This is a Reference RFI Response document containing 34 questions and answers regarding a federal contract solicitation for Power Systems Design and Implementation (PSDI) services submitted March 25, 2026.
The document addresses procedural and administrative clarifications for both Phase 1 and Phase 2 proposal submissions. Key requirements include: offerors must submit no more than three completed contracts/projects within five years as relevant corporate experience; affiliated company experience under common ownership is acceptable if resources and personnel are available to support contract performance; project completion is defined as receipt of signed CAI, submission of final contractor invoice, or receipt of final payment; Factor 1 (Scope) and Factor 2 (Geographic Support Experience) are evaluated separately with no maximum limit on geographic regions indicated; cover sheets and tables of contents are excluded from page limitations; 20-page resume limit applies to key personnel; and standalone battery energy storage system replacement work qualifies as relevant experience for Alternative Energy Systems projects. Additional guidance covers technical submission requirements including font sizes (no smaller than 12 point for J.32 attachment), SIR documentation requirements (front page and sections B-M required), invoicing procedures under 3.3.1-40 ELECTRONIC SUBMISSION OF PAYMENT REQUESTS, and certification requirements in Section K. The solicitation includes a small business set-aside (Category 1) with task order allocation to the lowest-price offeror who captured the requirement scope. The contractor will support FAA personnel on Operational Risk Management coordination, testing and acceptance procedures, and constructability recommendations, with specific requirements referenced in SOW sections 3.2.7.9, 3.2.7.10, 3.2.8.8, and 3.2.8.9. A Phase 2 question and answer period will be provided following Phase 1 evaluation.
View the file
Other files
Show all 42
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REFERENCE RFI RESPONSE
1 J.32 Attachment J.32 Relevant Corporate Experience is provided as a PDF and is cumbersome to modify with entries. Can we duplicate the document in Word and save as a PDF?
Yes, provided the page count remains the same, the table dimensions are not altered and meets font requirements.
2 Section K
Please confirm the required fill ins in the SIR are as follows:
Cover Page blocks 12-17 blocks (complete blocks 13-17) Section I Page 29: ANNUAL CERTIFICATION OF DISCLOSURE OF CERTAIN EMPLOYEE RELATIONSHIPS asks to sign a disclosure of employee 3.1.7-6 Section K Page 83: Minimum Acceptance Period 3.2.2.3-2 (optional) Section K Page 83: Place of Performance 3.2.2.3-23 Section K Page 84: Responsibility Matters (A-D) 3.2.2.7-7 Section K Page 86: Certification of Registration in SAM 3.3.1-35 Section K Page 86: Electronic Invoicing 3.3.1-41 Section K Page 91: Covered Telecom Equipment 3.8.9-3 (1-2) Section K Page 92: UEI Number 3.13-4 Section K Page 93: Conformance to MMAC EMS and OSHMS AC4560 Section L Page 97: Geographic Support Experience Conus (this is included in SIR attachment J.32) Section L Page 98: Geographic Support Experience OConus (this is included in SIR attachment J.32) Section L Page 105 : Descriptive Literature Submittal 3.2.2.3-5 (1-2) Section L Page 105 : Authorized Negotiator 3.2.2.3-15
Please confirm these fill ins in the SIR are not required Section H Page 20: Key Personnel and Facilities asks for a list of PMs and / or facilities?
3.8.2-17 (no need to complete) Section L Page 106: Site Visit Attendees 3.2.2.3-63 (no need to complete)
Please see notes in red in RFI column.
Below are 2 additional clauses that must be completed:
Section K Page 86 - REPRESENTATION BY CORPORATIONS
REGARDING DELINQUENT TAX LIABILITY
OR A FELONY CONVICTION UNDER ANY FEDERAL LAW 3.2.2.7-9
(1-2) Section K Page 90 - REPRESENTATION REGARDING CERTAIN
TELECOMMUNICATIONS AND VIDEO
SURVEILLANCE SERVICES OR EQUIPMENT (JUL 2023)
3.8.9-1 (1-2)
3 No Reference Will the contractor be responsible for performing National Airspace System (NAS) Configuration Management (CM) processes such as developing and tracking NAS Change Proposals (NCP) for Power Systems?
