenced.

Factor 1 – Scope:

The Offeror must demonstrate scope for Relevant Corporate Experience, provide no more than three (3) completed contracts/projects, within five (5) years of the issuance of this SIR. The Offeror must provide three (3) different types of design and/or installation projects from the following six (6) classifications; of which a minimum of one (1) submissions must be for an installation project.

Yes No Project Classification

☐ ☐ 1. Engine Generator (EG), 20 kW or larger.

☐ ☐ 2. Uninterruptible Power Supplies (UPS), facility size 40 kVA or larger.

☐ ☐ 3. Fuel Storage Tank (FST) Systems, 250 gallon tank or larger with environmental monitoring.

☐ ☐ 4. Underground cabling (direct buried) for Electrical Line

Distribution (ELD) of a minimum of 1,000 feet, to include splicing and terminations OR

Direct burial of low voltage conduit systems, installation of handholes with 500 feet of low voltage circuits to include termination.

☐ ☐ 5. Alternative Energy Systems (AES) such as photovoltaic/solar, wind power, fuel cells and other emerging alternative energy technologies. AES system, 1kW or larger.

☐ ☐ 6. Lightning Protection, Grounding, Bonding and Shielding

(LPGBS). There are five main components of LPGBS work:

(1) exterior lightning protection systems, (2) earth electrode system (EES), (3) sensitive electronic equipment grounding systems, (4) surge protection, and (5) fences and gates grounding. LPGBS Project submission must include three (3) of the five (5) main components.

If you have selected yes for any of the above project classifications, you will be required to fill out the project classification form relevant to that project and provide additional project information and details. Project classification forms provided in this document proceeding the vendor information section.

Factor 2 – Geographic Support Experience:

The Offeror must demonstrate their Geographic Support Experience by completing SIR attachment J.32 - Factor 2. The Offeror must indicate with an “X” or check mark the region(s) or location(s) listed below where the Offeror’s has experience in providing services similar to the requirements described in the SOW.

The Offeror must demonstrate experience supporting at least three (3) Continental United

States (CONUS) regions and at least one (1) Outside Continental United States (OCONUS) region or location. (https://www.faa.gov/airports/regions).

CONUS:

☐ Central Region (IA, KS, MO, NE)

☐ Eastern Region (DC, DE, MD, NJ, NY, PA, VA, WV)

☐ Great Lakes Region (IL, IN, MI, MN, ND, OH, SD, WI)

☐ New England Region (CT, MA, ME, NH, RI, VT)

☐ Northwest Mountain Region (CO, ID, MT, OR, UT, WA, WY)

☐ Southern Region (AL, FL, GA, KY, MS, NC, SC, TN)

☐ Southwest Region (AR, LA, NM, OK, TX)

☐ Western-Pacific Region (AZ, CA, NV)

OCONUS:

☐ Alaskan Region

☐ Hawaii

☐ Saipan

☐ Guam

☐ Caribbean Islands

☐ Puerto Rico

☐ American Samoa

☐ Marshall Islands

This form can be completed on government and/or commercial sector installations.

Scope may be represented on one contract/project or be represented on separate contract(s)/ project(s) providing same or similar services; within five (5) years of the issuance of the SIR. Offeror must not use more space than provided and must not modify the form in anyway.

Block 2 must be completed with only one email address and be for the individual authorized to communicate on behalf of the Offeror.

https://www.faa.gov/airports/regions https://www.faa.gov/airports/central/ https://www.faa.gov/airports/eastern/ https://www.faa.gov/airports/great_lakes/ https://www.faa.gov/airports/new_england/ https://www.faa.gov/airports/northwest_mountain/ https://www.faa.gov/airports/southern/ https://www.faa.gov/airports/southwest/ https://www.faa.gov/airports/western_pacific/

Vendor Information:

1. Offeror/Vendor Name:

2. Offeror/Vendor Email Address:

3. Contract Number(s):

A

B

C

4. Issuing Office:

5. Total Estimated Value of the

Contract/Projects (s):

6. Period of Performance(s): A

7. Place(s) of Performance: A

8. Factor 1: Scope - The information provided in this Block must reference the information submitted in Blocks 3 through 7. Provide no more than three (3) completed contracts/projects, within five (5) years of the issuance of this SIR. The Offeror must provide three (3) different types of design and/or installation projects from the following six (6) classifications; of which a minimum of one (1) submissions must be for an installation project.

Project Classification No. 1

EG, 20 kW or larger? YES ☐ or NO ☐

Project Title

Select the letter(s) for the contract number from Block 3 for this project.

A ☐ B ☐ C ☐

Please indicate if this project is Design and/or Install ☐ Design and/or ☐ Install

START DATE COMPLETION DATE FACILITY TYPE

If yes, provide details of the effort below:

Project Classification No. 2

UPS, facility size 40 kVA or larger; YES ☐ or NO ☐

Project Title

Select the letter(s) for the contract number from Block 3 for this project.

A ☐ B ☐ C ☐

Please indicate if this project is Design and/or Install

Project Classification No. 3

FST Systems, 250 gallon tank or larger with environmental monitoring.

YES ☐ or NO ☐

Project Title

Select the letter(s) for the contract number from Block 3 for this project.

A ☐ B ☐ C ☐

Please indicate if this project is Design and/or Install

Project Classification No. 4

Underground cabling (direct buried) for

ELD of a minimum of 1,000 feet, to include splicing and terminations OR

Direct burial of low voltage conduit systems, installation of handholes with 500 feet of low voltage circuits to include termination;

YES ☐ or NO ☐

Project Title

Select the letter(s) for the contract number from Block 3 for this project.

A ☐ B ☐ C ☐

Please indicate if this project is Design and/or Install

Project Classification No. 5

AES such as photovoltaic/solar, wind power, fuel cells and other emerging alternative energy technologies.

AES system typically range from 1KW to

50KW

YES ☐ or NO ☐

Project Title

Select the letter(s) for the contract number from Block 3 for this project.

A ☐ B ☐ C ☐

Please indicate if this project is Design and/or Install

Project Classification No. 6

LPGBS -There are five main components of

LPGBS work: (1) exterior lightning protection , (2) earth electrode system

(EES), (3) sensitive electronic equipment grounding systems, (4) surge protection, and

(5) fences and gates grounding. LPGBS

Project submission must include three (3) of the five (5) main components.

YES ☐ or NO ☐

Project Title

Select the letter(s) for the contract number from Block 3 for this project.

A ☐ B ☐ C ☐

Please indicate if this project is Design and/or Install

File details come from the government source that posted it. Updated .