Attachment_60_CLIN_Chart.pdf
PDF 493 KB Posted
- Attached to
- LOGHOUSE Federal contract opportunity
- Solicitation number
- HSFE80-17-R-0005
About this file
Section J - Attachment 60 CLIN Chart
View the file
Other files for this federal contract opportunity
Show all 37
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CLIN CLIN TITLE DESCRIPTION
V A
LU
E
O F
IS
SU
E
TY
P
E UNIT OF
ISSUE
TI
M
E N
EG
O
TI
A
TE
D
Base year
CLINS
BASE YEAR
COST
Option
Year
CLINS
OPTION
YEAR 1 PRICE
Option
Year
CLINS
OPTION
YEAR 2 PRICE
Option
Year
CLINS
OPTION
YEAR 3 PRICE
Option
Year
CLINS
OPTION YEAR
4 PRICE
RESERVED FOR FUTURE USE
RESERVED FOR FUTURE USE 0001AA
MH/PM/TT TRANSPORTATION & STAGING
RESERVED FOR FUTURE USE
TRANSPORTATION PERMITS
Payment for applicable transportation permits. Receipts shall be submitted to the COR.
NTE FUP EACH WO 0002AA 1002AA 2002AA 3002AA 4002AA
TRAVEL TRAILER HAUL
Ground mileage for towing a TT from point A to point B for non-installation.
NTE FUP MI CON 0002AC 1002AC 2002AC 3002AC 4002AC
MH / PM SHORT HAUL
Short Haul - Ground Mileage for Towing of MH/PM from the
Manufactured Housing Storage Site (MHSS) to either the
Manufactured Housing Staging Area (MHSA) or other destination as directed by the COR 100 miles or less. (Includes hook-up charges)
NTE FUP MI CON 0002AE 1002AE 2002AE 3002AE 4002AE
MH / PM LONG HAUL
Long Haul - Ground Mileage for Towing of MH/PM from the
Manufactured Housing Storage Site (MHSS) to the Manufactured
Housing Staging Area (MHSA) or Installation Site (greater than 100 miles - first 100 miles is included in basic installation CLIN). (Includes hook-up charges)
NTE FUP MI CON 0002AG 1002AG 2002AG 3002AG 4002AG
TT TRANSPORTATION FOR INSTALL (ADDITIONAL MILES)
Additional miles for installation of TT in a private or commercial site.
Note: First 100 miles are included in the appropriate install CLIN.
NTE FUP MI CON 0002AH 1002AH 2002AH 3002AH 4002AH
MH / PM TRANSPORTATION FOR INSTALL (ADDITIONAL MILES)
Additional miles for installation of a MH/PM in a private/commercial/group site. Note: First 100 miles are included in the appropriate install CLIN.
NTE FUP MI CON 0002AI 1002AI 2002AI 3002AI 4002AI
TRANSPORTATION MISCELLANOUS
This CLIN is only to be used if the work required does not fit within the definition of any other “transportation” CLIN. The contractor shall develop a cost proposal which includes all costs related to the unforeseen work and present the estimate to the CO/COR for review.
Once the CO/COR has agreed to a price for the work, the final cost will become a fixed unit price. CO approval required if >$3,500.
NTE FUP EACH WO 0002AJ 1002AJ 2002AJ 3002AJ 4002AJ
RESERVED FOR FUTURE USE
STAGING MANAGEMENT Unit Staging Area - Management & Support. NTE FUP WEEKLY TO 0002AK 1002AK 2002AK 3002AK 4002AK
CLIN CHART
STAGING SECURITY
Staging Area Security (Level of commitment based on risk assessment.
Minimum of one unarmed guard per staging area 24 hrs./day, 7 days/week.)
NTE FUP WEEKLY TO 0002AL 1002AL 2002AL 3002AL 4002AL
STAGING MHU MAINTENANCE & REPAIR Perform maintenance and repair activities at the staging area(s) NTE FUP EACH WO 0002AN 1002AN 2002AN 3002AN 4002AN
RESERVED FOR FUTURE USE
STAGING MISCELLANOUS
This CLIN is only to be used if the work required does not fit within the definition of any other “staging” CLIN. The contractor shall develop a cost proposal which includes all costs related to the unforeseen work and present the estimate to the CO/COR for review.
Once the CO/COR has agreed to a price for the work, the final cost will become a fixed unit price. CO approval required if >$3,500
NTE FUP EACH WO 0002AP 1002AP 2002AP 3002AP 4002AP
STAGING AREA - TIER ONE SITE ASSESSMENT FOR SITE
DEVELOPMENT
Windshield identification and basic assessment of land for staging area site development. A report identifying certain features and development potential is submitted to the COR.
NTE FUP EA CON 0002AQ 1002AQ 2002AQ 3002AQ 4002AQ
STAGING AREA - FLOOD PLAIN EVALUATION
Determine Flood Plain designation of potential Staging area as directed by the COR
NTE FUP EA CON 0002AS 1002AS 2002AS 3002AS 4002AS
RESERVED FOR FUTURE USE
STAGING AREA - TIER TWO SITE ASSESSMENT
A more detailed assessment of sites identified in Tier One assessment. A report identifying certain features and development potential is submitted to the COR.
NTE FUP EA CON 0002BA 1002BA 2002BA 3002BA 4002BA
STAGING AREA - HISTORICAL PRESERVATION SURVEY
Conduct research on each site in accordance with preservation laws, policies, and executive orders such as the National Historic
Preservation Act. Submit a report of findings to the COR.
NTE FUP EA CON 0002BC 1002BC 2002BC 3002BC 4002BC
STAGING AREA - ENVIRONMENTAL DATABASE SEARCH
Conduct a database search on each site to identify past uses of the site
NTE FUP EA CON 0002BE 1002BE 2002BE 3002BE 4002BE
STAGING AREA - NEPA COMPLIANCE ASSESSMENT
Generate a report addressing the items needed for a comprehensive
Environmental Assessment (EA)
NTE FUP EA CON 0002BG 1002BG 2002BG 3002BG 4002BG
RESERVED FOR FUTURE USE
STAGING AREA - CONCEPTUAL DESIGN
At the direction of the COR and with the issuance of a work order, conduct a conceptual design not to exceed 25% design package.
NTE FUP EA CON 0002BH 1002BH 2002BH 3002BH 4002BH
STAGING AREA - CONCEPTUAL DESIGN - RE-DESIGN
During the design process FEMA may request that the Contractor redesign the Staging Area to include changes. If FEMA requests a redesign, the Contractor shall complete the work within the timeframes and performance requirements that are mandatory for the conceptual design.
NTE FUP EA WO 0002BJ 1002BJ 2002BJ 3002BJ 4002BJ
STAGING AREA - 50% SITE DESIGN
This CLIN covers all design activities as outlined under the contract section “Staging Area” from concept to 50 percent design package.
NTE FUP EA CON 0002BL 1002BL 2002BL 3002BL 4002BL
STAGING AREA - 50% SITE DESIGN - REDESIGN
During the design process FEMA may request that the Contractor redesign the Staging Area to include changes. If FEMA requests a redesign, the Contractor shall complete the work within the timeframes and performance requirements that are mandatory for the 50% design.
NTE FUP EA WO 0002BN 1002BN 2002BN 3002BN 4002BN
STAGING AREA - 100% SITE DESIGN
This CLIN covers all design activities as outlined under the contract section “Staging Area” for 100% design package.
