Attch 29 - Appendix 14.5 - Guidance and Standards-Metering.pdf
PDF 162 KB Posted
- Attached to
- Multiple Award Construction Contract (MACC) Federal contract opportunity
- Solicitation number
- FA9401-12-R-0002
View the file
Other files for this federal contract opportunity
Show all 50
Multiple Award Construction Contract (MACC) has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
2 Feb 2012 Page 1 of 1 Attachment 29 Solicitation FA9401-12-R-0002
GUIDANCE AND STANDARDS-METERING
All new installations will require gas, water, or electrical meter replacement. Use meters with pulse output.
New electrical shall be Elster, 3 phase, Alpha Meters, with 900 MHz LAN, Type A3TL to match the AMI metering system recently installed at KAFB. The Form of the meter will be determined by the standard wiring configuration. i.e. 4 wire Wye uses a Form 9s.
File details come from the government source that posted it. Updated .