DIECK DE-T101-DE-T101.pdf
PDF 224 KB Posted
- Attached to
- 2025 E-Rate Network Cabling Additions
- Solicitation number
- RFP-SCC-250000001194-3
- Issued by
- Genesee County, Michigan
About this file
This is a structured cabling design drawing created by Convergent Technology Partners for the Swartz Creek Community Schools' Dieck Elementary School, dated January 23, 2025. The drawing shows a floor plan with technical specifications for Category 6A UTP cable installations throughout the building, including wall and ceiling mounting locations, cabinet placements, and bus bar positions. The general notes specify that all UTP cable must meet ANSI/TIA Category 6A standards, with wall locations requiring surface-mounted single-gang back boxes with white two-port faceplates.
The technical requirements detail that installations must include blank keystone jack inserts for unused top ports, wall locations centered below whiteboards at standard height, concealed raceway cabling, ceiling service loops, white 8P/8C (RJ45) jacks for all Category 6A cable terminations, and grounding for all cabinets. The drawing includes a symbol legend identifying UTP locations, ceiling UTP locations, telecom cabinets, telecom bus bars, and replacement cabinets. The project appears to be part of a larger technology infrastructure upgrade for the school district.
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1 1 1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1 1 1 1 1 1 1
1 11 1
1 1
1 1 1 1
TGB
SYMBOL LEGEND
UTP LOCATION, QTY AS
NOTED
CEILING UTP LOCATION,
QTY AS NOTED
TELECOM CABINET
TELECOM BUS-BAR
REPLACE CABINETR
GENERAL NOTES
1. ALL UTP CABLE SHALL BE ANSI/TIA
CATEGORY 6A. PLACE WALL LOCATIONS
IN A SURFACE MOUNTED SINGLE-GANG
BACK BOX WITH A WHITE TWO PORT
FACEPLATE.
2. THE UNUSED TOP PORT OF THE
FACEPLATE IS TO BE FILLED WITH A
BLANK KEYSTONE JACK INSERT.
3. PLACE WALL LOCATIONS CENTERED
BELOW WHITEBOARD AT STANDARD
HEIGHT.
4. LOCATIONS WITHOUT WHITEBOARDS,
CENTER THE INSTALLATION ON THE
WALL AT STANDARD HEIGHT.
5. ALL CABLE BELOW CEILING SHALL BE
CONCEALED IN RACEWAY PROVIDED BY
CONTRACTOR.
6. PROVIDE CEILING LOCATION WITH
SERVICE LOOP LONG ENOUGH TO
REACH THE FARTHEST LOCATION IN THE
ASSOCIATED ROOM. SECURELY FASTEN
SERVICE LOOP TO STRUCTURE.
7. TERMINATE ALL CATEGORY 6A CABLES
ON WHITE 8P/8C (RJ45) JACKS.
8. LOCATION OF BUS BLOCKS ARE
ESTIMATED, USE BEST PRACTICES FOR
INSTALLATION LOCATION.
9. FOR ESTIMATES ASSUME ALL CABINETS
NEED GROUNDING.
C O N V E R G E N T 6197 Miller Road Suite 4 Swartz Creek, MI 48473
Phone: 810.720.3820 www.ctpartners.net
T E C H N O L O G Y P A R T N E R S
TECHNOLOGY DESIGN I CONSULTING I PLANNING
1/23/2025 DESIGN DLF
12/17/2024 DESIGN EGH
DATE ISSUE AUTHOR
SWARTZ CREEK
COMMUNITY SCHOOLS
STRUCTURED CABLING
DIECK ELEMENTARY
SCHOOL
DE-T101
T101
NTS
DIECK FLOOR PLAN
| Sheets and Views |
| DE-T101 |
File details come from the government source that posted it. Updated .