NTE FUP EA CON 0002BP 1002BP 2002BP 3002BP 4002BP
STAGING AREA - 100% SITE DESIGN - REDESIGN
During the design process FEMA may request that the Contractor redesign the “Staging Area” to include changes. If FEMA requests a redesign, the Contractor shall complete the work within the timeframes and performance requirements that are mandatory for the 100% design.
NTE FUP EA WO 0002BQ 1002BQ 2002BQ 3002BQ 4002BQ
COMPLETE CONSTRUCTION
This CLIN includes all work required to complete a fully functional
“Staging Area”site in accordance with the references and requirements described in this contract. Includes all Labor, Material and Equipment.
NTE FUP EA WO 0002BR 1002BR 2002BR 3002BR 4002BR
STAGING AREA - ADDITIONAL SITE WORK
This CLIN is to be used for additional considerations during the construction period that are either new requirements or requirements not readily identifiable at the time of design. The
Contractor shall develop a cost proposal for all work to be carried out as part of this assignment. The final cost will become a fixed unit price. CO approval required if >$3,500
NTE FUP EA WO 0002BT 1002BT 2002BT 3002BT 4002BT
TEMPORARY CONSTRUCTION OFFICE FOR FEMA STAFF
At the discretion of the COR, the Contractor may be required to furnish and install an office trailer complete with all utilities and restroom facility
NTE FUP EA WO 0002BV 1002BV 2002BV 3002BV 4002BV
RESERVED FOR FUTURE USE
SITE INSPECTIONS
RESERVED FOR FUTURE USE
PRIVATE / COMMERCIAL SITE INSPECTIONS
Perform Private Site or Commercial Park Pad Inspections. For use in
Commercial Parks when there are four or less pads to be inspected.
Each pad is inspected individually.
NTE FUP EA CON 0003AA 1003AA 2003AA 3003AA 4003AA
COMMERCIAL PARK FEASIBILITY
Perform Commercial Park Feasibility Inspection (For use when more than four pads are to be inspected in a park). Includes pad assessment
NTE FUP EA CON 0003AC 1003AC 2003AC 3003AC $1,252.65 4003AC
PRIORITY PRIVATE / COMMERCIAL SITE INSPECTION
Perform a Priority Private Site or Commercial Park Pad Inspection. For use in Commercial Parks when there are four or less pads to be inspected. Each pad is inspected individually.
NTE FUP EA CON 0003AE 1003AE 2003AE 3003AE $291.17 4003AE
PRIORITY COMMERCIAL PARK FEASIBILITY
Perform a Priority Commercial Park Feasibility Inspection (For use when more than four pads are to be inspected in a park). Includes pad assessment
NTE FUP EA CON 0003AG 1003AG 2003AG 3003AG $1,252.66 4003AG
UTILITY LOCATOR FEE
In the event that the Contractor pays for the service required for MHU installation, the Government will reimburse the Contractor at actual expense (receipt and/or proper documentation required).
NTE FUP EA WO 0003AI 1003AI 2003AI 3003AI $1,311.27 4003AI
FLOOD ZONE SITE INSPECTION ENGINEERING
Fee for a professional engineer to determine the requirements for installation of a MHU in a flood zone.
NTE FUP EA WO 0003AK 1003AK 2003AK 3003AK $17,483.63 4003AK
RESERVED FOR FUTURE USE
NO CONTACT
the Contractor must perform and document a minimum of four (4) attempts to contact the disaster survivor within a 48 hour period prior to returning the SIR Work Order as “No Contact”.
NTE FUP EA CON 0003AM 1003AM 2003AM 3003AM $218.55 4003AM
WITHDRAWN PHONE
A site inspection is deemed Withdrawn when the disaster survivor states over the phone that the survivor no longer wishes to participate in the Manufactured Housing Program. If the disaster survivor informs the Contractor during the appointment process, the
Contractor will note on the SIR “withdrawn phone” and provide the time and date of the call.
NTE FUP EA CON 0003AO 1003AO 2003AO 3003AO $163.91 4003AO
WITHDRAWN SITE
Withdrawn – A site inspection is deemed Withdrawn when the disaster survivor informs the site inspector at the site that the survivor no longer wishes to participate in the Manufactured Housing
Program.
NTE FUP EA WO 0003AQ 1003AQ 2003AQ 3003AQ $327.82 4003AQ
RESERVED FOR FUTURE USE
AREA ASSESSMENT (Semi permanent/permanent installation) Conduct area assessment to investigate the regulations that govern permanent installation work and other data for the area.
NTE FUP EA WO 0003AS 1003AS 2003AS 3003AS $327.82 4003AS
INDIVIDUAL SITE INSPECTION/DETAILED SCOPE OF WORK (Semi permanent/permanent installation)
Perform site inspection and provide a detialed Scope of Work including a sketch and detailed cost estimate
NTE FUP EA WO 0003AU 1003AU 2003AU 3003AU $5,354.36 4003AU
RESERVED FOR FUTURE USE
INSTALLATION
RESERVED FOR FUTURE USE
INSTALLATION PERMITS Bonds and Permits for installation NTE FUP EA WO 0004AA 1004AA 2004AA 3004AA 4004AA
PRIVATE INSTALL MH / PM
Basic Manufactured Home / Park Model Installation on a private site.
Includes one set of stairs installed at the rear entrance ONLY. Includes transportation for install (up to 100 miles), basic site preparation, blocking, strapping and anchoring, electrical/water/sewer connection/installation (up to 50 feet), hvac installation, skirting, and clean and make ready for occupancy. For Park Model units, the
Contractor may, at their option, use a single porch bridging between both doors, provided that the Park Models have both entrance/exit doors on the same side of the unit, with a single set of stairs or platform stair servicing the porch.
NTE FUP EA CON 0004AC 1004AC 2004AC 3004AC 4004AC
PRIVATE INSTALL TT
Basic Manufactured Travel Trailer Installation on private site. Includes transportation for install (up to 100 miles), basic site preparation, blocking, strapping and anchoring, electrical / water/sewer connection / installation (up to 50 feet), and Clean and Make Ready for Occupancy. This CLIN DOES NOT include steps.
NTE FUP EA CON 0004AE 1004AE 2004AE 3004AE 4004AE
MISCELLANOUS SITE PREP MH / PM
Misc. Expenses for Private Site Preparation and /or Basic MH / PM installation over & above basic installation charges. The Contractor shall develop a cost proposal for all work to be carried out as part of this assignment. The final negotiated cost will become a fixed price item. CO approval required if >$3,500
NTE FUP EA WO 0004AG 1004AG 2004AG 3004AG 4004AG
MISCELLANOUS SITE PREP TT
Misc. Expenses for Private Site Preparation and/or Basic Travel Trailer
Installation over & above basic installation charges. The Contractor shall develop a cost proposal for all work to be carried out as part of this assignment. The final negotiated cost will become a fixed price item. CO approval required if >$3,500
NTE FUP EA WO 0004AI 1004AI 2004AI 3004AI 4004AI
MH / PM COMMERCIAL / GROUP BASIC INSTALL
Basic Manufactured Home / Park Model installation at a commercial or group site. Includes one set of stairs installed at the rear entrance.
Includes: transportation for install (up to 100 miles).
