LogHouse_Section_E_(v_AC)_CLEAN_14Nov2017.pdf

PDF 503 KB Posted

Attached to
LOGHOUSE Federal contract opportunity
Solicitation number
HSFE80-17-R-0005
Issued by
Federal Emergency Management Agency Headquarters Office of the Chief Procurement Officer

About this file

LogHouse (v AC) Section E CLEAN

View the file

Other files for this federal contract opportunity

Other files attached to LOGHOUSE, newest first.
File Type Posted
LOGHOUSE_Comments_Matrix_resubmit_12-13-2017_(PT).pdf PDF
LogHouse_Section_E_(v_AC)_Changes_Only_14Nov2017.pdf PDF
LogHouse_Section_C_(v_AC)_CLEAN_27Nov2017.pdf PDF
LogHouse_Section_J_(v_AB)_Changes_Only_16Nov2017.pdf PDF
LogHouse_Section_F_(v_AC)_CLEAN_14Nov2017.pdf PDF
HSFE80-17-R-0005_000006-signed.pdf PDF
LogHouse_Section_C_(v_AC)_Changes_Only_27Nov2017.pdf PDF
LogHouse_Section_J_(v_AB)_CLEAN_16Nov2017.pdf PDF
LogHouse_Section_F_(v_AC)_Changes_Only_14Nov2017.pdf PDF
HSFE80-17-R-0005_A0004-signed.pdf PDF
Attachment 38 - Section J.38 MHU Fire Sprinkler System Installation Test Maintenance Repair and Deactivation Guide Rev 1.0 July 15 2017.pdf PDF
HAUL & INSTALL —
LogHouse SECTION M 18Aug2017 TRACKED CHANGES.pdf PDF
FULL AND OPEN CLIN TABLE with Pricing Scenarios 17AUG17 LOCKED.xlsx XLSX spreadsheet
HSFE80-17-R-0005_A0003_final-signed.pdf PDF
Technical Scenarios Template LOCKED.xlsx XLSX spreadsheet
Attachment 59 - Section J.59 TANK AND PUMP SYSTEM —
Attachment 62 - Section J.62 Talco Fire System - Talco FEMA TPS Installation Operation and Maintenance Manual.pdf PDF
LOGHOUSE_RFP_Government_Responses.pdf PDF
Attachment 39 - Section J.39 Tank and Pump System —
Log HOUSE Section E 18AUGUST2017 TRACKED CHANGES.pdf PDF
Attachment 61 - Section J.61 General Air Products Tank and Pump System for FEMA - Alarm Bar Installation Addendum - 1-24-17 Revision BB_005.pdf PDF
Loghouse SECTION J 18Aug2017 For Forms etc.docx DOCX document
Attachment 60 - Section J.60 General Air Products Tank and Pump System for FEMA - Installation Operation and Maintenance Manual Revision BB_004.pdf PDF
LogHouse SECTION L 18Aug2017 TRACKED CHANGES.pdf PDF
Log HOUSE Section C 18Aug2017 TRACKED CHANGES.pdf PDF
Log HOUSE Section F 18Aug2017 TRACKED CHANGES.pdf PDF
MAINTENANCE & DEACT —
LogHouse SECTION B 18AUG2017 TRACK CHANGES.pdf PDF
Attachment_33_-_Section_J.33_FEMA_MHU_CLEAN_FOR_REUSE_PROCEDURES_Revision_AA__August_18_2017_.pdf PDF
HSFE80-17-R-0005_LogHouse_18AUG2017.pdf PDF
HSFE80-17-R-0005_A0002final-signed.pdf PDF
Attachment_48_Past_Performance_Questionnaire.pdf PDF
DHS_Form_700-23.pdf PDF
Comment_Matrix_Questions.pdf PDF
Attachment_60_CLIN_Chart.pdf PDF
HSFE80-17-R-0005_Solicitation._Final_06.30.17.pdf PDF
Show all 37

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

HSFE80-17-R-0005 Section E

VERSION AC NOVEMBER 14, 2017

E-1

SECTION E - INSPECTION AND ACCEPTANCE

TABLE OF CONTENTS

SECTION E - INSPECTION AND ACCEPTANCE

TABLE OF CONTENTS

Table of Revisions

Section E.1 Introduction and Purpose

E.1.1 Introduction E.1.2 Purpose

Section E.2 Overview and Scope

E.2.1 Overview E.2.2 Performance

E.2.2.1 Performance Areas E.2.2.2 Performance Requirement

E.2.3 Evaluation Procedures

E.3 Roles and Responsibilities

E.3.1 Contracting Officer E.3.2 Contracting Officer’s Representative E.3.3 Technical Monitor E.3.4 Contractor

Section E.4 Methods of Surveillance

E.4.1 Inspection E.4.2 Database and Reports Analysis E.4.3 Progress and Status Meetings E.4.4 Other Monitoring Techniques

Section E.5 Implementation of the Performance Evaluation

E.5.1 Performance Criteria E.5.1.1 Ratings

E.5.2 Rating Determination E.5.3 Surveillance Outcomes

E.5.3.1 Contractor Notification of Surveillance Outcomes E.5.3.2 Nonconforming Outcomes E.5.3.3 Discrepancy Report

Section E.6 Calculating the CPARS Performance Area Rating

E.6.1 CPARS Rating Category E.6.2 In-Process Task Order or Contract Year Scores E.6.3 Termination for Default

E-2

Section E.7 Contractor’s Process to Challenge CPARS Rating

Section E.8 Performance Incentive

E.8.1 Basis and Funding for Performance Positive and Negative Incentives

E.8.2 Method of Incentive CLIN Award/Payment E.8.3 Example

APPENDIX 1: UTPA DATA COLLECTION (SECTION C.2.3)

APPENDIX 1.1: SINGLE HAUL PERFORMANCE ASSESSMENT .. 27

APPENDIX 1.2: QUALITY PERFORMANCE AREA MATRIX

APPENDIX 1.3: SCHEDULE PERFORMANCE AREA MATRIX

APPENDIX 1.4: COST PERFORMANCE AREA MATRIX

APPENDIX 1.5: MANAGEMENT PERFORMANCE AREA

MATRIX

APPENDIX 1.6: UTILIZATION OF SMALL BUSINESS

PERFORMANCE AREA MATRIX

APPENDIX 1.7: REGULATORY COMPLIANCE PERFORMANCE

AREA MATRIX

APPENDIX 1.8: OTHER AREAS PERFORMANCE AREA MATRIX 29

APPENDIX 2: SIPA DATA COLLECTION (SECTION C.3)

