This is a structured cabling design drawing created by Convergent Technology Partners for the Swartz Creek Community Schools' Dieck Elementary School, dated January 23, 2025. The drawing shows a floor plan with technical specifications for Category 6A UTP cable installations throughout the building, including wall and ceiling mounting locations, cabinet placements, and bus bar positions. The general notes specify that all UTP cable must meet ANSI/TIA Category 6A standards, with wall locations requiring surface-mounted single-gang back boxes with white two-port faceplates.

The technical requirements detail that installations must include blank keystone jack inserts for unused top ports, wall locations centered below whiteboards at standard height, concealed raceway cabling, ceiling service loops, white 8P/8C (RJ45) jacks for all Category 6A cable terminations, and grounding for all cabinets. The drawing includes a symbol legend identifying UTP locations, ceiling UTP locations, telecom cabinets, telecom bus bars, and replacement cabinets. The project appears to be part of a larger technology infrastructure upgrade for the school district.

View the file

Other files

Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1 1 1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1 1 1 1 1 1 1

1 11 1

1 1

1 1 1 1

TGB

SYMBOL LEGEND

UTP LOCATION, QTY AS

NOTED

CEILING UTP LOCATION,

QTY AS NOTED

TELECOM CABINET

TELECOM BUS-BAR

REPLACE CABINETR

GENERAL NOTES

1. ALL UTP CABLE SHALL BE ANSI/TIA

CATEGORY 6A. PLACE WALL LOCATIONS

IN A SURFACE MOUNTED SINGLE-GANG

BACK BOX WITH A WHITE TWO PORT

FACEPLATE.

2. THE UNUSED TOP PORT OF THE

FACEPLATE IS TO BE FILLED WITH A

BLANK KEYSTONE JACK INSERT.

3. PLACE WALL LOCATIONS CENTERED

BELOW WHITEBOARD AT STANDARD

HEIGHT.

4. LOCATIONS WITHOUT WHITEBOARDS,

CENTER THE INSTALLATION ON THE

WALL AT STANDARD HEIGHT.

5. ALL CABLE BELOW CEILING SHALL BE

CONCEALED IN RACEWAY PROVIDED BY

CONTRACTOR.

6. PROVIDE CEILING LOCATION WITH

SERVICE LOOP LONG ENOUGH TO

REACH THE FARTHEST LOCATION IN THE

ASSOCIATED ROOM. SECURELY FASTEN

SERVICE LOOP TO STRUCTURE.

7. TERMINATE ALL CATEGORY 6A CABLES

ON WHITE 8P/8C (RJ45) JACKS.

8. LOCATION OF BUS BLOCKS ARE

ESTIMATED, USE BEST PRACTICES FOR

INSTALLATION LOCATION.

9. FOR ESTIMATES ASSUME ALL CABINETS

NEED GROUNDING.

C O N V E R G E N T 6197 Miller Road Suite 4 Swartz Creek, MI 48473

Phone: 810.720.3820 www.ctpartners.net

T E C H N O L O G Y P A R T N E R S

TECHNOLOGY DESIGN I CONSULTING I PLANNING

1/23/2025 DESIGN DLF

12/17/2024 DESIGN EGH

DATE ISSUE AUTHOR

SWARTZ CREEK

COMMUNITY SCHOOLS

STRUCTURED CABLING

DIECK ELEMENTARY

SCHOOL

DE-T101

T101

NTS

DIECK FLOOR PLAN

Sheets and Views
DE-T101

File details come from the government source that posted it. Updated .