NTE FUP EA CON 0004AK 1004AK 2004AK 3004AK 4004AK
TT COMMERCIAL / GROUP BASIC INSTALL
Basic Manufactured Travel Trailer Installation at commercial or group site. Include: Transportation for install (up to 100 miles). This CLIN
DOES NOT include stairs, steps or ramp. NTE FUP EA CON 0004AM 1004AM 2004AM 3004AM 4004AM
MISCELLANOUS COMMERCIAL SITE PREP MH / PM
Misc. expenses for commercial site preparation over & above basic
MHU installation charges. The Contractor shall develop a cost proposal for all work to be carried out as part of this assignment. The final negotiated cost will become a fixed price item. CO approval required if >$3,500.
NTE FUP EA WO 0004AO 1004AO 2004AO 3004AO 4004AO
MISCELLANOUS COMMERCIAL SITE PREP TT
Misc. expenses for commercial site preparation over & above basic TT installation charges. The Contractor shall develop a cost proposal for all work to be carried out as part of this assignment. The final negotiated cost will become a fixed price item. CO approval required if >$3,500
NTE FUP EA WO 0004AQ 1004AQ 2004AQ 3004AQ 4004AQ
PAD ENHANCEMENT
The contractor shall provide all materials, equipment and labor to complete the Pad Enhancement. Crowning of an installation site will only be required on private sites and commercial pads.
NTE FUP EA WO 0004AS 1004AS 2004AS 3004AS 4004AS
STEPS / STAIRS MH / PM
Standard Steps for MH/PM (Price per additional entrance, i.e. Front
Stairs)
NTE FUP EA CON 0004AU 1004AU 2004AU 3004AU 4004AU
STEPS / STAIRS TT Standard Steps for travel trailer. NTE FUP EA CON 0004AX 1004AX 2004AX 3004AX 4004AX
MH / PM UFAS RAMP Manufactured Home UFAS Ramp (up to 40 feet of ramp) NTE FUP EA CON 0004AZ 1004AZ 2004AZ 3004AZ 4004AZ
TT UFAS RAMP Travel Trailer UFAS Ramp (up to 30 feet of ramp) NTE FUP EA CON 0004BA 1004BA 2004BA 3004BA 4004BA
ADDITIONAL RAMP Additional per foot ramp NTE FUP LF CON 0004BC 1004BC 2004BC 3004BC 4004BC
PLATFORM STEPS/STAIRS FOR MH/PM Platform Steps For MH/PM NTE FUP EA CON 0004BE 1004BE 2004BE 3004BE 4004BE
PLATFORM STEPS / STAIRS FOR TT Platform Steps for TT NTE FUP EA CON 0004BG 1004BG 2004BG 3004BG 4004BG
RESERVED FOR FUTURE USE
SEWER TAP FEE Sewer Tap Fee. NTE FUP EA WO 0004BI 1004BI 2004BI 3004BI 4004BI
ADDITIONAL SEWER LINE (ABOVE GROUND)
4-Inch Lateral Sewer Line, Above ground (over basic install included sewer line).
NTE FUP LF CON 0004BK 1004BK 2004BK 3004BK 4004BK
ADDITIONAL SEWER LINE (BURIED)
4-Inch Lateral Sewer Line, Buried (over basic install included buried sewer line).
NTE FUP LF CON 0004BM 1004BM 2004BM 3004BM 4004BM
BLADDER INSTALLATION (FLEXIBLE HOLDING TANK)
Contractor shall provide and install a poly-plastic bladder (holding tank ) to capture and store waste water from the MHU.
NTE FUP EA WO 0004BO 1004BO 2004BO 3004BO 4004BO
RESERVED FOR FUTURE USE
WATER TAP FEE Municipal Water Tap Fee. NTE FUP EA WO 0004BQ 1004BQ 2004BQ 3004BQ 4004BQ
ADDITIONAL BURIED WATER LINE
3/4 inch Water Line Extension, Buried (over basic install included buried water line).
NTE FUP LF CON 0004BS 1004BS 2004BS 3004BS 4004BS
ADDITIONAL WATER LINE FOR TT
Provide additional RV grade polyurethane hose that is RoHS compliant.
NTE FUP
EA
WO 0004BT 1004BT 2004BT 3004BT 4004BT
WELL PUMP Direct Wiring of Well Pump. NTE FUP EA CON 0004BV 1004BV 2004BV 3004BV 4004BV
RESERVED FOR FUTURE USE
ELECTRIC TAP FEE Electric Tap Fee. NTE FUP EA WO 0004BX 1004BX 2004BX 3004BX 4004BX
POWER POLE Power Pole and Meter Loop. NTE FUP EA CON 0004BZ 1004BZ 2004BZ 3004BZ 4004BZ
INTERIM (INTERMEDIATE) POWER POLE
Power Pole without a meter loop that supports overhead electrical lines
NTE FUP EA CON 0004CA 1004CA 2004CA 3004CA 4004CA
POWER PEDESTAL Single Power Pedestal & Meter Loop. NTE FUP EA CON 0004CC 1004CC 2004CC 3004CC 4004CC
ADDITIONAL WIRING Additional wiring over basic install NTE FUP LF CON 0004CE 1004CE 2004CE 3004CE 4004CE
ELECTRICAL GANG RACK
Provide and install an electrical gang rack consisting of two (2) or more two hundred (200) amp meter loops. The contractor shall develop a cost proposal for this work. Once the CO/COR has approved the cost proposal, the final cost will become a fixed unit price. CO approval required if >$3,500
NTE FUP EA WO 0004CG 1004CG 2004CG 3004CG 4004CG
ADDITIONAL EXCAVATION
Excavation beyond 48 inches requires COR approval and cost proposal.
NTE FUP
CUBIC
YARD
WO 0004CI 1004CI 2004CI 3004CI 4004CI
RESERVED FOR FUTURE USE
LIQUID PROPANE (LP) INSTALLATION
May be used in conjunction with a separate contract to provide delivery, rental, maintenance of tanks and fuel.
NTE FUP EA WO 0004CK 1004CK 2004CK 3004CK 4004CK
LP FILL / REFILLING Initial fill or refill of liquid propane tanks. NTE FUP EA WO 0004CM 1004CM 2004CM 3004CM 4004CM
NATURAL GAS CONNECTION Natural Gas Connection. NTE FUP EA WO 0004CO 1004CO 2004CO 3004CO 4004CO
CONVERT FROM NATURAL GAS TO LIQUID PROPANE
Convert appliances from Natural Gas to Liquid Propane. For use when there is an MHU that is suited for Natural Gas but the available source is Liquid Propane.
NTE FUP EA WO 0004CQ 1004CQ 2004CQ 3004CQ 4004CQ
SKIRTING FOR TT Installation of skirting on a TT. Requires COR approval NTE FUP EA WO 0004CT 1004CT 2004CT 3004CT 4004CT
INSTALLATION MISCELLANOUS
This CLIN is only to be used if the work required does not fit within the definition of any other “installation” CLIN. The contractor shall develop a cost proposal which includes all costs related to the unforeseen work and present the estimate to the CO/COR for approval. Once the CO/COR has approved the cost proposal, the final cost will become a fixed unit price. CO approval required if >$3,500.
NTE FUP EA WO 0004CU 1004CU 2004CU 3004CU 4004CU
RESERVED FOR FUTURE USE
MHU SEMI-PERMANENT/PERMANENT INSTALLATION Requirements necessary to make an MHU installation permanent. NTE FUP EA WO 0004CY 1004CY 2004CY 3004CY 4004CY
ROAD/ACCESS PREPARATION
Work to make ingress/egress feasible prior to manufactured home transportation to private/commercial site. Requires COR/CO approval.