APPENDIX 2.1: SINGLE SITE INSPECTION PERFORMANCE

ASSESSMENT

APPENDIX 2.2: QUALITY PERFORMANCE AREA MATRIX

APPENDIX 2.3: SCHEDULE PERFORMANCE AREA MATRIX

APPENDIX 2.4: COST PERFORMANCE AREA MATRIX

APPENDIX 2.5: MANAGEMENT PERFORMANCE AREA

MATRIX

APPENDIX 2.6: UTILIZATION OF SMALL BUSINESS

PERFORMANCE AREA MATRIX

APPENDIX 2.7: REGULATORY COMPLIANCE PERFORMANCE

AREA MATRIX

APPENDIX 2.8: OTHER AREAS PERFORMANCE AREA MATRIX 32

APPENDIX 3: HIPA DATA COLLECTION (SECTION C.4)

APPENDIX 3.1: SINGLE INSTALLATION PERFORMANCE

ASSESSMENT

APPENDIX 3.2: QUALITY PERFORMANCE AREA MATRIX

APPENDIX 3.3: SCHEDULE PERFORMANCE AREA MATRIX

APPENDIX 3.4: COST PERFORMANCE AREA MATRIX

APPENDIX 3.5: MANAGEMENT PERFORMANCE AREA

MATRIX

APPENDIX 3.6: UTILIZATION OF SMALL BUSINESS

PERFORMANCE AREA MATRIX

E-3

APPENDIX 3.7: REGULATORY COMPLIANCE PERFORMANCE

AREA MATRIX

APPENDIX 3.8: OTHER AREAS PERFORMANCE AREA MATRIX 35

APPENDIX 4: UMPA DATA COLLECTION (SECTION C.5)

APPENDIX 4.1: SINGLE UNIT MAINTENANCE PERFORMANCE

ASSESSMENT

APPENDIX 4.2: QUALITY PERFORMANCE AREA MATRIX

APPENDIX 4.3: SCHEDULE PERFORMANCE AREA MATRIX

APPENDIX 4.4: COST PERFORMANCE AREA MATRIX

APPENDIX 4.5: MANAGEMENT PERFORMANCE AREA

MATRIX

APPENDIX 4.6: UTILIZATION OF SMALL BUSINESS

PERFORMANCE AREA MATRIX

APPENDIX 4.7: REGULATORY COMPLIANCE PERFORMANCE

AREA MATRIX

APPENDIX 4.8: OTHER AREAS PERFORMANCE AREA MATRIX 38

APPENDIX 5: UDPA DATA COLLECTION (SECTION C.6.2 AND

C.6.3)

APPENDIX 5.1: SINGLE DEACTIVATION PERFORMANCE

ASSESSMENT

APPENDIX 5.2: QUALITY PERFORMANCE AREA MATRIX

APPENDIX 5.3: SCHEDULE PERFORMANCE AREA MATRIX

APPENDIX 5.4: COST PERFORMANCE AREA MATRIX

APPENDIX 5.5: MANAGEMENT PERFORMANCE AREA

MATRIX

APPENDIX 5.6: UTILIZATION OF SMALL BUSINESS

PERFORMANCE AREA MATRIX

APPENDIX 5.7: REGULATORY COMPLIANCE PERFORMANCE

AREA MATRIX

APPENDIX 5.8: OTHER AREAS PERFORMANCE AREA MATRIX 41

APPENDIX 6: URPA DATA COLLECTION (SECTIONS C.6.4, C.6.5

and C.6.6)

APPENDIX 6.1: UNIT REPOSITIONING, RELOCATION OR

REINSTALLATION PERFORMANCE ASSESSMENT

APPENDIX 6.2: QUALITY PERFORMANCE AREA MATRIX

APPENDIX 6.3: SCHEDULE PERFORMANCE AREA MATRIX

APPENDIX 6.4: COST PERFORMANCE AREA MATRIX

APPENDIX 6.5: MANAGEMENT PERFORMANCE AREA

MATRIX

APPENDIX 6.6: UTILIZATION OF SMALL BUSINESS

PERFORMANCE AREA MATRIX

E-4

APPENDIX 6.7: REGULATORY COMPLIANCE PERFORMANCE

AREA MATRIX

APPENDIX 6.8: OTHER AREAS PERFORMANCE AREA MATRIX 44

APPENDIX 7: CPEPA DATA COLLECTION (SECTION C.7)

APPENDIX 7.1: COMERCIAL PARK EXPANSION PERFORMANCE

ASSESSMENT

APPENDIX 7.2: QUALITY PERFORMANCE AREA MATRIX

APPENDIX 7.3: SCHEDULE PERFORMANCE AREA MATRIX

APPENDIX 7.4: COST PERFORMANCE AREA MATRIX

APPENDIX 7.5: MANAGEMENT PERFORMANCE AREA

MATRIX

APPENDIX 7.6: UTILIZATION OF SMALL BUSINESS

PERFORMANCE AREA MATRIX

APPENDIX 7.7: REGULATORY COMPLIANCE PERFORMANCE

AREA MATRIX

APPENDIX 7.8: OTHER AREAS PERFORMANCE AREA MATRIX 46

APPENDIX 8: GSCPA DATA COLLECTION (SECTION C.8)

APPENDIX 8.1: GROUP SITE CONSTRUCTION PERFORMANCE

ASSESSMENT

APPENDIX 8.2: QUALITY PERFORMANCE AREA MATRIX

APPENDIX 8.3: SCHEDULE PERFORMANCE AREA MATRIX

APPENDIX 8.4: COST PERFORMANCE AREA MATRIX

APPENDIX 8.5: MANAGEMENT PERFORMANCE AREA

MATRIX

APPENDIX 8.6: UTILIZATION OF SMALL BUSINESS

PERFORMANCE AREA MATRIX

APPENDIX 8.7: REGULATORY COMPLIANCE PERFORMANCE

AREA MATRIX

APPENDIX 8.8: OTHER AREAS PERFORMANCE AREA MATRIX 48

APPENDIX 9: GSMPA DATA COLLECTION (SECTION C.9)

