LogHouse_Section_E_(v_AC)_Changes_Only_14Nov2017.pdf
PDF 151 KB Posted
- Attached to
- LOGHOUSE Federal contract opportunity
- Solicitation number
- HSFE80-17-R-0005
About this file
LogHouse Section E (v AC) Changes Only
View the file
Other files for this federal contract opportunity
Show all 37
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
HSFE80-17-R-0005 Section E
VERSION ACB AUGUST 18NOVEMBER 14, 2017
E-1
SECTION E - INSPECTION AND ACCEPTANCE
TABLE OF CONTENTS
SECTION E - INSPECTION AND ACCEPTANCE
TABLE OF CONTENTS
Table of Revisions
E.5.2 Rating Determination
APPENDIX 1.1: SINGLE HAUL PERFORMANCE ASSESSMENT
APPENDIX 2.1: SINGLE SITE INSPECTION PERFORMANCE
ASSESSMENT
APPENDIX 3.1: SINGLE INSTALLATION PERFORMANCE
ASSESSMENT
APPENDIX 5.1: SINGLE DEACTIVATION PERFORMANCE
ASSESSMENT
APPENDIX 6.1: UNIT REPOSITIONING, RELOCATION OR
REINSTALLATION PERFORMANCE ASSESSMENT
APPENDIX 7.1: COMERCIAL PARK EXPANSION PERFORMANCE
ASSESSMENT
APPENDIX 8.1: GROUP SITE CONSTRUCTION PERFORMANCE
ASSESSMENT
E-2
Table of Revisions
Version Date Revision AA 6/30/2017 Initial Solicitation AB 8/18/2017 Responses to Questions and
General Clean-up AC 11/14/2017 Additional Clean-up
E-3
E.5.2 Rating Determination
The COR will evaluate the contractor’s performance for each applicable Performance Area as is described in the Performance Area Matrices contained the appendices. The evaluations in each of the Performance Areas use one or more of the following terms.
Table E.5-4: Evaluation Terms
Clock-Stop Days Days where the work on the task could not be performed due to delays beyond the Contractor's control.
Findings The CORs determination of the acceptability of the Contractor’s performance recorded as either “Yes” or “No”.
Though the COR may ascribe a negative finding to any performance outside of requirements, a finding of "No" is typically reserved for failure to deliver or a late / incomplete delivery rendering the deliverable obsolete.
Escalations When the Contractor's performance requires FEMA to resolve an issue within the Contractor’s control in order to complete a task.When the Contractor requires FEMA to resolve an issue within the Contractor’s control in order to complete a task.
Escalations are typically used in the Cost Performance Area Matrix.
Exceptions Events where the Contractor's performance was delayed or undermined by circumstances beyond the Contractor's control.
Exceptions are typically used in the Cost Performance Area Matrix.
Points A point is awarded for each “Yes” finding.
Points are typically used in the Quality, Schedule and Management Performance Area Matrices.
The ratings for each individual Performance Area will be aggregated into the rating category as described in Appendix 10, TOMPA. Specific examples from the individual Performance Areas will be used to justify any rating that is above or below a rating of ME. To the extent possible, the Government has made the individual criteria as quantitative as possible to reduce the level of subjectivity in the evaluation process.
Prime contractors are responsible for the performance of subcontractors at all levels. A Prime contractor is defined as the contractor who has the relationship with FEMA. Subcontractors are defined as any contractor who is working on the contract at any level but does not have a direct contract with FEMA.
The Government is aware that many TOs require substantial coordination efforts with County, City, State, and Federal agency personnel over whom the contractor has no control and who may have different priorities than FEMA contractors. Wherever possible, the COR will note mitigating circumstances that are outside the contractor’s control when making evaluations.
APPENDIX 1.1: SINGLE HAUL PERFORMANCE ASSESSMENT
Enter the data into the following Performance Assessment Table.
E-4
The TM forwards each completed delivery inspection checklist to the COR.