No, unless specifically tasked on the task order.
4 No Reference Will the contractor be responsible for supporting the evaluation/review of FAA standard power architecture (GNAS, CPDS, ACEPS, etc.)?
Any requirement for contractor support related to the evaluation or review of FAA standard power architecture will be defined on the task order.
RFI submitted from OFFICIAL Solicitation - 03.25.2026
5 No Reference Will the contractor be responsible for abating hazmat (lead, asbestos, batteries, oils/chemicals, etc.) materials in the implementation or maintenance of Power Systems?
Any requirement for abating hazmat will be defined on the task order.
6 No Reference Will there be any third party or FAA testing required on major electrical or HVAC systems prior to selection by the Contractor?
This is a post award question.
7 J.01 SIR documentation mentions onsite testing and submission of test reports. Will there be requirements for the Contractor to submit test reports to the FAA or to support FAA testing and acceptance prior to connecting to CDPS or ACEPS systems?
Yes, refer to SOW sections 3.2.7.9, 3.2.7.10, 3.2.8.8, and 3.2.8.9.
8 J.01, Section 3.2.6.2
The SOW states, "An inherent part of constructability is Operational Risk Management (ORM). The FAA has set requirements for documentation and participation in the ORM process. As determined by the CO, the Contractor must document or participate in this process."
Will the Contractor be responsible for coordinating maintenance periods with controlling authorities directly for work affecting operational facilities/systems?
As determined by the CO, the contractor will participate in the ORM coordination process. However, all ORM coordination with controlling authorities will be performed by FAA personnel.
9 J.01, Section 3.2.6.2
The SOW states, "The contractor must recommend a construction period of optimum duration for each assigned project that includes allowances for system cutover, adverse weather conditions, and in-service modifications, and must develop a design that assures constructability of facilities with minimum operational disruption."
Does this mean direct coordination with AT/SOCs/SSCs/Command Center or will the Contractor support PSG who in turn works with Ops to define the MOP used and the windows of work that will minimize impact?
Unless otherwise directed, the contractor will support the FAA (Program Offices and Engineers), who will coordinate with the appropriate stakeholders.
10 Volume 1, Factor 1, SIR attachment J.
Attachment J.32 states that references used in response to Factor 1, Scope, must be for “completed” contracts/projects. Please confirm a citation may be used for a project that was completed under a task order or contract that is still considered to be active.
It is acceptable to cite a project that has been completed, even if the associated task order or contract remains active.
11 Volume 1, Factor 1, SIR attachment J.
Can the Government confirm if a contract/project performed by an Offeror’s affiliate (i.e., an entity under the same parent company) may be submitted as “corporate experience” in Attachment J.32? For instance, may an Offeror include a past performance citation for a project completed by its affiliate if that affiliate is part of its PSDI team?
Verbiage has been added to the SIR.
12 Section M.5.1 - Phase I Experience
For purposes of evaluating project relevance under Phase I experience criteria, will design-build projects executed OCONUS on U.S. Government or U.S. military installations be considered equivalent in relevance to similar projects performed within
CONUS?
Yes, provided the cited project meets the requirements outlined in SIR Attachment J.32
Section M.5.1 - Phase I Experience;
J.32 Phase I Relevant Corporate Experience Form -
May an Offeror include relevant corporate experience performed by affiliated companies under common ownership, where the affiliate’s resources, management, and personnel will be available to support performance under this contract?
Verbiage has been added to the SIR.
14 No Reference Is it acceptable to include a table of contents for each proposal volume? Yes
15 No Reference
In the PDF “6973GH-26-R-00018 PSDI – 03.03.26,” page 98 states that offerors must submit one electronic copy of the SIR with a properly signed front page and the entire Section B through Section M. Aside from Sections I and K, other sections like B through M doesn’t contain any forms that need to be filled out. Should we simply acknowledge and include these sections as part of the Volume II proposal, or is any additional action required for these sections?