APPENDIX 9.1: GROUP SITE MAINTENANCE PERFORMANCE

ASSESSMENT

APPENDIX 9.2: QUALITY PERFORMANCE AREA MATRIX

APPENDIX 9.3: SCHEDULE PERFORMANCE AREA MATRIX

APPENDIX 9.4: COST PERFORMANCE AREA MATRIX

APPENDIX 9.5: MANAGEMENT PERFORMANCE AREA

MATRIX

APPENDIX 9.6: UTILIZATION OF SMALL BUSINESS

PERFORMANCE AREA MATRIX

APPENDIX 9.7: REGULATORY COMPLIANCE PERFORMANCE

AREA MATRIX

E-5

APPENDIX 9.8: OTHER AREAS PERFORMANCE AREA MATRIX 50

APPENDIX 10: TOMPA DATA COLLECTION

APPENDIX 10.1: TASK ORDER MANAGEMENT PERFORMANCE

ASSESSMENT

APPENDIX 10.2: QUALITY PERFORMANCE AREA MATRIX

APPENDIX 10.3: SCHEDULE PERFORMANCE AREA MATRIX ... 51

APPENDIX 10.4: COST PERFORMANCE AREA MATRIX

APPENDIX 10.5: MANAGEMENT PERFORMANCE AREA

MATRIX

APPENDIX 10.6: UTILIZATION OF SMALL BUSINESS

PERFORMANCE AREA MATRIX

APPENDIX 10.7: REGULATORY COMPLIANCE PERFORMANCE

AREA MATRIX

APPENDIX 10.8: OTHER AREAS PERFORMANCE AREA

MATRIX

APPENDIX 11: CMPA DATA COLLECTION

APPENDIX 11.1: CONTRACT MANAGEMENT PERFORMANCE

ASSESSMENT

APPENDIX 11.2: QUALITY PERFORMANCE AREA MATRIX

APPENDIX 11.3: SCHEDULE PERFORMANCE AREA MATRIX ... 56

APPENDIX 11.4: COST PERFORMANCE AREA MATRIX

APPENDIX 11.5: MANAGEMENT PERFORMANCE AREA

MATRIX

APPENDIX 11.6: UTILIZATION OF SMALL BUSINESS

PERFORMANCE AREA MATRIX

APPENDIX 11.7: REGULATORY COMPLIANCE PERFORMANCE

AREA MATRIX

APPENDIX 11.8: OTHER AREAS PERFORMANCE AREA

MATRIX

E-6

Table of Revisions

Version Date Revision AA 6/30/2017 Initial Solicitation AB 8/18/2017 Responses to Questions and

General Clean-up AC 11/14/2017 Additional Clean-up

E-7

Section E.1 Introduction and Purpose

E.1.1 Introduction

Due to the critical nature of this contract in providing assistance to disaster survivors and in accordance with FAR Subpart 42.15, FEMA will monitor and evaluate contractor performance to ensure that services and supplies are rendered thoroughly, completely and expeditiously with minimal setbacks. The role of the Government is to perform quality assurance to ensure that contract and task order (TO) requirements are appropriately achieved. FEMA’s approach to fulfilling its role is documented in FEMA’s Performance Evaluation Plan (PEP).

This PEP has been developed to support the requirements set forth in the Log HOUSE contract.

FEMA has developed the PEP to work in conjunction with the Government’s Contractor Performance Assessment Reporting System (CPARS). Contractors will be rated annually in CPARS for their performance on the contract for the base year and any option years that FEMA executes. Contractors will be rated on all TOs. The contractors will be rated on the quality of the work performed; compliance with the schedule requirements; the contractor’s ability to control costs and the contractor’s ability to manage the contract and TOs. Specific areas where technical performance requirements are defined are in Section C: The Performance Work Statement (PWS) and Section F: Deliverables and Performance.

E.1.2 Purpose

The purpose of this PEP is to document procedures, guidelines, and evaluation criteria the Government will use to monitor, evaluate, and ensure the contractor provides appropriate technical performance and quality service in a timely manner that is consistent with the objectives, mission, and performance requirements in Section C: the PWS and Section F:

Deliverables and Performance.

Section E.2 Overview and Scope

E.2.1 Overview

The PEP provides details of how the Government intends to monitor, evaluate and measure contractor performance for the base contract and all related TOs in accordance with Section C:

the PWS. Government surveillance and oversight of the contractor’s Quality Control Plan (QCP) will ensure the delivery of timely and effective service and achieve the results specified in Section C and Section F.

E.2.2 Performance

E.2.2.1 Performance Areas

E-8

The Performance Areas are identified by the type of work performed. The Performance Areas associated with this contract are as follows:

• Unit Transportation Performance Area (UTPA)

• Site Inspection Performance Area (SIPA)

• Haul and Install Performance Area (HIPA)

• Unit Maintenance Performance Area (UMPA)

• Unit Deactivation Performance Area (UDPA)

• Unit Repositioning, Relocation or Reinstallation Performance Area (URPA)

• Commercial Park Expansion Performance Area (CPEPA)

• Contract Management Performance Area (CMPA)

• Group Site Construction Performance Area (GSCPA)

• Group Site Maintenance Performance Area (GSMPA)

• Task Order Management Performance Area (TOMPA)

• Contract Management Performance Area (CMPA)

The process for assessing contractor performance in each of the Performance Areas above are attached as separate appendices. Contractors will only be evaluated on the Performance Areas that are applicable to the TO.

For example: If a contractor is tasked with only the installation of an MHU, the contractor will be evaluated for but not UMPA or UDPA. Conversely, if the contractor performs maintenance and deactivation but not installation, they will be evaluated for UMPA and UDPA only.

TOMPA applies to all TOs. CMPA is designed to evaluate the contractor’s overall annual performance. CMPA incorporates the contractor’s performance for non-MHU related TO activities, the contractor’s management of the contract, and is based on the average for any MHU related TOs awarded.

E.2.2.2 Performance Requirement

E-9

FEMA rates the Performance Areas using the CPARS rating categories. The following rating categories are contained within CPARS:

• Quality

• Schedule

• Cost Control

• Management

• Small Business Utilization

• Regulatory Compliance

• Other Areas

FEMA will only use the applicable rating categories. For example: The Regulatory Compliance category will not be used for tasks that are not subject to regulation. Each rating category will be used to evaluate the Performance Areas as follows:

Quality

Product Performance Relative to Contract’s Performance Parameters

Performance in Terms of Contract’s Quality Objectives

Use Quantitative Indicators Wherever Possible

Contractor’s Management of the Quality Control Program

Quality of the Work or Service

Schedule

Timeliness of Delivery

Timely Completion of Contract/Order

Milestones

Timely Completion of Administrative Requirements

Cost Control

Forecasting Cost

Managing Cost

Controlling Cost

Figure E.2-1: CPARS

E-10

Overrun/Underrun

Management

Integration and Coordination of Activity

Problem Identification

Corrective Action Plans

Reasonable and Cooperative Behavior

Customer Satisfaction

Subcontract Management

Program Management

Management of Key Personnel

Small Business Utilization

Compliance with Terms and Conditions for Small Business Participation

Achievement of Small Business Subcontracting Goals

Good Faith Effort to Meet Small Business Subcontracting Goals

Regulatory Compliance

Compliance with Regulations and Codes

Financial

Environmental

Labor

Safety

Reporting Requirements

Other rating categories will be identified on an as-needed basis.

E.2.3 Evaluation Procedures

Assessments for contractor performance will be documented using the procedures defined in the attached appendices.

