LogHouse_Section_F_(v_AC)_Changes_Only_14Nov2017.pdf

PDF 85 KB Posted

Attached to
LOGHOUSE Federal contract opportunity
Solicitation number
HSFE80-17-R-0005
Issued by
Federal Emergency Management Agency Headquarters Office of the Chief Procurement Officer

About this file

LogHouse Section F (v AC) Changes Only

View the file

Other files for this federal contract opportunity

Other files attached to LOGHOUSE, newest first.
File Type Posted
LOGHOUSE_Comments_Matrix_resubmit_12-13-2017_(PT).pdf PDF
LogHouse_Section_E_(v_AC)_Changes_Only_14Nov2017.pdf PDF
LogHouse_Section_C_(v_AC)_CLEAN_27Nov2017.pdf PDF
LogHouse_Section_J_(v_AB)_Changes_Only_16Nov2017.pdf PDF
LogHouse_Section_F_(v_AC)_CLEAN_14Nov2017.pdf PDF
LogHouse_Section_E_(v_AC)_CLEAN_14Nov2017.pdf PDF
LogHouse_Section_C_(v_AC)_Changes_Only_27Nov2017.pdf PDF
LogHouse_Section_J_(v_AB)_CLEAN_16Nov2017.pdf PDF
HSFE80-17-R-0005_000006-signed.pdf PDF
HSFE80-17-R-0005_A0004-signed.pdf PDF
Attachment 38 - Section J.38 MHU Fire Sprinkler System Installation Test Maintenance Repair and Deactivation Guide Rev 1.0 July 15 2017.pdf PDF
HAUL & INSTALL —
LogHouse SECTION M 18Aug2017 TRACKED CHANGES.pdf PDF
FULL AND OPEN CLIN TABLE with Pricing Scenarios 17AUG17 LOCKED.xlsx XLSX spreadsheet
HSFE80-17-R-0005_A0003_final-signed.pdf PDF
Attachment 62 - Section J.62 Talco Fire System - Talco FEMA TPS Installation Operation and Maintenance Manual.pdf PDF
LOGHOUSE_RFP_Government_Responses.pdf PDF
Attachment 39 - Section J.39 Tank and Pump System —
Log HOUSE Section E 18AUGUST2017 TRACKED CHANGES.pdf PDF
Attachment 61 - Section J.61 General Air Products Tank and Pump System for FEMA - Alarm Bar Installation Addendum - 1-24-17 Revision BB_005.pdf PDF
Loghouse SECTION J 18Aug2017 For Forms etc.docx DOCX document
Attachment 60 - Section J.60 General Air Products Tank and Pump System for FEMA - Installation Operation and Maintenance Manual Revision BB_004.pdf PDF
LogHouse SECTION L 18Aug2017 TRACKED CHANGES.pdf PDF
Technical Scenarios Template LOCKED.xlsx XLSX spreadsheet
Attachment 59 - Section J.59 TANK AND PUMP SYSTEM —
Log HOUSE Section C 18Aug2017 TRACKED CHANGES.pdf PDF
Log HOUSE Section F 18Aug2017 TRACKED CHANGES.pdf PDF
MAINTENANCE & DEACT —
LogHouse SECTION B 18AUG2017 TRACK CHANGES.pdf PDF
Attachment_33_-_Section_J.33_FEMA_MHU_CLEAN_FOR_REUSE_PROCEDURES_Revision_AA__August_18_2017_.pdf PDF
HSFE80-17-R-0005_LogHouse_18AUG2017.pdf PDF
HSFE80-17-R-0005_A0002final-signed.pdf PDF
Attachment_48_Past_Performance_Questionnaire.pdf PDF
DHS_Form_700-23.pdf PDF
Comment_Matrix_Questions.pdf PDF
Attachment_60_CLIN_Chart.pdf PDF
HSFE80-17-R-0005_Solicitation._Final_06.30.17.pdf PDF
Show all 37

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

HSFE80-17-R-0005 Section F

VERSION ACB AUGUST

18NOVEMBER 14, 2017

F-1

SECTION F - DELIVERIES OR PERFORMANCE

F.6

Deliverables and Required Reports Table Area

Required Report

/ Deliverable Delivery Date Delivery

Recipient Description Template

Provided by FEMA

Reference

F-2

13 MHU Installation - Report

Manufactured Home or HUD Specification Home (MH)/Park Model (PM) is Ready for Utilities (i.e., electric, water, sewer, etc.) within three (3) calendar days of work order issuance.

MH/PM is available for Ready for Occupancy (RFO) inspection within one

(1) calendar day after the unit is energized.

Travel Trailer is available for RFO inspection within two (2) calendar days of work order issuance.

The contractor shall identify and apply for all permits that are required for MHU installation within 1 business day, unless a deviation is approved by the COR.The Contractor must have all appropriate permits and licenses within three (3) calendar days of work order issuance.

If an MHU Reinstall is necessary, the Contractor shall remove and replace an MHU at the same site within two (2) calendar days of work order issuance.

COR

MHU installation shall be requested by FEMA specifically based on the needs of the disaster. FEMA will validate the deliverable either through the exchange of the Installation Summary Report, Individual Installation Report, Ready for Occupancy Checklist, and / or visual validation of the installation of the MHU.

N/A N/A

F-3

MHU

Deactivation Report

Manufactured Home or HUD Specification Home (MH)/Park Model (PM) shall be removed from the installation site within three (3) calendar days of work order issuance.

Travel Trailer shall be removed from the installation site within two (2) calendar days of work order issuance.

Work must be completed within 3 days (2 days for TTs) of receipt of all required permits if applicable, or within 3 days of work order issuance (2 days for TTs) if no permits are required.The Contractor must have all appropriate permits and licenses within three (3) calendar days of work order issuance.

In the case of an emergency MHU deactivation, the unit shall be removed from the site, made ready for transport, and transported back to a designated staging area within one (1) calendar day of the emergency deactivation work order issuance.

Variable

The deactivation of an MHU shall be requested by FEMA specifically based on the needs of the disaster. FEMA will validate the deliverable either through the exchange of FEMA Form 90-13, the MHU Deactivation Checklist, Deactivation

Summary Report, Individual Deactivation Report, and / or visual validation of the deactivation of the MHU.

N/A N/A

Difficult Single Unit Installation Site Safety and

Health Plan

Due prior to commencing work on a difficult unit installation.10 days after award to commencing work on a difficult unit installation.

COR

A Site Safety and Health Plan that is specific to a difficult individual construction project and is in compliance with applicable sections of the USACE Manual. Manual linked identified in Section C.

N/A No

END OF SECTION F