Attch 41 - Historical Data by Project Type and Cost.pdf

PDF 83 KB Posted

Attached to
Multiple Award Construction Contract (MACC)
Solicitation number
FA9401-12-R-0002
Issued by

View the file

Other files

File Type Posted
Attch_1_-_Wage_Determination_(Bernalillo_County)__Building_dated_7-20-2012.pdf PDF
MACC_RFP_FA9401-12-R-0002_Amendment_10.pdf PDF
Attch_2_-_Wage_Determination_(Bernalillo_County)__Residential_dated_4-6-2012.pdf PDF
Attch_3_-_Wage_Determination_(Bernalillo_County)__Heavy_dated_7-20-2012.pdf PDF
MACC_RFP_FA9401-12-R-0002_Amendment_9.pdf PDF
MACC RFP FA9401-12-R-0002 Amendment 8.pdf PDF
MACC RFP FA9401-12-R-0002 Q A Round 9.pdf PDF
MACC RFP FA9401-12-R-0002 Amendment 7.pdf PDF
MACC RFP FA9401-12-R-0002 Q A Round 8.pdf PDF
MACC RFP FA9401-12-R-0002 Amendment 6.pdf PDF
MACC RFP FA9401-12-R-0002 Amendment 6-Conformed Copy.pdf PDF
MACC RFP FA9401-12-R-0002 Q A Round 6.pdf PDF
MACC RFP FA9401-12-R-0002 Q A Round 7.pdf PDF
MACC RFP FA9401-12-R-0002 Q A Round 5.pdf PDF
RFP FA9401-12-R-0002 Pre-Proposal Conference-Site Visit Final Sign-in Sheet.pdf PDF
MACC Pre-Proposal Brief.pdf PDF
MACC RFP FA9401-12-R-0002 Q A Round 4.pdf PDF
MACC RFP FA9401-12-R-0002 Q A Round 3.pdf PDF
MACC RFP FA9401-12-R-0002 Q A Round 2.pdf PDF
MACC RFP FA9401-12-R-0002 Amendment 5-Conformed Copy.pdf PDF
MACC RFP FA9401-12-R-0002 Amendment 5.pdf PDF
MACC RFP FA9401-12-R-0002 Amendment 4.pdf PDF
MACC RFP FA9401-12-R-0002 Amendment 4-Conformed Copy.pdf PDF
Attch 5 - Past Performance Information Questionnaire Package.docx DOCX document
MACC RFP FA9401-12-R-0002 Amendment 3-Conformed Copy.pdf PDF
MACC RFP FA9401-12-R-0002 Amendment 3.pdf PDF
MACC RFP FA9401-12-R-0002 Amendment 2-Conformed Copy.pdf PDF
MACC RFP FA9401-12-R-0002 Amendment 2.pdf PDF
MACC RFP FA9401-12-R-0002 Q A Round 1.pdf PDF
MACC RFP FA9401-12-R-0002 Amendment 1.doc DOC document
Attch 32 - Seed Project Bid Schedule.xlsx XLSX spreadsheet
Attch 20 - Appendix 9 - Environmental Requirements KAFB.pdf PDF
Attch 10 - Appendix 4.1 - 13280 Asbestos Containing Materials Remediation.pdf PDF
Attch 40 - Kirtland AFB-West Map.pdf PDF
Attch 37 - Seed Project - Future Expansion Power Requirements Table.pdf PDF
Attch 13 - Appendix 4.4 - 16721 New Construction Automatic Fire Detection and Alarm System.pdf PDF
Attch 26 - Appendix 14.2 - Guidance and Standards-Backflow Prevention.pdf PDF
Attch 15 - Appendix 4.6 - Native Grass Seeding Specification.pdf PDF
Attch 9 - Appendix 3 - DUSD —
Attch 23 - Appendix 12 - Waste Diversion Report.pdf PDF
Attch 25 - Appendix 14.1 - Guidance and Standards-Irrigation.pdf PDF
Attch 18 - Appendix 7 Air Force Federal Mandates Quick Reference.pdf PDF
Attch 35 - Seed Project Water flow Test Results.pdf PDF
Attch 31 - Seed Project Price Schedule - AF3052.xlsx XLSX spreadsheet
Attch 36 - Seed Project - Westside Shoppette Geotechnical Report.pdf PDF
Attch 39 - AF Form 3065 - Progress Report.pdf PDF
Attch 30 - Seed Project Statement of Work.pdf PDF
Attch 22 - Appendix 11 - DoD Minimum Antiterrorism Construction Standards Pre-Final Checklist.pdf PDF
MACC RFP FA9401-12-R-0002.doc DOC document
Attch 14 - Appendix 4.5 - 16721 Existing Bldg Remodel-Automatic Fire Detection and Alarm System.pdf PDF
Show 40 more

