J.36 Schedule B Price Proposal PSDI II Cost Worksheet_03.20.2026.xlsx
XLSX spreadsheet 31 KB Posted
- Solicitation number
- 6973GH-26-R-00018
About this file
This is a Schedule B Price Proposal Cost Worksheet for the Power Systems Design and Install II (PSDI II) contract with the Federal Aviation Administration. The worksheet is a pricing template that offerors must complete to submit their cost proposals for this 10-year firm fixed-price (FFP) contract opportunity (Solicitation 6973GH-26-R-00018). The estimated total contract value is $857,190,625.59, comprised of a 4-year base period (2027-2031) valued at $355,269,795.77 and two 3-year option periods (2031-2034 and 2034-2037), each valued at $250,960,414.91.
Offerors must provide fully burdened labor rates (inclusive of overhead, G&A, and profit) for CLINs X001, X003, and X004A-H, which cover site survey travel and labor (both CONUS and OCONUS), site survey reports, and engineering design services across multiple disciplines (Project Manager, Electrical Engineer, Mechanical Engineer, Structural Engineer, Civil Engineer, Environmental Engineer, CAD Operator/Designer, and Clerical). CLINs X002, X004I, and X005 are fixed not-to-exceed prices set by the government at $652,661.39, $2,720,000.00 (base period), and $351,897,134.38 (base period) respectively, covering OCONUS travel, other direct costs, and installation services. The worksheet requires offerors to input unit prices and estimated quantities for each labor category across all contract periods. Phase I bids are due April 3, 2026 at 5:00 PM CDT, with questions due by March 13, 2026. The NAICS code is 238210 with a $19M business size standard, and offerors must be registered in SAM.gov at time of proposal submission.
View the file
Other files
Show all 42
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Instructions
| ENTER YOUR COMPANY NAME HERE |
| Schedule B, Price Proposal Power Systems Design and Install II Cost Worksheet |
| Instructions: |
| Overall Offeror Instructions for Price Proposal, Power Systems Design and Install II Cost Worksheet |
The Offeror must provide a complete Power Systems Design and Install II Cost Worksheet, inputting pricing for CLINS X001,X003 and X004A-H, except for CLINs X002, X004I, X005 as they are given a not to exceed price which will be used in the proposed total estimated price.
| 1. Enter Company Name in cell A1 of this sheet. |
| BLUE FIELDS are to be completed by the Offeror. |
| RED FIELDS are Not-to-Exceed |
| WHITE FIELD are information only no actions are required. |
| 2. Price Schedule Tab Instructions: |
| a. Pricing Column: Indicates whether the CLIN is Firm Fixed Price (FFP) or FFP Not to Exceed (NTE). |
| b. Item, Unit; Est. Quantity; Price per Unit; and Est Total: These are self explanatory. |
| c. FFP and FFP NTE CLINs: The Offerors must complete all sections highlighted in BLUE on FFP CLINs with their unit price. |
d. CLIN X004: Offerors must propose CLIN 4, Labor Rates that are fully burdened (overhead, general and administrative (G&A) and profit). The fully burdened rate will be applicable whether the work is performed by the prime contractor or a subcontractor.