Table A1-1: Performance Assessment Table
WORK ORDER
ISSUE DATE
Driver Arrived On Time For Pickup
(Target = Yes)
Driver On Pickup List
Driver Arrived On Time Per Delivery
Table (Target = Yes)
Unit Accepted Upon Delivery
Finding (Yes or No) (Yes or No) (Yes or No) (Yes or No)
Escalation 0 0 0 0
Points (0 - 1)
0 0 0 0
TOTAL POINTS: 0
TOTAL ESCALATIONS: 0
Though the COR may ascribe a negative finding to any performance outside of requirements, a finding of "No" is typically reserved for failure to deliver or the late / incomplete delivery rendering the deliverable obsolete.
An "Escalation" occurs when a Contractor's performance requires FEMA to resolve an issue within the Contractor’s control in order to complete a task.An "Escalation" consists of the Contractor requiring FEMA to resolve an issue in order to complete delivery.
Table A1-2: Delivery Table
Distance Target
(Miles) (Days)
1 – 499 3
500 – 999 4
1,000 - 1,499 5
1,500 - 1,999 6
2000 - 2,499 7
2,500+ 8
Distances will be calculated using MapQuest unless the contractor submits documentation from the local entity requiring routes to be used that are not available on MapQuest.
Mileage documentation will be submitted with the transportation permit package.
APPENDIX 2.1: SINGLE SITE INSPECTION PERFORMANCE ASSESSMENT
The TM forwards each completed Site Inspection Checklist to the COR.
Table A2-1: Performance Assessment Table
NUMBER
Site Inspection Returned Completed Within
Specified Timeframes
No Contact / Withdrawal Documented Properly
OR
SFIR Submitted Complete
E-5
Feasibility Determined Accurately
Finding (Yes or No) (Yes or No) (Yes or No)
Escalations 0 0 0
Points (0 - 1)
0 0 0 rendering the deliverable obsolete.
An "Escalation" occurs when a Contractor's performance requires FEMA to resolve an issue
Contractor requiring FEMA to resolve an issue in order to complete the site inspection.
APPENDIX 3.1: SINGLE INSTALLATION PERFORMANCE ASSESSMENT
The TM forwards each completed Installation Checklist to the COR.
Table A3-1: Performance Assessment Table
WORK
ORDER
NUMBER
ISSUE DATE
Permit Applications Submitted
THU / TPS
Site Prep
Handled Correctly
Water & Sewer
Hookup / Inspection
Electrical
System Testing
THU
Exterior / Interior
RFO Within Timeframe (See Date Below)
Complete Installation
Package Timely
(See date below)
(Target = Yes)
[DATE]
Clock Stop Days
0 0 0 0 0 0 0 0 0
Findings (Yes or No) (Yes or No) (Yes or No) (Yes or No) (Yes or No) (Yes or No) (Yes or No) (Yes or No) (Yes or No)
Escalations 0 0 0 0 0 0 0 0 0
Points (0 - 1)
0 0 0 0 0 0 0 0 0
"MHU / TPS Handled Correctly" includes bar code control, timely pickup and delivery, transportation diversions, etc.
Record "Clock Stop" for delays beyond the Contractor's control, and record in the column of the activity that is delayed.
Though the COR may ascribe a negative finding to any performance outside of requirements, a finding of "No" is typically reserved for failure to deliver or the late / incomplete delivery rendering the deliverable obsolete.
An "Escalation" occurs when a Contractor's performance requires FEMA to resolve an issue
Contractor requiring FEMA to resolve an issue in order to complete the task.
APPENDIX 5.1: SINGLE DEACTIVATION PERFORMANCE ASSESSMENT
The TM forwards each completed Deactivation Checklist to the COR.
E-6
Table 5-1: Performance Assessment Table
Unit / TPS Disconnected & Rendered Safe
Unit / TPS Ready For Transport
Site Hazards / Installation
Material Removed
(Target = Yes)
Unit / TPS Returned To
Staging
Completed Checklist
(Date)
Clock Stop Days 0 0 0 0 0
Findings (Yes or No) (Yes or No) (Yes or No) (Yes or No) (Yes or No)
Escalations 0 0 0 0 0
Points (0 - 1)
0 0 0 0 0 rendering the deliverable obsolete.