Latest 50 of 71 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Type PROJECT TITLE CONSTRUCTION COST

1 Repair Rooms 218, 218B and 219 $14,920.00 1 Upgrade Building $49,859.00 1 Repair Conference Room $107,025.18 1 Repair Conference Room $107,506.56 1 Repair Carpet on 2nd Floor Hallway $13,729.39 1 Repair Exit Door $4,224.00 1 Install Handrails in Conference Rm 7A $4,927.65 2 Install Humidifiers $17,173.13 2 Install Oven $4,000.00 3 Connect Alarm System $9,681.00 1 Block and Seal Door Openings - B497 $11,000.00 1 Renovate Bldg 66042 for MATRIX Experiment $1,200,000.00 1 Re-Construct Wall - B326 $2,000.00 1 ELLA Third Floor - B760 $113,000.00 1 Lab 115 Renovation - B760 $50,000.00 1 Renovate First Floor Conference Room - B760 $80,000.00 1 Install White Room - B277 $235,655.00 1 Replace Carpet - B326 $13,000.00 1 ELLA Conference Room - B760 $150,000.00 1 Construct 800SF Addition - B66047 $950,000.00 3 Install Quad-Plex Outlets Laboratories 107 & 109 - B422 $7,000.00 3 Install Quad-Plex Outlets - B400 $3,000.00 3 Additional Outlets and Circuits - B909 $2,000.00 3 Install Quad-Plex Outlets - 909 $2,000.00 3 Electrical Power Drops - B66001 $40,000.00 3 Install Crane Emergency Disconnect Switch - B323 $2,000.00 3 Modification of Existing Lighting - B400 $30,000.00 3 Electrical Construction Laboratory 120 - B760 $3,000.00 3 Install Quad-Plex Outlets Laboratory 110 - B422 $4,500.00 3 Security Alarm System - B405 $31,000.00 3 Install Shredder Receptacle - B497 $2,000.00 7 Install Flag Pole - B90020 $4,000.00 7 RAM Steel Structural Shelter - B760 $75,000.00 1 Repair West Wing $103,115.00 1 Repair Mezzanine Flooring $10,000.00 1 Install Steps $15,746.00 1 Seal 32 Windows $2,990.20 1 Paint Tunnel #1 $14,726.00 1 Repair East Stairs $8,623.00 1 Repair Wall/Add Shower $56,336.48 1 Repair Lab Offices $23,663.00 1 Replace Steps $24,408.00 1 Replace Steps $27,175.00 1 Repair 2nd Floor Carpet $65,124.00 1 Construct Storage Building $99,789.00 1 Install Carpet $95,293.54 1 Repair Building Complex Phase III $22,231.00 1 Replace Office Carpet $58,005.36 1 Repair East Stairs and Foyer $48,967.00 1 Repair Dock $51,363.00

Key - 1 = Architectural, 2 = Mechanical, 3 = Electrical, 4 = Civil, Utility, 5 = Roofing, 6 = Demolition, 7 = Structural, Landscape, ATFP

15 March 2012 Page 1 of 5 Attachment 41 Solicitation FA9401-12-R-0002

1 Replace Doors $80,021.00 1 Replace Door Seals & Wall Carpet $21,334.00 1 Repair Eastside Restrooms $109,318.00 1 Repair Breakroom $71,996.67 1 Repair Warehouse Office + 18A $59,385.00 2 Upgrade Heating System $8,963.61 3 Add Electrical Recptacles $2,000.00 3 Add Electrical $1,411.87 3 Install Enclave Wiring $22,590.00 3 Relocate Battery Charger $21,197.00 4 Repair Sidewalk $11,968.00