E.3 Roles and Responsibilities

The Government and contractor responsibilities for quality assurance are as follows:

E.3.1 Contracting Officer

E-11

The Contracting Officer (CO) ensures performance of all requirements of the base contract and TOs to ensure compliance with the terms and conditions of the contract and/or the TO. The CO safeguards the interests of the Government in the contractual relationship. The CO will receive all discrepancy reports and forward them to executive management of the contractor for action.

The CO may monitor, perform surveillance, and evaluate the contractor’s performance at any time during the life of the contract and/or TO.

E.3.2 Contracting Officer’s Representative

The Contracting Officer’s Representative (COR) is the individual responsible at a specific disaster for performing inspections and recommending acceptance or rejection of contractor performance against all contract/TO requirements to the CO. The COR will serve as a designated government representative for monitoring, surveillance, evaluating and performing quality assurance activities for the contract and TOs. The COR ensures that contractor quality, cost effectiveness, timeliness, and performance is monitored, assessed, recorded, and documented. The COR responsibilities are contained in the written Letter of Designation from the CO. The COR is responsible for reporting a status on all assigned TOs to the CO.

The COR is responsible for the following activities:

• Inspection of the product, work, supplies, and/or services and assignment of performance scores.

• Consolidating the reports from inspections performed by Technical Monitors (when present) and summarizing their findings into an overall performance report and performance score for the

CO.

• Recommending acceptance or rejection of the product, work, supplies, and/or services.

• Assisting the CO in evaluating the contractor's response to a rejection notification.

• Maintaining and securing a comprehensive TO file until the completion of the TO, at which point the file will be forwarded to the CO.

• Establishing and maintaining regular and ongoing communication with the CO regarding contractor performance including status, relevant information, and reports.

E.3.3 Technical Monitor

The Technical Monitor (TM) assists the COR in observing the progress of the contractor’s performance, completes checklists and logs as prescribed in the PEP and reports findings to the COR in a timely, complete, and impartial manner. The TM assists the COR in monitoring, E-12 assessing, recording, and reporting on the technical performance of the contractor. The TM will document all observations and provide a copy to the COR.

E.3.4 Contractor

The contractor must develop a Quality Control Plan (QCP), subject to CO and COR approval, that sets forth procedures and responsibilities for ensuring high-quality work and adequately addressing and supporting the mission requirements, objectives, and schedules in the most cost-efficient manner. See Section F: Deliveries or Performance, Section F.6, #2.

Section E.4 Methods of Surveillance

The Government will use, at its discretion, the appropriate method for surveillance. The following are examples of the types of surveillance that the Government uses.

E.4.1 Inspection

When this type of surveillance is used, the COR or TM shall monitor, survey, and evaluate the contractor’s performance when the contractor performs a task associated with the TO. This method provides the best indication of contractor performance and is the most thoroughly documented basis for taking contract payment actions.

One-hundred percent (100%) inspection is preferred when the requirements are so critical that non-performance would pose a direct risk to the safety of personnel or property, or when the work occurs infrequently and the output quantity is small. Inspecting smaller percentages can be acceptable as long as the frequency of inspection increases and the sample size selected for inspection is representative of 100% of the units being inspected.

E.4.2 Database and Reports Analysis

The COR shall perform 100% inspection of the reports received and routinely inspect the contents of databases used—if any—to capture contractor performance. If the reports and/or databases identify any trends, issues, or information that could negatively impact the mission, the contractor may need to perform additional analysis.

This method of surveillance allows the COR or TM to evaluate the outputs or reports through the use of management information systems. When using generated reports that indicate a possible performance or quality concern, the COR will use other methods to confirm quality, quantity, and/or investigate problem areas.

E.4.3 Progress and Status Meetings

E-13

Progress or status meetings shall be held with the contractor as required by the COR. These meetings will allow the COR and contractor the opportunity to review and discuss any and all issues related to the execution of the TO.

E.4.4 Other Monitoring Techniques

The TO will indicate how the Government will monitor various aspects of the TO. In addition to inspection, database and report analysis, and progress and status meetings, other monitoring techniques may be used such as:

• Site visits

• Personal observations

• Phone calls

• Contractor requests

• Contacting other Government agencies

Section E.5 Implementation of the Performance Evaluation

E.5.1 Performance Criteria

Results of surveillance activities will be documented using the criteria noted below. Services shall ordinarily not be accepted before completion of Government contract quality assurance actions (FAR Part 46.5). Most TOs awarded will be evaluated using TO specific information.

All ratings assigned by the COR will be supported with formal documentation.

E.5.1.1 Ratings

Contractor performance for each will be evaluated by aggregating the rating category’s requirements within each Performance Area into a final score.

E.5.1.1.1 CPARS Ratings

The final score entered into CPARS will use the definitions provided in FAR 42.1503 Table 42-1 for all rating categories that are not related to small business utilization. Ratings for small business utilization are defined in FAR 42.1503 Table 42-1. For contractor performance or TOs that extend beyond a single rating period, FEMA may use a plus or minus sign to indicate an improving (+) or worsening (-) trend that is notable but insufficient to change the rating. FEMA will use N/A (not applicable) if a rating category is not going to be applied to a particular Performance Area.

Table E.5-1: Evaluation Ratings Definitions (Excluding Utilization of Small Business)

E-14

Evaluation Ratings Definitions (Excluding Utilization of Small Business) – FAR 42.1503 Table 42-1 CPARS Rating Definition Note Exceptional Performance meets contractual requirements and exceeds many to the Government’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with few minor problems for which corrective actions taken by the contractor was highly effective.

To justify an Exceptional rating, identify multiple significant events and state how they were of benefit to the Government. A singular benefit, however, could be of such magnitude that it alone constitutes an Exceptional rating. Also, there should have been NO significant weaknesses identified.

Very Good Performance meets contractual requirements and exceeds some to the Government’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with some minor problems for which corrective actions taken by the contractor was effective.

To justify a Very Good rating, identify a significant event and state how it was a benefit to the Government. There should have been no significant weaknesses identified.

Satisfactory Performance meets contractual requirements. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory.

To justify a Satisfactory rating, there should have been only minor problems, or major problems the contractor recovered from without impact to the contract. There should have been NO significant weaknesses identified. A fundamental principle of assigning ratings is that contractors will not be assessed a rating lower than Satisfactory solely for not performing beyond the requirements of the contract.

Marginal Performance does not meet some contractual requirements. The contractual performance of the element or sub-element being assessed reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor’s proposed actions appear only marginally effective or were not fully implemented.

To justify Marginal performance, identify a significant event in each category that the contractor had trouble overcoming and state how it impacted the Government. A Marginal rating should be supported by referencing the management tool that notified the contractor of the contractual deficiency (e.g., management, E-15 quality, safety, or environmental deficiency report or letter).

Unsatisfactory Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element contains a serious problem(s) for which the contractor’s corrective actions appear or were ineffective.

