J.34 Phase 2 Technical Approach - Factor 1, Design Proposal Form .docx

DOCX document 30 KB Posted

Attached to
Power Systems Design & Install 2 Solicitation - 6973GH-26-R-00018
Solicitation number
6973GH-26-R-00018
Issued by

About this file

This is a Technical Approach design proposal form template (Attachment J.34) for Phase 2 of the Power Systems Design & Install solicitation issued by the FAA. The form requires offerors to submit project examples across six technical categories: AES Project, CPDS Project, EG Project, ELD Project, FST Project, and UPS Project. For each project submission, contractors must complete standardized fields including: project category selection (Category 1, 2, or 3), project title, location, completion date, customer name, company role (prime contractor, subcontractor, designer, etc.), and identification of associated prime contractors, design/engineering firms, and subcontractors.

The form serves as a template for demonstrating relevant past performance and technical qualifications across multiple project types. Offerors must populate each section with specific project information to substantiate their capability to execute the power systems design and installation work. This is a blank template requiring completion rather than a substantive requirements document, and Phase 1 bids are due April 3, 2026 at 5:00 PM CDT. Questions regarding project specifications must be submitted by March 13, 2026 at 5:00 PM CDT to jennifer.l.perry@faa.gov or stefanie.wiles@faa.gov with the solicitation number 6973GH-26-R-00018 referenced in all communications.

View the file

Other files

File Type Posted
Official SIR RFI_Final 03.25.2026.pdf PDF
Amendment Form 00001.pdf PDF
6973GH-26-R-00018 Revised 03.25.26.pdf PDF
J.36 Schedule B Price Proposal PSDI II Cost Worksheet_03.20.2026.xlsx XLSX spreadsheet
J.00 Index.docx DOCX document
J.06 Travel Authorization Form.xlsx XLSX spreadsheet
J.15 FAA-STD-019G.pdf PDF
J.25 FAA Order 1370.121B - FAA Information Security and Privacy Policy.pdf PDF
J.22 FAA Order JO_6950_2F .pdf PDF
J.02 Contract Data Requirements List (CDRL).pdf PDF
J.27 FAA-STD-061A.pdf PDF
J.21 FAA Order JO 1050 17B.pdf PDF
J.10 Pre-Construction Agenda and Checklist - DOT Form F4220.3.doc DOC document
J.24 FST Program Specifications.pdf PDF
J.11 FAA-C-1217H Chg 2.pdf PDF
J.01 Statement of Work 02.17.26.docx DOCX document
J.16 FAA-STD-032.pdf PDF
J.07 Performance Bond - FAA Form Number FAA 4400-63.pdf PDF
J.03 Data Item Description (DID).pdf PDF
J.08 Payment Bond - FAA Form Number 4400-61.pdf PDF
J.04 Government Furnished Equipment (GFE).pdf PDF
J.35 Phase 2 Technical Approach - Factor 2, Installation Proposal Form .docx DOCX document
J.23 FST Guidelines.pdf PDF
J.13 FAA-D-2494B.pdf PDF
6973GH-26-R-00018 PSDI - 03.03.26.pdf PDF
J.12 FAA-C-1391f.pdf PDF
J.09 Pre-Construction Installation EOSH Checklist - FAA Form 3900-18.pdf PDF
J.20 FAA Order 6950_27B.pdf PDF
J.33 PSDI II Technical Approach Evaluation Worksheets_02.27.2026.xlsx XLSX spreadsheet
J.17 FAA Order 1050.10D.pdf PDF
J.36 Schedule B, Price Proposal PSDI II Cost Worksheet_10.28.2025.xlsx XLSX spreadsheet
J.29 6980_37 Maintenance of Solar Photovoltaic System.pdf PDF
J.19 FAA Order JO 3900.64A - Air Traffic Organization Electrical SafetyProgram.pdf PDF
J.28 FAA Order 6980_36 Maintenance of Hydrogen Fuel Cells.pdf PDF
J.18 FAA Order JO_3900_57A_W-CHG_1_Inc.pdf PDF
PSDI 2 - RFIs from DRAFT SIR.pdf PDF
J.14 faa-std-002H.pdf PDF
J.32 Phase I Relevant Corporate Experience Form.pdf PDF
J.31 Contractor Release DOT 4220.4 (1).pdf PDF
J.30 LPGBS Checklist.xls XLS spreadsheet
J.05 6010-5 CAI Form.pdf PDF
J.26 FAA-E-99001 - Photovoltaic Specification.pdf PDF
Show all 42

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment J.34 Technical Approach – Factor 1, Design Proposal Offeror must submit this form, addressing the following fields for Factor 1, Design Proposal.

AES Project

A. Select the category for this project submission.
A. Category 1☐ Category 2 ☐ Category 3 ☐
B. Project Title:
B.
C. Location:
C.
D. Date of Completion:
D.
E. Customer Name:
E.
F. Company Role (prime contractor, subcontractor, designer, etc.)
F.
F.1 Name of Prime/General Contractor:
F.1
F.2 Name of Designer/Engineering Company
F.2
F.3 Name of subcontractor(s) (If applicable)
F.3

CPDS Project

A. Select the category for this project submission.
A. Category 2 ☐ Category 3 ☐
B. Project Title:
B.
C. Location:
C.
D. Date of Completion:
D.
E. Customer Name:
E.
F. Company Role (prime contractor, subcontractor, designer, etc.)
F.
F.1 Name of Prime/General Contractor:
F.1
F.2 Name of Designer/Engineering Company
F.2
F.3 Name of subcontractor(s) (If applicable)
F.3

EG Project

A. Select the category for this project submission.
A. Category 1☐ Category 2 ☐ Category 3 ☐
B. Project Title:
B.
C. Location:
C.
D. Date of Completion:
D.
E. Customer Name:
E.
F. Company Role(prime contractor, subcontractor, designer, etc.)
F.
F.1 Name of Prime/General Contractor:
F.1
F.2 Name of Designer/Engineering Company
F.2
F.3 Name of subcontractor(s) (If applicable)
F.3

ELD Project

A. Select the category for this project submission.
A. Category 1☐ Category 2 ☐ Category 3 ☐
B. Project Title:
B.
C. Location:
C.
D. Date of Completion:
D.
E. Customer Name:
E.
F. Company Role(prime contractor, subcontractor, designer, etc.)
F.
F.1 Name of Prime/General Contractor:
F.1
F.2 Name of Designer/Engineering Company
F.2
F.3 Name of subcontractor(s) (If applicable)
F.3

FST Project

A. Select the category for this project submission.
A. Category 1☐ Category 2 ☐ Category 3 ☐
B. Project Title:
B.
C. Location:
C.
D. Date of Completion:
D.
E. Customer Name:
E.
F. Company Role(prime contractor, subcontractor, designer, etc.)
F.
F.1 Name of Prime/General Contractor:
F.1
F.2 Name of Designer/Engineering Company
F.2
F.3 Name of subcontractor(s) (If applicable)
F.3

UPS Project

A. Select the category for this project submission.
A. Category 1☐ Category 2 ☐ Category 3 ☐
B. Project Title:
B.
C. Location:
C.
D. Date of Completion:
D.
E. Customer Name:
E.
F. Company Role(prime contractor, subcontractor, designer, etc.)
F.
F.1 Name of Prime/General Contractor:
F.1
F.2 Name of Designer/Engineering Company
F.2
F.3 Name of subcontractor(s) (If applicable)
F.3

File details come from the government source that posted it. Updated .