15 March 2012 Page 2 of 5 Attachment 41

1 Construct Wall Rm226 $53,124.00 1 Replace Office Carpet Phase II $76,427.73 1 Repair Skylights $148,740.78 1 Repair Office Area 223A, B, C $42,360.80 1 Repair Offices 236, A, B $58,260.52 1 Replace Office Carpet Phase IV $133,122.79 1 Add Doors $28,674.00 1 Replace Office Carpet Phase III $54,838.00 1 Repair Conference Room Rm229 $84,870.00 1 Repair HR Restroom $22,798.00 1 Refurbish Elevator $15,671.01 1 Replace Secure Room Door $9,811.00 1 Construct Restroom $97,689.00 1 Repair NRO SCIF $163,484.00 2 Repair Exterior Wall Vents $31,539.00 3 Upgrade Mezzanine SCIF Electrical $128,611.88 3 Install Enclave Wiring $89,307.00 3 Reconfigure Light Switches $2,835.00 3 Add Security Lighting $12,134.89 4 Construct Antenna Phase I $153,908.00 1 New Wall Construction - B497 $13,000.00 1 Maintenance and Repair Front Steps & Front Doors - B49 $40,000.00 1 1590 Bay Construction Addition - B909 $1,670,000.00 1 ELLA Test Director Office Room 300 - B760 $42,000.00 1 Repair North Side Rest Rooms - B277 $300,000.00 1 Replace Carpet - B499 $63,000.00 1 Replace Carpet - B416 $2,000.00 1 Replace Roll-Up Door - B760 $11,000.00 1 Maintenance and Repair Laboratories 105, 107, 109 - B41 $28,000.00 1 Install Spacesaver Shelving System - B419 $31,000.00 1 Repair Analytical Areas - B405 $110,000.00 1 Renovate Break and Rest Rooms - B760 $150,000.00 2 Install HVAC Chilled Water Buffer Tank - B323 $135,000.00 3 Repair Electrical Circuits High Bay Laboratory - B322 $3,500.00 3 Reconfigure Electrical System - B911 $10,000.00 3 Install Electrical Receptacles - B323 $2,000.00 6 Remove Saw Dust Hopper - B277 $5,000.00 6 RDH Division Move Asbestos Abatement - B499 $60,000.00 6 Asbestos Abatement Laboratories 105, 107 & 109 - B416 $35,000.00 1 Design/Build Fire Material Removal AFIA B24499 $1,296,101.20 1 Design/Renovate B20604 $778,575.52 1 Repair B20245, Housing Relocation, NWC/708th $240,481.50

1 AFOTEC Command Section & Facility Repair, B20130 $838,956.19 1 Repair Bathrooms 58th MXS, B336 $173,541.45 1 Golf Course Bathrooms, B28054 $167,319.30

Corrosion Control for Climbing Training Structure, B19092 $410,927.93

1 Design/Sustain Basketball Court Floors-East Gym $17,386.48 1 Design/Sustain Basketball Court Floors - West Gym $9,057.51 1 Repaint Hangar Floor, H1001 $1,098,886.36 1 Renovate Wheel and Tire Section, H1002 $304,259.27

15 March 2012 Page 3 of 5 Attachment 41

Electrical and Communications Upgrades, NWC, B20235 $876,216.79

1 Remodel Elevator, B413 $299,611.09 1 Repair B20201 JNWC-Phase I $171,545.56 1 Construct Orderly Room B24499 AFSC $111,985.61

Repair Electrical and Comm for AFIA Furniture Installation $75,755.25

1 Repair AFIA Server Room & SIPR Area, B24499 $125,354.57 1 898 MUNS Equipment Garage $55,999.46 1 Repair/Mold Remediation Dorm 20221 $1,955,511.58

1 Repair AFOTEC Command Section & Facility Repair- Phase II $231,949.00

1 Repair Bathrooms, Dorm B20221 (Bid lot #1) $215,165.51 1 Repair Dorm Doors, B20221 (Bid lot #3) $210,902.52 1 Repair Dorm Stairs, B20221 (Bid lot #4) $60,425.68 1 Repair B20201, JNWC OPS, Ph. II $330,893.52 1 DTRA Mezzanine $1,299,959.52