To justify an Unsatisfactory rating, identify multiple significant events in each category that the contractor had trouble overcoming and state how it impacted the Government.

A singular problem, however, could be of such serious magnitude that it alone constitutes an unsatisfactory rating. An Unsatisfactory rating should be supported by referencing the management tools used to notify the contractor of the contractual deficiencies (e.g., management, quality, safety, or environmental deficiency reports, or letters).

E-16

Table E.5-2: Evaluation Ratings Definitions (Utilization of Small Business)

Evaluation Ratings Definitions (Utilization of Small Business) – FAR 42.1503 Table 42-2 CPARS Rating Definition Note Exceptional Exceeded all negotiated subcontracting goals or exceeded at least one goal and met all of the other negotiated subcontracting goals for the current period. Had exceptional success with initiatives to assist, promote, and utilize small business (SB), small disadvantaged business (SDB), women-owned small business (WOSB), HUBZone small business, veteran-owned small business (VOSB) and service disabled veteran owned small business (SDVOSB).

Complied with FAR 52.219-8, Utilization of Small Business Concerns. Exceeded any other small business participation requirements incorporated in the contract, including the use of small businesses in mission critical aspects of the program. Went above and beyond the required elements of the subcontracting plan and other small business requirements of the contract.

Completed and submitted Individual Subcontract Reports and/or Summary Subcontract Reports in an accurate and timely manner.

To justify an Exceptional rating, identify multiple significant events and state how they were a benefit to small business utilization. A singular benefit, however, could be of such magnitude that it constitutes an Exceptional rating. Ensure that small businesses are given meaningful, innovative work directly related to the project, rather than peripheral work, such as cleaning offices, supplies, landscaping, etc. Also, there should have been no significant weaknesses identified.

Very Good Met all of the negotiated subcontracting goals in the traditional socio-economic categories (SB, SDB and WOSB) and met at least one of the other socio-economic goals (HUBZone, VOSB, SDVOSB) for the current period. Had significant success with initiatives to assist, promote

To justify a Very Good rating, identify a significant event and state how they were a benefit to small business utilization. Ensure that small businesses are given meaningful, innovative work directly related to the project, rather than peripheral work, such as cleaning offices, supplies, E-17 and utilize SB, SDB, WOSB, HUBZone, VOSB, and SDVOSB.

Complied with FAR 52.219-8, Utilization of Small Business Concerns. Met or exceeded any other small business participation requirements incorporated in the contract, including the use of small businesses in mission critical aspects of the program.

Endeavored to go above and beyond the required elements of the subcontracting plan.

Completed and submitted Individual Subcontract Reports and/or Summary Subcontract Reports in an accurate and timely manner.

landscaping, etc. There should be no significant weaknesses identified.

Satisfactory Demonstrated a good faith effort to meet all of the negotiated subcontracting goals in the various socio-economic categories for the current period. Complied with FAR 52.219-8, Utilization of Small Business Concerns. Met any other small business participation requirements included in the contract. Fulfilled the requirements of the subcontracting plan included in the contract. Completed and submitted Individual Subcontract Reports and/or Summary Subcontract Reports in an accurate and timely manner.

To justify a Satisfactory rating, there should have been only minor problems, or major problems the contractor has addressed or taken corrective action. There should have been no significant weaknesses identified. A fundamental principle of assigning ratings is that contractors will not be assessed a rating lower than Satisfactory solely for not performing beyond the requirements of the contract.

Marginal Deficient in meeting key subcontracting plan elements.

Deficient in complying with FAR 52.219-8, Utilization of Small Business Concerns, and any other small business participation requirements in the contract. Did not submit Individual Subcontract Reports and/or Summary Subcontract Reports in an accurate

To justify Marginal performance, identify a significant event that the contractor had trouble overcoming and how it impacted small business utilization. A Marginal rating should be supported by referencing the actions taken by the government that notified the contractor of the contractual deficiency.

E-18 or timely manner. Failed to satisfy one or more requirements of a corrective action plan currently in place; however, does show an interest in bringing performance to a satisfactory level and has demonstrated a commitment to apply the necessary resources to do

so. Required a corrective action plan.

Unsatisfactory Noncompliant with FAR 52.219-8 and 52.219-9, and any other small business participation requirements in the contract. Did not submit Individual Subcontract Reports and/or Summary Subcontract Reports in an accurate or timely manner. Showed little interest in bringing performance to a satisfactory level or is generally uncooperative. Required a corrective action plan.

To justify an Unsatisfactory rating, identify multiple significant events that the contractor had trouble overcoming and state how it impacted small business utilization.

A singular problem, however, could be of such serious magnitude that it alone constitutes an Unsatisfactory rating. An Unsatisfactory rating should be supported by referencing the actions taken by the government to notify the contractor of the deficiencies. When an Unsatisfactory rating is justified, the contracting officer must consider whether the contractor made a good faith effort to comply with the requirements of the subcontracting plan required by FAR 52.219-9 and follow the procedures outlined in FAR 52.219-16, Liquidated Damages - Subcontracting Plan.

E.5.1.1.2 Performance Area Ratings

FEMA will provide both FEMA textual scores (e.g., Outstanding, Exceeds Expectation, etc.) and numeric scores (e.g., 5, 4, etc.) for each Performance Area. Numeric scores are defined during the rating of the individual Performance Area. The FEMA textual score definition and descriptions are provided here.

The FEMA textual scores, while similar to the CPARS rating descriptions, are tailored to reflect the characteristics of FEMA’s unique mission. Also, each Performance Area has area-specific

E-19 definitions for each rating level. Each Performance Area textual rating has an assigned point value that will be used to calculate the numeric rating. The FEMA textual scores, point value and related CPARs rating description are compared below.

Table E.5-3: FEMA and CPARS Rating Comparison

FEMA and CPARS Comparison FEMA Rating FEMA Point Value CPARS Rating Outstanding 3.51 – 4.00 Exceptional Exceeds Expectation 2.76 – 3.50 Very Good Meets Expectation 1.51 – 2.75 Satisfactory Below Expectation 0.51 – 1.50 Marginal Unacceptable 0.00 – 0.50 Unsatisfactory

E.5.1.1.2.1 Outstanding Rating

Outstanding (O) is the highest rating that can be given for an individual Performance Area. This rating is worth four (4) points for the Performance Area when the Performance Areas are aggregated into the CPARS rating category.

E.5.1.1.2.2 Exceeds Expectations Rating

Exceeds Expectation (EE) is the second highest rating that can be given for an individual Performance Area. This rating indicates that though the contractor exceeded the requirements, the performance did not meet the definition for an O rating. The EE rating is worth three (3) points for the Performance Area when the Performance Areas are aggregated into the rating category.