NTE FUP EA WO 0004CZ 1004CZ 2004CZ 3004CZ 4004CZ
EXTENSION OF UTILITY SERVICES
Contractor shall be prepared to coordinate and/or contract with the power utility, water company, and sewer service for the extension of services to the designated property. Requires COR/CO approval.
NTE FUP EA WO 0004DA 1004DA 2004DA 3004DA 4004DA
RESERVED FOR FUTURE USE
PREVENTIVE MAINTENANCE & REPAIRS
PMIR
Preventive Maintenance Inspection and Repairs (includes minor repair labor and materials).
NTE FUP PER UNIT CON 0005AA 1005AA 2005AA 3005AA 4005AA
RESERVED FOR FUTURE USE
CALL CENTER Maintenance Call Center. NTE FUP MONTHLY CON 0005AC 1005AC 2005AC 3005AC 4005AC
ROUTINE REPAIRS
Repairs that are serious but do not present an imminent danger to the health, safety or security of the unit occupant or property. Routine repairs are up to a $250.00 material. Labor for routine repairs is included in PMIR.
NTE FUP EA WO 0005AD 1005AD 2005AD 3005AD 4005AD
MAJOR REPAIRS
Major Repairs Items. As required by the COR in writing prior to any work being done. Maintenance in excess of $250 for materials and/or
$250 in labor but less than $3500 will require COR approval. CO approval required if >$3,500.
NTE FUP EA WO 0005AF 1005AF 2005AF 3005AF 4005AF
EMERGENCYT REPAIR MHU VISIT AND DETERMINATION
Use this CLIN to cover the Inspection and Determination of an
Emergency Repair MHU. Includes Labor and Travel to the site.
NTE FUP EA 0005AH 1005AH 2005AH 3005AH 4005AH
EMERGENCY REPAIRS LABOR
Emergency Repair Labor: Labor for emergency repairs performed. The contractor shall make repairs to the extent there is no longer a safety hazard, life or death situation, or emergency issue. The Contractor shall respond and initiate the repair within two hours. Contractor shall notify the COR by the next day.
NTE FUP
FIXED
HOURLY
RATE
WO 0005AJ 1005AJ 2005AJ 3005AJ 4005AJ
EMERGENCY REPAIR, ODC MATERIAL, AND EQUIPMENT
Emergency Maintenance Repair Equipment and Material. This CLIN is used to cover the actual costs for material and equipment only used during the Emergency Repair. The contractor shall use this CLIN for the material and equipment used to respond to Emergency Repairs to the extent there is no longer a safety hazard, life or death situation, or emergency issue. The Contractor shall respond and initiate the repair within two hours. Contractor shall notify the COR by the next day.
C O
S T
R E
IM
B
U R
S E
M E
N T
A C
T U
A L
EA
A C
T U
A L
0005AL 1005AL 2005AL 3005AL 4005AL
RESERVED FOR FUTURE USE
TRANSPORT REPAIRS
Transportation Maintenance Repairs and cleaning. As required by the
COR in writing prior to any work being done. COR approval required.
CO approval required if >$3,500.
NTE FUP EA WO 0005AN 1005AN 2005AN 3005AN 4005AN
EMERGENCY UNIT ENTRY SERVICE
Perform Emergency Unit Entry Service for occupants unable to gain access to a unit.
NTE FUP EA WO 0005AP 1005AP 2005AP 3005AP 4005AP
BLADDER PUMP OUT SERVICE
Provide septic pump out service for MHUs that have bladders installed to collect waste water. The Government will reimburse the
Contractor at actual expense (receipt and proper documentation required).
NTE
A C
T U
A L
EA WO 0005AR 1005AR 2005AR 3005AR 4005AR
PMIR MISCELLANOUS
During the “maintenance” of an MHU there may be issues that cannot be foreseen but are required to complete the “maintenance”. This
CLIN is only to be used if the work required does not fit within the definition of any other “maintenance” CLIN. The contractor shall develop a cost proposal which includes all costs related to the unforeseen work and present the estimate to the CO/COR for review.
The final negotiated cost will become a fixed price item. CO approval required if >$3,500.
NTE FUP EA WO 0005AT 1005AT 2005AT 3005AT 4005AT
RESIDENTIAL FIRE SPRINKLER SYSTEM REPAIRS
During the “maintenance” of the Residential Fire Sprinkler System and
Tank and Pump System there may be issues that requires the utilization of a certified Fire Suppression / Installation expert. This
CLIN is only to be used if the work required does not fit within the definition of the “maintenance” CLIN and requires parts and specailty labor . The contractor shall develop a cost proposal which includes all costs related to the unforeseen work and present the estimate to the
CO/COR for review. The final negotiated cost will become a fixed price item. CO approval required if >$3,500.
NTE FUP EA WO 0005AV 1005AV 2005AV 3005AV 4005AV
UNIT TRANSFER INSPECTION BETWEEN CONTRACTORS
Perform inspections when MHU responsibilities transfer from one contractor to another.
NTE FUP EA WO 0005AX 1005AX 2005AX 3005AX 4005AX
DEACTIVATION
CMRR Clean and Make Ready for Reuse NTE FUP EA CON 0006AA 1006AA 2006AA 3006AA 4006AA
CLEAN AND MAKE READY FOR REUSE MISCELLANOUS
A miscellaneous CLIN for Clean and Make Ready for Reuse may be issued to the Contractor if the work needed cannot be completed within the SCOPE of an existing CLIN. Any items or services required to Clean and Make Ready for Reuse not covered in other parts of this
PWS will require approval from the CO or COR. The Contractor shall develop a cost proposal for all work to be carried out as part of this assignment. The final negotiated cost will become a fixed price item.
CO approval required if >$3,500.
NTE FUP EA WO 0006AC 1006AC 2006AC 3006AC 4006AC
MH / PM DEACT MH / PM Basic Deactivation (Includes 100 miles) NTE FUP EA CON 0006AE 1006AE 2006AE 3006AE 4006AE
TT DEACT TT Basic Deactivation. NTE FUP EA CON 0006AG 1006AG 2006AG 3006AG 4006AG
DEACTIVATION MISCELLANOUS
This CLIN is only to be used if the work required does not fit within the definition of any other “deactivation” CLIN. The contractor shall develop a cost proposal which includes all costs related to the unforeseen work and present the estimate to the CO/COR for review.
Once the CO/COR has agreed to a price for the work, the final cost will become a fixed unit price. CO approval required if >$3,500.
NTE FUP EA WO 0006AI 1006AI 2006AI 3006AI 4006AI
MH / PM EMERGENCY DEACT MH / PM Emergency Deactivation. NTE FUP EA CON 0006AK 1006AK 2006AK 3006AK 4006AK
TT EMERGENCY DEACT TT Emergency Deactivation. NTE FUP EA CON 0006AM 1006AM 2006AM 3006AM 4006AM
RESERVED FOR FUTURE USE
RELOCATION MH/PM
Deactivation of the unit at its original location, and installation at a new location.
NTE FUP EA CON 0006AO 1006AO 2006AO 3006AO 4006AO
RELOCATION TT
Deactivation of the unit at its original location, and installation at a new location.
NTE FUP EA CON 0006AP 1006AP 2006AP 3006AP 4006AP
REPOSITION MH / PM
Deactivation of the unit at its original location, and install at a location on the same site.
NTE FUP EA CON 0006AR 1006AR 2006AR 3006AR 4006AR
REPOSITION TT
Deactivation of the unit at its original location, and install at a location on the same site.