The entire SIR (the front page and sections B-M).
L.6.3 Proposal Content, Phase I - Volume I - Technical Approach ; p.
“Relevant Corporate Experience must be from the bidding company...”
In accordance with 48 CFR 15.305(a)(2)(iii), the government may rely on company past performance and project experience of sister companies that meaningfully contribute to performance of the contract (GAO found in Matter of: Inquiries, Inc., 2020 U.S. Comp.
Gen. LEXIS 150, 2020 Comp. Gen. Proc. Dec. P182 (Matter of: GM-Bulltrack, JV, 2018 U.S. Comp. Gen. LEXIS 363, 2018 Comp. Gen. Proc. Dec. P378)).
Will the government please confirm that offerors are able to use sister company experience in their proposals?
Verbiage has been added to the SIR.
17 L.6.3 Proposal Content; p. 96 Will the government accept a Cover Sheet, identifying volume name and number, with each Phase I volume, not included in the page limitation?
Yes, cover sheet will be accepted and not included in the page limitations.
Phase I – Volume I – Factor 1 Scope in the SIR (p. 97). The SIR states:
“The Offeror must provide no more than three (3) completed contracts/projects, within five (5) years of the issuance of this SIR.”
We are currently evaluating several projects for inclusion in SIR Attachment J.32 and would appreciate clarification on when a project is considered complete. Specifically, should completion be defined as:
| 1. | Following final cutover |
| 2. | Upon receipt of a signed CAI |
| 3. | Upon submission of the final contractor invoice |
| 4. | Upon receipt of final payment from Delphi |
Several of the projects we are considering for submission are in different stages of “completion”, so clarification on this point would help ensure we include the most appropriate projects. Thank you for your guidance.
A project will be considered complete upon the occurrence of any of the following: 1) Receipt of a signed CAI. 2) Submission of the final contractor invoice. 3) Receipt of final payment.
19 General Will there be a question and answer period for phase 2? Yes
G.3 Invoicing and Payment, pg. 15
Would the government please confirm which clause is applicable for invoice and payment, as G.3 does not match the requirements of 3.3.1-40 ELECTRONIC
SUBMISSION OF PAYMENT REQUESTS (INTERIM DECEMBER 2025).
3.3.1-40 ELECTRONIC SUBMISSION OF PAYMENT REQUESTS
(INTERIM DECEMBER 2025) will be enforced.
G.3 Invoicing and Payment; G.4 Task Order Processing, pg. 15
Would the government please clarify the ordering process for small business as this is a partial set aside. How will the government determine and convey which Task Orders will be set aside?
"The small business set-aside portion of this contract is Category 1. The lowest price offeror who captured the scope of the requirement will receive the task order. If no small businesses are able to perform the requirement after CO receives responses from small business contract holders, then the CO will solicit a request from the other contract holders." will be added to the contract section G.4.
L.6.2 Proposal Overview - Phase 1,
pg. 95
May offeror's include a Volume 1 Cover Page and Volume 2 Cover Page, excluded from the Phase 1 page limitations? Yes
L.6.2 Proposal Overview - Phase 1,
pg. 95
May offeror's include a Volume 1 Table of Contents and Volume 2 Table of Contents, excluded from the Phase 1 page limitations? Yes
L.6.2 Proposal Overview - Phase 1,
pg. 95 Would the government please confirm if the resume page limit is 20 pages? IAW L.6.2 chart, 20 page limit
L.6 Instructions for Preparation of Proposals, pg. 95
Will the government allow a smaller, but readable, font size for graphics, tables and headers and footers (ex. 8 pt Times New Roman)? Yes
L.6.2(b)(2) Phase 1 - Volume II - SIR Documentation and Key Personnel Resume, pg. 96
Would the government please confirm that no other resumes are required other than the for the Program Manager?
Key personnel resume for the Program Manager
27 L.6.3 Proposal Content; (a) Phase 1 - Volume I - Factor 1 - Scope, para. 6.
Alternative Energy Systems…, pg. 97
Would the government accept "standalone battery energy storage system replacement" work as relevant experience for the AES Project Classification?