E.5.1.1.2.3 Meets Expectations

Meets Expectation (ME) is the rating given when the Performance Area score indicates that the requirements for the Performance Area have been met. This rating is worth two (2) points for the Performance Area when the Performance Areas are aggregated into the rating category.

E.5.1.1.2.4 Below Expectations Rating

The Below Expectations (BE) rating is given when the requirements of the Performance Area are not met as described in the contract. However, the contractor’s performance for the area overall has not fallen to the level of unacceptable. This rating is worth one (1) point for the Performance Area when the Performance Areas are aggregated into the rating category.

E.5.1.1.2.5 Unacceptable Rating

E-20

Unacceptable (U) means that the performance in this area does not meet the requirements of the contract and is therefore unacceptable. This rating is worth zero (0) points for the Performance Area when the Performance Areas are aggregated into the rating category.

E.5.1.1.3 Unused Categories

Any unused categories shall will not be rated and will not be used as part of any calculations.

E.5.2 Rating Determination

The COR will evaluate the contractor’s performance for each applicable Performance Area as is described in the Performance Area Matrices contained the appendices. The evaluations in each of the Performance Areas use one or more of the following terms.

Table E.5-4: Evaluation Terms

Clock-Stop Days Days where the work on the task could not be performed due to delays beyond the Contractor's control.

Findings The CORs determination of the acceptability of the Contractor’s performance recorded as either “Yes” or “No”.

Though the COR may ascribe a negative finding to any performance outside of requirements, a finding of "No" is typically reserved for failure to deliver or a late / incomplete delivery rendering the deliverable obsolete.

Escalations When the Contractor's performance requires FEMA to resolve an issue within the Contractor’s control in order to complete a task.

Escalations are typically used in the Cost Performance Area Matrix.

Exceptions Events where the Contractor's performance was delayed or undermined by circumstances beyond the Contractor's control.

Exceptions are typically used in the Cost Performance Area Matrix.

Points A point is awarded for each “Yes” finding.

Points are typically used in the Quality, Schedule and Management Performance Area Matrices.

E-21

The ratings for each individual Performance Area will be aggregated into the rating category as described in Appendix 10, TOMPA. Specific examples from the individual Performance Areas will be used to justify any rating that is above or below a rating of ME. To the extent possible, the Government has made the individual criteria as quantitative as possible to reduce the level of subjectivity in the evaluation process.

Prime contractors are responsible for the performance of subcontractors at all levels. A Prime contractor is defined as the contractor who has the relationship with FEMA. Subcontractors are defined as any contractor who is working on the contract at any level but does not have a direct contract with FEMA.

The Government is aware that many TOs require substantial coordination efforts with County, City, State, and Federal agency personnel over whom the contractor has no control and who may have different priorities than FEMA contractors. Wherever possible, the COR will note mitigating circumstances that are outside the contractor’s control when making evaluations.

E.5.3 Surveillance Outcomes

The results of surveillance activities will be documented to determine the contractor’s performance.

E.5.3.1 Contractor Notification of Surveillance Outcomes

The COR will inform the contractor of a potentially unsatisfactory performance by issuing a Discrepancy Report (“DR”, See Section J, Attachment J.50) as soon as the discrepancy is noted.

The contractor shall initial and date the TO and/or Work Order DR form. The contractor’s initials and date signifies acknowledgement of receipt of the form and does not indicate that the contractor agrees with the discrepancy.

If the contractor disputes the results of the evaluation, the COR shall arrange for a meeting with the CO, in person or by telephone conference, to attempt to resolve the matter. The COR shall provide the form and written narrative to substantiate the findings to the CO.

E.5.3.2 Nonconforming Outcomes

When nonconforming supplies or services are identified, the CO shall give the contractor an opportunity to correct or replace the nonconforming supplies or services when this can be accomplished within the required delivery schedule. Unless the contract specifies otherwise, correction or replacement will be without additional cost to the Government.

E-22

Nonconforming outcomes occur when a contractor delivers goods or services that are not in compliance with the terms and conditions of the contract, TO or any modification thereof. If the nonconformance is major or critical, the COR may not accept the supply or service.

For a minor nonconformance, the COR may recommend the following to the CO:

1. Accept and have the contractor repair/replace/repeat the service at no additional cost to the Government.

2. Accept at price reduction.

3. Reject.

The COR does not have the authority to approve any of the above courses of action. When the CO approves a recommendation to accept at price reduction, the recommended value may be used to determine an equitable adjustment for nonconforming services for fixed price TOs. When the CO approves a recommendation to reject, the CO will provide a notice of rejection to the contractor that includes the reasons for rejection.

E.5.3.3 Discrepancy Report

A Discrepancy Report (See Section J, Attachment J.50) can be initiated by the COR at any time during the evaluation period when the results of an evaluation show unsatisfactory or marginal performance for the period being monitored, or when the contractor is performing below the acceptable performance level.

If the COR determines that the performance is unsatisfactory, the following steps will be followed:

1. The COR discusses the potential issue with the Contractor Field TO Manager (FTOM) and provides a DR.

2. The COR evaluates the information and notifies the CO of concurrence or non-concurrence.

Upon receipt of the contractor’s response, the CO, in consultation with the COR, must evaluate the contractor’s response and take appropriate action.

Section E.6 Calculating the CPARS Performance Area Rating

E.6.1 CPARS Rating Category

E-23

The rating categories for CPARS are calculated based on an average of the FEMA point values for individual Performance Areas contained within a rating category. Only Performance Areas that are used will be included in the calculation for the rating category.

E.6.2 In-Process Task Order or Contract Year Scores

From time to time, it may be necessary to generate a CPARS rating for a TO before it is closed.

In such cases, the CO will establish a timeframe upon which the interim CPARS rating will be based; and only the documented performance during that timeframe will be used in generating the CPARS rating. Interim CPARS ratings for TOs are replaced with final TO CPARS ratings once they become available.

Similarly, CPARS ratings may be required to be generated at the conclusion of a contract year regardless if one or more TOs are still in-progress. In such cases, all TOs closed within the contract year—regardless of when they began—will be used. Also, interim TO ratings will be generated for TOs that are still open at the end of the contract year; and the interim TO ratings will be averaged with the closed TO ratings to generate the CPARS rating.

E.6.3 Termination for Default

If the contractor is terminated for default, the Final Contractor Rating will automatically be Unsatisfactory.

Section E.7 Contractor’s Process to Challenge CPARS Rating

FEMA will use a sample ranging from five percent (5%) to one hundred percent (100%) when calculating the individual Performance Areas that are aggregated into the contractor’s CPARS ratings.

While FEMA does not anticipate a challenge to the rating, the Agency has included a process by which the contractor may challenge the rating. If the contractor chooses to challenge any or all of the ratings, the contractor may do so by using a one hundred percent (100%) sample of all of the work orders for each applicable Performance Area. It is the contractor’s burden to provide the data analysis in a report to the COR. The challenge report shall be written so that it can be clearly understood.

