LOGHOUSE_Comments_Matrix_resubmit_12-13-2017_(PT).pdf

PDF 160 KB Posted

Attached to
LOGHOUSE Federal contract opportunity
Solicitation number
HSFE80-17-R-0005
Issued by
Federal Emergency Management Agency Headquarters Office of the Chief Procurement Officer

About this file

Resubmission of LogHouse Comments Matrix

View the file

Other files for this federal contract opportunity

Other files attached to LOGHOUSE, newest first.
File Type Posted
HSFE80-17-R-0005_000006-signed.pdf PDF
LogHouse_Section_E_(v_AC)_CLEAN_14Nov2017.pdf PDF
LogHouse_Section_C_(v_AC)_Changes_Only_27Nov2017.pdf PDF
LogHouse_Section_J_(v_AB)_CLEAN_16Nov2017.pdf PDF
LogHouse_Section_F_(v_AC)_Changes_Only_14Nov2017.pdf PDF
LogHouse_Section_E_(v_AC)_Changes_Only_14Nov2017.pdf PDF
LogHouse_Section_C_(v_AC)_CLEAN_27Nov2017.pdf PDF
LogHouse_Section_J_(v_AB)_Changes_Only_16Nov2017.pdf PDF
LogHouse_Section_F_(v_AC)_CLEAN_14Nov2017.pdf PDF
HSFE80-17-R-0005_A0004-signed.pdf PDF
Technical Scenarios Template LOCKED.xlsx XLSX spreadsheet
Attachment 59 - Section J.59 TANK AND PUMP SYSTEM —
Log HOUSE Section C 18Aug2017 TRACKED CHANGES.pdf PDF
Log HOUSE Section F 18Aug2017 TRACKED CHANGES.pdf PDF
MAINTENANCE & DEACT —
LogHouse SECTION B 18AUG2017 TRACK CHANGES.pdf PDF
Attachment_33_-_Section_J.33_FEMA_MHU_CLEAN_FOR_REUSE_PROCEDURES_Revision_AA__August_18_2017_.pdf PDF
HSFE80-17-R-0005_LogHouse_18AUG2017.pdf PDF
Attachment 62 - Section J.62 Talco Fire System - Talco FEMA TPS Installation Operation and Maintenance Manual.pdf PDF
LOGHOUSE_RFP_Government_Responses.pdf PDF
Attachment 39 - Section J.39 Tank and Pump System —
Log HOUSE Section E 18AUGUST2017 TRACKED CHANGES.pdf PDF
Attachment 61 - Section J.61 General Air Products Tank and Pump System for FEMA - Alarm Bar Installation Addendum - 1-24-17 Revision BB_005.pdf PDF
Loghouse SECTION J 18Aug2017 For Forms etc.docx DOCX document
Attachment 60 - Section J.60 General Air Products Tank and Pump System for FEMA - Installation Operation and Maintenance Manual Revision BB_004.pdf PDF
LogHouse SECTION L 18Aug2017 TRACKED CHANGES.pdf PDF
Attachment 38 - Section J.38 MHU Fire Sprinkler System Installation Test Maintenance Repair and Deactivation Guide Rev 1.0 July 15 2017.pdf PDF
HAUL & INSTALL —
LogHouse SECTION M 18Aug2017 TRACKED CHANGES.pdf PDF
FULL AND OPEN CLIN TABLE with Pricing Scenarios 17AUG17 LOCKED.xlsx XLSX spreadsheet
HSFE80-17-R-0005_A0003_final-signed.pdf PDF
HSFE80-17-R-0005_A0002final-signed.pdf PDF
DHS_Form_700-23.pdf PDF
Comment_Matrix_Questions.pdf PDF
Attachment_60_CLIN_Chart.pdf PDF
Attachment_48_Past_Performance_Questionnaire.pdf PDF
HSFE80-17-R-0005_Solicitation._Final_06.30.17.pdf PDF
Show all 37

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FEMA LOGHOUSE

Final RFP Comments Matrix

Page Number Question Answer

Submitted 08/29

Government Responses, p30 In reference to section H.13: the question was “Are offerors required to complete this table?”

Response: “Yes”

Is this required with the initial proposal submission? If so, in which tab/sub-tab?

Yes - Tab 2, Sub-Tab 2

Government Responses, p31 In reference to section I.15: the question was “Are offerors required to complete this table?”

Response: “Yes”

We note that I.15 (page 307 of 581 in the original RFP) was struck from the revised RFP (page 389 of 665). Please clarify. Is there a requirement for offerors to complete the original I.15 table with the initial proposal submission? If so, in which tab/sub-tab?

I.15 requested the same information as H.13. Provide answer for H.13 under Tab 2, Sub-Tab 2.

