Attch 41 - Historical Data by Project Type and Cost.pdf
PDF 83 KB Posted
- Attached to
- Multiple Award Construction Contract (MACC) Federal contract opportunity
- Solicitation number
- FA9401-12-R-0002
View the file
Other files for this federal contract opportunity
Show all 50
Multiple Award Construction Contract (MACC) has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Type PROJECT TITLE CONSTRUCTION COST
1 Repair Rooms 218, 218B and 219 $14,920.00 1 Upgrade Building $49,859.00 1 Repair Conference Room $107,025.18 1 Repair Conference Room $107,506.56 1 Repair Carpet on 2nd Floor Hallway $13,729.39 1 Repair Exit Door $4,224.00 1 Install Handrails in Conference Rm 7A $4,927.65 2 Install Humidifiers $17,173.13 2 Install Oven $4,000.00 3 Connect Alarm System $9,681.00 1 Block and Seal Door Openings - B497 $11,000.00 1 Renovate Bldg 66042 for MATRIX Experiment $1,200,000.00 1 Re-Construct Wall - B326 $2,000.00 1 ELLA Third Floor - B760 $113,000.00 1 Lab 115 Renovation - B760 $50,000.00 1 Renovate First Floor Conference Room - B760 $80,000.00 1 Install White Room - B277 $235,655.00 1 Replace Carpet - B326 $13,000.00 1 ELLA Conference Room - B760 $150,000.00 1 Construct 800SF Addition - B66047 $950,000.00 3 Install Quad-Plex Outlets Laboratories 107 & 109 - B422 $7,000.00 3 Install Quad-Plex Outlets - B400 $3,000.00 3 Additional Outlets and Circuits - B909 $2,000.00 3 Install Quad-Plex Outlets - 909 $2,000.00 3 Electrical Power Drops - B66001 $40,000.00 3 Install Crane Emergency Disconnect Switch - B323 $2,000.00 3 Modification of Existing Lighting - B400 $30,000.00 3 Electrical Construction Laboratory 120 - B760 $3,000.00 3 Install Quad-Plex Outlets Laboratory 110 - B422 $4,500.00 3 Security Alarm System - B405 $31,000.00 3 Install Shredder Receptacle - B497 $2,000.00 7 Install Flag Pole - B90020 $4,000.00 7 RAM Steel Structural Shelter - B760 $75,000.00 1 Repair West Wing $103,115.00 1 Repair Mezzanine Flooring $10,000.00 1 Install Steps $15,746.00 1 Seal 32 Windows $2,990.20 1 Paint Tunnel #1 $14,726.00 1 Repair East Stairs $8,623.00 1 Repair Wall/Add Shower $56,336.48 1 Repair Lab Offices $23,663.00 1 Replace Steps $24,408.00 1 Replace Steps $27,175.00 1 Repair 2nd Floor Carpet $65,124.00 1 Construct Storage Building $99,789.00 1 Install Carpet $95,293.54 1 Repair Building Complex Phase III $22,231.00 1 Replace Office Carpet $58,005.36 1 Repair East Stairs and Foyer $48,967.00 1 Repair Dock $51,363.00
Key - 1 = Architectural, 2 = Mechanical, 3 = Electrical, 4 = Civil, Utility, 5 = Roofing, 6 = Demolition, 7 = Structural, Landscape, ATFP
15 March 2012 Page 1 of 5 Attachment 41 Solicitation FA9401-12-R-0002
1 Replace Doors $80,021.00 1 Replace Door Seals & Wall Carpet $21,334.00 1 Repair Eastside Restrooms $109,318.00 1 Repair Breakroom $71,996.67 1 Repair Warehouse Office + 18A $59,385.00 2 Upgrade Heating System $8,963.61 3 Add Electrical Recptacles $2,000.00 3 Add Electrical $1,411.87 3 Install Enclave Wiring $22,590.00 3 Relocate Battery Charger $21,197.00 4 Repair Sidewalk $11,968.00
15 March 2012 Page 2 of 5 Attachment 41