1 Comm & Electrical Upgrade-Furniture Support, B20203 Basement $229,333.91

1 Install Open Storage, B20202 $81,655.55

1 NWC Combined Projects - Rm. 111A B20325 and TO Library B20604 $372,516.47

1 Repair Generator Command Post, B20604 $74,510.16 1 Repair Maintenance Bay Floor, B381 $41,421.26 1 Renovate Mens & Womens Locker/Bathroom Area, B202 $399,000.00 1 Repair Weather Damage 2011-Multiple Bldgs. - Phase I $331,995.56 1 Repair Weather Damage 2011-Multiple Bldgs. - Phase II $1,468,949.72 1 Repair Weather Damage 2011-Multiple Bldgs. - Phase III $543,152.48 1 Repair Weather Damage 2011-Multiple Bldgs. - Phase VI $690,650.53 1 Repair Weather Damage 2011-Multiple Bldgs. - Phase VI $37,571.96 2 Repair HVAC B20130 AFOTEC-Phase II $1,204,185.71 2 Repair Chiller, B996 $173,759.08 2 Sustain HVAC Dorm Systems, B20221 (Bid lot #2) $298,241.70

2 Repair LPG Tank Systems, Aircraft Fire Trainer Facility, B638 - Phase I $116,686.93

3 Repair Subs 1, 3, 11, & 22 - Phase I $157,029.21 3 Repair Sub 20, High Voltage Isolation Switch $264,358.74 3 Repair Mechanical Systems, Hangar Doors, H1001 $533,452.46 3 Repair UPS Breakers, B27496 $87,224.50 3 Repair Apron E Lighting, 58th SOW $1,841,935.15 3 Sustain Dorm Electrical, B20221 (Bid lot #6) $378,010.01

3 Repair LPS Manzano Area Igloos & WCTT Area (DOE) $124,295.01 3 Electrical Upgrades, B400 $177,458.42 4 Construct ECIP Utility Upgrade-AFSO $405,532.54 4 Repair Carlisle Blvd. - Aberdeen to Randolph $481,613.86

Repair Collapsed Communications Duct-Wyoming and TX St. $1,388,573.09

Resurface Interior Above Ground Water System Reservoirs $1,521,907.91

4 Repair Water Distribution, (FSD2)-Ph. I $73,124.03 4 Replace Gas Lines Phase IIIa $503,367.55 4 Repair Manzano Bridge Approaches $1,851,000.58

15 March 2012 Page 4 of 5 Attachment 41

4 Pave Parking Lot North of B413 $321,133.05 4 Repair "M" Street-Phase I $793,660.57

4 Install New Duct Banks Manhole 11KW to 15KW-East side of B1004 $329,666.42

4 Repair Sanitary Sewer-East $498,371.76 4 Repair Sidewalk between B414 and B201, ADA $24,185.26 4 Repair Weather Damage 2011-Multiple Bldgs. - Phase V $436,739.76 5 Repair Roof, Film Laboratory/Processing B20140 $410,637.98 5 Repair Roof, B29099 $31,552.02 6 Demo Two Guard Towers, 26000 Area $62,679.37 6 Demo Shade Structure, B57037 $10,820.70 6 Demolish Guard Shack, Bldg. 20612 $5,361.91 6 Demo Training Aid Shop, Bldg. 29071 $11,655.16 6 Demo Equipment Research Test Building 37505 $24,158.27 6 Demo Storage Building 57006 $2,630.58 6 Demo Tech Training Classroom, B30143 $664,855.48 6 Demo West Side Steam Plant $588,314.81 6 Demo Building 1003 $3,126.85 6 Demo Building 605 $69,657.71 6 Demo Building 736 $36,853.96 7 Construct Fall Restraint H1000-Bid Lot #3 $53,759.62 7 Construct Fall Restraint H1001-Bid lot #2 $70,486.02 7 Construct Fall Restraint H1002-Bid lot #1 $83,614.55 7 Design/Construct Fall Restraint H1037 $25,633.67

15 March 2012 Page 5 of 5 Attachment 41

Combined List

File details come from the government source that posted it. Updated .