Yes, standalone battery energy storage system replacement is acceptable for AES provided the cited project meets the size requirement outlined in the AES project classification.
28 L.6.3 Proposal Content; (a) Phase 1 - Volume I - Factor 1 - Scope, para. 1,
pg. 97
Does the Offeror need to submit work experience for all 6 Project Classification in Phase 1 to qualify to Phase 2?
No, in accordance with Section L.6.3, (a) Phase 1 - Volume I - Factor 1 - Scope, paragraph 1 "The Offeror must provide no more than three (3) completed contracts/projects, within five (5) years of the issuance of this SIR"
L.6.3 Proposal Content; (b) Phase 1 - Volume I - Factor 2 - Geographic Support Experience, pg. 97 and SIR Attach. J.32
May Offerors check geographical support experience locations (within the template provided) where they have completed work beyond (in addition to) the Relevant Corporate Experience presented in Phase 1, Volume 1, Factor 1?
Yes
L.6.2 Proposal Overview - Phase 1,
pg. 95
This RFP section states that file "J.32 Phase 1 - Relevant Corporate Experience Form" is limited to 9 page and 12 point font.
Question: Would the government consider allowing a smaller font size in this attachment so that required information will fit on the lines provided?
No
Phase 2 - Volume II - Factor 1 Cost/Price Proposal, paragraph (d),
pg. 101 and Paragraph M.5.1.2 Phase 1 - Volume II - SIR Documentation and Key Personnel,
pg. 112
Would the government please clarify the "FAA BOX" that is referenced as well as the FAA secure Submittal Link. We would like to understand this process in case there are special parameters or other items the Offeror needs to consider that may have a lead time.
No purchase is necessary. The offeror may begin uploading proposal files immediately after the link is received from the CO.
Section L, Phase 2 - Volume II - Factor 1 - Cost/Price Proposal, para.
(a), pg. 101 and Attach. J.36
Re: instructions “The offeror's Cost/Price Proposal shall include completed pricing schedule for the Base Period only, Attachment J.36 Schedule B, Price Proposal.”
Re: Instructions tab in Attachment J.36 Schedule B Price Proposal PSDI II Cost Worksheet, “Pricing for all CLINS should include the base period and all option periods.”
Would the Government please confirm that, for Attachment J.36, offerors should include the Price Per Unit for all periods in Option Period 1 and Option Period 2?
Page 5 states "Option Years 1 and 2, CLINS 0001,0003 and 0004 prices will be negotiated prior to the option year exercise." J.36 has been revised.
Section L, Phase 2 - Volume II - Factor 1 - Cost/Price Proposal, para.
(e), pg. 101 and Attach. J.36
Re: instructions for Phase 2 on page 101, “Pricing for CLINS 0002, 0004I, and 0005 are not required.”
Re: instructions tab in Attachment J.36 Schedule B Price Proposal PSDI II Cost Worksheet, “Offerors must propose CLIN 5, Labor Rates that are fully burdened.”
Would the Government please confirm that, for Attachment J.36, offerors should add a tab to include the fully burdened labor rates for CLIN 5?
J.36 Instructions CLIN 0005 should state 0004. J.36 has been revised
34 Section L; p.97
“The Offeror must provide no more than three (3) completed contracts/projects within five (5) years of the issuance of this SIR.” However, further down the same page it also states: “The Offeror must indicate experience supporting at least three (3) Continental United States (CONUS) regions and at least one (1) Outside Continental United States (OCONUS) region or location.”
In the above references it calls for no more than 3 past performances but in the geographical section it calls for a total of 4 past performances needed. Could the Government please clarify the number of past performance examples that should be submitted and confirm how CONUS and OCONUS experience should be represented within those examples?
Factor 1 – Scope and Factor 2 – Geographic Support Experience are not related.
For Factor 2 – Geographic Support, there is no maximum limit on indicating the CONUS or OCONUS regions or location(s) listed on Attachment J.32 where the Offeror has experience in providing services similar to the requirements described in the
SOW.