Contract Total
CONTRACT PERIOD
(4-YEAR BASE, TWO (2), 3-YEAR OPTION PERIODS; TOTAL OF 10-YEARS POSSIBLE)
| CONTRACT TOTAL | |
| Base Period (2027-2031) | $355,269,795.77 |
| Option Period 01 (2031-2034) | $250,960,414.91 |
| Option Period 02 (2034-2037) | $250,960,414.91 |
| Total Estimated Contract Value | $857,190,625.59 |
Base Period(2027-2031)
| BASE PERIOD (2027-2031) | ||||||||||||||||
| CLIN | Supplies or Services Description | CLIN Type | Unit | Base Period (Year 1_2027-2028) | Base Period (Year 2_2028-2029) | Base Period (Year 3_2029-2030) | Base Period (Year 4_2030-2031) | Total Base Period | ||||||||
| Est. Qty | Price Per Unit | Est. Total | Est. Qty | Price Per Unit | Est. Total | Est. Qty | Price Per Unit | Est. Total | Est. Qty | Price Per Unit | Est. Total | Est. Total | ||||
| 0001 | Site Survey Travel and Labor (CONUS) SOW C.3.2.5 | |||||||||||||||
| 0001A | Category 1 or 2 (1 day) SOW C.3.2.5.1 | FFP | EA | 186 | $0.00 | 203 | $0.00 | 201 | $0.00 | 205 | $0.00 | $0.00 | ||||
| 0001B | Category 3 (up to 3 days) SOW C.3.2.5.2 | FFP | EA | 42 | $0.00 | 42 | $0.00 | 42 | $0.00 | 42 | $0.00 | $0.00 | ||||
| 0002 | Site Survey Travel and Labor (OCONUS) SOW C.3.2.5 | FFP NTE | FFP | $652,661.39 | ||||||||||||
| 0003 | Site Survey Report SOW C.3.2.5 | FFP | EA | 253 | $0.00 | 251 | $0.00 | 268 | $0.00 | 361 | $0.00 | $0.00 | ||||
| 0004 | Engineering Design Services SOW C.3.2.6 | |||||||||||||||
| 0004A | Project Manager | FFP | Hours | 8464 | $0.00 | 9025 | $0.00 | 8899 | $0.00 | 8834 | $0.00 | $0.00 | ||||
| 0004B | Electrical Engineer | FFP | Hours | 32004 | $0.00 | 33176 | $0.00 | 32931 | $0.00 | 32370 | $0.00 | $0.00 | ||||
| 0004C | Mechanical Engineer | FFP | Hours | 4090 | $0.00 | 4306 | $0.00 | 4292 | $0.00 | 4272 | $0.00 | $0.00 | ||||
| 0004D | Structural Engineer | FFP | Hours | 2240 | $0.00 | 2420 | $0.00 | 2380 | $0.00 | 2508 | $0.00 | $0.00 | ||||
| 0004E | Civil Engineer | FFP | Hours | 3525 | $0.00 | 4072 | $0.00 | 4000 | $0.00 | 3960 | $0.00 | $0.00 | ||||
| 0004F | Environmental Engineer | FFP | Hours | 1020 | $0.00 | 1200 | $0.00 | 1180 | $0.00 | 1205 | $0.00 | $0.00 | ||||
| 0004G | CAD Operator/ Designer | FFP | Hours | 8856 | $0.00 | 8490 | $0.00 | 9596 | $0.00 | 9237 | $0.00 | $0.00 | ||||
| 0004H | Clerical | FFP | Hours | 5277 | $0.00 | 5592 | $0.00 | 5646 | $0.00 | 5547 | $0.00 | $0.00 | ||||
| 0004I | Other Direct Costs (ODC) | FFP NTE | FFP | $2,720,000.00 | ||||||||||||
| 0005 | Installation Services SOW C.3.2.7 and C.3.2.8 | FFP NTE | FFP | $351,897,134.38 | ||||||||||||
| Estimated Total, Base Period: | $355,269,795.77 |
Option Period 01 (2031-2034)
| OPTION PERIOD 1 (2031-2034) | |||||||||||||
| CLIN | Supplies or Services Description | CLIN Type | Unit | Option Period 1 (Year 1_2031-2032) | Option Period 1 - (Year 2_2032-2033) | Option Period 1 - (Year 3_2033-2034) | Total Base Period | ||||||
| Est. Qty | Price Per Unit | Est. Total | Est. Qty | Price Per Unit | Est. Total | Est. Qty | Price Per Unit | Est. Total | Est. Total | ||||
| 0001 | Site Survey Travel and Labor (CONUS) SOW C.3.2.5 | ||||||||||||
| 0001A | Category 1 or 2 (1 day) SOW C.3.2.5.1 | FFP | EA | 179 | $0.00 | 194 | $0.00 | 193 | $0.00 | $0.00 | |||
| 0001B | Category 3 (up to 3 days) SOW C.3.2.5.2 | FFP | EA | 43 | $0.00 | 42 | $0.00 | 42 | $0.00 | $0.00 | |||