NTE FUP EA CON 0006AT 1006AT 2006AT 3006AT 4006AT
MH / PM REINSTALLATION
The work order includes removal and replacement of the MHU at the same site.
NTE FUP EA WO 0006AU 1006AU 2006AU 3006AU 4006AU
TT REINSTALLATION
The work order includes removal and replacement of the TT at the same site.
NTE FUP EA WO 0006AW 1006AW 2006AW 3006AW 4006AW
CROWNING REMOVAL
The work includes all materials, equipment and labor to remove the crowning of a Commercial/Private Site.
NTE FUP EA WO 0006AY 1006AY 2006AY 3006AY 4006AY
RESERVED FOR FUTURE USE
BLADDER TANK REMOVAL (FLEXIBLE HOLDING TANK)
Contractor shall remove a previously installed poly-plastic bladder
(holding tank) to capture and store waste water from the MHU.
NTE FUP EA WO 0006BA 1006BA 2006BA 3006BA 4006BA
INVENTORY OF PERSONAL PROPERTY
At the direction of the COR and issuance of a work order the
Contractor shall inventory and secure all person property in accordance with the Inventory of Personal Property Procedures.
NTE FUP EA CON 0006BC 1006BC 2006BC 3006BC 4006BC
COMMERCIAL PARK EXPANSION
TIER ONE SITE ASSESSMENT FOR COMMERCIAL PARK EXPANSION
DEVELOPMENT
Windshield identification and basic assessment of land for commercial park development. A report identifying certain features and development potential is submitted to the COR.
NTE FUP EA WO 0007AA 1007AA 2007AA 3007AA 4007AA
FLOOD PLAIN EVALUATION
Determine Flood Plain designation of potential commercial park expansion as directed by the COR.
NTE FUP EA WO 0007AC 1007AC 2007AC 3007AC 4007AC
WRAP AROUND SERVICES EVALUATION Identify distances to the nearest shopping area, schools, etc. NTE FUP EA CON 0007AE 1007AE 2007AE 3007AE 4007AE
RESERVED FOR FUTURE USE
TIER TWO SITE ASSESSMENT
A more detailed assessment of sites identified in Tier One assessment. A report identifying certain features and development potential is submitted to the COR.
NTE FUP EA WO 0007AG 1007AG 2007AG 3007AG 4007AG
HISTORICAL PRESERVATION SURVEY
Conduct research on each site in accordance with preservation laws, policies, and executive orders such as the National Historic
Preservation Act. Submit a report of findings to the COR.
NTE FUP EA WO 0007AI 1007AI 2007AI 3007AI 4007AI
ENVIRONMENTAL DATABASE SEARCH
Conduct a database search on each site to identify past uses of the site.
NTE FUP EA WO 0007AK 1007AK 2007AK 3007AK 4007AK
NEPA COMPLIANCE ASSESSMENT
Generate a report addressing the items needed for a comprehensive
Environmental Assessment (EA).
NTE FUP EA WO 0007AM 1007AM 2007AM 3007AM 4007AM
CONCEPTUAL DESIGN
At the direction of the COR and with the issuance of a work order, conduct a conceptual design not to exceed 25% design package.
NTE FUP EA WO 0007AO 1007AO 2007AO 3007AO 4007AO
CONCEPTUAL DESIGN- REDESIGN
During the design process FEMA may request that the Contractor redesign the commercial site expansion to include changes. If FEMA requests a redesign, the Contractor shall complete the work within the timeframes and performance requirements that are mandatory for the conceptual design.
NTE FUP EA WO 0007AQ 1007AQ 2007AQ 3007AQ 4007AQ
50% SITE DESIGN
This CLIN covers all design activities as outlined under the contract section “Commercial Park Expansion” from concept to 50 percent design package.
NTE FUP EA WO 0007AS 1007AS 2007AS 3007AS 4007AS
50% SITE DESIGN - REDESIGN
During the design process FEMA may request that the Contractor redesign the commercial site expansion to include changes. If FEMA requests a redesign, the Contractor shall complete the work within the timeframes and performance requirements that are mandatory for the 50% design.
NTE FUP EA WO 0007AU 1007AU 2007AU 3007AU 4007AU
100% SITE DESIGN
This CLIN covers all design activities as outlined under the contract section “Commercial Park Expansion” for 100% design package.
NTE FUP EA WO 0007AW 1007AW 2007AW 3007AW 4007AW
100% SITE DESIGN - REDESIGN
During the design process FEMA may request that the Contractor redesign the commercial site expansion to include changes. If FEMA requests a redesign, the Contractor shall complete the work within the timeframes and performance requirements that are mandatory for the 100% design.
NTE FUP EA WO 0007AY 1007AY 2007AY 3007AY 4007AY
COMPLETE CONSTRUCTION
This CLIN includes all work required to complete a fully functional commercial park expansion site in accordance with the references and requirements described in this contract. Includes all Labor, Material and Equipment.
NTE FUP EA WO 0007BA 1007BA 2007BA 3007BA 4007BA
ADDITIONAL SITE WORK
This CLIN is to be used for additional considerations during the construction period that are either new requirements or requirements not readily identifiable at the time of design. The
Contractor shall develop a cost proposal for all work to be carried out as part of this assignment. The final negotiated cost will become a fixed price item. CO approval required if >$3,500.
NTE FUP EA WO 0007BC 1007BC 2007BC 3007BC 4007BC
UTILITY ACCOUNT SET UP
Contractor to obtain utility account(s) for initial set-up of units and / or group site construction
NTE FUP EA WO 0007BE 1007BE 2007BE 3007BE 4007BE
TEMPORARY CONSTRUCTION OFFICE FOR FEMA STAFF
At the discretion of the COR, the Contractor may be required to furnish and install an office trailer complete with all utilities and restroom facility
NTE FUP EA WO 0007BG 1007BG 2007BG 3007BG 4007BG
CONTRACTOR FIELD OFFICE
Establishment of a contractor field office within the disaster area of operation. Requires prior COR/CO approval. CO approval required if
>$3,500.
NTE FUP EA WO 0007BJ 1007BJ 2007BJ 3007BJ 4007BJ
GROUP SITE CONSTRUCTION
TIER ONE SITE ASSESSMENT GROUP SITE DEVELOPMENT
Windshield identification and basic assessment of land for group site development. A report identifying certain features and development potential is submitted to the COR.
NTE FUP EA WO 0008AA 1008AA 2008AA 3008AA 4008AA
FLOOD PLAIN EVALUATION
Determine Flood Plain designation of potential group site as directed by the COR.
NTE FUP EA WO 0008AC 1008AC 2008AC 3008AC 4008AC
WRAP AROUND SERVICES EVALUATION Identify distances to the nearest shopping area, schools, etc. NTE FUP EA CON 0008AD 1008AD 2008AD 3008AD 4008AD
RESERVED FOR FUTURE USE
TIER TWO SITE ASSESSMENT
A more detailed assessment of sites identified in Tier One assessment. A report identifying certain features and development potential is submitted to the COR.
NTE FUP EA WO 0008AF 1008AF 2008AF 3008AF 4008AF
HISTORICAL PRESERVATION SURVEY
Conduct research on each site in accordance with preservation laws, policies, and executive orders such as the National Historic
Preservation Act. Submit a report of findings to the COR.
NTE FUP EA WO 0008AH 1008AH 2008AH 3008AH 4008AH
ENVIRONMENTAL DATABASE SEARCH
Conduct a database search on each site to identify past uses of the site.