An "Escalation" occurs when a Contractor's performance requires FEMA to resolve an issue
APPENDIX 6.1: UNIT REPOSITIONING, RELOCATION OR REINSTALLATION
PERFORMANCE ASSESSMENT
The TM forwards each completed Unit Repositioning, Relocation or Reinstallation Checklist to the COR.
Table A6-1: Performance Assessment Table
ISSUE
DATE
Unit / TPS Disconnected & Rendered
Safe
Site Hazards / Installation
Material Removed
Permit Applications
Site Prep &
THU / TPS
Handled Correctly
Water & Sewer
Electrical
System Testing
RFO Within Timeframe
Reinstallation / Relocation / Reposition
Package Timely
(Date)
Clock Stop Days
0 0 0 0 0 0 0 0 0
Findings (Yes or No) (Yes or No) (Yes or No) (Yes or No) (Yes or No) (Yes or No) (Yes or No) (Yes or No) (Yes or No)
Escalations 0 0 0 0 0 0 0 0 0
Points (0 - 1)
0 0 0 0 0 0 0 0 0
"Site Prep & MHU / TPS Handled Correctly" includes bar code control, timely pickup and delivery, transportation diversions, etc.
Record "Clock Stop" for delays beyond the Contractor's control, and record in the column of the activity that is delayed.
Though the COR may ascribe a negative finding to any performance outside of requirements, a rendering the deliverable obsolete.
E-7
An "Escalation" occurs when a Contractor's performance requires FEMA to resolve an issue
APPENDIX 7.1: COMERCIAL PARK EXPANSION PERFORMANCE ASSESSMENT
The TM forwards each completed Commercial Park Expansion Checklist to the COR.
Enter the completion dates into the following Performance Assessment Table.
Table A7-1: Performance Assessment Table
Report is Timely /
Construction On-Schedule
Report Content / Construction Is Accurate &
Complete
"V-Zone" / EA
/ NEPA
Conflicts Avoided
Wrap-Around Services
Complete & Accurate
Cost Estimate Within
Parameters
(Date) (Date) (Date) Tier 1 X X X X Tier 2 X X X
Concept X X X X 50% X X X X X
100% X X X X X Construction X X X X X
Clock Stop Days
0 0 0 0 0
Findings (Yes or No) (Yes or No) (Yes or No) (Yes or No) (Yes or No)
Escalations 0 0 0 0 0
Points (0 - 1)
0 0 0 0 0
TOTAL CLOCK DAYS: 0
Record "Clock Stop" for delays beyond the Contractor's control, and record in the column of the activity that is delayed.
Though the COR may ascribe a negative finding to any performance outside of requirements, a finding of "No" is typically reserved for failure to deliver or the late / incomplete delivery rendering the deliverable obsolete.
An "Escalation" occurs when a Contractor's performance requires FEMA to resolve an issue
APPENDIX 8.1: GROUP SITE CONSTRUCTION PERFORMANCE ASSESSMENT
The TM forwards each completed Group Site Construction Checklist to the COR.
Table A8-1: Performance Assessment Table
Report is Timely /
Construction On-Schedule
Report Content / Construction Is Accurate &
Complete
"V-Zone" / EA
/ NEPA
Conflicts Avoided
Wrap-Around Services
Complete & Accurate
Cost Estimate Within
Parameters
(Date) (Date) (Date) Tier 1 X X X X Tier 2 X X X
E-8
Concept X X X X 50% X X X X X
100% X X X X X Construction X X X X X
Clock Stop Days
0 0 0 0 0
Findings (Yes or No) (Yes or No) (Yes or No) (Yes or No) (Yes or No)
Escalations 0 0 0 0 0
Points (0 - 1)
0 0 0 0 0
TOTAL CLOCK DAYS: 0
Record "Clock Stop" for delays beyond the Contractor's control, and record in the column of the activity that is delayed.
Though the COR may ascribe a negative finding to any performance outside of requirements, a finding of "No" is typically reserved for failure to deliver or the late / incomplete delivery rendering the deliverable obsolete.
An "Escalation" occurs when a Contractor's performance requires FEMA to resolve an issue
File details come from the government source that posted it.