1 Construct Wall Rm226 $53,124.00 1 Replace Office Carpet Phase II $76,427.73 1 Repair Skylights $148,740.78 1 Repair Office Area 223A, B, C $42,360.80 1 Repair Offices 236, A, B $58,260.52 1 Replace Office Carpet Phase IV $133,122.79 1 Add Doors $28,674.00 1 Replace Office Carpet Phase III $54,838.00 1 Repair Conference Room Rm229 $84,870.00 1 Repair HR Restroom $22,798.00 1 Refurbish Elevator $15,671.01 1 Replace Secure Room Door $9,811.00 1 Construct Restroom $97,689.00 1 Repair NRO SCIF $163,484.00 2 Repair Exterior Wall Vents $31,539.00 3 Upgrade Mezzanine SCIF Electrical $128,611.88 3 Install Enclave Wiring $89,307.00 3 Reconfigure Light Switches $2,835.00 3 Add Security Lighting $12,134.89 4 Construct Antenna Phase I $153,908.00 1 New Wall Construction - B497 $13,000.00 1 Maintenance and Repair Front Steps & Front Doors - B49 $40,000.00 1 1590 Bay Construction Addition - B909 $1,670,000.00 1 ELLA Test Director Office Room 300 - B760 $42,000.00 1 Repair North Side Rest Rooms - B277 $300,000.00 1 Replace Carpet - B499 $63,000.00 1 Replace Carpet - B416 $2,000.00 1 Replace Roll-Up Door - B760 $11,000.00 1 Maintenance and Repair Laboratories 105, 107, 109 - B41 $28,000.00 1 Install Spacesaver Shelving System - B419 $31,000.00 1 Repair Analytical Areas - B405 $110,000.00 1 Renovate Break and Rest Rooms - B760 $150,000.00 2 Install HVAC Chilled Water Buffer Tank - B323 $135,000.00 3 Repair Electrical Circuits High Bay Laboratory - B322 $3,500.00 3 Reconfigure Electrical System - B911 $10,000.00 3 Install Electrical Receptacles - B323 $2,000.00 6 Remove Saw Dust Hopper - B277 $5,000.00 6 RDH Division Move Asbestos Abatement - B499 $60,000.00 6 Asbestos Abatement Laboratories 105, 107 & 109 - B416 $35,000.00 1 Design/Build Fire Material Removal AFIA B24499 $1,296,101.20 1 Design/Renovate B20604 $778,575.52 1 Repair B20245, Housing Relocation, NWC/708th $240,481.50
1 AFOTEC Command Section & Facility Repair, B20130 $838,956.19 1 Repair Bathrooms 58th MXS, B336 $173,541.45 1 Golf Course Bathrooms, B28054 $167,319.30
Corrosion Control for Climbing Training Structure, B19092 $410,927.93
1 Design/Sustain Basketball Court Floors-East Gym $17,386.48 1 Design/Sustain Basketball Court Floors - West Gym $9,057.51 1 Repaint Hangar Floor, H1001 $1,098,886.36 1 Renovate Wheel and Tire Section, H1002 $304,259.27
15 March 2012 Page 3 of 5 Attachment 41
Electrical and Communications Upgrades, NWC, B20235 $876,216.79
1 Remodel Elevator, B413 $299,611.09 1 Repair B20201 JNWC-Phase I $171,545.56 1 Construct Orderly Room B24499 AFSC $111,985.61
Repair Electrical and Comm for AFIA Furniture Installation $75,755.25
1 Repair AFIA Server Room & SIPR Area, B24499 $125,354.57 1 898 MUNS Equipment Garage $55,999.46 1 Repair/Mold Remediation Dorm 20221 $1,955,511.58
1 Repair AFOTEC Command Section & Facility Repair- Phase II $231,949.00
1 Repair Bathrooms, Dorm B20221 (Bid lot #1) $215,165.51 1 Repair Dorm Doors, B20221 (Bid lot #3) $210,902.52 1 Repair Dorm Stairs, B20221 (Bid lot #4) $60,425.68 1 Repair B20201, JNWC OPS, Ph. II $330,893.52 1 DTRA Mezzanine $1,299,959.52