Government Responses, p32 In reference to the question on header/footer text point size, the question was “Can text in the header and footer be 8 point or smaller? How small can it be?”

Response: “No”

Please clarify. What is the required minimum point size for header/footer text?

12 point font

See L.7.2 Proposal Files: "...A standard, 12-point minimum font size applies. Arial or Times New Roman fonts are required. Tables and illustrations may use a reduced font size not less than 8-point and may be landscape."

Section M 18Aug2017, pM-2 For the tabs that do not apply to an offeror's proposal (i.e., the SB tabs for a F&O offer), are we to include those sub-tabs but leave them blank?

Or are we to only include sub-tabs that we are completing?

Only include sub-tabs applicable to the vendor competing.

Section L 18Aug2017, pL-29 Paragraph L.7.4.2.2 states the page limit for Corporate and

Field Organizational Structure and Chart is a maximum of 25 pages.

The paragraphs below limit the section to 4 pages plus a chart for corporate, and 4 pages plus a chart for field. This would be a total of 10 pages.

Please clarify the page limitations for this sub-tab.

Tab 2 (Factor 2) Sub-Tab 2b (Sub-Factor 2b) Allows for more than one chart. "One chart per organization within the field structure shall be on 1 page each,"

Comments Matrix/Questions

Section L 18Aug2017, pL-41 Paragraph L.7.5.2.4 - this paragraph number is used for both

Evidence of Responsibility and Partnering Agreement.

Should the paragraph for Partnering Agreement be changed to L.7.5.2.6?

Yes

Section J 18Aug2017, J.48 We note that with the change in the CO to Mr. Edwards, the e-mail address for returning PPQs has been changed in

Attachment 48.

Please confirm that PPQs previously distributed to our references and returned to the original e-mail address for Mr.

Williams will still be accepted.

All PPQs that were previously submitted to Mr. Williams have been sent to Mr. Edwards. All future PPQs should go to Mr. Edwards

Government Responses, p40 In reference to Sub-Tab 3, Financial Responsibility form, the

Q&A response states, "Sub Tab 3 Financial Responsibility

Form added as attachment."

We are unable to locate this form as an attachment. Would the Government please provide it?

See L.36 to L.37 in Amendment 3 of the Revised

Solicitation.

Submitted 10/03

Section L.7.1a 18Aug2017, pL-6 What is the maximum size for each e-mail? We note that the

TS drawings are typically very large files and may be difficult to e-mail unless split into multiple e-mails.

Offerors will be permitted to submit multiple emails to satisfy the requirement.

Section L.7.5.2.1 18Aug2017, pL-34 We note that Amendment 0001 (posted to FBO 07/07/2017) did not include a SF30. Offerors only have SF30s for

Amendments 0002, 0003, and 0004 to complete. Please confirm that this is acceptable or provide the SF30 for

Amendment 0001 if we are to complete it.

This will be acceptable.

Section L.7.4.1 18Aug2017 pL-13 The instructions state that offerors are to provide "all TS1 submission requirements." Please clarify which Section J

Attachments are to be completed for TS1.

See "Technical Scenarios Template" in Amendment 3 of the Revised Solicitation.

Section L.7.4.2 18Aug2017 pL-17 The instructions state that offerors are to provide "all TS2 submission requirements." Please clarify which Section J

Attachments are to be completed for TS2.

See "Technical Scenarios Template" in Amendment 3 of the Revised Solicitation.

Section L.7.4.1.2.1 18Aug2017 pL-18 The instructions refer to Attachment 63, Section J-63 CLIN

Table for Full and Open proposals.

Please clarify - in Section J, Attachment 63 is an acronyms list (pJ-3, J-181).

* For responses to the pricing scenarios, please use the applicable Clin Table below depending on the contract type. These are located in Amendment 3 of the Revised

Solicitation.

"Full AND OPEN CLIN TABLE with Pricing Scenarios" and

"MAINTENANCE & DEACT (SBSA) TABLE with Pricing

Scenarios"

"HAUL & INSTALL (SBSA) TABLE with Pricing Scenarios"

* For responses to the Technical Scenarios, please use

"Technical Scenarios Template" in Amendment 3 of the

Revised Solicitation.

Section L.7.1.a 19Aug2017 pL-6 Please confirm that the electronic submission is to include both a PDF and the Word/Excel files for every section (price and non-price).

The instruction states "In addition, the offeror’s proposal shall be submitted in Microsoft Office format as applicable and be compatible with MS Office 2013." Please clarify if this is in reference to all volumes or only the price tabs. We note that our Technical volume is comprised of multiple documents and large file sizes.

Recommend clarifying the requirement to PDF versions of the entire proposal (all volumes) plus Microsoft Excel files for the cost proposal CLIN table.

Provide both PDF and Word/Excel versions.