J.05 6010-5 CAI Form.pdf

PDF 517 KB Posted

Attached to
Power Systems Design & Install 2 Solicitation - 6973GH-26-R-00018
Solicitation number
6973GH-26-R-00018
Issued by

About this file

This document is the FAA Form 6010-5, a Contractor Acceptance Inspection (CAI) Cover Sheet used to document the formal acceptance of completed contractor work on FAA projects. The form serves as an administrative record for projects involving facilities, systems, or equipment. Key data elements captured include a unique CAI number (electronically assigned with service area, year, and sequential identifiers), inspection date, project identifiers (Job Control Number and Job Order Numbers), and facility information such as location identifier, FSEP facility type, physical location, and a six-digit Facility Ident Code that breaks down system, category, facility, type, model, and class specifications. The form also records project details including the project title, contractor name, contract number, contract award date, and descriptions of both the project work accomplished and real property assets accepted from the contractor.

The form requires certification by an FAA employee serving as the Project Implementer Representative or Contracting Officer's Technical Representative (COTR), who must sign and date the cover sheet. Additional fields capture remarks to clarify any discrepancies, and a punch list section indicates whether outstanding work items exist with a recommended completion date, or alternatively confirms that all contract deliverables have been received by the FAA. This form functions as a control document within the FAA's national database for project tracking and asset acceptance purposes, with three pages providing both instructional guidance and the actual form template for completion.

View the file

Other files

File Type Posted
Official SIR RFI_Final 03.25.2026.pdf PDF
Amendment Form 00001.pdf PDF
6973GH-26-R-00018 Revised 03.25.26.pdf PDF
J.36 Schedule B Price Proposal PSDI II Cost Worksheet_03.20.2026.xlsx XLSX spreadsheet
J.00 Index.docx DOCX document
J.06 Travel Authorization Form.xlsx XLSX spreadsheet
J.15 FAA-STD-019G.pdf PDF
J.25 FAA Order 1370.121B - FAA Information Security and Privacy Policy.pdf PDF
J.22 FAA Order JO_6950_2F .pdf PDF
J.02 Contract Data Requirements List (CDRL).pdf PDF
J.27 FAA-STD-061A.pdf PDF
J.21 FAA Order JO 1050 17B.pdf PDF
J.10 Pre-Construction Agenda and Checklist - DOT Form F4220.3.doc DOC document
J.24 FST Program Specifications.pdf PDF
J.11 FAA-C-1217H Chg 2.pdf PDF
J.01 Statement of Work 02.17.26.docx DOCX document
J.16 FAA-STD-032.pdf PDF
J.07 Performance Bond - FAA Form Number FAA 4400-63.pdf PDF
J.03 Data Item Description (DID).pdf PDF
J.34 Phase 2 Technical Approach - Factor 1, Design Proposal Form .docx DOCX document
J.08 Payment Bond - FAA Form Number 4400-61.pdf PDF
J.04 Government Furnished Equipment (GFE).pdf PDF
J.35 Phase 2 Technical Approach - Factor 2, Installation Proposal Form .docx DOCX document
J.23 FST Guidelines.pdf PDF
J.13 FAA-D-2494B.pdf PDF
6973GH-26-R-00018 PSDI - 03.03.26.pdf PDF
J.12 FAA-C-1391f.pdf PDF
J.09 Pre-Construction Installation EOSH Checklist - FAA Form 3900-18.pdf PDF
J.20 FAA Order 6950_27B.pdf PDF
J.33 PSDI II Technical Approach Evaluation Worksheets_02.27.2026.xlsx XLSX spreadsheet
J.17 FAA Order 1050.10D.pdf PDF
J.36 Schedule B, Price Proposal PSDI II Cost Worksheet_10.28.2025.xlsx XLSX spreadsheet
J.29 6980_37 Maintenance of Solar Photovoltaic System.pdf PDF
J.19 FAA Order JO 3900.64A - Air Traffic Organization Electrical SafetyProgram.pdf PDF
J.28 FAA Order 6980_36 Maintenance of Hydrogen Fuel Cells.pdf PDF
J.18 FAA Order JO_3900_57A_W-CHG_1_Inc.pdf PDF
PSDI 2 - RFIs from DRAFT SIR.pdf PDF
J.14 faa-std-002H.pdf PDF
J.32 Phase I Relevant Corporate Experience Form.pdf PDF
J.31 Contractor Release DOT 4220.4 (1).pdf PDF
J.30 LPGBS Checklist.xls XLS spreadsheet
J.26 FAA-E-99001 - Photovoltaic Specification.pdf PDF
Show all 42

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FAA Form 6010-5 (10/16) Page 1 of 3

Contractor Acceptance Inspection (CAI) Cover Sheet

INSTRUCTIONS FOR COMPLETING FAA FORM 6010-5

Form Block

Description

1 CAI number. Electronically assigned by national database: The first character represents the Service Area, the next two characters represent the calendar year that the CAI was performed; then a dash followed by the letter ‘C’, which designates CAI; and the last five characters are sequentially assigned.

