GAINES GE-T101-GE-T101.pdf

PDF 198 KB Posted

Attached to
2025 E-Rate Network Cabling Additions
Solicitation number
RFP-SCC-250000001194-3
Issued by
Genesee County, Michigan

About this file

This is a structured cabling design drawing for Gaines Elementary School in the Swartz Creek Community Schools district, created by Convergent Technology Partners. The floor plan details the installation of Category 6A UTP cabling throughout the school building, including wall and ceiling UTP locations, telecom cabinets, and telecom bus-bars. The design specifies standard installation requirements including surface-mounted single-gang back boxes with white two-port faceplates, wall locations centered below whiteboards at standard height, and concealed raceway for below-ceiling cable runs.

The technical specifications require all UTP cable to meet ANSI/TIA Category 6A standards, with white 8P/8C (RJ45) jacks for termination. Service loops must be long enough to reach the farthest location in associated rooms and securely fastened to the structure. The drawing indicates several telecom cabinet locations that require grounding, with bus block locations to be determined using best practices during installation. The design was authored by DLF and EGH, with design dates of 12/17/2024 and 1/23/2025.

View the file

Other files

Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1 1

1 1

1 1

1 1

1 1

1 1

1 11 11 11 1

1 1

1 1

TG

B

TGB

SYMBOL LEGEND

UTP LOCATION, QTY AS

NOTED

CEILING UTP LOCATION,

QTY AS NOTED

TELECOM CABINET

TELECOM BUS-BAR

REPLACE CABINETR

GENERAL NOTES

1. ALL UTP CABLE SHALL BE ANSI/TIA

CATEGORY 6A. PLACE WALL

LOCATIONS IN A SURFACE MOUNTED

SINGLE-GANG BACK BOX WITH A

WHITE TWO PORT FACEPLATE.

2. THE UNUSED TOP PORT OF THE

FACEPLATE IS TO BE FILLED WITH A

BLANK KEYSTONE JACK INSERT.

3. PLACE WALL LOCATIONS CENTERED

BELOW WHITEBOARD AT STANDARD

HEIGHT.

4. LOCATIONS WITHOUT WHITEBOARDS,

CENTER THE INSTALLATION ON THE

WALL AT STANDARD HEIGHT.

5. ALL CABLE BELOW CEILING SHALL BE

CONCEALED IN RACEWAY PROVIDED

BY CONTRACTOR.

6. PROVIDE CEILING LOCATION WITH

SERVICE LOOP LONG ENOUGH TO

REACH THE FARTHEST LOCATION IN

THE ASSOCIATED ROOM. SECURELY

FASTEN SERVICE LOOP TO

STRUCTURE.

7. TERMINATE ALL CATEGORY 6A

CABLES ON WHITE 8P/8C (RJ45) JACKS.

8. LOCATION OF BUS BLOCKS ARE

ESTIMATED, USE BEST PRACTICES

FOR INSTALLATION LOCATION.

9. FOR ESTIMATES ASSUME ALL

CABINETS NEED GROUNDING.

C O N V E R G E N T 6197 Miller Road Suite 4 Swartz Creek, MI 48473

Phone: 810.720.3820 www.ctpartners.net

T E C H N O L O G Y P A R T N E R S

TECHNOLOGY DESIGN I CONSULTING I PLANNING

1/23/2025 DESIGN DLF

12/17/2024 DESIGN EGH

DATE ISSUE AUTHOR

SWARTZ CREEK

COMMUNITY SCHOOLS

STRUCTURED CABLING

GAINES ELEMENTARY

SCHOOL

GE-T101

T101

NTS

GAINES FLOOR PLAN

Sheets and Views
GE-T101

File details come from the government source that posted it. Updated .