| 0002 | Site Survey Travel and Labor (OCONUS) SOW C.3.2.5 | FFP NTE | FFP | $309,291.97 | |||||||||
| 0003 | Site Survey Report SOW C.3.2.5 | FFP | EA | 230 | $0.00 | 250 | $0.00 | 251 | $0.00 | $0.00 | |||
| 0004 | Engineering Design Services SOW C.3.2.6 | ||||||||||||
| 0004A | Project Manager | FFP | Hours | 7423 | $0.00 | 8452 | $0.00 | 8396 | $0.00 | $0.00 | |||
| 0004B | Electrical Engineer | FFP | Hours | 29795 | $0.00 | 31563 | $0.00 | 31202 | $0.00 | $0.00 | |||
| 0004C | Mechanical Engineer | FFP | Hours | 3992 | $0.00 | 4222 | $0.00 | 4164 | $0.00 | $0.00 | |||
| 0004D | Structural Engineer | FFP | Hours | 1865 | $0.00 | 2130 | $0.00 | 2120 | $0.00 | $0.00 | |||
| 0004E | Civil Engineer | FFP | Hours | 3435 | $0.00 | 3126 | $0.00 | 3879 | $0.00 | $0.00 | |||
| 0004F | Environmental Engineer | FFP | Hours | 830 | $0.00 | 1090 | $0.00 | 940 | $0.00 | $0.00 | |||
| 0004G | CAD Operator/ Designer | FFP | Hours | 8152 | $0.00 | 12158 | $0.00 | 8938 | $0.00 | $0.00 | |||
| 0004H | Clerical | FFP | Hours | 5386 | $0.00 | 5623 | $0.00 | 5578 | $0.00 | $0.00 | |||
| 0004I | Other Direct Costs (ODC) | FFP NTE | FFP | $2,040,000.00 | |||||||||
| 0005 | Installation Services SOW C.3.2.7 and C.3.2.8 | FFP NTE | FFP | $248,611,122.94 | |||||||||
| Estimated Total, Base Period: | $250,960,414.91 |
Option Period 02 (2034-2037)
| OPTION PERIOD 1 (2031-2034) | |||||||||||||
| CLIN | Supplies or Services Description | CLIN Type | Unit | Option Period 2 (Year 1_2034-2035) | Option Period 2 - (Year 2_2035-2036) | Option Period 2 - (Year 3_2036-2037) | Total Base Period | ||||||
| Est. Qty | Price Per Unit | Est. Total | Est. Qty | Price Per Unit | Est. Total | Est. Qty | Price Per Unit | Est. Total | Est. Total | ||||
| 0001 | Site Survey Travel and Labor (CONUS) SOW C.3.2.5 | ||||||||||||
| 0001A | Category 1 or 2 (1 day) SOW C.3.2.5.1 | FFP | EA | 185 | $0.00 | 200 | $0.00 | 200 | $0.00 | $0.00 | |||
| 0001B | Category 3 (up to 3 days) SOW C.3.2.5.2 | FFP | EA | 42 | $0.00 | 42 | $0.00 | 42 | $0.00 | $0.00 | |||
| 0002 | Site Survey Travel and Labor (OCONUS) SOW C.3.2.5 | FFP NTE | FFP | $309,291.97 | |||||||||
| 0003 | Site Survey Report SOW C.3.2.5 | FFP | EA | 237 | $0.00 | 251 | $0.00 | 249 | $0.00 | $0.00 | |||
| 0004 | Engineering Design Services SOW C.3.2.6 | ||||||||||||
| 0004A | Project Manager | FFP | Hours | 7371 | $0.00 | 8536 | $0.00 | 8251 | $0.00 | $0.00 | |||
| 0004B | Electrical Engineer | FFP | Hours | 28702 | $0.00 | 30823 | $0.00 | 30124 | $0.00 | $0.00 | |||
| 0004C | Mechanical Engineer | FFP | Hours | 4115 | $0.00 | 4288 | $0.00 | 4228 | $0.00 | $0.00 | |||
| 0004D | Structural Engineer | FFP | Hours | 2115 | $0.00 | 2300 | $0.00 | 2200 | $0.00 | $0.00 | |||
| 0004E | Civil Engineer | FFP | Hours | 3520 | $0.00 | 3966 | $0.00 | 3540 | $0.00 | $0.00 | |||
| 0004F | Environmental Engineer | FFP | Hours | 950 | $0.00 | 1095 | $0.00 | 1000 | $0.00 | $0.00 | |||
| 0004G | CAD Operator/ Designer | FFP | Hours | 7886 | $0.00 | 8836 | $0.00 | 8444 | $0.00 | $0.00 | |||
| 0004H | Clerical | FFP | Hours | 6935 | $0.00 | 5518 | $0.00 | 5385 | $0.00 | $0.00 | |||
| 0004I | Other Direct Costs (ODC) | FFP NTE | FFP | $2,040,000.00 | |||||||||
| 0005 | Installation Services SOW C.3.2.7 and C.3.2.8 | FFP NTE | FFP | $248,611,122.94 | |||||||||
| Estimated Total, Base Period: | $250,960,414.91 |
File details come from the government source that posted it. Updated .