1 Comm & Electrical Upgrade-Furniture Support, B20203 Basement $229,333.91
1 Install Open Storage, B20202 $81,655.55
1 NWC Combined Projects - Rm. 111A B20325 and TO Library B20604 $372,516.47
1 Repair Generator Command Post, B20604 $74,510.16 1 Repair Maintenance Bay Floor, B381 $41,421.26 1 Renovate Mens & Womens Locker/Bathroom Area, B202 $399,000.00 1 Repair Weather Damage 2011-Multiple Bldgs. - Phase I $331,995.56 1 Repair Weather Damage 2011-Multiple Bldgs. - Phase II $1,468,949.72 1 Repair Weather Damage 2011-Multiple Bldgs. - Phase III $543,152.48 1 Repair Weather Damage 2011-Multiple Bldgs. - Phase VI $690,650.53 1 Repair Weather Damage 2011-Multiple Bldgs. - Phase VI $37,571.96 2 Repair HVAC B20130 AFOTEC-Phase II $1,204,185.71 2 Repair Chiller, B996 $173,759.08 2 Sustain HVAC Dorm Systems, B20221 (Bid lot #2) $298,241.70
2 Repair LPG Tank Systems, Aircraft Fire Trainer Facility, B638 - Phase I $116,686.93
3 Repair Subs 1, 3, 11, & 22 - Phase I $157,029.21 3 Repair Sub 20, High Voltage Isolation Switch $264,358.74 3 Repair Mechanical Systems, Hangar Doors, H1001 $533,452.46 3 Repair UPS Breakers, B27496 $87,224.50 3 Repair Apron E Lighting, 58th SOW $1,841,935.15 3 Sustain Dorm Electrical, B20221 (Bid lot #6) $378,010.01
3 Repair LPS Manzano Area Igloos & WCTT Area (DOE) $124,295.01 3 Electrical Upgrades, B400 $177,458.42 4 Construct ECIP Utility Upgrade-AFSO $405,532.54 4 Repair Carlisle Blvd. - Aberdeen to Randolph $481,613.86
Repair Collapsed Communications Duct-Wyoming and TX St. $1,388,573.09
Resurface Interior Above Ground Water System Reservoirs $1,521,907.91
4 Repair Water Distribution, (FSD2)-Ph. I $73,124.03 4 Replace Gas Lines Phase IIIa $503,367.55 4 Repair Manzano Bridge Approaches $1,851,000.58
15 March 2012 Page 4 of 5 Attachment 41
4 Pave Parking Lot North of B413 $321,133.05 4 Repair "M" Street-Phase I $793,660.57
4 Install New Duct Banks Manhole 11KW to 15KW-East side of B1004 $329,666.42
4 Repair Sanitary Sewer-East $498,371.76 4 Repair Sidewalk between B414 and B201, ADA $24,185.26 4 Repair Weather Damage 2011-Multiple Bldgs. - Phase V $436,739.76 5 Repair Roof, Film Laboratory/Processing B20140 $410,637.98 5 Repair Roof, B29099 $31,552.02 6 Demo Two Guard Towers, 26000 Area $62,679.37 6 Demo Shade Structure, B57037 $10,820.70 6 Demolish Guard Shack, Bldg. 20612 $5,361.91 6 Demo Training Aid Shop, Bldg. 29071 $11,655.16 6 Demo Equipment Research Test Building 37505 $24,158.27 6 Demo Storage Building 57006 $2,630.58 6 Demo Tech Training Classroom, B30143 $664,855.48 6 Demo West Side Steam Plant $588,314.81 6 Demo Building 1003 $3,126.85 6 Demo Building 605 $69,657.71 6 Demo Building 736 $36,853.96 7 Construct Fall Restraint H1000-Bid Lot #3 $53,759.62 7 Construct Fall Restraint H1001-Bid lot #2 $70,486.02 7 Construct Fall Restraint H1002-Bid lot #1 $83,614.55 7 Design/Construct Fall Restraint H1037 $25,633.67
15 March 2012 Page 5 of 5 Attachment 41
Combined List
File details come from the government source that posted it. Updated .