NTE FUP EA WO 0008AJ 1008AJ 2008AJ 3008AJ 4008AJ
NEPA COMPLIANCE ASSESSMENT
Generate a report addressing the items needed for a comprehensive
Environmental Assessment (EA).
NTE FUP EA WO 0008AL 1008AL 2008AL 3008AL 4008AL
CONCEPTUAL DESIGN
At the direction of the COR and with the issuance of a work order, conduct a conceptual design not to exceed 25% design package.
NTE FUP EA WO 0008AN 1008AN 2008AN 3008AN 4008AN
CONCEPTUAL DESIGN - RE-DESIGN
During the design process FEMA may request that the Contractor redesign the group site to include changes. If FEMA requests a redesign, the Contractor shall complete the work within the timeframes and performance requirements that are mandatory for the conceptual design.
NTE FUP EA WO 0008AP 1008AP 2008AP 3008AP 4008AP
50% SITE DESIGN
This CLIN covers all design activities as outlined under the contract section “Group site design” from concept to 50 percent design package.
NTE FUP EA WO 0008AR 1008AR 2008AR 3008AR 4008AR
50% SITE DESIGN - REDESIGN
During the design process FEMA may request that the Contractor redesign the group site to include changes. If FEMA requests a redesign, the Contractor shall complete the work within the timeframes and performance requirements that are mandatory for the 50% design.
NTE FUP EA WO 0008AT 1008AT 2008AT 3008AT 4008AT
100% SITE DESIGN
This CLIN covers all design activities as outlined under the contract section Group site design” for 100% design package.
NTE FUP EA WO 0008AV 1008AV 2008AV 3008AV 4008AV
100% SITE DESIGN (REDESIGN)
During the design process FEMA may request that the Contractor redesign the group site to include changes. If FEMA requests a redesign, the Contractor shall complete the work within the timeframes and performance requirements that are mandatory for the 100% design.
NTE FUP EA WO 0008AX 1008AX 2008RAX 3008AX 4008AX
RESERVED FOR FUTURE USE
COMPLETE CONSTRUCTION
This CLIN includes all work required to complete a fully functional
Group site in accordance with the references and requirements described in this contract. Includes all Labor, Material and
Equipment.
NTE FUP EA WO 0008AY 1008AY 2008AY 3008AY 4008AY
ADDITIONAL SITE WORK
This CLIN is to be used for additional considerations during the construction period that are either new requirements or requirements not readily identifiable at the time of design. The
Contractor shall develop a cost proposal for all work to be carried out as part of this assignment. The final negotiated cost will become a fixed price item.
NTE FUP EA WO 0008BA 1008BA 2008BA 3008BA 4008BA
UTILITY ACCOUNT SET UP
Contractor to obtain utility account(s) for initial set-up of units and / or group site construction
NTE FUP EA WO 0008BC 1008BC 2008BC 3008BC 4008BC
TEMPORARY CONSTRUCTION OFFICE FOR FEMA STAFF
At the discretion of the COR, the Contractor may be required to furnish and install an office trailer complete with all utilities and restroom facility
NTE FUP EA WO 0008BF 108BF 2008BF 3008BF 4008BF
GROUP SITE MAINTENANCE
GROUP SITE MAINTENANCE
Maintenance and upkeep of the group site. Period of performance will be defined at TO award.
NTE FUP MONTHLY TO 0009AA 1009AA 2009AA 3009AA 4009AA
GROUP SITE INSPECTION
Inspection of the entire group site, as required by FEMA to include inspections for preparatory and post storm reasons and activities, and/or incidents of national significance.
NTE FUP EA WO 0009AC 1009AC 2009AC 3009AC 4009AC
LAWN SERVICE
Cutting and trimming around all MHUs and common areas located inside the boundaries of the group site. Frequency to be determined by the COR.
NTE FUP EA WO 0009AE 1009AE 2009AE 3009AE 4009AE
SNOW REMOVAL
Removal of snow from group site road surfaces, UFAS ramps / platform step and all common areas inside the site. Frequency to be determined by the COR.
NTE FUP EA WO 0009AG 1009AG 2009AG 3009AG 4009AG
MISCELLANEOUS MAINTENANCE
Any items or services required to maintain the group site not covered in other parts of this PWS. The Contractor shall develop a cost proposal for all work to be carried out as part of this assignment. The final negotiated cost will become a fixed price item. CO approval required if >$3,500.
NTE FUP EA WO 0009AI 1009AI 2009AI 3009AI 4009AI
RESERVED FOR FUTURE USE
ADDITIONAL REQUIREMENTS
TABLETOP EXERCISE / ANNUAL MEETING / FIELD TRAINING
Participation in Field Operations/Mission Readiness Exercise Event /
Annual meeting / field training. Includes Salary, Benefits etc. and
Travel Costs per Contractor (See Section 14.1.2.1)
NTE FUP EA TO 0010AA 1010AA 2010AA 3010AA 4010AA
SAMS AND HOMES TRAINING
Participation in Sunflower Asset Management System (SAMS) and
HOMES Training (See section C.14.1.2.2 and C.14.1.2.3)
NTE FUP EA TO 0010AC 1010AC 2010AC 3010AC 4010AC
STAFF PREPAREDNESS
This CLIN allows for specific staff to meet the requirements of HSPD-
12. Staff based on the number of simultaneous missions allowing for limited redundancy for staff that may not be available. (See Section
14.1.2.4)
NTE FUP EA TO 0010AD 1010AD 2010AD 3010AD 4010AD
SCREENING OF POTENTIAL SUBCONTRACTORS
The screening of subcontractors applies to businesses that may be required to provide a Contractor with material, personnel, or service support on short notice, as required to execute contract.