2 Date of Inspection. The date the JAI checklist was completed.

3 Job Control Number (JCN). Service Area unique number assigned to specific projects.

4 Related Job Order Number(s) (JONs). Budgetary Control Number.

5 Project Implementer. The entity implementing the project.

6 District. The affected District identifier.

7 SSC. The affected Systems Service Center identifier.

8 Cost Center Code. The cost center of the affected facility, system, or equipment.

9 Location Identifier. Alpha Numeric location identifier (LOCID) where the facility, system, or equipment is physically located (can be found in FSEP).

10 FSEP Facility Type. The Facility Type published in the FSEP.

11 City. Full name of the location where the facility, system, or equipment is actually located.

12 State. The two-letter abbreviation of the State where facility, system, or equipment is actually located.

13 Facility Ident Code. From the FSEP, lists the facility, system, or equipment features and capabilities in a six-digit code. The digits are broken out below:

S = System C = Category F = Facility T = Type M = Model C = Class

14 Runway number. If applicable, list of the runway impacted by this JAI. Typically, if the Facility Ident Code System Code (S) is a ‘3’, then a runway must be listed here.

15 Project Title. Short title of project.

16 Contractor. The business name of the contractor performing the work.

17 Contract Number. The number of the contract that authorized the expenditure of funds required to complete this work.

18 Contract Date. The date that the contract was awarded.

19 Description of Project. Describes the work accomplished by the project.

20 Description of Real Property Assets. Describes each real property asset that was accepted from the contractor.

pxantus Typewritten Text Electronic Version (PDF) pxantus Typewritten Text

FAA Form 6010-5 (10/16) Page 2 of 3

21 PI Representative Performing the Inspection or Acceptance. The PI Representative or COTR that performed the inspection must be an FAA employee. The PI Representative or COTR signs and dates the CAI Cover Sheet.

22 Remarks. Any comments or discrepancies necessary to clarify the CAI.

23 Punch List. The appropriate box is checked to indicate if a punch list was completed. Also lists the date that any punch list items will be completed.

Electronic Version (PDF)

FAA Form 6010-5 (10/16) Page 3 of 3

CONTRACTOR ACCEPTANCE

INSPECTION REPORT

CAI COVER

SHEET

CAI Number Date of Inspection

Job Control Number (JCN) Related Job Order Number(s) (JONs) Project Implementer District SSC

Cost Center Code

Location Identifier

Facility Type

(FSEP)

Physical Location Facility Ident. Code Runway City State S C F T M C

Project Title:

Contractor: Contract Number: Contract Date:

Description of Project:

Description of Real Property Assets (List each asset separately):

Name and Title of Person Performing the Inspection or Acceptance:

Print Name and Title Signature Date

Remarks:

Punch List Attached. Recommended Date of Completion for Punch List Items:

No Punch List. All Contract Deliverables Received by the FAA.

FAA Form 6010-5 (07/08)

Electronic Version (PDF)

Rectangle

Job Control Number JCNRow1:
Related Job Order Numbers JONsRow1:
Project ImplementerRow1:
DistrictRow1:
SSCRow1:
Cost Center CodeRow1:
Location IdentifierRow1:
Facility Type FSEPRow1:
CityRow1:
StateRow1:
SRow1:
CRow1:
FRow1:
TRow1:
MRow1:
CRow1_2:
RunwayRow1:
Project Title:
ContractorRow1:
Contract NumberRow1:
Contract DateRow1:
Description of Project:
Description of Real Property Assets List each asset separately:
Print Name and Title:
Date:
Remarks:
Punch List Attached Recommended Date of Completion for Punch List Items: Off
No Punch List All Contract Deliverables Received by the FAA: Off
undefined:
Text1:
0:
1:

File details come from the government source that posted it. Updated .