Section E.8 Performance Incentive

This section is written in accordance with FAR Sub-Part 16.4-Incentive Contracts. Performance Incentives will only be used for TOs related to field operations. All contractors, no matter what award type, are eligible to receive performance incentives.

E-24

PERFORMANCE INCENTIVES ARE NOT A MANDATORY PART OF THIS CONTRACT

AND WILL NOT BE INCLUDED IN ANY TASK ORDER WITHOUT THE USE OF THE

FOLLOWING TWO-STEP PROCESS.

The two-step process for including performance incentives is as follows:

1. Step One- As part of the TO Proposal Process, FEMA will announce if the TO is being considered for the inclusion of performance incentives.

2. Step Two- The contractor notifies FEMA if they would like the performance incentive to be included in the TO when FEMA notifies the contractor that they have received the TO award.

Performance incentive will not affect the TO proposal process.

E.8.1 Basis and Funding for Performance Positive and Negative Incentives

If incentives are used, the positive incentive can equal up to ten percent (10%) of the TO award not including travel or other TO management expenses, such as FTOM labor. The negative incentive can equal a reduction of up to ten percent (10%) of the TO award, not including travel or other TO management expenses. Determination of the increase or decrease in the dollar amount of the incentive is based on the performance ratings that the contractor receives.

Specifically, for each TO that includes incentives, FEMA will add a Contract Line Item Number (CLIN) titled “FEMA incentive”, which will contain ten percent (10%) of the total non-FTOM TO value. In addition, the price that the contractor charges FEMA for each non-FTOM CLIN will be reduced by ten percent (10%); and the sum of those reductions will be placed in a separate CLIN titled “contractor incentive”.

Both the FEMA incentive CLIN and the contractor incentive CLIN will be divided into sub-CLINs, one each corresponding to the seven (7) rating categoies that are included in CPARS (e.g., Quality, Schedule, Cost Control, etc.). For both the FEMA incentive CLIN and the contractor incentive CLIN, funds will be equally allocated into the rating category sub-CLINs that are applicable to the TO. Based on the Performance Area ratings, FEMA will pay the contractor none, some or all of either or both CLINs.

E.8.2 Method of Incentive CLIN Award/Payment

E-25

Table E.8-1: Allocation of FEMA Incentive and Contractor Incentive CLINs

Allocation of FEMA Incentive and Contractor Incentive CLINs

FEMA Rating FEMA Incentive sub-CLIN Contractor Incentive sub-CLIN Outstanding 100% 100% Exceeds Expectations 50% 100% Meets Expectations 0 100% Below Expectations 0 50% Unacceptable 0 0

E.8.3 Example

A small business is awarded a TO.

1. The rating categories used for the task order are Quality, Schedule, Cost Control and Management. Each rating category will be given equal weight, which will be 25% of the positive incentive awarded or negative incentive deducted.

2. The total value of the non-FTOM CLINs is $1,000,000

3. The FEMA incentive CLIN will have a funding allocation of $100,000 (i.e., 10% of the total value of the non-FTOM CLINs)

a. FEMA incentive sub-CLIN Quality will have $25,000

b. FEMA incentive sub-CLIN Schedule will have $25,000

c. FEMA incentive sub-CLIN Cost Control will have $25,000

d. FEMA incentive sub-CLIN Management will have $25,000

4. The contractor incentive CLIN will also have a funding allocation of $100,000

a. Contractor incentive sub-CLIN Quality will have $25,000

b. Contractor incentive sub-CLIN Schedule will have $25,000

c. Contractor incentive sub-CLIN Cost Control will have $25,000

d. Contractor incentive sub-CLIN Management will have $25,000

e. The total value of the non-FTOM CLINs is $1,000,000

E-26

5. The contractor receives the following ratings:

Table E.8-2: Example Ratings

Rating Category FEMA Rating Quality Outstanding Schedule Exceeds Expectations Cost Control Meets Expectations Management Unacceptable

6. Allocate the incentives

Table E.8-3: Example Incentives

CLIN Sub-CLIN Maximum

Value

FEMA

Rating

Incentive Percentage

Incentive Value

FEMA

Incentive

Quality $25,000 O 100% $25,000

Schedule $25,000 EE 50% $12,500 Cost Control $25,000 ME 0% $0 Management $25,000 U 0% $0

Subtotal $37,500 Contractor Incentive

Quality $25,000 O 100% $25,000

Schedule $25,000 EE 100% $25,000 Cost Control $25,000 ME 100% $25,000 Management $25,000 U 0% $0

Subtotal $75,000

7. Based on the above table the contractor would receive a total incentive of $112,500:

a. $37,500 from the FEMA Incentive CLIN

b. $75,000 from the Contractor Incentive CLIN

END OF SECTION E

E-27

APPENDIX 1: UTPA DATA COLLECTION (SECTION C.2.3)

APPENDIX 1.1: SINGLE HAUL PERFORMANCE ASSESSMENT

Enter the data into the following Performance Assessment Table.

The TM forwards each completed delivery inspection checklist to the COR.

Table A1-1: Performance Assessment Table

WORK ORDER

ISSUE DATE

Driver Arrived On Time For Pickup

(Target = Yes)

Driver On Pickup List

Driver Arrived On Time Per Delivery

Table (Target = Yes)

Unit Accepted Upon Delivery

Finding (Yes or No) (Yes or No) (Yes or No) (Yes or No)

Escalation 0 0 0 0

Points (0 - 1)

0 0 0 0

TOTAL POINTS: 0

TOTAL ESCALATIONS: 0

Though the COR may ascribe a negative finding to any performance outside of requirements, a finding of "No" is typically reserved for failure to deliver or the late / incomplete delivery rendering the deliverable obsolete.

An "Escalation" occurs when a Contractor's performance requires FEMA to resolve an issue within the Contractor’s control in order to complete a task.

Table A1-2: Delivery Table

Distance Target

(Miles) (Days)

1 – 499 3

500 – 999 4

1,000 - 1,499 5

1,500 - 1,999 6

2000 - 2,499 7

E-28

2,500+ 8

Distances will be calculated using MapQuest unless the contractor submits documentation from the local entity requiring routes to be used that are not available on MapQuest.

Mileage documentation will be submitted with the transportation permit package.

APPENDIX 1.2: QUALITY PERFORMANCE AREA MATRIX

The COR averages the points earns across all Performance Assessment Tables.

Compare the resulting average to the Quality Performance Area Matrix below.

Table A1-3: Quality Performance Area Matrix

Business Size Outstanding

Exceeds Expectations

Meets Expectations

Below Expectations Unacceptable

Small 3.75 – 4.00 3.40 – 3.74 3.35 – 3.39 3.00 – 3.34 < 3.00

Full & Open 3.90 – 4.00 3.65 – 3.89 3.40 – 3.64 3.15 – 3.39 < 3.15

APPENDIX 1.3: SCHEDULE PERFORMANCE AREA MATRIX

FEMA expects each haul to result in at least two points, one of which must have been earned by meeting the target established in the Delivery Table found in Section 1.1 above.

Calculate the percentage of installations that earned the two-point requirement and the target established in the Delivery Table.

Compare the resulting percentage to the Schedule Performance Area Matrix below.

Table A1-4: Schedule Performance Area Matrix

Business Size

Outstanding Exceeds

Expectations Meets

Expectations Below

Expectations Unacceptable

Small 89 – 100 87 – 88 85 – 86 83 – 84 < 83

Full & Open 95 – 100 93 – 94 91 – 92 89 – 90 < 89

APPENDIX 1.4: COST PERFORMANCE AREA MATRIX

The COR calculates the percentage of installations that required NO escalation and compares the percentage to the Cost Performance Area Matrix below.

E-29

Table A1-5: Cost Performance Area Matrix

Business Size Outstanding Exceeds

Expectations Meets

Expectations Below

Expectations Unacceptable

Small 75 – 100 70 – 74 65 – 69 60 – 64 < 60

Full & Open 90 – 100 85 – 89 80 – 84 75 – 79 < 75

APPENDIX 1.5: MANAGEMENT PERFORMANCE AREA MATRIX

The COR calculates the percentage of hauls that earned all four points.

Table A1-6: Management Performance Area Matrix

Exceeds

Expectations Meets

Expectations Below

Expectations Unacceptable

Small 40 – 100 30 – 39 20 – 29 10 – 19 < 10

Full & Open 70 – 100 60 – 69 50 – 59 40 – 49 < 40

APPENDIX 1.6: UTILIZATION OF SMALL BUSINESS PERFORMANCE AREA

MATRIX

Small business utilization is evaluated at the Task Order level and Contract level only. See Appendix 10, TOMPA Data Collection, and Appendix 11, CMPA Data Collection, for the relevant Performance Area Matrices.

APPENDIX 1.7: REGULATORY COMPLIANCE PERFORMANCE AREA MATRIX

RESERVED.

APPENDIX 1.8: OTHER AREAS PERFORMANCE AREA MATRIX

The only “Other Area” applicable to this contract is the use of local businesses—i.e., businesses located within the disaster declaration area that employ local residents. Utilization of such local businesses is evaluated at the Task Order level and Contract level only. See Appendix 10, TOMPA Data Collection, and Appendix 11, CMPA Data Collection, for the relevant

END OF APPENDIX 1

E-30

APPENDIX 2: SIPA DATA COLLECTION (SECTION C.3)

APPENDIX 2.1: SINGLE SITE INSPECTION PERFORMANCE ASSESSMENT

The TM forwards each completed Site Inspection Checklist to the COR.

Table A2-1: Performance Assessment Table

NUMBER

Site Inspection Returned Completed Within

Specified Timeframes

No Contact / Withdrawal Documented Properly

OR

Feasibility Determined

Accurately (Target = Yes)

SFIR Submitted Complete

Finding (Yes or No) (Yes or No) (Yes or No)

Escalations 0 0 0

Points (0 - 1)

0 0 0 rendering the deliverable obsolete.

An "Escalation" occurs when a Contractor's performance requires FEMA to resolve an issue within the Contractor’s control in order to complete a task.

APPENDIX 2.2: QUALITY PERFORMANCE AREA MATRIX

Table A2-2: Quality Performance Area Matrix

Exceeds

Expectations Meets

Expectations Below

Expectations Unacceptable

Small 2.75 – 3.00 2.40 – 2.74 2.35 – 2.39 2.00 – 2.34 < 2.00

Full & Open 2.90 – 3.00 2.65 – 2.89 2.40 – 2.64 2.15 – 2.39 < 2.15

E-31

APPENDIX 2.3: SCHEDULE PERFORMANCE AREA MATRIX

Calculate the percentage of site inspections completed within specified timeframes.

Table A2-3: Schedule Performance Area Matrix

Exceeds

Expectations Meets

Expectations Below

Expectations Unacceptable

APPENDIX 2.4: COST PERFORMANCE AREA MATRIX

The COR calculates the percentage of site inspections that required NO escalation.

Compare the percentage to the Cost Performance Area Matrix below.

Table A2-4: Cost Performance Area Matrix

Exceeds

Expectations Meets

Expectations Below

Expectations Unacceptable

APPENDIX 2.5: MANAGEMENT PERFORMANCE AREA MATRIX

The COR calculates the percentage of installations that earned all three points.

Compare the resulting percentage to the Management Performance Area Matrix below.

Table A2-5: Management Performance Area Matrix

Exceeds

Expectations Meets

Expectations Below

Expectations Unacceptable

E-32

APPENDIX 2.6: UTILIZATION OF SMALL BUSINESS PERFORMANCE AREA

Small business utilization is evaluated at the Task Order level and Contract level only. See Appendix 10, TOMPA Data Collection, and Appendix 11, CMPA Data Collection, for the relevant Performance Area Matrices.

APPENDIX 2.7: REGULATORY COMPLIANCE PERFORMANCE AREA MATRIX

RESERVED.

APPENDIX 2.8: OTHER AREAS PERFORMANCE AREA MATRIX

The only “Other Area” applicable to this contract is the use of local businesses—i.e., businesses located within the disaster declaration area that employ local residents. Utilization of such local businesses is evaluated at the Task Order level and Contract level only. See Appendix 10, END OF APPENDIX 2

E-33

APPENDIX 3: HIPA DATA COLLECTION (SECTION C.4)

APPENDIX 3.1: SINGLE INSTALLATION PERFORMANCE ASSESSMENT

The TM forwards each completed Installation Checklist to the COR.

Table A3-1: Performance Assessment Table

WORK

ORDER

NUMBER

ISSUE DATE

Permit Applications Submitted

THU / TPS

Site Prep

Handled Correctly

Water & Sewer

Hookup / Inspection

Electrical

System Testing

THU

Exterior / Interior

RFO Within Timeframe (See Date Below)

Complete Installation

Package Timely

(See date below)

(Target = Yes)

[DATE]

Clock Stop Days

0 0 0 0 0 0 0 0 0

Findings (Yes or No) (Yes or No) (Yes or No) (Yes or No) (Yes or No) (Yes or No) (Yes or No) (Yes or No) (Yes or No)

Escalations 0 0 0 0 0 0 0 0 0

Points (0 - 1)

0 0 0 0 0 0 0 0 0

"MHU / TPS Handled Correctly" includes bar code control, timely pickup and delivery, transportation…