NTE FUP EA TO 0010AE 1010AE 2010AE 3010AE 4010AE
ENHANCEMENTS TO FEMA GUIDES
Use this CLIN for enhancements for FEMA guides (See Section
C.14.1.2.6 )
NTE FUP EA TO 0010AG 1010AG 2010AG 3010AG 4010AG
REESERVED FOR FUTURE USE
PRE- EVENT SAFETY PLAN This CLIN is for the Pre-Event Safety Plan (See Section C.14.1.2.7) NTE FUP EA TO 0010AI 1010AI 2010AI 3010AI 4010AI
LICENSES This CLIN is for Licenses as part of the Licenses (See Section C.14.1.3) NTE FUP EA TO 0010AK 1010AK 2010AK 3010AK 4010AK
SITE INSPECTION TRAINING DEVELOPMENT Training development for Site Inspection (See Section C.14.1.4.2) NTE FUP EA TO 0010AM 1010AM 2010AM 3010AM 4010AM
INSTALLATION (HAUL AND INSTALL) TRAININIG DEVELOPMENT Training development for Installation (See Section C.14.1.4.3) NTE FUP EA TO 0010AO 1010AO 2010AO 3010AO 4010AO
MAINTENANCE TRAINING Training Development – Maintenance (See Section C.14.1.4.4) NTE FUP EA TO 0010AQ 1010AQ 2010AQ 3010AQ 4010AQ
DEACTIVATION TRAINING Training Development – Deactivation (See Section C.14.1.4.5) NTE FUP EA TO 0010AS 1010AS 2010AS 3010AS 4010AS
COMMERCIAL PARK EXPANSION / GROUP SITE-SITE INSPECTION /
FEASIBILITY / SITE DESIGN TRAINING
Training Development for - Commercial Park Expansion / Group site -
Site Inspection / Feasibility and Design (See Section C.14.1.4.6)
NTE FUP EA TO 0010AU 1010AU 2010AU 3010AU 4010AU
COMMERCIAL PARK EXPANSION/GROUP SITE -CONSTRUCTION OVERSIGHT
TRAINING
Training Development – Commercial Park Expansion / Group Site –
Construction
NTE FUP EA TO 0010AW 1010AW 2010AW 3010AW 4010AW
MHU INSTALLATION TRAINING
MHU Installation Training – Physical Installation (Small Business Haul and Install Contractors Only – General Use) - See Section C.14.1.4.8.1
NTE FUP EA TO 0010AY 1010AY 2010AY 3010AY 4010AY
MHU DEACTIVATION TRAINING
MHU Deactivation Training (Small Business Maintenance and
Deactivation Contractors Only – General Use) - See Section
C.14.1.4.8.2
NTE FUP EA TO 0010BA 1010BA 2010BA 3010BA 4010BA
LICENSE AND NON-INSTALLATION REQUIREMENTS
Pre- Event Database Development for License and Non-Installation
Requirements (See Section C.14.1.5.1)
NTE FUP EA TO 0010BC 1010BC 2010BC 3010BC 4010BC
TRANSPORTATION REQUIREMENTS
Pre-Event Database Development – Transportation Requirements
(See Section C.14.1.5.2)
NTE FUP EA TO 0010BE 1010BE 2010BE 3010BE 4010BE
REESERVED FOR FUTURE USE
POTENTIAL SUB-CONTRACTOR
Pre-Event Database Development – Potential Sub-contractors (See
Section C.14.1.5.3)
NTE FUP EA TO 0010BG 1010BG 2010BG 3010BG 4010BG
INSTALLATION REQUIREMENTS DATABASE DEVELOPMENT
Pre-Event Database Development – Installation Requirements
Database Development (See Section 14.1.5.4.1)
NTE FUP EA TO 0010BI 1010BI 2010BI 3010BI 4010BI
INSTALLATION REQUIREMENTS DATABASE COMPARISON
Pre-Event Database Development – Installation Requirements
Database Comparison (See Section 14.1.5.4.2)
NTE FUP EA TO 0010BK 1010BK 2010BK 3010BK 4010BK
COMMERCIAL PARK DATABASE
Pre-Event Database Development – Commercial Park Database (See
Section 14.1.5.4.3)
NTE FUP EA TO 0010BM 1010BM 2010BM 3010BM 4010BM
RECREATIONAL VEHICLE PARK DATABASE
Pre-Event Database Development – Recreational Vehicle Park
Database (See Section C.14.1.5.4.4)
NTE FUP EA TO 0010BO 1010BO 2010BO 3010BO 4010BO
STATE LAND DATABASE
Pre-Event Database Development – State Land Database (See Section
14.5.1.5.4.5)
NTE FUP EA TO 0010BR 1010BR 2010BR 3010BR 4010BR
FEDERAL LAND DATABASE
Pre-Event Database Development – Federal Land Database (See
Section 14.5.1.5.4.5)
NTE FUP EA TO 0010BT 1010BT 2010BT 3010BT 4010BT
REESERVED FOR FUTURE USE
ELECTRICAL ULITILITY PROVIDER DATABASE
Pre-Event Database Development – Electrical Utility Provider
Database (See Section C.14.1.5.5.1)
NTE FUP EA TO 0010BV 1010BV 2010BV 3010BV 4010BV
SEWER UTILITY PROVIDER DATABASE
Pre-Event Database Development – Sewer Utility Provider Database
(See Section 14.1.5.5.2)
NTE FUP EA TO 0010BX 1010BX 2010BX 3010BX 4010BX
WATER UTILITY PROVIDER DATABASE
Pre-Event Database Development – Water Utility Provider Database
(See Section 14.1.5.5.3)
NTE FUP EA TO 0010CA 1010CA 2010CA 3010CA 4010CA
FROST LINE DATABASE
Pre-Event Database Development – Frost Line Database (See Section
14.1.5.5.3)
NTE FUP EA TO 0010CC 1010CC 2010CC 3010CC 4010CC
COMMERCIAL PARK EXPANSION SITE SAFETY AND HEALTH PLAN
The Contractor shall be required to prepare event specific Site Safety
& Health Plans (SSHP) in accordance with Section F, Areas #58 and
#59. The SSHP which will be reviewed and approved by the
Government prior to commencement of any commercial park expansion or group site construction work shall be in compliance with the applicable portions of U.S. Army Corps of Engineers Manual EM
385-1-1.
NTE FUP EA WO 0010CE 1010CE 2010CE 3010CE 4010CE
GROUP SITE CONSTRUCTION SAFETY AND HEALTH PLAN
The Contractor shall be required to prepare event specific Site Safety
& Health Plans (SSHP) in accordance with Section F, Areas #58 and
#59. The SSHP which will be reviewed and approved by the
Government prior to commencement of any commercial park expansion or group site construction work shall be in compliance with the applicable portions of U.S. Army Corps of Engineers Manual EM
385-1-1.
NTE FUP EA WO 0010CG 1010CG 2010CG 3010CG 4010CG
DIFFICULT SINGLE UNIT INSTALLATION SITE SAFETY AND HEALTH PLAN
Utilize this CLIN to develop a Difficult Single unit installation Safety
Plan (requires prior COR approval)
NTE FUP EA WO 0010CI 1010CI 2010CI 3010CI 4010CI
REESERVED FOR FUTURE USE
FIELD TASK ORDER REQUIREMENTS
TASK ORDER MANAGER General Contract Management. NTE FUP WEEKLY CON 0011AA 1011AA 2011AA 3011AA 4011AA
DEPUTY TASK ORDER MANAGER General Contract Management. NTE FUP WEEKLY CON 0011AC 1011AC 2011AC 3011AC 4011AC
ADMINISTRATIVE COORDINATOR General Contract Support NTE FUP WEEKLY CON 0011AE 1011AE 2011AE 3011AE 4011AE
OTHER DIRECT COSTS Travel, Hotel, Rental Car, Per Diem, etc. NTE FUP
FEMA
RATES
WO 0011AG 1011AG 2011AG 3011AG 4011AG
OTHER DIRECT COSTS (NON TRAVEL) Non Travel Other Direct Cost NTE FUP
FEMA
RATES
WO 0011AH 1011AH 2011AH 3011AH 4011AH
PROGRAM MANAGER General Contract Management. NTE FUP DAILY CON 0011AI 1011AI 2011AI 3011AI 4011AI
CONTRACT MANAGER General Contract Management. NTE FUP DAILY CON 0011AK 1011AK 2011AK 3011AK 4011AK
SUB-CONTRACT MANAGER General Contract Management. NTE FUP DAILY CON 0011AM 1011AM 2011AM 3011AM 4011AM
QUALITY MANAGER General Contract Management. NTE FUP DAILY CON 0011AO 1011AO 2011AO 3011AO 4011AO
QUALITY CONTROL TECHNICIAN General Contract Management. NTE FUP DAILY CON 0011AQ 1011AQ 2011AQ 3011AQ 4011AQ
SAFETY MANAGER General Contract Management. NTE FUP DAILY CON 0011AR 1011AR 2011AR 3011AR 4011AR
CONSTRUCTION MANAGER General Contract Management. NTE FUP WEEKLY CON 0011AT 1011AT 2011AT 3011AT 4011AT
COST ACCOUNTANT General Contract Management. NTE FUP DAILY CON 0011AV 1011AV 2011AV 3011AV 4011AV
MAINTENANCE/DEACTIVATION LEAD General Contract Management. NTE FUP WEEKLY CON 0011AX 1011AX 2011AX 3011AX 4011AX
REESERVED FOR FUTURE USE
MAINTENANCE/DEACTIVATION INSPECTOR General Contract Management. NTE FUP WEEKLY CON 0011AZ 1011AZ 2011AZ 3011AZ 4011AZ
STANDBY COSTS
SITE INSPECTION WORK ORDER ISSUANCE RATE- LOSS
FEMA will allow the contractor to recover 65% of the Fixed Unit Price for the allowable number of MHU installations below FEMA’s provided estimated rate. The “current” estimated installation rate will remain in place until FEMA notifies the Contractor, in writing, that there is a change.
NTE FUP WO WO 0012AA 1012AA 2012AA 3012AA 4012AA
REESERVED FOR FUTURE USE
INSTALLATION WORK ORDER ISSUANCE RATE- LOSS
FEMA will allow the contractor to recover 65% of the Fixed Unit Price for the allowable number of site inspections below FEMA’s provided estimated rate. The “current” estimated installation rate will remain in place until FEMA notifies the Contractor, in writing, that there is a change.
NTE FUP WO WO 0012AC 1012AC 2012AC 3012AC 4012AC
CHARGE BACK (FEMA ESTABLISHED RATES)
REPLACE A NON WORKING FIRE/SMOKE DETECTOR WITH A BUILT
IN STROBE LIGHT
Replace a fire/smoke detector with a fire/smoke detector that has a built in strobe light because the fire/smoke detector is not working during the initial start-up of the MHU. This Charge Back is for the replacement of the first non-working fire/smoke detector in a MHU.
NTE FUP
EACH
USING
FEMA
RATES
WO 0013AA 1013AA 2013AA 3013AA 4013AA
REPLACE ADDITIONAL NON WORKING FIRE/SMOKE DETECTOR(S)
WITH A BUILT IN STROBE LIGHT
Additional fire/smoke detectors that are replaced under this Charge
Back are fire/smoke detectors that are not working during the initial start-up of the MHU. This Charge Back is for each additional non-working smoke detector with built in strobe light replaced. This
Charge back cannot be used for the first non-working fire/smoke detector with a built in strobe light replacement.
NTE FUP
EACH
USING
FEMA
RATES
WO 0013AC 1013AC 2013AC 3013AC 4013AC
REPLACE A NON-WORKING CEILING LIGHT FIXTURE
Replace a ceiling light fixture because it is not working during the initial start-up of the MHU. This Charge Back is for the replacement of the first non-working ceiling light fixture in an MHU
NTE FUP
EACH
USING
FEMA
RATES
WO 0013AE 1013AE 2013AE 3013AE 4013AE
REPLACE AN ADDITIONAL NON-WORKING CEILING LIGHT FIXTURE
Replace an additional ceiling light fixture because it is not working during the initial start-up of the MHU. This Charge Back is for each additional ceiling light fixture that is replaced. This Charge back cannot be used for the first non-working ceiling light fixture.
NTE FUP
EACH
USING
FEMA
RATES
WO 0013AG 1013AG 2013AG 3013AG 4013AG
REPLACE NON WORKING OR DEFECTIVE CIRCUIT BREAKERS (UP
TO 4 SINGLE POLE OR 2 DOUBLE POLE)
Replace a non-working or defective circuit breaker, up to 4 single or up to 2 double pole, because the breaker(s) is/are not working during the initial start-up of a MHU. This Charge Back is for up to 4 single pole breakers or up to 2 double pole breakers that are not working or defective during the initial start-up of the MHU.
NTE FUP
EACH
USING
FEMA
RATES
WO 0013AI 1013AI 2013AI 3013AI 4013AI
REPLACE ADDITIONAL NON WORKING OR DEFECTIVE CIRCUIT
BREAKERS (UP TO 2 SINGLE POLE OR 1 DOUBLE POLE)
Replace additional circuit breakers that are not working during the initial start up of the MHU. This Charge Back is for up to 2 single pole breakers or up to 1 double pole breaker that are not working or defective during the initial start-up of the MHU. This Charge Back can not be used for the first (up to 4 single or 2 double) non-working or defective circuit breaker.
NTE FUP
EACH
USING
FEMA
RATES
WO 0013AK 1013AK 2013AK 3013AK 4013AK
REPAIR NON-WORKING OR DEFECTIVE TOILET
This Charge Back is for the repair of the first non working or defective toilet during the initial start-up of a MHU. This repair includes the tank repair kit, tank seals and wax ring.
NTE FUP
EACH
USING
FEMA
RATES
WO 0013AM 1013AM 2013AM 3013AM 4013AM
REPAIR ADDITIONAL NON WORKING OR DEFECTIVE TOILET(S)
This Charge Back is for each additional toilet (after the first toilet charge back) that is not working or defective during the initial start up of a MHU. Charge Back includes tank repair kit, tank seals and wax ring. This Charge back cannot be used for the repair of the first non-working or defective toilet in an MHU.
NTE FUP
EACH
USING
FEMA
RATES
WO 0013AP 1013AP 2013AP 3013AP 4013AP
REPLACE NON-WORKING OR DEFECTIVE TOILET (TANK AND BOWL)
This Charge Back is for replacement of the first (1st) toilet (tank & bowl) because it is not working or is broken during the initial start-up of an MHU.
NTE FUP
EACH
USING
FEMA
RATES
WO 0013AR 1013AR 2013AR 3013AR 4013AR
REPLACE ADDITIONAL NON-WORKING OR DEFECTIVE TOILET(S)
(TANK AND BOWL)
This Charge Back is used for replacement of (after a charge back for the first toilet replaced in the same MHU) each additional toilet (tank
& bowl) that is not working or is broken during the initial start-up of a
MHU. This Charge Back cannot be used for the first toilet replacement in an MHU.
NTE FUP
EACH
USING
FEMA
RATES
WO 0013AT 1013AT 2013AT 3013AT 4013AT
REPLACE "ONE ONLY", KITCHEN, BATH OR TUB FAUCET
This Charge Back is for the replacement of the first (1st) "one only" kitchen, bath or tub faucet, because it is not working or is broken during the initial start-up of an MHU.
NTE FUP
EACH
USING
FEMA
RATES
WO 0013AV 1013AV 2013AV 3013AV 4013AV
REPLACEA ADDITIONAL "ONE ONLY", KITCHEN, BATH OR TUB
FAUCET
This Charge Back is for each additional kitchen, bath or tub faucet
(after the first faucet replacement) because it is not working or is broken during the initial start-up of an MHU.
NTE FUP
EACH
USING
FEMA
RATES
WO 0013AW 1013AW 2013AW 3013AW 4013AW
REPAIR NON WORKING WATER HEATER
This Charge Back is used to repair a water heater because it is not working or is defective during the initial start up of the MHU. This
Charge Back includes: labor, repair parts and supplies such as elements, thermostats, and temperature and pressure [T&P] valve.
NTE FUP
EACH
USING
FEMA
RATES
WO 0013AY 1013AY 2013AY 3013AY 4013AY
REPLACE NON WORKING WATER HEATER
This Charge Back is used for a replacement of the water heater because is not working or is defective during the initial start up of the
MHU. This Charge Back cannot be…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .